ITH EXPLOSIVES MANAGEMENT PLAN
December 18th, 2013
Prepared by: EGT Northwind Ltd P.O Box 177 Tuktoyaktuk, NT X0E 1C0 867-977-7000
Prepared for: GNWT Department of Transportation Yellowknife, NT
2
Table of Contents Page
1 Introduction 3 2 Explosive Management Plan Objectives 3 3 Ammonia Nitrate 3 3.1 Nitrate Loss Mechanisms 3
3.2 Mitigation Strategy 4 4 Explosive Usage 4 4.1 Explosive Material Ratios 4 5 Transport of Explosives 6 6 Explosive Storage 7 6.1 Explosive Magazines (Off-Site Storage) 7 6.2 Explosive Magazines (On-Site Storage) 8 7 Best Management Practices 8
7.1 Personnel Training Program 8 8 Blasting Operations 9
8.1 Blasting Safety Measures 9 8.2 Spill Prevention 10 8.3 Disposal of Explosives 11 8.4 DFO Commitments 12
9 Internal Audit and Inspections 12
List of Tables
Table 4.0-1 Explosives – Hazard Class and Potential Impacts 5 Table 4.0-2 Explosives – Safe Handling Procedures 5 Table 4.0-3 Explosives – Personal Protective Equipment 6
Maps Appendix 1 Construction Plan Overview Atlas 13 - 18
3
1.0 INTRODUCTION The Inuvik to Tuktoyaktuk Highway Project (ITH) is a 137 km highway which will require approximately 5.8 million in-place cubic metres of gravel (not including the Source 177 Upgrade) for embankment construction with 250,000 cubic metres of surfacing gravel. In order to quarry this material, explosives will be employed as a primary means of breaking the frozen material from designated sources. These designated sources are attached on Appendix A – Construction Plan Overview Atlas 2.0 EXPLOSIVES MANAGEMENT PLAN OBJECTIVES
The purpose of the Explosive Management Plan is to outline management practices employed on the ITH Project that are aimed to minimize the safety and environmental risks of handling ammonia nitrates, which are present in blasting agents. Specifically, methods used to minimize ammonia nitrate losses to the environment will be explained.
2.1 Legislation Compliance The Blasting Contractor will operate and will be compliant under the following legislation:
• NWT Mines Act and Regulations • WSCC Occupational Health and Safety Regulations • ERD Federal and Territorial/Provincial Legislations and Guidelines
2.2 Environmental Management Plan
The Explosives Management Plan is a component of the ITH Project’s Environmental Management Plan. Several of the plans within the Environmental Management Plan relate to spill management and water quality monitoring, and complement the best practices identified in the Explosives Management Plan:
• Spill Contingency Management Plan • Fish and Fish Habitat Protection Plan
3.0 AMMONIA NITRATE MANAGEMENT
3.1 Nitrate Loss Mechanisms Blasting is subject to regulations limiting ammonia, nitrate, and nitrate levels in quarry effluents released into the environment. The primary source of these nitrogen compounds is typically explosive used in blasting operations, as AN remains a significant component of most explosives used in the blasting industry. The amount of AN entering a local water drainage system is related to site conditions, explosives used, explosive handling, and blast efficiency. The key mechanism by which AN is lost to the water drainage system are as follows:
4
• Spillage during blasthole loading or transportation to the blast site; • Dissolution by standing or flowing water through the blasthole; • Erosion of explosive from high flowing water through the blasthole; and, • Leaching of undetonated explosive from the blasted muck.
3.2 Mitigation Strategy In order to minimize potential impacts, an explosives management plan will be implemented as part of the construction start-up. In addition to what is included in this management plan, the explosives management strategy will include the following:
• An education program for all production employees that outlines the potential problem and appropriate mitigation techniques;
• A Spill Contingency Management Plan; • A monitoring program that is integrated with baseline water quality information (Fish and
Fish Habitat Protection Plan); • A review of blasting operations early in production to determine efficiency levels.
4.0 EXPLOSIVE USAGE
Explosives use management will have the primary goal of limiting loss of ammonia nitrates to quarried material, pit areas, and water bodies, which could subsequently leach into runoff. Explosives storage will be controlled and runoff from storage areas contained although it is expected that all blasting activities will be completed during winter months prior to any freshet runoff. The project proposes to use packaged ANFO (ammonium nitrate/fuel oil) to facilitate borrow source extractions. ANFO is a solid material that is a widely used bulk industrial explosive mixture. It consists of 94 percent ammonium nitrate (NH4NO3), (AN) that acts as the oxidizing agent and absorbent for the fuel and six percent number 2 fuel oil (FO).
The detonation of ANFO will produce gaseous byproducts. Complete detonation of ANFO produces H2O, CO2 and N2, which are harmless gases. Incomplete detonation of ANFO produces NO2, NO and CO which is toxic gases in high concentrations. Incomplete detonation can occur when blast holes contain water or if ANFO becomes wet. Since ANFO is hydroscopic and water soluble, the appropriate overall methodology for management is keeping it sealed and dry, which is consistent with blasting mid-winter and the overall low humidity in the region. Blast holes are not expected to contain any water during winter. Any spills are managed with the cleanup of the solid ANFO (as per the Spill Contingency Management Plan). Explosives will be
5
managed in accordance with the Guidelines for the Use of Explosives in or Near Canadian Fisheries Waters (DFO 1998). With the application of these practices, there is not expected to be a pathway for residue and/or gases to enter adjacent water bodies.
4.1 Explosive Material Ratios
• Hole size: 6 1/2" • Average hole depth: 8 m • Pattern: 4 meters x 5 m • Powder Factor: .7 - 1 kg per m3
Products Utililized:
• Amex; 25 kg, double-lined bags • 200 x 400 mm Power Pro; 20 kg boxes • XT Det Cord; 15 kg cases • Nonels; 9 m - 15 m lengths
Material hazard class, potential impacts, site handling and storage requirements, and recommended personal protective equipment are summarized in Tables 3.0-1 to 3.0-3.
Table 4.0-1 Explosives – Hazard Class and Potential Impacts Material Hazard Class Potential Impact
Ammonium Nitrate 5.1 Water & Soil Contamination
High Explosive Detonators 1 Negligible Blasting Caps 1 Negligible
Table 4.0-2 Explosives – Safe Handling Procedures Material Safe Handling Procedures Ammonium Nitrate Keep away from heat and sources of
ignition. Do not ingest or breathe dust. In case of insufficient ventilation, wear suitable respiratory equipment. Avoid contact with skin and eyes. Store in a cool, well-ventilated area separate from acids, alkalies, reducing agents and combustibles.
6
High Explosive Detonators Store under dry conditions in a cool, well ventilated magazine in closed containers. Keep away from heat, sparks, and flames.
Blasting Caps Store under dry conditions in a cool, well ventilated magazine
Table 4.0-3 Explosives – Personal Protective Equipment Material Personal Protective Equipment
Eyes Skin Respiration Ammonium Nitrate Safety goggles Nitrile or rubber
gloves; protective clothing
NIOSH/MSHA approved respirator
High Explosive Detonators Safety goggles Nitrile or rubber gloves; protective clothing made from cotton
None usually required
Blasting Caps Safety goggles Nitrile or rubber gloves; protective clothing made from cotton
None usually required
5.0 TRANSPORT OF EXPLOSIVES The handling of explosives to the site and on the site will be carried out by the supplier and blasting contractor under a license to conduct such work. Transportation of explosives from the explosive supplier to the quarry areas will be conducted in such a manner as to safeguard human health and prevent impacts on the environment. The transfer will be arranged so that:
• delays between the points of transfer are minimized • explosives are not left at any location other than designated locations • explosives are not left unattended during transportation
Transportation of explosives will be undertaken according to the requirements of applicable regulations including the Canada - Explosives Act and Regulations; Transport of Dangerous
7
Goods Act and Regulations; National Fire Code of Canada. The explosives contractor and personnel are responsible for ensuring compliance to these regulations. Explosives transported from the explosives supplier to the site will be transported by fully licensed and certified transport carriers; always utilizing a double-driver system. These carriers will be fully compliant with applicable Federal, Provincial and Territorial legislation regarding explosives hauling and transport and applicable TDG guidelines and compliance. These operators or transport drivers will be fully versed in their 'specific' companies' Emergency Response Procedures for TDG and explosives transport. Associated risks or possible emergency situations associated with transport could include:
• Motor vehicle accident (MVA) requiring simple transfer of explosives to alternate vehicle designed for transporting explosives
• MVA with our without injuries, where explosives have been spilled on roadbed • Motor vehicle breakdown (mechanical); delay in transport • MVA with fire and potential for detonation, and finally in a worst case scenario, • MVA with a detonation
Mobile equipment used for transporting explosives onsite will:
• be kept in sound mechanical working condition • be provided with orange diamond-shaped placards and with clearly visible signs marked
"EXPLOSIVES" in letters not less than 150 mm in height when carrying explosives • not be used to transport other goods or materials at the same time as explosives are
transported • be equipped with a type 20-ABC fire extinguisher • not be loaded with explosives in excess of 80% of its rated carrying capacity • have explosives secured or fastened so as to prevent any part of the load from becoming
dislodged • only be operated by an authorized person who is in attendance at all times • carry only those persons necessary for handling explosives • not be refueled if explosives or detonators are on board except where the mobile
equipment is designed and used solely for transportation of bulk blasting agents • have its engine shut off and its parking brake engaged while loading or unloading
explosives, except where the vehicle uses an engine-powered device for loading and unloading
6.0 EXPLOSIVES STORAGE
8
Packaged ANFO, detonators, and primers, will be shipped to site as explosives and be stored in site magazines. 6.1 Explosive Magazines (Off-Site Storage) Explosives magazines to be fully licenced, equipped with security reader system and proper locking system as per ERD Federal and Provincial/Territorial regulations
• Explosives (Powder) magazine registered to contain 30,000 kgs of product • Detonator (Cap) magazine registered to contain 20,000 units • As security precaution and to monitor magazine access and as per ERD Federal
regulations, electronic monitoring of magazines will be completed by the Blaster(s) upon each entry into magazines utilizing the electronic fob reader provided
• Signage will be clearly posted at magazines, as required, warning of potential danger, safe distances and hazards in storage vicinity
• Blaster(s) to monitor magazine(s) inventory by continually updating products added/taken in the blasthole logbooks, provided in each magazine
• Magazine inspections to be completed by Blaster(s) on a weekly basis
6.2 Explosive Magazines (On-Site Storage)
Explosives (Amex), will be situated near the worksite, when required. Each pallet will contain 50 bags of Amex, which, will be shrink-wrapped. Explosives stored on-site would be placed in designated work area under constant (24 hour) watch/supervision. Explosives will never be left unattended, at any time.
• Explosives (Powder) stored in powder trucks: 1,500 to 2,000 bags per truck • Explosives (Detonators) stored in powder trucks: 300 to 400 units (or 6 to 8 boxes) per
truck Locations of the magazines will be site specific and will follow the guidelines below:
• a minimum of 500 metres away from camps or any structures that frequently house personnel
• a minimum of 500 metres away from quarrying activities • set on flat terrain to reduce the risk of spillage • area around magazines to be flagged with required signage
7.0 BEST MANAGEMENT PRACTICES Only trained and certified persons will work with explosives. The explosives personnel will undertake formal training and on-the-job training to ensure compliance with legislation. Internal audits and inspections of all components related to the explosives management will be conducted
9
on a regular basis by qualified personnel, and the results recorded according to quality and safety standard operating procedures. All recommendations and orders made by regulators and inspectors will be responded to and acted upon accordingly.
7.1 Personnel Training Program Only trained and certified persons will work with explosives. The explosives personnel will undertake formal training and on-the-job training to ensure compliance with legislation. Training requirements will include (but not be limited to): • Specific fire procedures as per the Federal Explosives Act; • First Aid; • Transportation of Dangerous Goods (TDG); • Blasting Certificate; and • Workplace Hazardous Materials Information System (WHMIS). 8.0 BLASTING OPERATIONS Blasting will be carried out by a certified blasting contractor following blasting regulations and safety protocols and under the supervision of General Contractor. A revised detailed Explosives Management Plan will be developed by the blasting contractor and reviewed by the General Contractor. Blasting operations on the ITH Project will involve a qualified and licensed explosives contractor responsible for all blasting operations. The explosives contractor will be responsible for the inspection of all explosives facilities and the safe operation of all explosives equipment. Weekly reports to the General Contractor detailing total explosives consumption, inventory of ammonium nitrate onsite, other explosives, and safety concerns or incidents will be required. Transport of ANFO and detonators will only be done by trained personnel on controlled roads under rigorous supervision. All explosives transport must comply with the Canadian Explosives Act & Regulations (1985). The drilling of blast holes will be completed by the blasting contractor. Appropriate precautions will be taken to secure the area prior to blasting to ensure the safety of personnel. As well, precautions will be taken to minimize damage from flyrock.
8.1 Blasting Safety Measures Blasting safety procedures on frozen material are described below for blasting on quarry operations:
• No unauthorized person is allowed inside a posted blast area whether the holes have been loaded or not;
10
• The Blasting Supervisor and the Blaster are responsible for the safe handling, loading and connection of a blast;
• The Shift Supervisor is responsible for the evacuation of all personnel and equipment from the blast area and the guarding of the blast;
• The Project Superintendent is responsible for notifying the appropriate personnel, aerodromes, and other departments and personnel who may be affected by a particular blast;
• Guards will be posted prior to blast time, and must remain guarding until they are told verbally by the Shift Supervisor that they can leave their position; • Once guards are posted, the blast area must be inspected by the shift supervisor to ensure
that no personnel or equipment remain inside the blast area; • One half hour prior to a blast, the Shift Supervisor will instruct the Wildlife and
Environmental Monitor to inspect with their snowmobiles a 500 metre perimeter for any personnel or wildlife and report back immediately to the supervisor that all is clear
• A blast-warning siren will be sounded for one (1) minute; three (3) minutes after this, the blast will be fired;
• The blaster will only fire the blast when given a direct verbal order to do so by the shift supervisor;
• Before firing a shot, the blaster must ensure the immediate area is clear (i.e. aircraft, etc.); and radio silence is maintained
• The Shift Supervisor and blaster will inspect the fired shot for indications of any problems such as misfires or cut-offs;
• After the blast, the Shift Supervisor will instruct the Wildlife and Environmental Monitor to inspect with their snowmobiles a 500 metre perimeter for any personnel or wildlife and report back immediately to the supervisor that all is clear
• Areas in which charged holes are awaiting firing shall be guarded or posted against unauthorized entry;
• Vehicles containing explosives shall not be taken to the repair shop or any other building for any purpose; no open flames or welding are to be used for field repairs unless explosives are first removed;
• Downhole initiation lines must be attached to a stake planted in the cuttings on all holes; • All loaded patterns, in addition to being marked with blasting signs, shall be clearly
delineated to outline the pattern; • Redrills shall be marked with a plastic cone and be designated by a member of the
blasting crew; the plastic drill cone shall be firmly implanted in the cuttings of the hole to be redrilled; the cone should be removed by the driller before drilling and inverted in the hole after drilling for pickup by the blasting crew;
• Where redrills are required on loaded patterns, the drill must be guided by the Blasting Supervisor, or Blaster or a responsible person designated by them; and
• Service vehicles and fuel trucks are not allowed on a loaded pattern; the drill must pull well clear of the loaded holes before work be done on it; where the drill cannot be moved and service is required, it may be done only under the direct supervision of the Blast Supervisor or designate and all loaded holes must be covered.
11
8.2 Spill Prevention
Protecting water-soluble products from rain, snow and the elements is of great consideration. This is primarily an environmental concern to avoid run off of the soluble product which, could adversely affect any streams or other fish bearing waters, waterways accessed by local wildlife or areas of vegetation. There potential for spills to occur when handling packaged ANFO. Other incidents such as fire or explosion are also a risk. Detailed work instructions will be provided in the revised Explosives Management Plan that will be developed by the explosives contractor. In general, the following procedures will be implemented to prevent or mitigate incidents involving spills, fire, or explosion:
• Amex bags are double-lined • Pallets are all shrink-wrapped • If a spill occurs, follow the Spill Contingency Management Plan • All spills to be reported immediately • All spills to be cleaned up immediately, if/when upon occurrence • A spill report form will be completed, documenting the spill • Caution to be used while loading holes to ensure all poured product (Am ex) goes into
blasthole and all Amex surrounding blasthole to be swept into blasthole when loading is complete; prior to blasthole stemming
• Caution to be used while carrying Amex bags during loading process on pattern • Pallets to be sheltered from weather by tarps, until product is used • Explosives not immediately utilized to be stored in proper explosives magazine(s) • All blastholes containing water will be loaded utilizing blasthole liners to prevent seepage
of product into rock and underground waterways. The use of blasthole liners in wet blastholes also, results in maintaining desired rock quality for the shot.
• Ensure that fire extinguishers are provided both inside and outside the facility so that if extinguishers inside could not be used in an incident, outside ones are available. Fire extinguishers must be compatible with flammable materials (water-based where ammonium nitrate is involved).
• Used ANFO bags should be emptied completely and stored outside the facility at a safe
distance from explosives to reduce the fire hazard risk.
• Any spills will be cleaned up and removed immediately to appropriate disposal facility. The spill will be reported and investigation of cause may be required.
• A “NO SMOKING” sign will be posted on visible walls of the facility.
• Ensure that lighters, matches, mobile phones, or radio transmitters or any item that might
conduct electricity is not used at the explosives storage area.
• Follow all transportation, storage, use, and handling procedures outlined in this Plan.
12
• Report incidents of “near-miss” and actual accidents to appropriate personnel. Incidents will be investigated to help identify trends and reduce future reoccurrence.
8.3 Disposal of Explosives Explosives and explosive materials can be disposed of by burning, detonation, dissolution in water or solvent, or by chemical destruction. The selected disposal method will depend on the type of explosive, quantity, condition, and specifications from the manufacturer. All destruction of explosives will be carried out by licensed blasting personnel. Destruction of large quantities of explosives will be carried out at a designated location at least 500 m from any building that could be damaged by the detonation. Personnel and other property damage will be avoided by sheltering the detonation area. Small quantities of explosives may be added to production charges in blast-holes for destruction. Blasting personnel will adhere to the following procedures:
• Only a licensed person, or a person under the supervision of a licensed person, is allowed to dispose of or destroy explosives.
• Use a method of disposal that provides the greatest degree of safety to humans and protection of property and the environment. Take adequate precautions to protect against injury or damage to property.
• Ensure that the method of disposal is appropriate to the type and condition of explosives. • Follow recommended disposal method indicated by manufacturer or responsible
authorities. • Unused explosives and explosive waste must be removed and disposed of under the
supervision of or by the blasting contractor.
8.4 DFO Commitments
It is the intent of this plan to follow the Guidelines for the Use of Explosives In or Near Canadian Fisheries Waters as follows:
• Instantaneous Pressure Change (IPC) If blasting is required within 500 meters of a fish bearing water body, monitoring
systems will be in-place to meet the 50 kpa criteria
• Blasting techniques will be revised to minimise water pressure and seismic forces
9.0 INTERNAL AUDIT AND INSPECTIONS
13
Internal audits and inspections of all components related to the Explosives Management Plan will be conducted as required by the regulation. Inspections will be done on a regular basis by qualified personnel for physical condition and serviceability, and the results recorded according to quality and safety standard operating procedures. Qualified personnel will perform regular inspections the magazines storing the boosters, caps and explosives to ensure that inventory is documented. All recommendations and orders made by Natural Resources Canada (NRC) Explosives Branch Inspectors, Fire Marshals and Insurance Inspectors will be responded to and acted upon accordingly.
NU
NWTYT
INUVIK - TUKTOYAKTUK GEOTECHNIOCAL INVESTIGATIONS PROGRAM
Construction Plan Overview AtlasIndex
FIGURE NO.INDEX
ProjectLocation
Acknowledgements: Original Drawing by Jacques Whitford - AXYS Ltd.
Last
Modif
ied: S
eptem
ber 1
3, 20
13 By
: jpeth
o
!(!(
!(
!(
!(
!(
!(
!
!
!
4
Inuvik
Tuktoyaktuk
SitidgiLakeNoel
Lake
HuskyLakes
ParsonsLake
HuskyLakes
Old ManLake
Macke
nzie R
iver
Holmes Creek
Middle Channel
East Channel
5
1
2
3
KM 70.7
KM 61.7
KM 134.2
KM 112.1
KM 105.6
KM 30.9KM 30.2
PW18 314/325
GSC4
GSC3
PW11
PW10
I401A
309
312 West
PW19A
174173/305
170
177
PREPARED FOR
123510689-145
0 5 10 15
KilometresMetres - 1:375,000
!( Proposed Pullout Location
Highway Alignment
Map Frame
Proposed Borrow Source
Pingo Canadian Landmark
PREPARED BY
±
NWTYT
NU
INUVIK - TUKTOYAKTUK HIGHWAY CONSTRUCTION PLAN
Year One (North)FIGURE NO. of 05
ProjectLocation
Acknowledgements: Original Drawing by KAVIK-STANTEC LTD: Base Data: Government of Canada DISCLAIMER: All locations are approximate, please refer to the Highway Final Design for specific locations.
Last
Modif
ied: S
eptem
ber 1
3, 20
13 By
: jpeth
o
Winter Camp 2(Year 1 and Year 2
Operation)
Winter Camp 1(Operation)
Winter Camp 1(Year 1 Move andYear 2 & 3 Operational)
177
174 Year 2
170
173/305
End of ConstructionYear One
Tuk 3 (105)
Tuk 4
Tuk 1
119
120
KP 110
A8
A3
A2a
39c
39b
39aKM 112.1
KM 105.6
KP 119
KP 118
KP 117
KP 116
KP 115
KP 114
KP 113
KP 112
KP 111
KP 110
KP 109
KP 108KP 107
KP 105
KP 104
KP 103
KP 102
KP 101
KP 100
A2
39d
566000
566000
568000
568000
570000
570000
572000
572000
574000
574000
576000
576000
578000
578000
580000
580000
582000
582000
584000
584000
586000
586000
588000
588000
7656
000
7656
000
7658
000
7658
000
7660
000
7660
000
7662
000
7662
000
7664
000
7664
000
7666
000
7666
000
7668
000
7668
000
7670
000
7670
000
7672
000
7672
000
7674
000
7674
000
7676
000
7676
000
7678
000
7678
000
7680
000
7680
000
7682
000
7682
000
7684
000
7684
000
7686
000
7686
000
7688
000
7688
000
7690
000
7690
000
PREPARED FOR
123510689-149
0 1,000 2,000 3,000 4,000
Metres - 1:100,000
Kilometre Post
Proposed Pullout Location
Summer Camp
Winter Camp
Winter Camp/Summer Storage
Bridge Crossing
Bridge Size Culvert Crossing
Culvert Crossing
Constructed Alignment
Year One Winter Road
Year One Contigency (Winter)
Year One Winter Access Trail
Year One Water Access (Winter)
Tuktoyaktuk to Source 177 Road
Year 1 Water Withdrawal Lake
Inuvik, 7(1)a Private Lands
Inuvik, 7(1)b Private Lands
Tuktoyaktuk, 7(1)a Private Lands
Tuktoyaktuk, 7(1)b Private Lands
PREPARED BY
01
NWTYT
NU
INUVIK - TUKTOYAKTUK HIGHWAY CONSTRUCTION PLAN
Year One (South)FIGURE NO. of 05
ProjectLocation
Acknowledgements: Original Drawing by KAVIK-STANTEC LTD: Base Data: Government of Canada DISCLAIMER: All locations are approximate, please refer to the Highway Final Design for specific locations.
Last
Mod
ified
: Sep
tem
ber 2
0, 2
013
By:
cth
ibod
eau
Q
Q
Q
Q
Q
Q
Q
R
R
R
R
Q
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
!
!
!
!
!
!
!
!!
!
(
(
(
(
(
(
(
((
(
G
G
G
G
G
G
G
F
F
F
F
F
F
F
!
!
!
!
!
!
!
(
(
(
(
(
(
(
!
!
C
C
Winter Camp 2(Year 1 & 2 Operation)
Winter Camp 1(Year 1 Move and
Year 2 Operational)
Summer Camp
Winter Camp 1 (Alternate)(Year 1 Move andYear 2 Operational)
Winter Camp 2(Alternate)
Winter Camp 1(Year 1 & 2 Operation)
Inuvik
GSC3
GSC4
I401A
PW11
PW10
End of ConstructionYear One
Inuvik 4
KP 11
KP 5
KP 1
38 (Jimmy Lake)
Inuvik 5
76
0
9
4
1
8
3
14
13
10
12
11
5a
12b
12a
13a
5
2
Inuvik 6
Inuvialuit Settlement Region
Gwich'in Settlement Area
KP 9
KP 8
KP 7
KP 6
KP 5
KP 4
KP 3
KP 2
KP 1
KP 0
KP 20
KP 19
KP 18
KP 17
KP 16
KP 14
KP 13
KP 12
KP 11KP 10
KP 15
542000
542000
544000
544000
546000
546000
548000
548000
550000
550000
552000
552000
554000
554000
556000
556000
558000
558000
560000
560000
562000
562000
564000
5640007582
000
7582
000
7584
000
7584
000
7586
000
7586
000
7588
000
7588
000
7590
000
7590
000
7592
000
7592
000
7594
000
7594
000
7596
000
7596
000
7598
000
7598
000
7600
000
7600
000
7602
000
7602
000
7604
000
7604
000
7606
000
7606
000
7608
000
7608
000
7610
000
7610
000
7612
000
7612
000
7614
000
7614
000
7616
000
7616
000
7618
000
7618
000
PREPARED FOR
123510689-150
0 1,000 2,000 3,000 4,000
Metres - 1:100,000
> Kilometre Post
Q Summer Camp
Q Winter Camp
R Winter Camp/Summer Storage
!( Proposed Pullout Location
!C Bridge Crossing
GF!( Bridge Size Culvert Crossing
!( Culvert Crossing
Constructed Alignment
Year One Winter Access Trail
Year One Contigency
Year One Winter Road
Year One Water Access (Winter)
Year 1 Water Withdrawal Lake
Administration Boundary
Inuvik, 7(1)a Private Lands
Inuvik, 7(1)b Private Lands
Tuktoyaktuk, 7(1)a Private Lands
Tuktoyaktuk, 7(1)b Private Lands
PREPARED BY
02
±
NWTYT
NU
INUVIK - TUKTOYAKTUK HIGHWAY CONSTRUCTION PLAN
Year Two (North)FIGURE NO. of 05
ProjectLocation
Acknowledgements: Original Drawing by KAVIK-STANTEC LTD: Base Data: Government of Canada DISCLAIMER: All locations are approximate, please refer to the Highway Final Design for specific locations.
Last
Modif
ied: S
eptem
ber 1
9, 20
13 By
: jpeth
o
"R
"R
"R
"R
Q
Q
!
!
!
!
!
!
!
!
!
(
(
(
(
(
(
(
(
(
GF!(
!C
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
Winter Camp 2(Year 1 and Year 2
Operation)
Winter Camp 1(Year 2 Move and
Year 3 & 4 Operation)
SummerCamp
Summer Camp
Winter Camp 1(Year 1 Move and
Year 2 & 3 Operational)
Winter Camp 2(Year 2 Move andYear 3 Operation)
309
174
PW19A
312 West
Year 2173/305
170
End of Construction
Year Two
KP 86KP 91
KP 85
KP 82AKP 82B
KP 100KP 101
A9
A13
A11A10
34e
34c
34b
34a
A12
35a
34a2
KP 91
KP 90KP 89
KP 88
KP 87
KP 86
KP 85
KP 84
KP 83
KP 82
KP 81
KP 80
KP 99
KP 98
KP 97KP 96
KP 95
KP 94
KP 93
KP 92
KP 103
KP 102
KP 101
KP 100
556000
556000
558000
558000
560000
560000
562000
562000
564000
564000
566000
566000
568000
568000
570000
570000
572000
572000
574000
574000
576000
576000
578000
578000
7640
000
7640
000
7642
000
7642
000
7644
000
7644
000
7646
000
7646
000
7648
000
7648
000
7650
000
7650
000
7652
000
7652
000
7654
000
7654
000
7656
000
7656
000
7658
000
7658
000
7660
000
7660
000
7662
000
7662
000
7664
000
7664
000
7666
000
7666
000
7668
000
7668
000
7670
000
7670
000
7672
000
7672
000
7674
000
7674
000
PREPARED FOR
123510689-151
0 1,000 2,000 3,000 4,000
Metres - 1:100,000
> Kilometre Post
!C Bridge Crossing
GF!( Bridge Size Culvert Crossing
!( Culvert Crossing
Q Summer Camp
"R Winter Camp/Summer Storage
!( Proposed Pullout Location
Constructed Alignment
Year Two Winter Road
Year Two Winter Access Trail
Year Two Water Access (Winter)
Year 2 Water Withdrawal Lake
Inuvik, 7(1)a Private Lands
Inuvik, 7(1)b Private Lands
Tuktoyaktuk, 7(1)a Private Lands
Tuktoyaktuk, 7(1)b Private Lands
PREPARED BY
03
±
NWTYT
NU
INUVIK - TUKTOYAKTUK HIGHWAY CONSTRUCTION PLAN
Year Two (South)FIGURE NO. of 05
ProjectLocation
Acknowledgements: Original Drawing by KAVIK-STANTEC LTD: Base Data: Government of Canada DISCLAIMER: All locations are approximate, please refer to the Highway Final Design for specific locations.
Last
Modif
ied: S
eptem
ber 2
0, 20
13 By
: dbro
wn
!
!
!!!
!
!
(
(
(((
(
(
GGG
G
GG
G
FFF
F
FF
F
!!!
!
!!
!
(((
(
((
(
!C
!(
!(
Q
"R
"R
"R
"R
"R
"R
Q
"R
"R
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>
>
>
>
>
Camp 2(Year 1 and 2)
Winter Camp 1(Year 1 Move and
Year 2 Operational)
Winter Camp 1(Year 2 Move and
Year 3 & 4 Operation)
Camp 3(Year 2 Move and
Year 3 Operational)
Winter Camp 2(Year 2 and Year 3 Operational)
Summer Camp
Winter Camp 1 (Alternate)(Year 1 Move andYear 2 Operational)
Camp 2 (Alternate)
GSC3
GSC4
I401A
PW19A
PW18
PW11
PW10
NavyPit
314/325
Summer Camp
End of ConstructionYear Two
29A
3729B
35
28 (Jimmy Lake)
KP 24
(Year 2 Operation)
2019
17
21
18
22b
21a
18a
22a
20a
17a
15C
15A
16
15B
KM 30.9KM 30.2
KP 9
KP 8
KP 7
KP 6
KP 5
KP 4
KP 3
KP 2
KP 1
KP 31
KP 30
KP 29KP 28
KP 27KP 26
KP 25
KP 24
KP 23
KP 22KP 21
KP 20
KP 19
KP 18
KP 17KP 16
KP 15
KP 14
KP 13
KP 12
KP 11
KP 10
KP 40
KP 39
KP 38
KP 37
KP 36
KP 35
KP 34
KP 33
KP 32
544000
544000
546000
546000
548000
548000
550000
550000
552000
552000
554000
554000
556000
556000
558000
558000
560000
560000
562000
562000
564000
564000
566000
566000
568000
568000
570000
570000
572000
572000
574000
574000
7590
000
7590
000
7592
000
7592
000
7594
000
7594
000
7596
000
7596
000
7598
000
7598
000
7600
000
7600
000
7602
000
7602
000
7604
000
7604
000
7606
000
7606
000
7608
000
7608
000
7610
000
7610
000
7612
000
7612
000
7614
000
7614
000
7616
000
7616
000
7618
000
7618
000
7620
000
7620
000
7622
000
7622
000
7624
000
7624
000
7626
000
7626
000
7628
000
7628
000
7630
000
7630
000
7632
000
7632
000
7634
000
7634
000
7636
000
7636
000
PREPARED FOR
123510689-152
0 1,250 2,500 3,750 5,000
Metres - 1:130,000
> Kilometre Post
Q Summer Camp
"R Winter Camp/Summer Storage
!( Proposed Pullout Location
!C Bridge Crossing
GF!( Bridge Size Culvert Crossing
!( Culvert Crossing
Constructed Alignment
Year Two Water Access (Winter)
Year Two Winter Road
Year Two Winter Access Trail
Year 2 Water Withdrawal Lake
Inuvik, 7(1)a Private Lands
Inuvik, 7(1)b Private Lands
Tuktoyaktuk, 7(1)a Private Lands
Tuktoyaktuk, 7(1)b Private Lands
PREPARED BY
04
±
NWTYT
NU
INUVIK - TUKTOYAKTUK HIGHWAY CONSTRUCTION PLAN
Year Three (North, South)FIGURE NO. of 05
ProjectLocation
Acknowledgements: Original Drawing by KAVIK-STANTEC LTD: Base Data: Government of Canada DISCLAIMER: All locations are approximate, please refer to the Highway Final Design for specific locations.
Last
Modif
ied: S
eptem
ber 2
0, 20
13 By
: CTh
ibode
au
!
!
!
!
!
!
!
!
!
(
(
(
(
(
(
(
(
(
G
G
G
F
F
F
!
!
!
(
(
(
!
!
!
C
C
C
!(
!(
R
R
R
R
R
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>>
>
>
>
>> >
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
Winter Camp 1(Year 2 Move and
Year 3 & 4 Operation)
Winter Camp 3(Year 2 Move and Year 3 Operation)
Winter Camp 2(Year 2 and
Year 3 Operation)
Winter Camp 1(Year 1 Move and
Year 2 & 3 Operational)
Winter Camp 2(Year 2 Move andYear 3 Operation)
309
PW13
174
PW19A
PW18
312 West
314/325
KP 77
KP 78
11BC
KP 70
KP 61
KP 55
KP 54
KP 50B
KP 50A
KP 45
KP 42
KP 41
KM90
KM55
KM53
KM52
KM51
KM50
KM49
KM48
KM47
KM46
KM45
KM44
KM43
KM42
KM41
KM39
KM38
KM89
KM88
KM87
KM86
KM85
KM84
KM83
KM82
KM81
KM80KM79KM78
KM77
KM76
KM75
KM74
KM73
KM72
KM71
KM70
KM69
KM68KM67
KM66
KM65
KM64
KM63
KM62
KM61
KM60KM59
KM58
KM57
KM56
KM54
KM40
26
25
31
27a
24b
29a
24a
30a
23a
27b2
28a
27c
27b
33b33a
KM 70.7
KM 61.7
548000
548000
550000
550000
552000
552000
554000
554000
556000
556000
558000
558000
560000
560000
562000
562000
564000
564000
566000
566000
568000
568000
570000
570000
572000
572000
574000
574000 7624
000
7626
000
7626
000
7628
000
7628
000
7630
000
7630
000
7632
000
7632
000
7634
000
7634
000
7636
000
7636
000
7638
000
7638
000
7640
000
7640
000
7642
000
7642
000
7644
000
7644
000
7646
000
7646
000
7648
000
7648
000
7650
000
7650
000
7652
000
7652
000
7654
000
7654
000
7656
000
7656
000
7658
000
7658
000
7660
000
7660
000
7662
000
7662
000
7664
000
7664
000
PREPARED FOR
123510689-153
0 1,000 2,000 3,000 4,000
Metres - 1:110,000
> Kilometre Post
R Winter Camp/Summer Storage
!( Proposed Pullout Location
!C Bridge Crossing
GF!( Bridge Size Culvert Crossing
!( Culvert Crossing
Constructed Alignment
Source 177 Access
Year Three Winter Road
Year Two Water Access (Winter)
Year 3 Water Withdrawal Lake
Inuvik, 7(1)a Private Lands
Inuvik, 7(1)b Private Lands
Tuktoyaktuk, 7(1)a Private Lands
Tuktoyaktuk, 7(1)b Private Lands
PREPARED BY
05
±