1EXOMARS industrial day 2010
Exomars Orbiter Module Bus
OMB
TAS-F – 23rd Sept 2010
Exomars Industrial day- Turin
2EXOMARS industrial day 2010
Exomars OMB definition
� Exomars OMB will:� serve as a carrier to deliver the
EDM at the right landing latitude in the 2016 Mission
� carry the five science payloads provided by JPL and stay around Mars for about 5.5 years
� Provide data relay capability in UHF to all Mars landed assets from Jan 2019 up to end 2022
Central tube & primary structure
Propellant tanks & Helium tanks
3EXOMARS industrial day 2010
Exomars OMB Responsibilities
� TAS-F is Prime of the Orbiter Module Bus Prime
� The OMB is composed of :� Mechanical, Thermal & Propulsion (MTP) : OHB responsibility� Avionics, Electrical & Radio-frequency (AER) : TAS-F
responsibility
MTP AER
4EXOMARS industrial day 2010
Exomars OMB Product tree
� Exomars OMB product tree:OMB
CSS
STR
GNC
TAS-F
OHB
HGA-Assy
X-DST
Telecom
TWTA
LGAs
RFDN
E 111
OMB AER system
E 1111
OMB MTP system E 1112
E 11113 E 11114
PCDU
Battery
Power
Harness
assy
E 11111
E 111111
E 111112
E 111113
Solar ArrayE 11112
Structural PanelE 111121
MechanismsE 111122
E 111131
E 111132
E 1111411
E 1111412
E 1111414
E 1111415
E 1111416
Data Handling
SMU
E 11115
E 111151
Photo Voltaic Assy E 111123
GSEK
X-Band UHFE 111141 E 111142
OBSW
PDHU
IMU
RWAUHF Transceiver*
UHF RFDN
UHF Antenna
SADM E 111124
*CFE
E 111152
E 111153
E 111133
E 111134
E 1111423
E 1111422
E 1111421
RCU
OMB
CSS
STR
GNC
TAS-F
OHB
HGA-Assy
X-DST
Telecom
TWTA
LGAs
RFDN
E 111
OMB AER system
E 1111
OMB MTP system E 1112
E 11113 E 11114
PCDU
Battery
Power
Harness
assy
E 11111
E 111111
E 111112
E 111113
Solar ArrayE 11112
Structural PanelE 111121
MechanismsE 111122
E 111131
E 111132
E 1111411
E 1111412
E 1111414
E 1111415
E 1111416
Data Handling
SMU
E 11115
E 111151
Photo Voltaic Assy E 111123
GSEK
X-Band UHFE 111141 E 111142
OBSW
PDHU
IMU
RWAUHF Transceiver*
UHF RFDN
UHF Antenna
SADM E 111124
*CFE
E 111152
E 111153
E 111133
E 111134
E 1111423
E 1111422
E 1111421
RCU
5EXOMARS industrial day 2010
Exomars OMB MTP/ product tree
� Exomars OMB / MTP product tree (See OHB presentation)
GSEK
OMB system
OMB
Tanks
PIA
PCA
Propulsion
TAS-F
OHBE 111
OMB MTP
systemE 1112
E 11124
Thermal ControlE 11123
Structure assy
E 11121
Central TubeE 111211
Structure panelsE 111212
BracketsE 111213
E 111241
E 111242
E 111243
E 1111
Active elements
Passive elements
E 111231
E 111232
Engines
and thrustersE 111244
GSEK
OMB system
OMB
Tanks
PIA
PCA
Propulsion
TAS-F
OHBE 111
OMB MTP
systemE 1112
E 11124
Thermal ControlE 11123
Structure assy
E 11121
Central TubeE 111211
Structure panelsE 111212
BracketsE 111213
E 111241
E 111242
E 111243
E 1111
Active elements
Passive elements
E 111231
E 111232
Engines
and thrustersE 111244
6EXOMARS industrial day 2010
Exomars OMB avionic architecture
� Exomars avionic architecture makes extensive use of 1553 bus for TM/TC of all units� Spacewire
and LVDS bus used for science & Rover data transfer via PDHU
SADM SADM
SA
Batteries
StarTrackers
CSS
Pyros to RCS,SA and HGA
deployment
HeaterHeater
Solar Arrays
Reaction Wheels
Rx
Tx
UHF antennasUHF
transceiversTCS
12 * 10 N thrusters
MainEngine424N
Pressure transducers
PPPPPP
Latchvalves
PCDU
Discrete links
PL 1553 bus
EDM Demonstrator
Interface with EDM
SMU
Spacewireor Packetwire
LGA 1 LGA 2
LGA 3
HGA
X-DST
X-DST
RFDN
TWTA
TWTA
APM
Gyroscopes
EDMpower line
LVDS data link
RC
S IF
PF 1553 bus
Science Payloads
MATMOS
HISCI
EMCS
SOIR NOMAD
MAGIE
PDHU
SBDL data link
Orbiter module bus : 2x1553 bus
SADMSADMSADM SADMSADMSADM
SA
Batteries
StarTrackersStar
TrackersStar
Trackers
CSS
Pyros to RCS,SA and HGA
deployment
HeaterHeaterHeaterHeater
HeaterHeater
Solar Arrays
Reaction Wheels
Rx
Tx
UHF antennasUHF
transceiversRx
Tx
UHF antennasUHF
transceiversTCS
12 * 10 N thrusters
MainEngine424N
Pressure transducers
PPPPPP
PPPPPPPPPPPPPPPP
Latchvalves
PCDU
Discrete links
PL 1553 bus
EDM Demonstrator
Interface with EDM
SMU
Spacewireor Packetwire
LGA 1 LGA 2
LGA 3
HGA
X-DST
X-DST
RFDN
TWTA
TWTA
APM
Gyroscopes
EDMpower line
LVDS data link
RC
S IF
PF 1553 bus
Science Payloads
MATMOS
HISCI
EMCS
SOIR NOMAD
MAGIE
PDHUPDHU
SBDL data link
Orbiter module bus : 2x1553 bus
7EXOMARS industrial day 2010
Exomars OMB Mission phases
� ESA-NASA 2016 mission timeline
Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4
2016 2017 2018 2019
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Global Dust Storm Season
Global Dust Storm Season
Transfer
Aerobraking Orbiter in circular orbit
TGMI Science from circular orbit TGMI Science
& Rovers data relay
2016 Mission
Launch
2016 Lander EDL
2018 Rovers Landing
SuperiorConjunction
Wait in
4 SOL Orbit
Mars orbit insertion 4
sol
Elliptic
Release 4 sol
Science observations
science & Rovers data-
relay
Lander data
relay
8EXOMARS industrial day 2010
End of
aerobraking
phase
Start of
aerobraking
phase
Exomars OMB – Design specificity
� Cruise phase : travel from Earth to Mars (10 months) –Stable attitude (only one face exposed to the sun)
� Aerobraking phase : 8 months of repetitive passes in Mars atmosphere to reach a circular orbit
� Primary mission : science mission July 2017- August 2019. Stable 2 hour orbit
� Secondary Mission : Jan 2019 – Dec 2022 : UHF data-relay . Same orbit as science orbit with different inclination.
1500W/m²
+X face
9EXOMARS industrial day 2010
Exomars OMB AER / ITT-RFQ approach
� Exomars OMB / AER procurement approach
EPS & GNC
S/S Item Baseline approach ITT/RFQ Out KOM Comments
POWER PCDU ITT 15/09/2010 20/12/2010
updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July) / ITT converted
in RFQ / Release date planned on 15/09/2010 Closing
date to be changed to 29/10/2010.
POWER Battery ITT 18/02/2011 29/06/2011
POWERHarness
AssemblyITT 03/03/2011 12/07/2011
GNC IMU RFQ 17/11/2010 01/03/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
GNC STR ITT 18/11/2010 01/03/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
GNC CSSA RFQ 27/05/2011 07/10/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
GNC RWS RFQ 27/04/2011 07/09/2011
10EXOMARS industrial day 2010
Exomars OMB AER / ITT-RFQ approach
� Exomars OMB / AER procurement DHSS and on-board
SWS/S Item Baseline approach ITT/RFQ Out KOM Comments
Data Handling SMU ITT 21/09/2010 17/12/2010updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
Data Handling PDHU ITT 08/12/2010 22/04/2011
Data Handling
OBSW
(OBSW
modules)
24/06/2011 02/11/2011
several modules of the OMB OBSW are proposed to be
subject to ITT (as per TAS-F proposal / 19th July 2010) -
need date is aligned with OBSW V2 development start OMB Thermal
control (OMB
Applicative SW implementing the thermal control law of
OMB units during the all the phaseEDM Thermal
control (EDM
applicative SW implementing the thermal control law of
EDM units during the Cruise phase
OMB EPS
management
(EPS ASW)
applicative SW controlling the PCDU heaters switches in
function of the main bus voltage and also taking over the
SA power management when necessary (MPPT clamping)
OMB Antenna
pointing
control (APM
Management of the HGA pointing mechanisms (HGA APM
ASW)UHF TTC
(Electra
transceiver
Managing of the RF equipments (power-on/off,
configuration, monitoring, ...)
PDHU
Management
(PDHU Mangt
applicative SW managing the PDHU (power on/off,
configuration, monitoring), download/upload of science
data to/from ground, communication with electra.Science
instruments
management
applicative SW setting the operating mode of each science
payload on each orbit, performing monitoring, context
storage, DH TM packets acquisitionEDM
management applicative SW in charge of setting the EDM units (CTPU,
RTPU) during the Cruise phase.
ITT
11EXOMARS industrial day 2010
Exomars OMB AER / ITT-RFQ approach
� Exomars OMB / AER procurement
approach Solar Array Assembly
S/S Item Baseline approach ITT/RFQ Out KOM Comments
SAStructural
PanelITT 22/11/2010 01/04/2011
updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
SAPhoto Voltaïc
Assy (PVA)ITT 25/05/2011 04/10/2011
updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
SA SADM ITT 18/02/2011 29/06/2011
12EXOMARS industrial day 2010
Exomars OMB AER / ITT-RFQ approach
� Exomars OMB / AER procurement
approach Telecom
S/S Item Baseline approach ITT/RFQ Out KOM Comments
Telecom X band RFDN ITT 01/02/2011 09/06/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
Telecom X band LGA ITT 03/08/2011 09/12/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
Telecom X band DST ITT 12/11/2010 01/04/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
Telecom X band TWTA ITT 17/01/2011 26/05/2011
TelecomX band HGA
AssemblyITT 17/12/2010 06/05/2011
updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
Telecom UHF RFDN ITT 08/02/2011 16/06/2011updated kick-off date based on AIV/schedule optimisation
meeting EXM-MS-MIN-AI-0857 (8th July)
Telecom UHF LGA ITT 31/05/2011 07/10/2011
13EXOMARS industrial day 2010
Exomars OMB GSE / product tree
� Exomars OMB
/GSEs product tree
14EXOMARS industrial day 2010
Exomars OMB EGSE / procurement approach
� Exomars OMB /EGSEs procurement
approach
item Baseline approach ITT/RFQ Out KOM Comments
EGSE CCS 02/05/2011 12/09/2011 CFI from TAS-I
EGSEX-band RF
SCOEITT 19/01/2011 30/05/2011
EGSERTS SCOE
(HW)ITT 02/05/2011 12/09/2011 ITT limited to HW
EGSEDH_GNC
SCOE (HW)ITT 02/05/2011 12/09/2011 ITT limited to HW
EGSE Power SCOE ITT 24/11/2010 06/04/2011
EGSETM/TC FEE
(HW)ITT 02/05/2011 12/09/2011 ITT limited to HW
EGSEPOWER FEE
(HW)ITT ITT limited to HW
EGSE STR EGSE as part of STR ITT
EGSE STR OGSE as part of STR ITT
EGSE IMU EGSE as part of SIMU ITT
EGSEUHF-band RF
SCOECFI from JPL
15EXOMARS industrial day 2010
Exomars OMB SCC GSE / product tree
� Exomars OMB /SCC GSEs product
tree
OHB
16EXOMARS industrial day 2010
Exomars OMB SCC GSE / procurement
� Exomars OMB /SCC GSEs procurement approach
SCC GSE
HGA
Deployment
device
as part of HGA ITT
SCC GSESCC Test
Clamp BandsOHB
note 1) this item is now procured by OHB due to the new
model philosophy (mechanical qualification at MTP level
on PFM)
SCC GSE
Simulant
liquid loading
device
OHB
SCC GSEPropellant
loading deviceOHB
SCC GSEX Band RF
SuitCaseITT 04/01/2013 16/05/2013 ITT limited to HW
SCC GSEInstrument I/F
Simulators02/05/2011 12/09/2011 CFI from JPL
SCC GSE
OMB
simulator
(need TBC)
MITT limited to HW. Note : need date and content to be
defined by TAS-I in OMB SOW