Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for...

9
1(: 7(55,725,(6 ⤎浓䁊 0,56 %$< Boundary of Hong Kong Special Administrative Region ⌾㵞 6+(1=+(16+, ⏵㵞䁊 +21* .21* ,6/$1' /$17$8 ,6/$1' 6287+ &+,1$ 6($ .2:/221 8 5 0 67 2 1 5 2 $ ' 朹塊 ⌾Ḓⳝ '((3 %$< 㲀䔗 呜㵳 ⤎➻ 匪䁊 ⱖ敧 K㛾 ⏷朙㸖 榓杴ⱘ 76,1* <, /$00$ ,6/$1' ⌾Ḓⳝ 喴⠿㵞ⳤ ❑㴙 奦岉 䱰ⶡ 敞㴙 潴滺㴙 㝘潴㴙 䟚滺㴙 ▃术㴙 嵋冿妹 㺿奦㴙 䉂Ⱕ㵞 ⯮庴㾚 㞃㴙例ⳝ 咙⏗例ⳝ 䴉但例ⳝ 䳎删䁊㵞 㷬㰛䁊⌱ⳝ 7$, 32 )$1/,1* 6+$ 7,1 6$, .81* 78(1 081 3(1* &+$8 768(1 :$1 <8(1 /21* .:$, &+81* 6+(81* 6+8, &+(81* &+$8 3257 6+(/7(5 &+(. /$3 .2. .$8 6$, &+$8 62.2 ,6/$1'6 /81* .:8 &+$8 52&.< +$5%285 76(81* .:$1 2 1,1(3,1 *5283 6+(. .:8 &+$8 +(, /,1* &+$8 781* /81* &+$8 32 72, ,6/$1'6 ⤎㵑䁊 7$, /21* :$1 ⤎䀿㵞 /21* +$5%285 72/2 +$5%285 &/($5 :$7(5 %$< 3(1,168/$ 0$ 21 6+$1 ⤎嵋敧 1257+ &+$11(/ 㝘⍁⯕㵞ⳤ 奦⍁⯕㵞ⳤ /$17$8 &+$11(/ 7 $ 7 + 2 1 * & + $ 1 1 ( / 9 , & 7 2 5 , $ + $ 5 % 2 8 5 ($67 /$00$ &+$11(/ :(67 /$00$ &+$11(/ ! ° Job No Issue P4 Drawing Status Draft Scale Drawing Title Job Title Client Level 5 Festival Walk 80 Tat Chee Avenue, Kowloon Tong, Kowloon Hong Kong 0 2,500 5,000 7,500 1,250 Metres Issue Date By Chkd Appd P4 19-01-12 JT ©Copyright Information 1:200,000 Civil Engineering and Development Department Agreement No. CE 9/2011 (CE) Increasing Land Supply by Reclamation and Rock Cavern Development cum Public Engagement - Feasibility Study LEGEND Marine Stop Area Sensitive Shoreline 1 STATUTORILY PROTECTED AND CONSTRAINT AREAS

Transcript of Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for...

Page 1: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

B o u n d a r y o f H o n g K o n g S p e c i a l A d m i n i s t r a t i v e R e g i o n

Job No Issue

Figure 4.1.1 P4

Drawing Status

Draft

Scale

Drawing Title

Job Title

Client

Level 5 Festival Walk80 Tat Chee Avenue, Kowloon Tong, KowloonHong Kong

0 2,500 5,000 7,5001,250

Metres

Issue Date By Chkd Appd

P4 19-01-12 JT

©Copyright Information

1:200,000

Civil Engineering and Development Department

Agreement No. CE 9/2011 (CE) Increasing Land Supply by Reclamation and Rock CavernDevelopment cum Public Engagement - Feasibility Study

STATUTORY PROTECTED ANDCONSTRAINED AREAS

LEGEND

Marine Stop Area

Sensitive Shoreline

1

STATUTORILY PROTECTED ANDCONSTRAINT AREAS

Page 2: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

B o u n d a r y o f H o n g K o n g S p e c i a l A d m i n i s t r a t i v e R e g i o n

Job No Issue

Figure 4.1.2 P3

Drawing Status

Draft

Scale at A3

Drawing Title

Job Title

Client

Level 5 Festival Walk80 Tat Chee Avenue, Kowloon Tong, KowloonHong Kong

0 2,500 5,000 7,5001,250

Metres

Issue Date By Chkd Appd

P3 19-01-12 JT

Legendçè Ship Wreck

P Marine Facility

I Fish Culture Zone

:::::::: Submarine Cable

Submarine Pipeline

Utility Area

C Anchorage

Exhausted Sand Borrow Pit forDisposal of Uncontaminated Sediment

Open Sea Disposal Area forDisposal of Uncontaminated Sediment

Dumping Ground

Marine Borrow Area

Extent Prior to Dredging

With Constraints on Dredging(e.g. environmental limitations, thickoverburden, etc)

Not Being Used on Environmental orOther Grounds

Contained Pit for Disposal ofContaminated Sediment (CPDCS)

Active CPDCS

Filled & Already FullyCapped CPDCS

Planned CPDCS

Airport Exclusion Zone

Tunnel

Central - Wan Chai Reclamation

Proposed CT10 Reclamation

Proposed HKBCF / TM-CLKLReclamations

Proposed IWMF Reclamation

Proposed Third Runway Reclamation

Proposed Tung Chung New TownExtension Area

Proposed North Lantau Leisure &Entertainment Node

Proposed Lantau Logistics Park

Proposed Lantau Theme Park

Proposed Lamma Marina / Resort

Proposed Cross Bay Link Reclamation

Proposed HKLR Reclamation

Proposed Marine Park

* *Proposed Windfarm

Proposed Cross Bay Link

Proposed DSD HATS Tunnel

Proposed HZMB

::::::: Proposed Windfarm Cable Route

Water Depth (metre below Chart Datum)

< 0.0

0.1 - 10.0

10.1 - 20.0

20.1 - 50.0

© Arup

©Copyright Information

1:200,000

Civil Engineering and Development Department

Agreement No. CE 9/2011 (CE) Increasing Land Supply by Reclamation and Rock CavernDevelopment cum Public Engagement - Feasibility Study

CONSTRAINED AREAS

Mangrove

Seagrass

2

MARINE CONSTRAINED AREAS

Page 3: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

B o u n d a r y o f H o n g K o n g S p e c i a l A d m i n i s t r a t i v e R e g i o n

3

Note:The size and shape ofreclamation sitesshown on this planare hypotheticalassumptions for thepurpose of BTAcarried out at thecorresponding stageof site selectionprocess only. Theydo not represent anyfuture design to beimplemented.

PRE-LONGLISTED RECLAMATIONSITES

Page 4: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

B o u n d a r y o f H o n g K o n g S p e c i a l A d m i n i s t r a t i v e R e g i o n

ECOMMENDED L

4

Note:The size and shape ofreclamation sitesshown on this planare hypotheticalassumptions for thepurpose of BTAcarried out at thecorresponding stageof site selectionprocess only. Theydo not represent anyfuture design to beimplemented.

LONGLISTED RECLAMATION SITES

Page 5: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

The existing Airport Height Restrictions will have an impact on the development potential of the proposed reclamation. Future development on the proposed reclamation will be limited to building heights ranging from 80mPD to 100mPD.

.

Page 6: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped
Page 7: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

industrial users are relocated.if the nearby

if the nearby industrial users are relocated.

Page 8: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

The proposed reclamation can provide land suitablefor residential development in Sha Tin New Townwhich benefit from the upcoming Shatin to CentralLink.

Page 9: Executive Summary on Final Report for Reclamation.pdf Figure Summary on... · Contained Pit for Disposal of Contaminated Sediment (CPDCS) Active CPDCS Filled & Already Fully Capped

comprehensive land use planning and land reserve.

and land reserve.

A proposed columbarium development is intended tobe located at Tsang Tsui. This may have traffic impactto Lung Kwu Tan and the proposed reclamation.