Exchange ezone july8 2013

56
C ontractor’s Z one weekly newspaper July 8, 2013 Vol. 7, No. 27 Placer County Contractors Association & Builders Exchange Bringing Government Contracting Opportunities to You! Click here for details on the event

description

Weekly publication for contractors to find bidding projects, education, networking opportunities and group discounts.

Transcript of Exchange ezone july8 2013

Page 1: Exchange ezone july8 2013

Contractor’s Zone

Contractor’s Zoneweekly newspaper

July 8, 2013Vol. 7, No. 27Placer County Contractors Association & Builders Exchange

Bringing GovernmentContracting Opportunities to You!

Click here for details on the event

Page 2: Exchange ezone july8 2013

July 8, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

Page 3: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Inside This Issue

This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

InspirationfortheWeek Page2

YourWeeklySmile Page2

IndustryLinks Page2

TheWeek’sWeatherForecast Page3

PCCACalendarofEvents Pages4-5

ContractorYellowPages Page6

NewsBriefs Pages7-9

IndustryNews Pages10-15

ClassifiedAds Page16

WeeklySafetyMeeting Page17

CalTrans Page18

PlansOnFile Pages20-51

LegalAds Page51

BidResults Page52

BottomlineLawyers Page22 WebsiteDiamondPacific Page8 WebsiteInlandBusinesSystems Page10 WebsiteJensenMasonry Page24 WebsitePhiladelphiaInsurance PageIFCStateFundInsurance Page6 Website

SUPPORT OUR ADVERTISERS!They support the PCCA

and deserve your business!

Don’t let the money ship

sail without you!A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!

Page 4: Exchange ezone july8 2013

July 8, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

Association Links CSLB Contractor’s State License Board OSHA Occupational Safety & Health Administration GSBE Golden State Builders Exchange AIA American Institute of Architects AGC Associated general Contractors BIA Building Industry Association SCIF State Compensation Insurance Fund Employers Guardian Human Resources American Subcontractors Association

Projects Online DGS Contracts DOT DOT District 3 SMUD CSI Code List Fed Biz Opps

Safety OSHA Hazard Communication OSHA Safety & Health Topics Click SafetyOnline OSHA Safety Classes Employer Records of Occupational Injury & Illness Governor’s Office of Emergency Services Injury & Illness Prevention Program Risk Management – IIPP

State & Federal Links California Building Standards California Prevailing Wage Rates Federal Prevailing Wage Rates California Dept. of Industrial Relations California Environmental Protection Agency Mechanics Lien Law Information Mechanics Lien Guide

Local Government Links California Chamber of Commerce City of Auburn City of Rocklin City of Roseville City of Lincoln County of Placer

Construction Industry Links

“Nothing is predestined: The obstacles of your past can become the

gateways that lead to new beginnings.”

— Ralph Blum

What do you get when you cross a dog with a telephone?

-A Golden Receiver!

Page 5: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

PCCA:

PresidentPatrick RemingtonRemington Construction

Vice PresidentChris HarrisJames L. Harris Painting, Inc.

DirectorCheryl GibsonVon-Jac Development

DirectorCyndi CookCook Design Company

DirectorAdam NooraniHomewood Lumber

DirectorEdward JohnsonWarren G. Bender Co.

DirectorMaggie MarfiaMoule’s Foothill Glass

VP Public RelationsTim BuskHeritage Painting

VP Governmental AffairsJack RemingtonAndregg Geomatics

PBX:PresidentJohn BrunJohn Brun Masonry

Vice PresidentChad TwardusTwardus Construction

DirectorNick ForestiereGurnee & Daniels LLP

DirectorMike BennettBennett Tile

Staff:Chae Gale-Director of [email protected]

Jeff Henry-Director of Business [email protected]

Kellie Russell-Auburn Planroom [email protected]

Vickie Guthrie - Roseville Planroom [email protected]

Jim Couk - Scan Technician

Placer County Contractors Association10656 Industrial Ave., Ste.160, Roseville, CA 95678 - 916-771-7229

470 Nevada Street., Ste.209, Auburn, CA 95603 - 530-889-3953Open Monday-Friday: 8am-5pm

www.placerbx.com

Board of Directors

RosevilleToday98oSun98o-57o

95o

57o

Tuesday Wednesday Thursday Friday

96o

64o93o

65o100o

66o

AuburnToday93oSun93o-64o

92o

64o

Tuesday Wednesday Thursday Friday

95o

67o90o

67o97o

68o

Page 6: Exchange ezone july8 2013

July 8, 2013Page 4 Contractor’s Zone• .Contractor’s Zone

J u l y 2 0 1 311 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

17 MurphyAustinPresents ConstructionContractSeminar attheRosevillePCCAClassroom.

24 ShouldyouformaCorporation in20139:00to11:00atRoseville PCCAhostedbyBurnett& Associates.

25 ShouldyouformaCorporation in2013?1:30to3:3atRoseville PCCAhostedbyBurnett& Associates.

26 OPENHOUSENew AuburnPlanroom!

26 WarrenG.Benderworkers compchanges.Seminarat RosevillePlanroom.

A u g u s t 2 0 1 35 QSP/QSDTrainingat RosevillePCCA

6 QSP/QSDTrainingat RosevillePCCA

7 QSP/QSDTrainingat RosevillePCCA

23 MeeksLumberMixerFriday Aug23rd11:30am–1:30pm.

S e p t e m b e r 2 0 1 312 ClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

17 AmvicPacificICFTrainingCourse atRoseville9:00amto4:00pm

O c t o b e r 2 0 1 33 PG&ERosevilleTrainingSeminar GoDuctless,TryMiniSplits9-3

Page 7: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

JulySUNDAY MONDAY TUESDAY WED. THURSDAY FRIDAY SAT.

2 8 3 0

23 2 4 25 26

20

31 2

14

2 1

17

329

18

2722

16

9

19

12

15

1 310July 7CPRClass

MurphyAustinPresents

ConstructionContractSeminar

ShouldyouformaCorporationin2013?

9:00to11:00

ShouldyouformaCorporationin2013?

1:30to3:30

118

August 1

OPENHOUSENewAuburnPlanroom!WarrenG.Bender

workerscompchanges.Seminar

Page 8: Exchange ezone july8 2013

July 8, 2013Page 6 Contractor’s Zone• .Contractor’s Zone

Contractor Yellow Pages

MasonryJensen

Full Service Masonry ContractorLicense # 804650

Mark Jensen916.663.3429

[email protected]

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com985LincolnWay,Auburn,CA95603

Hydraulic and Industrial HoseTwo Locations to Serve You

Air HoseAG SprayPaint SprayProtective ClothingSteam●AdhesivesCustom Gasket CuttingHandtrucks and CastersDock Hose●Sand BlastFood Suction & DischargeContractors Water Suction & DischargeGarden Hose●PVC Suction & Discharge

172519thStreetSacramento,CA95814916-498-1800916-498-1818 Fax

Air HoseAG Spray

Paint SprayProtective ClothingSteam●Adhesives

Custom Gasket CuttingHandtrucks and CastersDock Hose●Sand Blast

Food Suction & DischargeContractors Water Suction & Discharge

Garden Hose●PVC Suction & Discharge

1110S.WilsonWay,Suite1Stockton,CA95205209-464-1200209-464-2773 Fax

Capital Rubber Co., Ltd.

www.capitalrubberco.com

Page 9: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Sacramento Gets $115 Million For Flood Control Projects

The Sacramento region’s flood-con-trol infrastructuregotafreshinfusionofcashLastweekwiththeannounce-mentofabout$115million in federalmoney for projects for FolsomDam,the American River watershed andsouthSacramento.

Under themoney,partof thealloca-tionfortheU.S.ArmyCorpsofEngi-neers2013fiscalyearworkplan,thebulk, $98.8 million, will be spent onbuildinganauxiliary spillway forFol-somDam.Other projects include$2milliontoraisethedamand$700,000to improve flood protection aroundcreeks and streams in south Sacra-mentoCounty.

Though the funding also includes$13.5million forAmericanRiverwa-tershed work, including design tosupport leveesinNatomasandelse-where,theregionstillhasabitlongerwait formoney to finishwork on theNatomasbasin,whereabuildingmor-atoriumoverpotentialfloodissuesre-mainsinplace.

Jonelle Trimmer, press secretary forU.S.Rep.DorisMatsui,D-Sacramento,saidMatsuiisoptimisticingettingcon-gressionalauthorizationthisyeartofin-ishNatomaswork. “We believewe’regoingtoseeadraftbillinthenextcoupleweeks,andthecommitteechairwantstohavehearingsthissummer,”Trimmersaid.TheU.S.Senateincludedgenericlanguagegivingsuchauthorizationinabillalreadypassedthisyear,sohavingHouseofRepresentativesauthorizationwouldthenallowlocalflood-controloffi-cialstopursuefundingtoactuallycom-pletethework.

Shopping Center Remodel Planned In Citrus Heights

The Marketplace at Birdcage retail

News Briefs

Continued on next page

center in Citrus Heights could begetting a minor makeover, with aproposaltoreconfigureaportionofthe development that went beforethecity’splanningcommission lastweek.Staff’s recommendationwasfor theplanningcommission toap-proveboththedesignreviewpermitmodificationandatreepermitforthechangesoutlinedintheproposal.

Under the proposal from Perkins,Williams, & Cotterill Architects, aportion of a former CVS store at6197 Sunrise Boulevard would betorn down and a smaller additionconstructed. The work would re-ducethebuilding’sfootprintbyanet10,000 square feet, resulting in a38,575-square-foot building intend-edforgroceryorotherretailusers.

City staff wrote that the work alsowould allow construction of a neweast-west “drive aisle” that wouldallow better access by connect-ing Sunrise Boulevard to BirdcageStreet and improve visibility fromSunrise and Sunrise Mall to theeast.Pedestrianaccesswouldalsobe increased. The project wouldalso remove and replace severaltreeswithintheshoppingcenterandadd 30 new parking spaces alongthedriveaisle.

Final EIR For $70 Million Jail Facility In Porterville Goes

To Supervisors

Anothergiantstep toward thecon-structionofa$70millioncountyjailfacility inPortervillecouldbetakensoon when the Board of Supervi-sors is asked to approve the finalenvironmentalimpactreportfortheproject.TheEIRfoundthatanypo-tential environmental impacts canbemitigated,andtheboardshouldapprovalthefinalEIRtothecountycanproceedwiththeproject.

The jail EIR is just one of severalsignificant issues before the boardtoday. Also on the agenda is theconsideration of salary increasesformore than 500 employees andtheboard itself, anappeal filedbythe Tule River Indian Reservationoverconditionsplacedon itsplanstoconstructawastewatertreatmentfacility to serve residents of thereservation and the introduction ofamendmentstothecountybusinesslicenceordinance.

The jail is in thedesignstage,andconstruction could begin next yearor as late as 2016. The county isproposingconstructinga500-bed—250-double-occupancy units— jailfacility on approximately 75 acreson Scranton Avenue just west ofNewcomb Street.According to thestaff report, the facility will employup to 172 people working aroundtheclock.

Sport Complex In Petaluma Moves Forward

AsportscomplexinEastPetalumathathaslanguishedonthesidelinesfor more than 20 yearsmay actu-allybreakgroundinthespring.The$23millionEastWashingtonPark,whichbeganasa$2.1millionpub-lic-private partnership concept in1990,couldseeconstructionbeginnextspringonanabbreviatedfoot-print.

City leaders last week approved a$210,000 contract for design andengineeringworkona$6.7millionsegment, which includes at leasttwo—maybethree—artificialturfmulti-use fields, lighting, irrigation,frontage street improvements, agravel road and parking area andprovisionsforseatingandfencing.

Page 10: Exchange ezone july8 2013

July 8, 2013Page 8 Contractor’s Zone• .Contractor’s Zone

San Francisco Condo Project Breaks Ground

Oyster Development has starteddemolition and excavation of its114-condodevelopment in theMis-sion District, a $70 million projectthat will eventually abut a refur-bishedNewMissionmovie theater.BuildGroupisthecontractor.

InadditiontotheMissionStreetsite,Oysteralsoboughtaparcelat1296Shotwell,whichwillbehandedoverto the Mayor’s Office On Housingfordevelopmentofaffordablerentalhousing. Givas said the neighbor-hoodmadeitcleartheypreferredaland dedication over on-site afford-ableunitsbecauseitgeneratesmoreaffordable units than on-site afford-able(46versus14)andprovidestheflexibility fordeeperaffordability (byallowingaffordablerentalsinsteadofonlyaffordablecondos).

Regional Forecast Exceptionally Good

During the downturn, new homeconstruction plummeted along withjobs and personal incomes.A newforecast for the Sacramento regionpredictsthesemeasuresofeconom-ichealtharepoisedtorisetogetheroverthenextfouryearsHomebuild-ing,aneconomicpowerhouseintheregionwhenit’sinfullswing,willre-turn in force, rising to levels in linewithpopulationgrowthby2017,ac-cordingtothelatestforecastbytheUniversity of the Pacific’s BusinessForecastingCenter.Thenewreportfor the four-county Sacramento re-gionpredictssizablejobgrowthoverthenextfouryears,alongwithfallingunemployment. Personal incomes,adjusted for inflation,willeventuallyriseagainataratefasterthanduringtheboomyears.

With more good news, real estateinformationfirmDataQuickreported

lastweek that themedian price forresalehomesinSacramentoCountyroseastunning42percentinthepastyear,from$160,000inMay2012to$227,500 last month. New homepriceshavebeenontherise,too.InPlacerCounty,aprimehomebuild-ing area, the median sale price ofnewhomesroseinMayto$378,500,up23.5percent comparedwith thesamemonthayearago.

Michael Strech, president of theNorthStateBIA,saidmostbuildersagree the new home market is ontracktorecover.

Tulare And Visalia Summer Projects

The Tulare City School District willbereplacingtheheating,ventilationandair conditioningunitsatCherryAvenue Middle School, as well asreplacingtheroof.Thecostsforre-placingtheairconditioningunitswillbe $119,000 and costs for the roofreplacementswillbe$205,000.

The district will also be upgradingthe refrigerator and freezer units inits central kitchen, where all of thelunchandbreakfastmealsaremadefor all 14 school locations.The up-gradewillcostthedistrict$81,000.

Other projects the district will beworking on during the summer istheremodelingprojectofthelibraryatPleasantElementarySchool, theinstallationofwindowcoversatnineschoolsitesandroutineworkordersforanything thatneeds tobefixed.PleasantElementarySchoolwill re-model theexisting libraryandcom-bineitwiththecomputerlabtocre-atemorespace.

TulareJointUnionHighSchoolDis-trictwillalsobeworkingon itsownconstruction projects this summer.

News BriefsContinued from last page

http://designcenters.paccoast.com

Page 11: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

A classroom building at both Tu-lare Union and TulareWestern highschoolswillundergoconstruction.Theplanning for the new roofing beganlastOctoberand isexpected tocostthe district $750,000 for both sites.The district decided to go with thesamecontractor,GaryInterranteCon-structionfromExeter,forbothsites.

ForVisaliaschools,summerimprove-mentswillcomebywayofMeasureE, thevoter-approvedbond initiativeused to fund ongoing constructionandrenovationprojects.

Thelargestprojectontapforthissum-mer is the installationofsolarpanelsat12schools,beginningJuly10.

RedwoodHighSchool,HighlandEl-ementary and Crowley Elementary— identified byAdministrative Ser-vicesDirectorDavidLoverinas theworst offenders in the districtwhenit comes to energy costs—will bethefirstrecipientsofthenewpanels.The remaining schools—PinkhamElementary,LinwoodElementary,LaJoyaMiddleSchool,VevaBluntEl-ementary, Willow Glen Elementary,GreenAcres Middle School, Hous-ton Elementary, Fairview Elemen-taryandIvanhoeElementary—willbefurnishedwiththenewequipmentbyNovember.

Four Porterville Projects Get District Approval

ThePortervilleUnifiedSchoolDistrictwill includewhat itconsiders tobe itsfour highest priority construction proj-ects in the2013-14budget tobeap-proved by the board at its June 27meeting. Those projects are a mod-ernization project at Roche AvenueElementary School, the replacementof portable classrooms at BelleviewSchool,theconstructionofaswimmingpool at Strathmore High and the ex-pansionofButterfieldCharterSchool.

The Roche project will cost nearly$450,000 and will include a badlyneededexpansionof restroomsand

replacing two portable classrooms.Theschoolnowhasjustonegirlsre-stroomandoneboys restroom,andtheboysrestroomhasjustoneurinal.

Itwasalsotheconsensusoftheboardtobuildapermanent,two-story,nine-classroomstructureatBelleview,asopposedtoamodularbuilding.Thatwill increase the cost of the projectfromaround$2.8milliontomorethan$4.1million.ThebuildingwillreplaceportableclassroomsacrossthestreetfromBelleview,which have been attheschoolfor35years.

TheconstructionoftheswimmingpoolatStrathmoreHighwillcost$3.3mil-lion.ThepoolwillbeusedbyHarmo-nyMagnetAcademyandStrathmoreHighstudentswhocompeteforStrath-moreHighboysandgirlswaterpoloandboysandgirlsswimteams.Thoseteamscurrentlyhave topracticeandcompeteintheirhomecontestsattheGraniteHillsswimcomplex.Thepoolcouldalsobeusedbyyouthclubsandpossiblyeventhepublicaswell.Thepool will be constructed behind thetenniscourtsbetweenSpartanStadi-umandthejuniorvarsitysoftballfieldontheSHScampus.

Alloftheconstructionprojectsshouldbe completed during the 2013-14schoolyear.

Central Valley Construction Rebounding

Construction in the Central Valleymadesomedefiniteheadwayby thesecondquarteroftheyear,withbuild-ingpermitsupmorethan30percentoverthesametimelastyear.Through-outFresno,Madera,KingsandTularecounties, 4,449 construction permitswereissuedtobuildersinthefirstsixmonths of the year, up 30.5 percentfrom3,409duringthesameperiodlastyear,accordingtoaweeklyreportbyConstructionMonitor.

The value of all construction permitsrosefrom$403.4millionbyJuneoflastyearto$547.6millionsofarthisyear.

Commercial permits rose from 644during last year’s second quarter to667sofarthisyear.Amongthose,re-tail, warehouses and dining jumpedfrom18to26,whileoffices,banksandprofessionalbuildingswentfrom22to33.Industrialandmanufacturingbuild-ings andwarehouses dipped slightlyto22,althoughthevalueofthoseper-mitsdoubledto$39.3million.

Housing Gains Document Economic Recovery

U.S. builders steppeduphomecon-struction inMayandapplied forper-mits to build single-family homes atthe fastest pace in five years. Thegains show housing remains a keysourceofgrowthfortheeconomy.Theoverall pace of homes started rose6.8percentlastmonthtoaseasonallyadjustedannual rateof 914,000, theCommerceDepartmentreported.

Overall, the report points to moreevidenceofahousingrecoverythathasbecomesustainable.New-homeconstructionhas risen28.6percentsinceMayof2012.

Construction increased in May forbothsingle-familyhomesandapart-ments and condos. And builderssoughtmorepermitstobuildsingle-familyhomes,whichmakeupnearlytwo-third of the market. The sea-sonally adjusted annual rate rose1.3percentto622,000-thehighestsinceMay 2008.That’s a sign thatconstruction will increase further inthecomingmonths.

Abetteroutlookforhousinghasmadebuilders more optimistic, leading tomore construction and jobs. TheNa-tional Association of Home Builders/WellsFargobuildersentimentindexre-leasedlastweekroseto52thismonth,upfrom44inMay.Thatwasthehigh-est reading in seven years and thelargestmonthlyincreaseinmorethanadecade.Eachhomebuiltcreatesanaverage of three jobs for a year andgenerates about $90,000 in tax rev-enue,accordingtoNAHBstatistics.

Page 12: Exchange ezone july8 2013

July 8, 2013Page 10 Contractor’s Zone• .Contractor’s Zone

Industry News

New Rules For Contractors Disposing Of Mercury ThermostatsBeginning July 1, 2013, new rulestakeeffectinCaliforniaforbothC-20(Warm-Air Heating, Ventilating andAirConditioning)andC-21(BuildingMovingDemolition)contractorswhodispose of out-of-service thermo-stats containing mercury. The newregulationrequiresthecontractortoputhis/herCSLBlicensenumberonthe thermostat container or provideitatthecollectionlocationacceptingthedevice.

The new regulations were adoptedinMaybytheCaliforniaDepartmentofToxicSubstancesControl(DTSC)asthefinalpartoftheMercuryTher-mostatCollectionActof2008.

ThoughnolongersoldinCalifornia,DTSC estimates up to 10 millionmercurythermostatsarestillinCali-forniabusinessesandhomes.

C-20 contractors and C-21 contrac-torsareseenasacriticallinkinproperdisposalofobsolete thermostats thatcontain the toxin mercury. The newDTSCrulesalsowillhelpidentifycon-tractorsnotparticipating.

Thenonprofit,industry-fundedTher-mostat Recycling Corporation op-erates about 350 collection sites inCaliforniathatacceptandsafelyre-cycle old thermostats. Contractorscan find the nearest collection site

by clicking here and filling in aZIPcode.

Under the new regulations, collec-tionsiteswillprovidethenumberofmercury thermostats received andthe contractor license numbers tomanufacturers, who in turn submitanannualreporttoDTSC.Theregu-lationsrequiremanufacturerstocol-lect and recycle more than 32,500mercury thermostats in the secondhalfof2013,or30percentofthees-timated number of the devices thatbecomewaste.Recyclinggoalswillincreaseforthenextfiveyears.

Formoreinformation,Clickhere.

Continued on next page1500 North Market Boulevard, Sacramento, CA 95834

Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing needs and develop an individualized plan of products and services that will serve your company best.

&Dealer

Your Authorizedwww.igoinland.com

PCCA member since 2004

Page 13: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Page 14: Exchange ezone july8 2013

July 8, 2013Page 12 Contractor’s Zone• .Contractor’s Zone

Industry News

Big Fan Benefits Lack of airmovement on construc-tion sites can exacerbate safetyproblems associated with heat andair quality, and makeshift solutionscancreatenewissues,suchasnoisecontrolandfirehazards.Sincework-ersaretypicallyonconstructionsitesonlytemporarily,mobilefansthatsu-pervisorscanbring toevery jobsiteare ideal for continuous air move-mentneeds.Durable,portable fanscanbeused tohelp createhealthyand productive work environmentsin any location. Inmorepermanentfacilities such as warehouses usedtostoreconstructionequipmentandvehicles, large-diameter overheadfans maximize air movement andenergyefficiency.

Heat Safety Whetherworkersaredirectlyinsun-lightor insideaswelteringbuilding,stagnant air can create health andsafety hazards.Alongwith the lackof airmovement, the layers of pro-tectiveclothingconstructionworkersoftenmustwearaddachallengetokeepingworkerscool.

AccordingtoOSHA,airtemperaturesexceeding95Fsignificantly increasetheheat loadon thebody,and tem-peratures of 100.4 F and above aredangerousforworkers.Thisincreasedheat loadcanleadtoheat-relatedill-nesses and a difficulty focusing, re-sultinginahigherpotentialforsafetyissuesinconstructionzones.

Adequate air movement is important for the productivity and safety of your crew

Besidesbeingunsafe,discomfortcanalsohaveanegative impact onpro-ductivity. Studies show that elevatedtemperaturesaffectbothphysicalandmental work. Hot working conditionsnegatively affect worker morale andquality of workmanship and can in-creaseabsenteeism,turnoverandfre-quencyofaccidentsandgrievances.

Fansengineeredtowithstandharshwork environments, such as con-structionsites,makeworkersfeelupto10Fcooler,leadingtosafetyandproductivitybenefits.

Fan Mobility Mobility allows for flexibility in anyenvironment, from open-air treat-ment plants and accompanyingwarehouses to construction sites.Employees at the City of TampaAdvanced Wastewater TreatmentPlant sweltered in the underground6,900-sq.-ft. facility. To help ensureemployee comfort and safety, plantteamleaderEddyDrovieturnedtoamobileeight-ft.-diameter fanbuilt towithstand tough environments. Us-ingacrane,thefanwasloweredintothetankandrolled frombaytobayfollowingtheworkers.“Thefactthatyoucanmovethosefansaround isaplus,”saysDrovie.“Ithinkthat’sabigpartofthereasonwhywechosethis.”

Air Quality Airquality isoftenanissueoncon-

structionsites.Dustanddirtisoftenstirredupon jobs,andconstructionmaterialsmaycontainharshchemi-calsandtoxins.Poorairqualitycancontribute to decreased focus inworkers, leading to costlymistakesand health problems. Adequate in-door air quality is primarily impor-tantintheoccupantbreathingzone,whichisdefinedastheareathreeto72 inches from the floor.Accordingto theCenter for the Built Environ-ment, temperature and air qualityaretwoofthemostimportantfactorswhenconsideringproductivity.Prop-erlysizedfanscanturntheairoverseveraltimesperhour,creatinguni-form air distribution and improvinghealthconditionsforworkers.

Employees at the EnvironmentalService Center (ESC) HouseholdHazardousWastedrop-off facility inHouston,Texas,soughtabreathoffreshairafter inhalingvapors rang-ingfromexhaustfumestochemicalsand pesticides. In order to combatthe problem, ESC facility managerRogerJones turned to fansand in-creasedairmovement.Aneight-ft.-diameter vertical fan offered bothmassive air movement and easytransportationthroughoutthefacility,ensuring dilution of the gases dis-persedintheair.

“Thesefansmakeabigdifference,”Jonessaid.“Wedealwithnotonlytheambient temperature but the odors

Page 15: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

fromallthosechemicalswehandle,andthefanshelpmovethoseodorsoutofourbreathingzone.”

Withsomanydifferentfansizes,op-tionsandfeatures,itmaybedifficulttoknowwhattypeoffanisappropri-ateforyourspaceandneeds.Lookforafanthatisdesignedbyacom-pany that understands your needs.There’snoone-size-fits-all solution,

sobeingabletoworkwithsomebodywhorecognizeswhatyou’retryingtoachieveisimportant.

Additional Benefits In addition to reducing heat-relatedtroublesandair-quality issues, fanscan also help reduce safety haz-ards in other ways. In some casesasinglehigh-qualityfancanreplaceseveralsmallerfans,reducingnoise

andtriphazardspresentedbycordsonthefloor.Somefansincludemist-ing options, which create ultra-fineatomizedmiststhathavethecoolingeffectofup to22 tonsofair condi-tioningwithoutmakingyoufeelwet.Selectinga fan that isbuilt towith-stand harsh environments reducesthechance forsafety-relatedcatas-trophesandhindrances.

Page 16: Exchange ezone july8 2013

July 8, 2013Page 14 Contractor’s Zone• .Contractor’s Zone

Page 17: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

By Shauna Krause and David KalbCapitol Services, Inc.

Contractorswanta ‘level’fieldwhenmakingbidswithcompetition.That’swhyyourlicensenumberisrequiredin advertising, signage and otherplacesaconsumercanseeit.Hope-fully, when they check it at CSLB it‘flattens’ the ambition of unlicensedcompetitors.Wealsotakea‘shortcir-cuit’indescribingtheroutetoaddingalowvoltageclass…

Q: Can we take a contract with a“C-61” licenseand then subcontractoutaportiontoa“C”class?Forin-stance,coulda“D-28”(DoorsGatesActivating devices) take a contractand,knowingthatthereissomeelec-tricalwork,subthisportiontoaprop-erlylicensed“C-10”?

A:Itshouldnotbeaproblemaslongasthesubcontractedworkisincidentalandsupplemental(i.e.essential)tothecompletionofthe“D-28”project.Tothebestofmyknowledge,thereisnothingin the law or regulations to precludeaSpecialtyContractor fromdoing (orsubcontracting)incidentalwork.

Q:Wecurrentlyhavea“C-10”Elec-trical license and we are starting anewcorporationthatwillfocusondo-inglowvoltageelectricalwork.Canmybossobtainaseparatelicenseforthenewcompanyandgetawaiverofthe“C-7”lowvoltageexamsincehehasthe“C-10”classificationalready?Because of the certification require-mentsof“C-10”electricianshewantstohaveastand-alone“C-7”license.

A: Except inextremely rare cases,theCSLBwillnotgrantawaiverofatradeexam forabrandnew license

Capitol Connection Q&A Resource For ContractorsKalb Q & A

Shauna KrauseDavid Kalb

unless the qualifying individual haspreviouslyheldtheclassification.Hecanhoweverapplytoaddthe“C-7”toyour existing licenseand request towaive theexam. Keep inmind thatthis is only a request and in orderto be approved your bosswill needto show proof of at least five yearsofworkexperiencewithin the last 7yearswherethe“C-7”(LowVoltage)was a significant component of the“C-10”project.

Once the “C-7” has been added totheexistinglicensehecanthenapplyforastand-alonelowvoltagelicenseforthenewcompany.

Q:I’mahomeownerandfoundyournameontheInternet.Iwanttohireacontractor(forasmallbathroomremod-el)whoadvertisesinourlocalnewspa-per,butcouldnot locatehisnameontheCSLBwebsite.Hesaidhewas“li-censed,bondedandinsured”andgavemeagoodpriceforthework.YoufolksappeartoknowalotaboutcontractorsandIwashopingyoumighthavesomeadvice.Ifit’snottoomuchofaprob-lem,maybeyoucouldevencheck toseeifthisguyreallyislicensed?

A: Unfortunately many unlicensed“contractors”advertisethattheymeetallthestaterequirementswheninfacttheydonothaveavalidcontractor’slicense; bonding, orWorker’s Com-pensationcoveragefortheiremploy-ees.Inyourcase,wesearchedandcouldnotlocateavalidlicense;how-ever,wedidlocatesomeonewiththatnamewhohadalicensethatexpiredtwoyearsago.Thissameindividualhasapendingjudgmentagainsthimandotherpendinglegalactions.

Ouradviceistostaywellclearofthis“contractor”andfindsomeonewhohasanactivecontractor’slicenseingoodstanding. Also,makesure ifthecontractorhasemployees,theyare covered byWorker’sCompen-sation. While this unlicensed indi-vidualmayhavegivenyoua“goodprice”, you’ll likely end up payingmuchmore in the long run. If thisguyliedtoyouabouthavingavalidlicense,bonding,etc.canyoureallytrusthimtokeephiswordregardingyourbathroomremodel?So,noval-id license, judgments pending andless than truthful is three strikes,you’reout!

Page 18: Exchange ezone july8 2013

July 8, 2013Page 16 Contractor’s Zone• .Contractor’s Zone

Classified Ads

For Sale:CommercialGeneralContractorRETIRINGsellingeverythingfromofficefurnituretohandtools, includingplantablewithdigitizerandportabledigitizer.Toomuchtolist,callifinterested.Rick916-870-9637

For Sale:StainlessSteelThermadorDoubleOvenModel#PODC302JNewInBox$5,500.00BobHilton916-508-0723

“Surplus” Sale: GHHisdoingsomeSpringcleaning!Wehaveavarietyofconstructionmaterialsandtoolsrangingfrompipefittingstocompressorsandgenerators.Stopby,seewhatwehaveandmakeusanoffer!

Date:February15,2013Time: 9:00am-3:00pmLocation:11960HeritageOakPlace,Ste.2BAuburn,California95603Questions:(530)886-3100

Seeking:SacramentocompanylookingforExperiencedGutterInstaller.Someonewithatleast2yearsexperience.Cleancut.Workingcellphone.DrugtestandbackgroundchecksrequiredFaxResumeto916-943-0699oremailirina@soldate.netSalaryDOE

For Sale: 4planbincabinets,dimensionsare33”dx33”wx7’h24cubbiesineach,$150percabinetPleasecontactChaeGaleformoreinfo.916-771-7229

For Sale:2single(2drawer)filecabinets$35each1lateral(2drawer)filecabinet$50PleasecontactChaeGaleformoreinfo.916-771-7229

Don’t get thrown out on your way home!

DVBE/UDBE Good Faith ads are often required. This newspaper is state-certified.

Legal ads: are firms seeking bids or sub bids from DVBE/DBE/MBE/WBE/SBE companies. Legal ads are priced on the length of the ad. In general, most ads will fit into our standard ad shell which is one-column by

up to 2 1/2” tall. The price for a standard sized legal ad is $35. For this price, the ad is run in all three formats from the date the ad is placed until the bid date -- unmatched coverage and distribution, all for a rediciously low price! Ads larger than 2 1/2 column inches are priced by the size. CLICK HERE to place a legal ad. Or

Email your ad to: [email protected]

Page 19: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

‘’Beltyourwife-saveherlife”,“Clickitorticket’’,and“Buckleup–it’sthelaw”,areasayingswe’veheardfrequentlyovertheyears.

SeatbeltswerefirstofferedbyU.S.automobilemanufacturersintheearlysixties.Thosepeskyoldbeltshavebeenaroundfor40yearsnowbutwestillseepeopleoperatingmotorvehiclewithoutthem.TheNationalSafetyCouncilreportsintheir1992AccidentFactseditionthat43,500motorvehicledeathstookplacein1951;3,500ofthesedeathshappenedatwork.Thecostofthesemotorvehicleaccidentswasanastronomical96.1billiondollars!Manyoftheseinjuriesanddeathscouldhavebeenpreventedifthoseinvolvedhadtakentimeto‘’buckleup”.

Studiesby theNationalHighwayTrafficAdministrationshowthatmanual lapandshoulderbeltsareeffective inpreventingfatalities,50%effectiveinpreventingmoderatetocriticalinjuries,and10%effectiveinpreventingminorinjuries.Inearly1992over40stateshadenactedmandatorysafetybeltuselaws,butstudiesshowthatonly55%ofthemotoringpublicweartheirseatbelts.

Manynewcarsandtrucksarenowequippedwithsupplementalrestraintsystems(SRS),betterknowasairbags.FortheSRStobeeffectivetheoperatorand/orthepassengermustbewearingtheirseatbelttofullybenefitfromtheairbag.

Youmaythinkofmanyreasonswhyyoudon’torcan’twearyourbelt--“they’reuncomfortable”,‘whathappensifI’mknockedunconsciousandcan’tgetout”,“hey,I’monlygoingtothestore,nothingwillhappen”,or“neverhadanac-cidentsoIdon’tneedabelt”--allofthesearejustexcusesandindicateplainstupidityoraverypoorsafetyattitude.Remember,YOUaretheONLYONEtomakethedecisionwhetheryoudoordon’tbuckleup.Onoroffthejob,startthenewyearbymakingeverytripasafeonebybucklingup,andinsistingthatallpassengersinyourvehicledothesame.Whoknows,thelifeyousavemaybeyourown!

IT’S A PROVEN FACT - SEAT BELTS SAVE LIVES - BUCKLE UP!

Buckle Up - Save A LifeCompany Name: Job Name: Date:

Special topics for your project:

Employee Safety Recommendations:

Reviewed MSDS # Subject

Meeting attended by:

Supervisor’s Signature: Date:

Weekly Safety Meeting

Page 20: Exchange ezone july8 2013

July 8, 2013Page 18 Contractor’s Zone• .Contractor’s Zone

CDOT 21

CDOT 14

CDOT 21

CDOT 21

CDOT 7

CDOT 7

CDOT 57

CDOT 43

CDOT 14

CDOT 14

CDOT 7

CDOT 7

CDOT 21

CDOT 21

CDOT 7

07/02/2013

07/03/2013

07/11/2013

07/11/2013

07/11/2013

07/11/2013

07/16/2013

07/17/2013

07/18/2013

07/18/2013

07/23/2013

07/24/2013

07/25/2013

07/25/2013

08/08/2013

0

0 0

0

0 0

3

1 0

0

0

0

0

0

0

MENDOCINO COUNTY

MENDOCINO COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

SAN BERNARDINO COUNTY SAN BERNARDINO COUNTY

SAN JOAQUIN COUNTY

SACRAMENTO COUNTY

LOS ANGELES COUNTY

RIVERSIDE COUNTY

HUMBOLDT COUNTY

NAPA COUNTY

SAN BERNARDINO COUNTY

SAN DIEGO COUNTY

ORANGE COUNTY

CalTrans

DOT 01-364324 REPLACE DRAINAGE SYS-TEMS AND INSTALL PIPELINERS AND RSP.

DOT 01-0C3604 INSTALL HIGH FRICTION SURFACE TREATMENT

DOT 07-265904 REPLACE BRIDGE RAILING.

DOT 11-404304 CONSTRUCT OUTER SEPARA-TION BARRIER, WIDEN SHOULDER, MODI-FY DRAINAGE.

DOT 08-0K3104 REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE.

DOT 08-0N5704 BRIDGE SEISMIC RETROFIT

DOT 10-0G8004 PAVEMENT REHABILITA-TION AND BRIDGE CONSTRUCTION.

DOT 03-0F2304 BRIDGE WIDENING, PCC OVERLAY AND REPLACE CONCRETE BAR-RIER.

DOT 07-278304 REHABILITATE BRIDGE.

DOT 08-491804 REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOUL-DERS

DOT 01-459704 SEISMIC RETROFIT BRIDGE COLUMNS AND ABUTMENTS, CONST CON-CRETE BARRIER.

DOT 04-2A1104 BRIDGE REMOVAL, BRIDGE REPLACEMENT AND ROADWAY WIDENING.

DOT 08-368504 CONSTRUCT COMMERCIAL VEHICLE ENFORCEMENT FACILITY (CVEF)

DOT 11-401404 REPLACE MBGR WITH CON-CRETE BARRIER AND UPGRADE CRASH CUSHIONS.

DOT 12-0C5604 WIDEN RDWY AND BRIDGE, CONST RETAINING WALLS AND NEW BY-PASS OFF-RAMP.

Page 21: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Page 22: Exchange ezone july8 2013

July 8, 2013Page 20 Contractor’s Zone• .Contractor’s Zone

Plans On FileMonday, July 08, 2013

RFP CONSTRUCTION MANAGMENT SERVICES INTERMODAL PHASE 2 SACRAMENTO VALLEYPLAN #: 25028 Bid Date: 7/8/2013 Bid Time: 4:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On # OF ADDENDA: 1 DemandPREBID: 6/18 @ 1-3PM PREBID: 401 I Street OWNER: City of Sacramento DESCR: Contact,Jose Ledesma [email protected] City of Sacramento (“City”) Public Works Department has prepared this Request for Proposal (RFP) for submission of qualifications and proposal to provide construction management services for the Intermodal Phase 2 Sacramento Valley Station (SVS-2) Project. The construction management services will include: pre-construction design and constructability reviews; construction oversight and coordination; construction administration services; quality assurance materials sampling and testing, and special inspections; and labor compliance. Quality assurance construction inspection will be provided on an as-

AVAYA TELECOMMUNICATIONS EQUIPMENTPLAN #: 88071 Bid Date: 7/8/2013Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and Planroom OWNER: County of El Dorado DESCR: Contact, Rick Blake ([email protected] is a brand name specific bid, all items must be for Avaya products, new equipment. New and Used telecommunications equipment, purchase will be made on an as requested basis during the awarded 12

WILLOW AVENUE EXPRESSWAY BARRIER FENCINGPLAN #: 105095 Bid Date: 7/8/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Fresno Online & Print On DemandOWNER: Co of Fresno Ph: 559-262-4866 DESCR: Contact, Fresno, City of - Dept Purchasing Division (559) 621-1332 Construction of sections of expressway barrier fencing as shown on the provided plan sheet in conformance with City of Fresno Standard Drawing P-74 and the Technical Conditions, including all excavation, placement of concrete, fence construction, and clean up, along with all associated and incidental work. Not included in the Contractor’s responsibilities is the construction of a concrete mow strip as shown on

RFP - MENDOCINO COUNTY SHERIFF’S OFFICE CORRECTIONAL FACILITIES SECURITY CONTROLS UPGRADE

PLAN #: 116084 Bid Date: 7/8/2013 Bid Time: 2:00 PM PLANS AT: Location: UkiahOnline and Planroom OWNER: County of Mendocino DESCR: Contact, County of Mendocino (707) 234-6050 Work consists of replacing existing security controls and upgrading to an integrated touch screen control system, IP intercom, IPCCTV and video recording. ARTERIAL STREETS REHABILITATION PROJECTPLAN #: 169093 Bid Date: 7/8/2013 Bid Time: 10:00 AM PLANS AT: Costa Mesa Online and Planroom Est Cost: $937,000.00DESCR: Irina Gurovich - 714-754-5324Bristol St-405 FWY to Anton Blvd, Sunflower Ave - Avenue of the Arts to Main St, Aton Blvd- Avenue of the Arts to Sakiota Dr. Town Center D r-Bristol St to Park Center Dr. Park Center Dr. -Town Center Dr

MORGAN HILL CITY COUNCIL CHAMBER RENOVATIN PROJECTPLAN #: 270048 Bid Date: 7/8/2013 Bid Time: 2:30 PM PLANS AT: Morgan Hill Online and PlanroomPREBID: MAND 6/21, 6/24, or 6/28 @ 9 am DESCR: Contact,Morgan Hill, City of Architect/Engineer (408) 778-6480 This project is a multi- prime project and the Scope of Work includes the following Construction packages: 1 Demolition 2 General carpentry – Framing and installation of new walls, gypsum board installation, insulation, doors and hardware, floor leveling 3 Plumbing – Fixtures, concrete saw cut, pour-back 4 Electrical – Audio/visual, telephone/data

C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts, and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors?

For rates, call Steve today at (916) 729.5432 or email him at [email protected]

Page 23: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Continued on next page

5 Signage – Interior, exterior 6 Millwork – Trim, dais 7 Flooring – Carpet and resilient flooring 8 Tile 9 HVAC – Re-ducting of existing system and new units 10 Wallboard sound attenuation, ceiling treatment, clouds, and dropped ceiling 11 Restroom partitions and accessories 12 Painting and wall covering 13 Site Work – Minor grading, concrete, and asphalt paving 14. Storefront & Glazing

Tuesday, July 09, 2013

SIDEWALK REPAIR FY 13/14-PH 1 A ST. & 11’TH ST. SIDEWALK IMPROVEMENTPLAN #: 5026 Bid Date: 7/9/2013

Bid Time: 2:00 PM PLANS AT: Location: TracyOnline and Planroom OWNER: City of Tracy DESCR: Contact, Tracy, City of - Development & Engineering (209) 831-6400 The Project is more specifically defined in the Informal Contract Documents, but generally includes the following work to be done: Installation of curb ramps, sidewalk, asphalt concrete, curb & gutter,

2013 PARKING LOT CAPE/SLURRY SEAL PROJECTPLAN #: 33022 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Roseville Online & Print On Est Cost: $1,030,000.00 # OF ADDENDA: 4Demand OWNER: City of Roseville DESCR: Contact, City of Roseville (916) 746-1300 Work consists of roadway and parking lot resurfacing at the City Corporation Yard and the Dry Creek Waste Water Treatment Plant including dig-outs and replacement of concrete curb, gutter and BIDDERS LIST:Sub Contractor: Sierra Striping, Inc./sierr 916-652-0430 916-652-9663

OAKDALE ROAD PAVEMENT REHABILITAIONPLAN #: 38027 Bid Date: 7/9/2013 Bid Time: 11:00 AM PLANS AT: Location: ModestoOnline and Planroom Est Cost: $1,388,596.00 # OF ADDENDA: 2PREBID: 6/21 @ 11AM PREBID: 1010 Tenth Street OWNER: City of Modesto, Community and Economic Development Dept. DESCR: Contact, Modesto, City of (209) 577-5256 This project will rehabilitate the pavement on Oakdale Road between Briggsmore Avenue and Floyd Avenue. Also included will be storm drainage improvements and numerous curb ramp

upgrades to current ADA standards. The road will be restriped to include bike lanes. Bid alternates include additional hot mix asphalt and additional striping.

MAINTENANCE OF CITY OWNED VACANT LOTSPLAN #: 39023 Bid Date: 7/9/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sheryl Fox - 916-808-4959Work consists of Maintenance of City Owned Vacant Lots. Contractor shall provide all labor, equipment, and materials necessary to maintain City owned vacant lots as specified in scope of work.

INTERSTATE 80 VERTICAL CLEARANCE OUTREACH AND COMMUNICATION PROGRAMPLAN #: 48019 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $99,500.00 DemandPREBID: 6/18 @ 9AM PREBID: 1900 Royal Oaks Drive DESCR: Contact, Susanna Aaltonen - 916-227-6835The Department of Cal Trans District 3 office in Marysville invites qualified firms to submit a proposal, including a fee schedule for consulting services to create and execute a strategic communications plan for a multi year construction project on interstate 80 in South Placer County for public outreach services.

BROADWAY STREETSCAPE IMPROVEMENTS FROM DIVISADERO TO TUOLUMNE

PLAN #: 49016 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Fresno Online & Print On Est Cost: $700,000.00 DemandPREBID: 6/25 @ 11am PREBID: 4017N, City Hall OWNER: City of Fresno DESCR: Contact, Fresno Purchasing Dept (559) 621-1332 Construction of intersection bulb outs which shall include clearing, grubbing and proper disposal of any obstructions, improvements or facilities lying within the limits of the improvements, as well as the installation of concrete curbs, concrete curb and gutters, sidewalk and ramps. Including detectable warning devices, modified channel through walk drain, as well as installation of new drain inlets and reinforced concrete pipe. Slurry seal of existing pavement to include all required traffic striping and pavement markers as well as signage. Relocation of existing fire hydrants, installation of new landscaping and irrigation.

Page 24: Exchange ezone july8 2013

July 8, 2013Page 22 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 09, 2013

STATE AND CHURCH STREETS VAULT SUBSTRUCTURE PROJECTPLAN #: 52000 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: UkiahOnline and Planroom PREBID: MAND 6/25 @ 10AM OWNER: City of Ukiah DESCR: Contact, City of Ukiah (707) 463-6233 Excavation and setting of new electrical vault substructure (installed by Contractor, provided by City), remove and replace two (2) concrete ADA ramp, removal of concrete sidewalk, concrete driveway and asphalt for the installation of underground electric primary conduits and secondary conduits (provided and installed by Contractor). The installation of underground electric vault substructure shall conform to City of Ukiah Electric Utility Department specifications, project drawings and City of Ukiah Public Works Department specifications. The project location is in the 100 & 200 Block of South State Street (NW & SW Corners of West

PREQUALIFICATION- INTERNAL COMPLEX PHASE 1PLAN #: 69073 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Davis Online and Planroom Est Cost: $21,500,000.00OWNER: University Of California, Davis DESCR: Contact, Vanda Rovis - [email protected] and construction for a three story classroom building, including a commons/lounge, administrative offices, outdoor courtyard, landscaping and support spaces for facility. include all design work, labor, materials, tools, equipment, shoring, testing, inspection, commissioning, and all other necessary general conditions.

EXTERIOR PAINTING @ TFCPLAN #: 97073 Bid Date: 7/9/2013

Bid Time: 4:00 PM PLANS AT: Print On DemandLocation: Tustlin Online & Print On Est Cost: $120,000.00 DemandPREBID: MAND 6/19 @ 10AM PREBID: 15405 Landsdowne Road OWNER: County of Orange DESCR: Contact, Ronald Harper- 714-245-6077The successful bidder shall be required to furnish a Performance Bond in an amount equal to 100 percent of the amount of the contract and a Payment Bond in the amount of 100 percent of the contract, said bonds to be first approved by the County Counsel and the Risk Manager of Orange

INSTALLATION OF EIGHT (8) RAIN MASTER CONTROLLERS IN VARIOUS CITY PARKSPLAN #: 114088 Bid Date: 7/9/2013 Bid Time: 1:00 PM PLANS AT: VisaliaOnline and Planroom Est Cost: $80,000.00# OF ADDENDA: 2PREBID: 6/21 @ 9AM PREBID: 247 W. Ferguson OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, City of Visalia - 559-713-4820The City of Visalia is seeking bids from qualified contractors to install upgrade irrigation controllers in various city owned parks. Bids are being sought from contractors who have a proven record of experience in providing the service required for this bid.

IRVINGTON COMMUNITY CENTER HVAC AND ROOFING REPLACEMENTPLAN #: 125090 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: FremontOnline and Planroom Est Cost: $750,000.00PREBID: MAND 6/20 @ 10am

Continued from last page

Plans On File

INFO CENTER

CONTACT

WEB SITE

ABOUT

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Page 25: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Continued on next page

Click on the blue underline to go to the Online Planroom

PREBID: 41885 Blacow OWNER: City of Fremont DESCR: Contact, Purchasing Department - 510-494-4620HVAC and roofing replacement, specifically the HVAC work consists of replacement of five rooftop HVAC units and related ducts and plumbing lines. The roofing replacement includes removal of an existing built up roofing system and installation of a new PVC single membrane mechanically attached roofing system on all roof areas. The project also includes structural supports for HVAC units and new conduit in preparation for future installation of rooftop PV panels. BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881 Bobo Construction, Inc 916-685-2285 916-714-4850

PESCADERO LOFTSPLAN #: 143062 Bid Date: 7/9/2013 Bid Time: 12:00 PM PLANS AT: Isla Vista Online and PlanroomOWNER: Ashwood Construction, Inc. Ph: 559-253-7240 FAX: 559-253-5955DESCR: Contact,Ashwood Construction (559) 253-7240 33 Residential Dwelling Units,3 story mixed-use building on a .82 ac site, 24,073 square feet, including common areas. Construction Type V-B, fully sprinkler .Wood Framed Structure with Cement Plaster and Fiber-Cement Siding w/ Single-Ply Roofing. BIDDERS LIST:Sub Contractor: Ivers Electric, Inc. 916-295-4416 530-295-0423

STORYBOOK WOODS PARKPLAN #: 145071 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Elk Grove Online & Print On Demand OWNER: City of Elk Grove DESCR: Contact, Elk Grove, City of - Public Works (916) 478-7111 The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and shall consist of the following: construction of a 1.82 acre neighborhood park, including but not limited to grading, drainage, sewer, landscaping, irrigation, electrical, resilient surfacing, picnic tables, seating tables, play equipment, bridge, shade structure and other surfacing and appurtenances. BIDDERS LIST:General Contractor: Us Matrix Co Inc 925-473-1043 925-432-7103 Olympic Land Construct 916-972-7148 916-927-5769 S W Allen Construction 916-344-2098 916-344-0307

MERCED COUNTY OFFICE OF EDUCATIONPLAN #: 155067 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Merced Co.

Online and Planroom Est Cost: $5,000,000,000.00PREBID: 6/19 @ 10AM PREBID: 2100 Cooper Ave OWNER: CT Brayton & Sons, Inc. Ph: 209-838-7388 FAX: 209-838-3960DESCR: Greg Branch- 209-838-7388Pre manufactured metal buildings into administrative offices, site specific warehousing, conference center, and associated parking and site upgrades, scope includes selective demo, concrete removal and replacement, AC paving, landscape and irrigation, building modernization includes repair/replacement of exterior metal siding, metal stud framing and all finishes, insulation, drywall, doors and hardware, glass and glazing, polished concrete, FRP ceramic tile, carpet, acoustical ceiling tiles, painting, casework, specialty items, plumbing, HVAC and electrical including low voltage such as fire, voice and data.

STOCKTON METROPOLITAN AIRPORT REHABILITATE TERMINAL APRON

PLAN #: 177002 Bid Date: 7/9/2013 Bid Time: 1:00 PM PLANS AT: Print On DemandLocation: Stockton PREBID: MAND 7/2 @ 1 pm DESCR: Contact: Stockton Metropolitan Airport (209) 468-4700.The work included in this project shall consist of the following: -Rehabilitate Terminal Apron -Additive Alternative No. 1 – Terminal Pavement and Fencing -Additive Alternative No. 2 – Terminal Apron Shoulder Reconstruction

JUVENILE JUSTICE CENTER ROOFING AND HVAC PROJECTPLAN #:192083 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: ModestoOnline and Planroom # OF ADDENDA: 2DESCR: Contact, DIEDE CONSTRUCTION (209) 369-8255 (209) 368-0600 a. Demolition of 10 roof top air handler HVAC units, b. 10 new self-contained roof top HVAC units, c. Replacing the existing HVAC controls system with a new DDC system, d .Demolition of an existing HVAC central plant system, e. Demolition of an electric boiler system, f. Replacement of approximately 35,000 SF of the Juvenile Hall roof, g. Upgrading of approximately 12,000 SF of the Probation Building roof, h. Remediation and disposal of existing, regulated hazardous building materials, BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600

Page 26: Exchange ezone july8 2013

July 8, 2013Page 24 Contractor’s Zone• .Contractor’s Zone

571-2232 Demolition, site clearing, earthwork, hot-mix asphalt paving, Portland cement concrete paving, storm drainage, irrigation, chain link fencing & gates, planting, sealants & caulking; Div-16-electrical systemBIDDERS LIST:General Contractor: Bc Construction 209-531-1252 209-531-1254

Wednesday, July 10, 2013

ROBERT GABRIEL DRIVE & GONZALES STREET STORM DRAINAGE IMPROVEMENTSPLAN #: 4019 Bid Date: 7/10/2013

Bid Time: 2:00 PM PLANS AT: Location: TracyOnline and Planroom OWNER: City of Tracy DESCR: Contact, Tracy, City of - Development & Engineering (209) 831-6400 Includes installation of catch basin, 40 SF of sidewalk replacement, eight

RFQ PROFESSIONAL ENGINEERING SERVICES SEPTAGE AND SUPERNATANT LIQUID DISPOSALPLAN #: 12014 Bid Date: 7/10/2013Bid Time: 4:00 PM PLANS AT: Butte Co. Online and Planroom # OF ADDENDA: 1OWNER: Co of Butte FAX: 530-538-7171DESCR: Contact, Public Works Department- 530-538-7681The County of Butte’s Neal Road Recycling and Waste Facility is seeking qualified engineering firms to conduct feasible study for an alternative to disposing of septage supernatant at a municipal wastewater treatment

5TH STREET, 5TH STREET VIADUCT AND RAILYARDS BOULEVARD AT SACRAMENTO RAILYARDSPLAN #: 13028 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $23,000,000.00 # OF ADDENDA: 3 PREBID: 6/6 @ 10AM (Highly Recommended) PREBID: 5’th Street Railyards Boulevard OWNER: City of Sacramento DESCR: Contact, Job Blank - 916-808-7914Includes construction of +/- 712 LF of roadway and utility improvements from H Street north to the existing 5th Street overhead bridge, including accompanying retaining walls and embankment; +/- 391 LF of elevated viaduct; +/- 725 LF of roadway and utility improvements from the 5th Street viaduct to Railyards Boulevard, including accompanying retaining

Tuesday, July 09, 2013

BUS DROP OFF AT EISENHUT ELEMENTARY SCHOOLPLAN #: 214098 Bid Date: 7/9/2013

Bid Time: 2:00 PM PLANS AT: ModestoOnline and PlanroomPREBID: MAND 6/25 @ 2Pm PREBID: 1809 Sheldon Drive OWNER: Stanislaus Union School District DESCR: Contact, Timothy P. Huff & Associates, Inc (209)

Continued from last page

Plans On File

[email protected]

www.Jensen-Masonry.com

Mark Jensen, Master Mason

• BBQ’s • Fireplaces • Brick • Rock • Etc.

JensenMasonry

916.663.3429

CCL#:804650

Page 27: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Continued on next page

walls and embankment; +/- 2,795 LF of roadway and utility improvements from Bercut Drive to 7th Street; construction of lined retention basin and design / fabrication / installation of shade structures located at two locations on the 5th Street Overhead Bridge.BIDDERS LIST:General Contractor: Shasta Constructors 530-365-3930 530-365-5465Sub Contractor: Kck Builders 415-459-8698 415-453-9250 Preston Pipelines 408-262-1418 408-262-1870Supplier: Ferguson Enterprises 916-381-6100 916-381-7445

OLD HIGHWAY 99W FROM MAXWELL TO THE GLENN COUNTY LINEPLAN #: 15029 Bid Date: 7/10/2013

Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Colusa Online & Print On # OF ADDENDA: 1 DemandOWNER: County of Colusa DESCR: Contact, Colusa, County of - Public Works (530) 458-0466 Includes minor pavement repairs, placement of asphalt concrete overlay with reinforcing fabric on top of a leveling course throughout the limits of the project, traffic control, shoulder backing and traffic markings.

CARMICHAEL WATER DISTRICT RUSTIC WOODS PIPELINE AND BOYER DRIVE WATER MAIN EXTENSION PROJECTPLAN #: 21026 Bid Date: 7/10/2013 Bid Time: 11:00 AM PLANS AT: CarmichaelOnline and Planroom PREBID: MAND 6/14 @ 10AM OWNER: Carmichael Water District DESCR: Contact, Sara Rogers - 916-933-1997Construction and testing of approximately 460 Linear feet of new 8 inch diameter water main along Boyer Dive and Sarah Court, 20 linear feet of new 5 inch diameter water main, 60 linear feet of 4 inch ductile iron pipe connections in Oak Ave and Boyer drive, 450 linear feet of 3 and 430 linear feet of 2 inch diameter schedule 80 PVC within the Rustic Woods Condominiums, installation of new services, installation of new hydrants, and other appurtenances and restoration of existing surfaces. BIDDERS LIST:Supplier: Sierra Trench Protectio 530-887-9413 530-887-9112

RFQ WASTEWATER TREATMENT PLANT SECONDARY AND TERTIARY IMPROVEMENTS PROJECTPLAN #:42015 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Davis

Online and Planroom OWNER: City of Davis DESCR: Contact, Michael Lindquist @ [email protected] Contractor will be required to design, construct, acceptance test, startup, commission, and obtain designated governmental approvals for secondary and tertiary improvements and upgrades to the City’s existing wastewater treatment plant. BIDDERS LIST:Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

DISTRICT OFFICE AUTOMATIC VERTICAL PIVOT GATES WITH REMOTE OPENERSPLAN #: 43043 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: TruckeeOnline and PlanroomOWNER: Truckee Donner Recreation & Park District DESCR: Contact,Truckee Donner Public Utility District (530) 587-3896 1.Design and build of automatic vertical pivot gates system with remote openers 2.Access controls, remotes and keypads 3.Concrete work for counterweight/pad, yokes, goosenecks and bollards4.Installation of all electrical from the building to the gate.BIDDERS LIST:General Contractor: Efficient Energy Con 530-345-5658 530-879-3034

2013 STREET OVERLAY PROJECTPLAN #: 47020 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $2,700,000.00 # OF ADDENDA: 1Demand OWNER: City of Sacramento DESCR: Contact, Greg Smith - [email protected] consists of resurfacing the following street segments: Natomas Boulevard between North Park Drive and North Bend Drive (northbound only);Northgate Boulevard between San Juan Road and Potomac Avenue; J Street between 3rd Street and 4th Street; J Street between 13th Street and 16th Street; Capitol Mall between 3rd Street and 9th Street; Power Inn Road between Fruitridge Road and Lemon Hill Avenue; Wyndham Drive between Valley Hi Drive and Bruceville Road. Resurfacing treatments include the placement of Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) overlays and Bonded Wearing Course (BWC). Other work includes: pavement planning; adjusting maintenance holes and valve boxes to grade; installing traffic signal video detection cameras; replacing existing traffic signal detector loops and related equipment which are damaged or inoperative; placing new signing and striping; and placing colored pavement surface treatment for bike lanes.

Page 28: Exchange ezone july8 2013

July 8, 2013Page 26 Contractor’s Zone• .Contractor’s Zone

Wednesday, July 10, 2013

ANHEUSER-BUSCH BREWERY TOUR CENTERPLAN #: 113078 Bid Date: 7/10/2013

Bid Time: 1:00 PM PLANS AT: Location: FairfieldOnline and PlanroomG.C.: TRICORP HEARN CONSTRUCTION, INC. Ph: (916) 779-8010 FAX: (916) 779-8011DESCR: Contact, TriCorp Hearn (916) 779-8010 Renovate an existing tasting area -retail - back of house areas for Anheuser Busch tasting facility, including interior demolition, new flooring - tile, metal stud framing - drywall, painting, finish carpentry -casework, acoustical ceilings, MEP, kitchen equipment, miscellaneous concrete

RIVER BLUFF REGIONAL PARK EMERGENCY BANK STABILIZATION PROJECTPLAN #: 120078 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Ceres Online & Print On DemandPREBID: 7/2 @ 9AM PREBID: 3761 Hatch Road OWNER: County of Stanislaus DESCR: Contact, City of Ceres (209) 538-5792 Work consists of the installation of 158 L.F of 30” Class 3 RCP Storm Drain, (1) Neoprene Check valve, Rock Slope Protection, Turf Reinforcement Mat, (1) Manhole, (1) Drop Inlet, Excavation, Slope Stabilization, Seeding, Planting, Irrigation System and associated work.

FOOTHILL HORIZONS OUTDOOR EDUCATIONPLAN #: 131074 Bid Date: 7/10/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Modesto Online & Print On DemandPREBID: MAND 7/2 @ 3PM PREBID: 21925 Lyons Blvd OWNER: Stanislaus County Office of Education DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 571-2232 Div_02-demolition; Div_03-concrete reinforcement, cast-in-place concrete; Div_05-structural steel; Div_06-rough carpentry, composite decking; Div_09-painting. YULUPA AVENUE MISSION BOULEVARD CLASS II BIKE LANESPLAN #: 135018 Bid Date: 7/10/2013

Bid Time: 2:00 PM PLANS AT: Santa Rosa Online and Planroom Est Cost: $150,000.00OWNER: City of Santa Rosa DESCR: Contact, Rob Sprinkle - 707-543-3817Traffic control, remove existing striping & pavement markings, remove tree/grind stump, install street sign, relocate street sign, PCC curb and gutter, PCC median curb, PCC sidewalk, PCC Valley Gutter, PCC Island Paving, Detectable warning Surface, thermoplastic edge line, thermoplastic bike lane line, thermoplastic channeling line, thermoplastic crosswalk, thermoplastic yield line, thermoplastic arrow, Thermoplastic words, Thermoplastic Bike Lane Symbol and bike lane arrow, detector symbol, painted white curb marking, raised pavement marker, type QBIDDERS LIST:General Contractor: Ghilotti Brothers Inc 415-454-7011 415-454-8376

RFQ ARCHITECTURAL SERVIVCS FOR FRONTIER HIGH SCHOOL CLASSROOM EXPANSIONPLAN #: 136065 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: BakersfieldOnline and PlanroomPREBID: 7/2 @ 9AM PREBID: 6401 Allen Road OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309DESCR: Contact, Kern High School District (661) 827-3122 The Kern High School District (hereinafter, “OWNER”) is issuing this “Request for Qualifications” (RFQ) and is seeking qualifications with proposals from firms interested in providing\ architectural services for the following project: Frontier High School Classroom Expansion.

2027 LANCE STREETPLAN #: 138068 Bid Date: 7/10/2013

Bid Time: 4:30 PM PLANS AT: Print On DemandLocation: Modesto Online & Print On Demand PREBID: MAND 6/25 @ 3PM OWNER: City of Modesto, Public Works Dept. DESCR: Contact,Modesto, City of (209) 577-5462 Housing Rehabilitation work includes: New sewer line, re-roof, new HVAC, Bathroom remodel, new doors and windows, framing, electrical, plumbing, and miscellaneous.

PUBLIC SAFETY BUILDING BOILER REPLACEMENTPLAN #: 146073 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Santa Rosa Online & Print On

Continued from last page

Plans On File

Page 29: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Est Cost: $159,000.00 DemandOWNER: City of Santa Rosa DESCR: Contact, Dave Vandeveer 707-543-4521Public safety building boiler replacement, No bid will be awarded to a Contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division 3 of the Business and Professions Code.

H S A BOILER PROJECTPLAN #: 159085 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Stockton Online & Print On Demand PREBID: MAND 6/20 @ 9AM PREBID: 44 N. San Joaquin Street OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-2121 furnish and install new boiler equipment at the Human Services Building and provide any new infrastructure as per specifications.

RFQ ARCHITECTURAL SERVICES FOR HIGHLAND HIGH SCHOOL CLASSROOM EXPANSIONPLAN #: 168082 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: BakersfieldOnline and PlanroomPREBID: 7/1 @ 9AM PREBID: 2900 Royal Scots Way OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309DESCR: Contact,Kern High School District (661) 827-3122 Full architectural services for the classroom expansion at Highland High School campus presently identified as “Highland High School

HIGHWAY 99 WATER MAIN PROJECTPLAN #: 186097 Bid Date: 7/10/2013 Bid Time: 2:30 PM PLANS AT: Location: GridleyOnline and Planroom Est Cost: $265,000.00 # OF ADDENDA: 2DESCR: Contact, Gridley, City of . (999) 999-9999 Construction of approximately 1,693 lineal feet of 1 0-inch diameter water main and appurtenances, and destruction of an existing well, complete. BIDDERS LIST:General Contractor: Whitehawk Construction 530-547-5944 530-547-5944 Rsc General Engineering 916-971-3216 916-452-4739 Newland Entities, Inc. 530-755-1178 530-674-0756

PSYCHIATRIC HEALTH FACILITY - REQUEST FOR STATEMENTS OF QUALIFICATIONSPLAN #: 190096 Bid Date: 7/10/2013Bid Time: 2:00 PM PLANS AT: Ceres

Online and PlanroomDESCR: Contact, DIEDE CONSTRUCTION (209) 369-8255 Later this year, Stanislaus County intends to receive sealed Bids from Bidders pre-qualified through this Request for Statements of Qualifications (“RFSOQ”) for the construction of the Psychiatric Health Facility (“Project”) in Ceres, California. The Project will consist of constructing a 16-bed Psychiatric Health Facility (PHF) by remodeling an existing County-owned building located at 1904 Richland Avenue, Ceres, California 95307. The building is currently vacant, and was most recently used as a clean and sober living facility. Remodeling of the current facility will be needed to meet the varying code requirements of licensing a PHF within the existing building. A minor remodel was performed in 1998. The existing facility will be remodeled to meet State Department of Social Services licensing requirements and California Health and Safety Code Section 1250.2. The facility is not regulated by OSHPD. The Project generally includes the following requirements for the new PHF facility: a. 16-bed in-patient rooms with restrooms, showers, and storage lockersb. Intake & Processing Rooms and Visitors Lobby c. Offices for: 1 Psychiatrist, 2 Administrative Personnel, Patient Interview Room(s), Hearing/Conference Room and 1 Exam Room d. Nurses Station(s), 1 Group Therapy Room, 1 Day Room/Dining Room with adjacent food prep and warm-up kitchen, 1 Activity Room e. Staff support components: break room with storage lockers, restroom f. Separate client shower room g. Seclusion Rooms, Quiet Room h. Storerooms for: cleaning supplies, hygiene, food, patient records, patient personal items, miscellaneous i. Secure storage room for drugs j. HVAC system replacement or renovation, potentially including HVAC roof top package unit and ductwork k. Roofing system replacement or repair l. A new fire alarm system, subject to evaluation of the existing system BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600

Continued on next page

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are

often required.This newspaper is state-certified.

Email your ad to: [email protected]

Page 30: Exchange ezone july8 2013

July 8, 2013Page 28 Contractor’s Zone• .Contractor’s Zone

Wednesday, July 10, 2013

BUILDING 650 PANCAKE FINISHESPLAN #: 201098 Bid Date: 7/10/2013 Bid Time: 10:00 AM PLANS AT: Location: MatherOnline and Planroom Est Cost: $250,000.00 # OF ADDENDA: 2 PREBID: 6/21 @ 4:30 PM DESCR: Contact, BVB Construction, Inc. Michael Corral (805) 642-8381 Upgrade finishes in primary care, to include new paint, flooring, and cove base. The work site is located at the Sacramento V.A. Hospital, 10535 hospital Way, Mather Ca., 95655, Bldg 650. Paint one prime and two finish coats in all offices, waiting rooms, and hallways, and in all areas as indicated on drawings, and in accordance with specifications. Each office / exam room will have one accent wall. Install VCT flooring in accordance with manufacturer’s recommendations. Install 6” cove base

Thursday, July 11, 2013

NEW HOUSEHOLD HAZARDOUS WASTE FACILITY AT THE AMERICAN AVENUE DISPOSAL SITEPLAN #: 1029 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: FresnoOnline and Planroom PREBID: 6/27 @ 9AM PREBID: 18950 W. American Avenue, Kerman OWNER: Co of Fresno Ph: 559-262-4866DESCR: Contact, Public Works - 559-600-4399Constructing a new 15,000 square foot household hazardous waste facility at the American avenue disposal site, the construction work shall include but is not limited to the following; Native soil excavation and compaction, placement and separation geotextile fabric, placement and compaction of aggregate base cast in place steel, reinforced concrete slabs, landings and liquid recovery basins, parking painting, pre fabricated toilet building, reverse osmosis water purification plant, booster pump, drains and pipe, selective epoxy painting of concrete surfaces, shade canopy structure, electrical main panel, telephone and low voltage alarm wiring, site plumbing to include water, sewer and drain pipe, below grade liquid recovery, chain link fencing and gates, placement and electrical grounding of owner supplied shipping storage containers.

PAITING TRAFFIC SIGNL HARDWAREPLAN #: 8017 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Print On

Continued from last page

Plans On FileDemand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sacramento, city of (916) 808-2266 Painting of traffic signal heads, pedestrian signal heads, and related hardware located on traffic signal and pedestrian signal poles throughout the City of Sacramento.

MATHER MAINBASE ELEVATED TANK RECOATING PROJECTPLAN #: 9056 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $600,000.00# OF ADDENDA: 1 PREBID: MAND 6/25 @ 2PM OWNER: County of Sacramento DESCR: Contact, Municipal Services (x 5) (916) 874-6544 Perform coating and minor repair of an elevated treated water storage tank, including surface preparation of exterior and interior surfaces of the elevated tank, application of exterior / interior coating systems and application of two painted tank logos.

WATSONVILLE MUNICIPLE AIRPORT RECONSTRUCTION OF TAXIWAY C AND GENERALPLAN #: 11025 Bid Date: 7/11/2013 Bid Time: 11:00 AM PLANS AT: WatsonvilleOnline and Planroom Est Cost: $735,000.00PREBID: 6/26 @ 11am PREBID: 100 Aviation Way OWNER: City of Watsonville DESCR: Contact, Rayvon Williams-- 831-728-7717Reconstruction of Taxiway C(35 ft x1,350 ft) and reconstruction of General Aviation Apron Phase 1 (5,850 sq yards) BIDDERS LIST:General Contractor: Duran & Venables 408-934-7300 408-934-7310

CONSTRUCTION ON COUNTY ROADS VARIOUS LOCATIONS SEAL-COAT SURFACING

PLAN #: 18033 Bid Date: 7/11/2013 Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Colusa Online & Print On Demand OWNER: County of Colusa DESCR: Contact,County of Colusa Department of Public Works Mobilization, signs and traffic control, seal coat, fog seal, traffic markings, County roads various locations seal coat surfacing.

Page 31: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Bid Time: 12:00 PM PLANS AT: SacramentoOnline and PlanroomPREBID: 6/18 @ 8AM or 6/25 @ 8AM PREBID: 10951 White Rock Road, Room 103 OWNER: County of Sacramento DESCR: Contact, Dennis Fong - 916-876-6313Clean closure of White Rock Dump 2 and consolidation of burn dump debris and contaminated soil at the White Rock dump 1. Site preparation, earthwork, excavation and transport of burn debris from WRD 2 to WRD1. installation of perimeter fence along White Rock Road and installation of temporary fencing as necessary. BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 Gabe Mendez 916-663-3372 916-663-1478Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925

2013 WATER PROJECTPLAN #: 73071 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: WilliamsOnline and Planroom Est Cost: $2,800,000.00PREBID: 6/28 @ 10AM OWNER: City of Williams DESCR: Contact, Project Manager PACE Engineering (530) 244-0202 Work consists of theater drive pump station, 1.0 million gallon welded steel tank, approximately 1,400 feet of 16” water main, Well 9 manganese filtration system, Supervisory Control and Data Acquisition system improvements at Wells 6, and 10.BIDDERS LIST:General Contractor: R & R Horn, Inc. 530-342-8655 530-892-1324 Argonaut Constructors 707-542-4862 707-542-4897Supplier: Sierra Trench Protection 530-887-9413 530-887-9112

DOLLAR HILL II WATER SERVICE REPLACEMENT PROJECTPLAN #: 82079 Bid Date: 7/11/2013 Bid Time: 10:00 AM PLANS AT: Tahoe CityOnline and Planroom Est Cost: $125,000.00PREBID: MAND 6/27 @ 1pm PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact, Tahoe City, City of - Public Utility District (530) 583-3796 Construct +/- 1,813 LF of 2” water service pipe and associated

LEASE AND MAINTENANCE OF MULTI-FUNCTION PRINTERS AND MAINTENANCE OF WIDE FORMAT AND LASER PRINTERSPLAN #: 20012 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Elk GroveOnline and Planroom OWNER: City of Elk Grove DESCR: Contact, Purchasing Manager - [email protected] purpose of this contract is to secure and establish a contract to lease Multi function printers, including full services maintenance as defined, all supplies and consumables such as toner, drums, image belts, fusers, developer, staples, user replaceable component.

RFP TRANSIT TECHNOLOGY SOLUTIONPLAN #: 22019 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and PlanroomOWNER: Co of Nevada Ph: 530-265-1403 DESCR: Contact, Pamela Mowry - 530-265-1692Ability to provide reports on all functions listed, a vehicle locator, including latitude, longitude, time and odometer, vehicle maintenance, ability to provide reports on activities such as mileage, bus stop boarding, fare data, driver information and productivity.

KIEFER LANDFILL MULTI- PURPOSE AREA ASPHALT REHABILITATIONPLAN #: 30026 Bid Date: 7/11/2013 Bid Time: 2:30 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $417,118.00PREBID:6/19 @ 10AM PREBID: 12701 Kiefer Boulevard OWNER: County of Sacramento DESCR: Contact, Michael Anderson ([email protected])Apply an asphalt concrete overlay with a thickness of 8” to extend the service life by 10 years, including cold milling 3” of the existing asphalt and using Caltrans hot mix asphalt Type C for the overlay.

RFP ANTELOPE ROAD SAFE ROUTES TO SCHOOLPLAN #: 34019 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Antelope Online and PlanroomOWNER: City of Citrus Heights DESCR: Contact, Citrus Heights, City of - Eng/Gen Services/Planning (916) 727-4770 The City of Citrus Heights General Services Department (City) invites your proposal to assist us in preparing for the construction of a Safe Routes to School (SR2S) sidewalk infill project along the north side of Antelope Road between Auburn Boulevard and Interstate 80. This project is funded through a Safe Routes to School grant from the State of California

WHITE ROCK DUMP CLOSURE DUMP-1 AND DUMP-2PLAN #:37020 Bid Date: 7/11/2013 Continued on next page

Page 32: Exchange ezone july8 2013

July 8, 2013Page 30 Contractor’s Zone• .Contractor’s Zone

Thursday, July 11, 2013

CITY OF STOCKTON IT DEPARTMENT RELOCATION PROJECTPLAN #: 87079 Bid Date: 7/11/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Stockton Online & Print On Est Cost: $1,800,000.00 DemandPREBID: 6/13 @ 10am DESCR: Contact, Stockton, City of (209) 937-8088 Perform tenant improvements, including but not limited to architectural, mechanical, electrical, and plumbing components as described in the Plans and Specifications to accommodate the relocation of the City of Stockton’s Information Technology Division.BIDDERS LIST:General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 Hometown 916-991-2486 916-991-2881 Younger General Contract 916-631-8000 916-631-8293 Younger General Contrac 916-631-8000 916-631-8293 Seward L. Schreder 530-229-0001 530-229-0070 Bobo Construction, Inc. 916-685-2285 916-714-4850 S W Allen Construction 916-344-2098 916-344-0307 Diede Construction 209-369-8255 209-368-0600Sub Contractor: Gehvac Company 209-204-0100 209-566-9995 National Electric, Inc. 510-475-9400 510-475-9411

ASPHALT CONCRETE OVERLAY PROJECTPLAN #: 89077 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $3,065,000.00PREBID: 6/26 @ 10AM PREBID: 9630 Conservation WyOWNER: County of Sacramento DESCR: Contact, Purchasing Department - 916-875-2700All labor, materials and equipment associated with placing rubberized asphalt concrete pavement, grinding the pavement to accommodate the overlay, adjusting manholes to grade, installing new sidewalk accessibility ramps, replacing detector loops, placing pavement striping, BIDDERS LIST:General Contractor: Teichert 916-645-4840 916-645-4801

CALABAZAS PARK COURTS LIGHTING AND IMPROVEMENTS PROJECTPLAN #: 92081 Bid Date: 7/11/2013

Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: San Jose Online & Print On Demand OWNER: City of San Jose DESCR: Contact,San Jose, City Of (408) 535-8300 Construction,Tennis/Sports Court, Lighting Services for Parks, Athletic Fields, Parking Lots, etc. Park Area Construction/Renovation Demolition, Concrete reinforcing, site furnishings, earthwork, exterior improvements.

INMAN AVENUE RECONSTRUCTIONPLAN #: 96093 Bid Date: 7/11/2013Bid Time: 1:30 PM PLANS AT: San Joaquin Online and PlanroomOWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 Reconstructing approximately 0.36 mile of existing local road with asphalt concrete, aggregate base over soil stabilization fabric, removing and replacing portions of curb, gutter and sidewalk.

JACK TONE ROAD BRIDGE NO. 29C-163 SCOUR MITIGATION AND PILE REPAIRPLAN #: 98073 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: San Joaquin Online and Planroom Est Cost: $200,000.00OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3043 The work, in general, consists of placing rock slope protection around the piles and southern abutment of the Jack Tone Road Bridge across Mormon Slough. This project also includes, but not limited to: channel excavation,

CHRISTINA AVENUE AND DE OVAN AVENUE RESURFACINGPLAN #: 99078 Bid Date: 7/11/2013Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On Est Cost: $200,000.00 DemandOWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3043 The work, in general, consists of removing, resurfacing, and repairing approximately 1.32 miles of existing urban roadway with asphalt concrete, and other items or details that are required by the Plans, Standard Specifications or these or these special provisions shall be performed, placed, constructed or installed.

CHIPPEWA SOUTH CSA PAVEMENT REHABILITATIONPLAN #: 109089 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Lake County

Continued from last page

Plans On File

Page 33: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Online and Planroom Est Cost: $615,000.00PREBID: 6/27 @ 10AM PREBID: 9192 Chippewa Trail, KelseyvilleOWNER: County of Lake Ph: 707-263-2341 DESCR: Contact, County of Lake (707) 263-2341 Work consists of the rehabilitation of approx. 410,900sf of County maintained roads located in Lake County. Work includes traffic control, signage, adjusting utilities to grade, in-place pulverization and reconstruction of existing asphal surfaces and 1.5” HMA overlay.

WOODBRIDGE STREETS IMPROVEMENTS, PHASE IIPLAN #: 128075 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On Demand PREBID: 7/2 @ 1:30 PM PREBID: 1810 East Hazelton Ave OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 The work, in general, consists of constructing curb, gutter, sidewalk, installing new water line, reconstructing roadway, installing drainage features, and performing various work as required by the plans, specifications, and these Special Provisions.

WEST COUNTRY CLUB RECONSTRUCTION, PHASE 6PLAN #: 137072 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On DemandOWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 Reconstructing 0.61 mile of urban streets with asphalt concrete, aggregate base over soil stabilization fabric, replacing portions of curb, gutter, and sidewalk.

DOLLAR HILL II WATER SERVICE REPLACEMENT PROJECTPLAN #: 82079 Bid Date: 7/11/2013 Bid Time: 10:00 AM PLANS AT: Tahoe CityOnline and Planroom Est Cost: $125,000.00PREBID: MAND 6/27 @ 1pm PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact, Tahoe City, City of - Public Utility District (530) 583-3796 Construct +/- 1,813 LF of 2” water service pipe and associated

EIGHT MILE ROAD BRIDGE AND BACON ISLAND ROAD BRIDGEPLAN #: 142059 Bid Date: 7/11/2013

Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On Demand PREBID: 7/2 @ 1:30PM PREBID: 1810 East Hazelton Ave OWNER: County of San Joaquin DESCR: Contact,San Joaquin, County of (209) 468-3043 The work, in general, consists of excavating the existing asphalt concrete approaches and placing precast reinforced concrete slabs to mitigate approach settlement

SR-GAP CLOSUREPLAN #: 157075 Bid Date: 7/11/2013

Bid Time: 11:00 AM PLANS AT: Print On DemandLocation: Bakersfield Online & Print On Est Cost: $15,000,000.00 DemandOWNER: City Of Bakersfield DESCR: Contact, Teichert Construction - 559-813-3100Petroleum, sand and gravel, asphalt supplier, concrete and cement supplier, pipe supplier, drainage system, storm water, traffic stripes, markings and traffic control, adjust roadway items, groove and grind pavement, speed monitoring station, water truck, asphalt oil tankers, street sweeping truck broker and other items and related work not

DAVIS ROAD AND WAGNER HEIGHTS ROAD TRAFFIC SIGNAL INSTALLATION PROJECTPLAN #: 161066 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Stockton Online and Planroom Est Cost: $350,000.00PREBID: MAND 6/20 @ 10am PREBID: 425 N. El Dorado Street OWNER: City of Stockton DESCR: Contact, Dennis Yep - 209-937-8825Furnish and installation, termination of fiber optic cables, conduits and accessories in Weston Ranch area and at San Joaquin Regional Transit District office.

RFQ- CMAR-COOPER COURT RESIDENCE HALLPLAN #: 166078 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: RenoOnline and PlanroomOWNER: Nevada System of Higher Ed DESCR: Contact, Melanie Lever - 775-784-6503The intent of this project is to provide pre construction services that ultimately leads to the delivery of a guaranteed maximum price for the demolition of existing multiple buildings and the follow up construction of

Continued on next page

Click on the plan title to go directly to that plan on the Online Planroom

Page 34: Exchange ezone july8 2013

July 8, 2013Page 32 Contractor’s Zone• .Contractor’s Zone

Friday, July 12, 2013

RFQ FEASIBILITY STUDY FOR BRUNSWICK ROAD/LOMA RICA DRIVE INTERSECTIONPLAN #: 27027 Bid Date: 7/12/2013Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom OWNER: County of Nevada Ph: 530-265-1403DESCR: Contact, Nevada, County of (530) 265-1238 The Nevada County Purchasing Agent, on behalf of the Department of Public Works, hereinafter collectively referred to as “County,” is requesting Statements of Qualification (“SOQ”) from traffic and/or civil engineering firms interested in providing a Feasibility Study for Brunswick Road / Loma Rica Drive Intersection Improvements.

STANFORD RANCH ROAD RECONSTRUCTION & INTERSECTION MODIFICATIONSPLAN #: 50008 Bid Date: 7/12/2013 Bid Time: 3:00 PM PLANS AT: RocklinOnline and Planroom PREBID: MAND 7/9 @ 10am PREBID: 4081 Alvis Ct OWNER: City of Rocklin DESCR: Contact, Purchasing Department - 916-625-5119Reconstructing paved roadway, constructing new sidewalks, pedestrian ramps, curbs and decorative concrete, modify existing and installing new traffic signals, applying slurry seal, applying pavement striping and related improvements.

ASPHALT AND EMULSION, DELIVERED AND SPREAD FOR THE COUNTY’S CHIP SEAL PROGRAM

PLAN #: 156092 Bid Date: 7/12/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Santa Clara Online & Print On Demand OWNER: City of Santa Clara DESCR: Contact, Loretta Smith - 408-491-7488The County of Santa Clara (hereinafter, “County”) is requesting bids from qualified suppliers to provide asphalt and emulsion products delivered and spread by the supplier as required by the County Roads Department for the County’s Chip Seal program.

RFQ - ENERGY EFFICIENCY MEASURES AT COUNTY GOVERNMENT CENTER PROJECTPLAN #: 167075 Bid Date: 7/12/2013

Bid Time: 5:00 PM PLANS AT: Print On DemandLocation: Santa Clara Online & Print On

Demand OWNER: County of Santa Clara DESCR: Contact,Santa Clara, County of (408) 993-4600 The County wishes to prequalify Design/Build Entities (DBEs) with the demonstrated experience, competency, and capacity to design and install the comprehensive energy efficiency measures listed in the Attachment 2 Scope of Work and Exhibit 2 Investment Grade Audit Report at its County Government Center (Project), and their Qualifying Team Members with sufficient experience and training to competently manage and complete the design and installation of the Project. The County is conducting a two-step selection process.

RENOVATE DIAGNOSTIC, IMAGING, CARDIOLOGY, AND ENDOSCOPY (RDICE)PLAN #: 187007 Bid Date: 7/12/2013Bid Time: 1:00 PM PLANS AT: Washose Online and Planroom Est Cost: $100,000.00PREBID: 7/2 @ 2PM PREBID: 975 Kirman Avenue DESCR: Contact, Kevcon Enterprises, Inc. (760) 432-0307 In general, work consists of but not limited to remodel and expand Diagnostic, Imaging, Cardiology & Endoscopy (DICE) Services. Site work includes: 28,000sf renovation different floors of Bldg 1D and approximately 2,000 sf of new square footage on the 1st and 2nd floors.

REPLACE HEATING HOT WATER EXCHANGERSPLAN #: 197002 Bid Date: 7/12/2013Bid Time: 1:00 PM PLANS AT: Palo Alto Online and Planroom Est Cost: $250,000.00PREBID: 7/3 @ 10AM PREBID: 3801 Miranda Avenue DESCR: Contact, Estimating (760) 432-0307 Replace two (2) existing HVAC heating hot water exchangers with two (2) new heating hot water exchangers and auxiliary components serving HVAC reheat coils in Building 100 at VAPAHCS campus.

RFP LANDSCAPE MAINTENANCE SERVICESPLAN #: 209010 Bid Date: 7/12/2013 Bid Time: 2:00 PM PLANS AT: Marin Co. Online and Planroom OWNER: County of Marin DESCR: Contact, Ilya Filmus (415) 491-2525 The Housing Authority of the County of Marin (MHA) is requesting proposals from qualified contractors to provide landscape maintenance services at its six public housing properties and central office. The initial term of the contract is for two years with options to extend by one-year terms for up to a total of five years.

Continued from last page

Plans On File

Page 35: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

MONTGOMERY ESTATES AREA 2 EROSION CONTROL PROJECT

PLAN #: 254070 Bid Date: 7/12/2013 Bid Time: 2:00 PM PLANS AT: El Dorado Co. Online and Planroom Est Cost: $450,000.00DESCR: Contact,Daniel Kikkert (530) 573-7900 Construction of erosion control improvements including culverts, rock-lined channels, blanket-lined channels, curb and gutter, drainage inlets, sediment traps, basins, and slope stabilization.

Monday, July 15, 2013

COOPER AVE. STORM DRAIN LINEPLAN #: 31022 Bid Date: 7/15/2013

Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Turlock Online & Print On Est Cost: $564,000.00 DemandOWNER: City of Turlock DESCR: Contact,Turlock, City of - Dev. Ser. Dept/Engineering (209) 668-5599 work consists, in general of: demolition, excavation, trenching, pipe placement, manholes, catch basins, paving and furnishing all necessary labor, materials, tools, equipment and any incidentals needed to perform

VEHICLE GLASS REPLACEMENT SERVICESPLAN #: 94072 Bid Date: 7/15/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Stockton Online & Print On Demand OWNER: County of San Joaquin DESCR: Contact,San Joaquin, County of - Purchasing (209) 468-2074 Provide glass replacement services on heavy and light equipment for San Joaquin County. Repair or replace glass in the field, travel to designated locations within the san Joaquin Co. and replace or repair vehicle glass for various light and heavy equipment.

ASPEN ROAD PAVING PROJECTPLAN #: 118083 Bid Date: 7/15/2013 Bid Time: 4:30 PM PLANS AT: Mono Co. Online and Planroom PREBID: 6/25 @ 11am PREBID: 74 North School Street OWNER: County of Mono FAX: 760-932-5441DESCR: Contact, Purchasing Department - 760-932-5440Mono County Department of Public Works calls fo bids from qualified General Engineers or Earthwork and Paving contractors for the Aspen Road Paving Project. Re paving of Aspen Road.

PROVIDE AGGREGATE BASE FOR COUNTY OF ORANGE LANDFILL SITESPLAN #: 151071 Bid Date: 7/15/2013

Bid Time: 4:15 PM PLANS AT: Orange Co. Online and Planroom OWNER: County of Orange DESCR: Contact, County of Orange - 714-356-2278The County of Orange, OC Waste & Recycling, (hereinafter referred to as “County”) is requesting competitive sealed bids from qualified firms (hereinafter referred to as “Bidder”) to establish an annual contract to provideAggregate Base for County of Orange Landfill Sites, renewable annually for two additional one year periods.The awarded contract, (hereinafter referred to as “Contract”) will be a firm fixed price Contract between the County and awarded Bidder (hereinafter referred to as “Contractor”) in

RFQ-UCLA UNIVERSITY EXTENSION SEISMIC CORRECTIONPLAN #: 154073 Bid Date: 7/15/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Los Angeles Online & Print On DemandDESCR: Contact, Liliana Martinez - 310-206-3128Seismic improvements of the existing 95,065 gross square foot building and code triggered upgrades to meet the California Building code and the Americans with Disability act. Pre design evaluations of possible facility improvements for UCLA extension programs, which may be incorporated into seismic project scope or considered for a subsequent

PROVIDE DOOR CONTRACTOR SERVICES AS REQUIRED BY FACILITIES MIANTENANCEPLAN #: 207099 Bid Date: 7/15/2013 Bid Time: 3:00 PM PLANS AT: Santa MonicaOnline and Planroom PREBID: 7/2 @ 9:30AM OWNER: City of Santa Monica DESCR: Contact,Mark Cuneo [email protected] door contractor services as required by facilities maintenance Division. Furnish and deliver materials and labor for door contractor services per the attached terms, specifications and conditions.

PROVIDE POOL MAINTENANCE AND REPAIR SERVICES AT THREE CITY OF SANTA MONICA FACILITIES AS REQUIRED BY FACILITIESPLAN #: 208017 Bid Date: 7/15/2013 Bid Time: 3:00 PM PLANS AT: Santa MonicaOnline and Planroom PREBID: 7/3 @ 9:30AM OWNER: City of Santa Monica DESCR: Contact, Purchasing Department - Mark Cuneo - [email protected] pool maintenance and repair services at three city of Santa Monica facilities as required by facilities maintenance.

Continued on next page

Page 36: Exchange ezone july8 2013

July 8, 2013Page 34 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 16, 2013

2013 STREET REJUVENATION PROJECTPLAN #: 6036 Bid Date: 7/16/2013

Bid Time: 3:00 PM PLANS AT: Napa Online and Planroom Est Cost: $190,500.00OWNER: City of Napa DESCR: Contact, Mike Socorro - 707-257-9305Control of work, control of materials, traffic control, mobilization, water pollution control, rejuvenating seal.

HISTORIC FOLSOM STATION LIGHTING, LANDSCAPING AND ENHANCEMENTS PROJECT

PLAN #: 16031 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Folsom Online & Print On Demand OWNER: City of Folsom DESCR: Contact, Dave Nugen 916-355-7247Mobilization, ground plane planting, trees, shrub. soil analysis, hardwood mulch, root barrier, native planting, 1 year landscape maintenance, trash receptacle, tree guard, bicycle rack, removable handrail, irrigation system, irrigation controller, copper wire, photo cell, Pioneer lighting and power, wall mount weather proof, sound system, furnish and install stage

BROOKS SWIM CENTER RENOVATIONPLAN #: 23028 Bid Date: 7/16/2013

Bid Time: 2:00 PM PLANS AT: Woodland Online and Planroom Est Cost: $770,000.00PREBID: Call Clara Olmedo to view site OWNER: City of Woodland DESCR: Contact ,Clara Olmedo ([email protected]) (530) 661-5952 Renovate the pool, including repairs of structural cracks, removal / replacement of plaster, abandonment of observation chamber, replacement of edge coping, deck replacement, replacement of electrical conduits, new starting blocks,

RFQ-STORM DRAINAGE RATE IMPLEMENTATION ASSISTANCE

PLAN #: 41021 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Demand OWNER: City of Sacramento

DESCR: Contact, Wally Cole - 916-808-6203The City of Sacramento Department of Utilities (DOU) is in the process of analyzing its Storm Drainage rate to determine whether or not a revised rate structure should be proposed. Proposition 218 requires voter approval for any storm drainage rate increase.This Request for Qualifications (RFQ) is being issued to request a Statement of Qualifications (SOQ) from firms interested in providing services to the City of Sacramento (City) to assist in the process of implementing any

STOCK RANCH NATURE PRESERVE RE -BIDPLAN #: 66091 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Citrus Heights Online & Print On DemandPREBID: MAND 6/19 @ 10am PREBID: Trellis Hall DESCR: Contact, Citrus Heights, City of - Eng/Gen Services/Planning (916) 727-4770 The work to be performed consists, in general, of building The Stock Ranch Nature Preserve, which is a Nature Education Facility consisting of interactive exhibits, identification and educational signage, demonstration garden, oak restoration area, and outdoor classroom area; and all other work as shown on the contract documents

COVERED WALKWAY EXTENSION AT MARY LOU DIETERICH ELEMENTARY SCHOOLPLAN #: 69073 Bid Date: 7/16/2013 Bid Time: 3:00 PM PLANS AT: ModestoOnline and Planroom PREBID: MAND 7/9 @3pm PREBID: 2412 Warm Springs Drive OWNER: County of Stanislaus DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 571-2232 Covered Walkway Extension At Mary Lou Dieterich Elementary, Cutting and patching, fitting or patching that may be required to complete the work. clean up, communications, indemnification, BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

REROOF POLICE DEPARTMENT HEADQUARTERSPLAN #: 85064 Bid Date: 7/16/2013 Bid Time: 3:00 PM PLANS AT: FresnoOnline and Planroom Est Cost: $220,000.00OWNER: City of Fresno

Continued from last page

Plans On File

Page 37: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

DESCR: Contact, Mark Johnson - 559-621-1163Removal of existing roofing materials, related finishing elements, asbestos containing asphaltic felts and specific mechanical equipment, installation of two new loose laid and mechanically attached 60 mil PVC thermoplastic membrane roofing system, over layer of 3.0 loose laid, isocyanurate roof insulation and 1/2 gypsum cover board and related components. Roof systems shall include air vents as specified by primary roofing materials manufacturer install replacement roof access

FRESNO STREET BIKE LANES - A STREET TO C

PLAN #: 100088 Bid Date: 7/16/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Fresno Online & Print On Demand OWNER: City of Fresno DESCR: Contact, Purchasing Department - 559-621-5600Grinding off thermoplastic crosswalk striping, the placing of type II slurry seal and application of temporary traffic control markers to delineate traffic, bike lanes and crosswalks.

UNIVERSITY HOUSING WROUGHT IRON FENCE

PLAN #: 103092 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Carson Online & Print On Demand PREBID: MAND 6/25 @ 10AM DESCR: Contact, Adelbert baylis - 310-243-3799Contractor shall provide all labor and limited materials, tools, equipment, rigging, transportation, etc. necessary to strip and repaintUniversity Housing exterior wrought iron fence.

UNIVERSITY HOUSING WROUGHT IRON FENCEPLAN #: 103092 Bid Date: 7/16/2013

Bid Time: 2:00 PM PLANS AT: Carson Online and Planroom PREBID: MAND 6/25 @ 10AM OWNER: State of CA DESCR: Contact, Adelbert baylis - 310-243-3799Contractor shall provide all labor and limited materials, tools, equipment, rigging, transportation, etc. necessary to strip and repaintUniversity Housing exterior wrought iron fence.

RFQ NACIMIENTO WATER TREATMENT PLANTPLAN #: 112089 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Paso De Online and PlanroomPREBID: 6/26 @ 2PM PREBID: 1600 Ramada Drive, Paso Robles

OWNER: City of El Paso de Robles DESCR: Contact, City of Paso Robles Public Works Dept. (805) 237-3861The City wishes to construct a water treatment plant (WTP) to treat surface water received from Lake Nacimiento, utilizing this additional water source to increase supply reliability, particularly during the summer months. The treatment plant will be located on an 18-acre City-owned parcel within the City limits. Five City drinking water wells and the NWP pipeline flow control and metering structure are currently located on the parcel. The WTP is to provide a daily treatment capacity of approximately 2.4 MGD of potable BIDDERS LIST:General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435

LEVEE SEEPAGE REPAIR PROJECT SLURRY CUTOFF WALL SAN JOAQUIN, RIVER MILE 42.3 RIGHT BANK AT STATION 118+00 TO STATION 134+93PLAN #: 115082 Bid Date: 7/16/2013Bid Time: 2:00 PM PLANS AT: San Joaquin Online and Planroom PREBID: 7/8 @ 10Am OWNER: County of San Joaquin DESCR: Contact, Purchasing Department - 209-946-0268Clearing and grubbing, tree removal and disposal, removal of pipes and concrete standpipes, remove existing power pole, excavate levee crown, install soil bentonite slurry cutoff wall to a tip elevation of minus 23, placement and removal of 12,400 cu yd of temporary cap, settlement monitoring, install tracer wire and boxes, furnish and place import crown fill material and furnish aggregate base materials.

REPAIR CONCRETE WALKWAYS @ OCFCPLAN #: 170003 Bid Date: 7/16/2013

Bid Time: 4:00 PM PLANS AT: Print On DemandLocation: Orange Co. Online & Print On Est Cost: $80,000.00 DemandPREBID: MAND 7/2 @ 10AM PREBID: 401 The City Drive OWNER: County of Orange DESCR: Contact, Ronald Harper - 714-245-6077Provide and install articulating concrete walkway joints as indicated at new/replacement sections of concrete walkways as indicated, The work shall consist of grinding existing concrete walkway joints, removal of concrete walkway sections including root removal and paving base restoration, and do other work in accordance with these specifications.

Continued on next page

Page 38: Exchange ezone july8 2013

July 8, 2013Page 36 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 16, 2013

RFQ WATER TREATMENT PLANTPLAN #: 171002 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: El Paso De Online and Planroom PREBID: 6/26 @ 2PM OWNER: City of El Paso de Robles DESCR: Contact, Christopher Alakel- [email protected] The City of El Paso de Robles invites general contractors to apply for pre qualification in connection with the City’s upcoming Water Treatment Plant Project.

Wednesday, July 17, 2013

WHITE SLOUGH WATER POLLUTION CONTROL FACILITY DIGESTER PAINTING PROJECTPLAN #: 7029 Bid Date: 7/17/2013 Bid Time: 11:00 AM PLANS AT: Print OnDemand Location: Lodi Online & Print On DemandPREBID: MAND 7/2 @ 10AM PREBID: White Slough WPCF OWNER: City of Lodi DESCR: Control, City of Lodi (209) 333-6740 The work consists of preparing and coating the exterior roofing and piping components associated with Anaerobic Digesters No. 1, 2 and 3 at the White Slough Water Pollution Control Facility (WPCF).

AUBURN AREA RECREATION & PARK DISTRICT (530) 885-0611PLAN #: 75070 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: Auburn Online and PlanroomPREBID: MAND 6/27 @ 10AM PREBID: 1601 Auburn Ravine Road OWNER: Auburn Area Recreation & Park District Ph: 530-885-0611 DESCR: Contact, Pamela Vann (x 102) (530) 885-0611 Includes renovation of existing ADA parking surfaces and hardscape at the existing restrooms, new retaining walls and stairs and renovation of existing paving and pond overflow at existing pond area.BIDDERS LIST:General Contractor: Pbm Construction Inc. 916-315-2614 916-315-2619

POWERLINE ROAD STORM DRAINPLAN #: 10029 Bid Date: 7/17/2013

Bid Time: 10:00 AM PLANS AT: OlivehurstOnline and Planroom Est Cost: $114,000.00OWNER: County of Yuba DESCR: Contact, Public Works - 530-749-5420Placing and/or replacing storm drain culverts on Powerline Road from North of 10’th Ave to North of 9’th Ave in Olivehurst, CA.

CHAIN LINK FENCE INSTALLATION AT THE MAXWELL TRANSFER STATION

PLAN #: 19034 Bid Date: 7/17/2013 Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Colusa Online & Print On Demand OWNER: County of Colusa DESCR: Contact, County of Colusa (530) 458-0466 Work consists of providing site preparation, the placement of line posts, gate posts and chain link fabric, mobilization, clearing and grubbing, 8’ chain link fence, 20 foot swing gate.

LAW ENFORCEMENT DUTY AND SAFETY GEAR

PLAN #: 57009 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and PlanroomOWNER: County of El Dorado DESCR: Contact, Purchasing District (530) 622-4513. Miscellaneous law enforcement accessories for various departments throughout El Dorado County on an as requested basis.

ASHFORD PARK PAVING RENOVATION PROJECTPLAN #: 75070 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: Auburn Online and PlanroomPREBID: MAND 6/27 @ 10AM PREBID: 1601 Auburn Ravine Road OWNER: Auburn Area Recreation & Park District Ph: 530-885-0611 DESCR: Contact, Pamela Vann (x 102) (530) 885-0611 Includes renovation of existing ADA parking surfaces and hardscape at the existing restrooms, new retaining walls and stairs and renovation of existing paving and pond overflow at existing pond area.BIDDERS LIST:General Contractor: Pbm Construction Inc. 916-315-2614 916-315-2619

Continued from last page

Plans On File

Page 39: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

FRANK RAINES OHV PARK WATER FILTRATION AND DISTRIBUTION SYSTEM IMPROVEMENTSPLAN #: 129072 Bid Date: 7/17/2013 Bid Time: 2:00 PM PLANS AT: ModestoOnline and Planroom Est Cost: $750,000.00OWNER: County of Stanislaus DESCR: Contact,Stanislaus, County of (209) 525-4130 Work consists of an upgrade to the water distribution system for portable and non-portable water supply for Frank Raines OHV Park Water Filtration and Distribution System Improvements.BIDDERS LIST:General Contractor: Tricon Construction 916-638-9866 916-638-9867

SALIDA SIDEWALK REPAIR PROJECTPLAN #: 133074 Bid Date: 7/17/2013 Bid Time: 2:30 PM PLANS AT: ModestoOnline and Planroom Est Cost: $165,000.00OWNER: County of Stanislaus DESCR: Contact,County of Stanislaus (209) 541-2509 Work consists of repairing damaged sidewalks, and removing and replacing trees along Pirrone Road in the Town of Salida.

ANNEX BUILDING STAGE PROJECTPLAN #: 181007 Bid Date: 7/17/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: San Francisco Online & Print On Est Cost: $360,000.00 DemandPREBID: 7/9 @10Am PREBID: 1600 Holloway Ave OWNER: San Francisco State University DESCR: Contact, Rose DiMaggio - 415-405-3654In general, the work consists of furnishing labor and material necessary to install stage, truss, audio equipment, power distribution and cable, lighting and sound equipment in Annex building in the Campus of San Francisco State University. The work is located at 1600 Holloway A venue, San Francisco, California 94132 and will be constructed in accordance with the plans and specifications prepared by Capital planning, Design & BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

Thursday, July 18, 2013

HAPPY VALLEY SAFE ROUTE TO SCHOOLPLAN #: 2025 Bid Date: 7/18/2013 Bid Time: 11:00 AM PLANS AT: Shasta Co. Online and Planroom OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, County of Shasta (530) 225-5661 Work consists of constructing approx. 5,860 feet of hot mix asphalt path and approx. 1,150 feet of concrete

sidewalk, curb and gutter. The path will be constructed along the West side of Oak Street, from Scout Street to approximately 530 feet north of Craig lane.

SAN JUAN NEW CONSTRUCTIONPLAN #: 17019 Bid Date: 7/18/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Ceres Online & Print On # OF ADDENDA: 1 DemandOWNER: Housing Authority of County of Stanislaus Ph: 209-557-2008 FAX: 209-557-2011DESCR: Contact, Housing Authority Of Co. Of Stanislaus @ 209-557-2007Construction of two-story single family dwelling units & one single story dingle family dwelling unit, including demolition, site clearing, excavation, filling & grading, hot mix asphalt paving, Portland cement concrete paving;-rough & finish carpentry; insulation, weather resistant membrane, sealants & caulking; vinyl windows, finish hardware;lath & plaster, decorative laminate flooring, vinyl sheet flooring, carpeting, painting;-appliances; -wood casework; plumbing, HVAC;-electrical system BIDDERS LIST:General Contractor: Bc Construction 209-531-1252 209-531-1254 Diede Construction 209-369-8255 209-368-0600 Harris Builders, Inc. 209-664-9486 209-667-0738

DTLL PHARM HVAC MODIFICATIONS TO CIVA ROOMPLAN #: 25028 Bid Date: 7/18/2013 Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Davis Online and Planroom Est Cost: $150,000.00 # OF ADDENDA: 1PREBID: MAND 6/25 @ 10AM OWNER: University of California, Davis Health System DESCR: Contact, Design and Construction - 916-734-7024Selective demolition of suspended ceiling, ductwork, and supports, relocate existing 5 ton AC unit and reconfigure ductwork. Relocate DX and hydronic piping to new location, construct new wall and infill openings. Install doors and windows, flooring patching with base, paint and patch, BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850

WESTERN NEVADA COUNTY 2013 OVERLAYPLAN #: 55003 Bid Date: 7/18/2013 Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom Est Cost: $1,119,723.00OWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, Nevada, County of (530) 265-1766 Overlay approximately 8.2 miles of roadway in the western portion of Nevada County, place striping and pavement markers.

Continued on next page

Page 40: Exchange ezone july8 2013

July 8, 2013Page 38 Contractor’s Zone• .Contractor’s Zone

Thursday, July 18, 2013

ANTELOPE VALLEY EAST KERN TURNOUT, TEHACHAPI EAST AFTERBAYPLAN #: 60095 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $870,000.00 DemandPREBID: 6/27 @ 10AM PREBID: OSO Pumping Plant OWNER: Dept. of Water Resources Ph: 916-653-4867 FAX: 916-653-6166DESCR: Contact, Jim Veres - 916-653-4867Mobilization and demobilization. 2. Clearing and grubbing. 3. Temporary erosion control. 4. Cofferdam. 5. Dewatering. 6. Demolition including, but not limited to: a. Removal of existing concrete channel liner. b. Removal of existing concrete drainage ditch. c. Removal of existing asphalt concrete road. 7. Earthwork: a. Excavation. b. Compacted backfill. c. Compacted soil liner (CSL). d. Slurry backfill. 8. Miscellaneous pavement repairs. 9. Steel pipe and fittings. 10. Concrete and reinforcing steel. 11. Miscellaneous metalwork: a. Trash rack. b. Fasteners and miscellaneous hardware. 12. Raceways and boxes: a. PVC conduit. b.

KIEFER LANDFILL, 2013 GAS EXTRACTION WELLS & PIPING INSTALLATIONPLAN #: 62008 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: SloughhouseOnline and Planroom Est Cost: $200,000.00PREBID:7/2 @ 10 AM PREBID: 12701 Kiefer Blvd OWNER: County of Sacramento DESCR: Contact, County of Sacramento Tim Isreal -916) 876-9431 Furnishing of all labor, materials, tools, equipment and transportation. Construct eight vertical gas collection wells and install wellheads and 3” lateral piping.

PRE QUALIFIED BIDDERS--AUBURN LAKE TRAILS WATER TREATMENT PLANT UPGRADES PROJECTPLAN #: 76074 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Georgetown Online & Print On Est Cost: $8,000,000.00 # OF ADDENDA: 1Demand OWNER: Public Utility District DESCR: Contact, Kelly Shively ([email protected] a new raw water pump station, new filter building,

300,000 gallon welded steel chlorine contact tank, clarification / filtration units, filtered water transfer pumps, backwash pump, high service pumps, backwash water recovery basin modifications, decant return pump station, filter to waste basin modifications, filter to waste return pump station, new plant electrical service, standby power generators, plant control system, piping, paving, grading and miscellaneous other site BIDDERS LIST:General Contractor: Westcon Construction 916-663-2425 916-663-2448 Westcon Construction 916-663-2425 916-663-2448

REPLACE AIR CONDITIONING G&T BUILDINGS

PLAN #: 101091 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Patton Online & Print On DemandPREBID: MAND 6/27 @ 9am PREBID: 3102 E. Highland Ave OWNER: State of CA DESCR: Contact, Kristen Hernandez - 909-425-7900Replace existing steam heat and evaporative cooling systems with HVAC system in the G&T Buildings. The floor plan for G is apprx 14,000 sq ft and floor plan for T is apprx 10,000 sq ft.

INSTALLATION OF BIRD NETTING FOR PIGEON

PLAN #: 107097 Bid Date: 7/18/2013 Bid Time: 2:15 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $11,052.00 DemandPREBID: 7/10 @ 10AM PREBID: 1120 N Street OWNER: State of CA DESCR: Contact, Ronald Beasley - 916-227-6491Contractor shall provide a one-time installation of bird netting to enclosed or semi enclosed areas where bird pest population needs to be

PASO ROBLES UPTOWN FAMILY PARK PROJECTPLAN #:111091 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: El Paso De Online and Planroom Est Cost: $1,861,650.00OWNER: City of El Paso de Robles DESCR: Contact,Paso Robles, City of (805) 227-7245 Furnishing all labor, materials, equipment, services, testing, permits, temporary controls and construction facilities, and all general conditions, general requirements and incidentals required to complete the Work for the

Continued from last page

Plans On File

Page 41: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Paso Robles Uptown Family Park Project, Project No. 11-13A, in its entirety as described in the Contract Documents, which includes, but is not necessarily limited to, the following: installation of entry elements, buildings, community garden, amphitheatre, pervious pavement and asphaltic concrete parking lot; play equipment, shade structures, site furnishings, hardscape, poured-in place resilient surfacing, walkways, stairs, walls, fencing, railings, drainage elements, utilities, irrigation, electrical, and surrounding landscape areas, as more fully described in the bidding and contract documentsBIDDERS LIST:General Contractor: Sansone Company, Inc. 805-549-0667 805-549-0702

SALE & REMOVAL OF ASPHALT GRINDING MATERIALSPLAN #: 117080 Bid Date: 7/18/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Visalia Online & Print On Demand PREBID: 7/10@ 9AMPREBID: 707 W. Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Visalia, City of (559) 713-4334 The City of Visalia Public Works Department has a large volume (approx. 2,500 c.y.) of Asphalt Grinding Materials located northwest of the intersection of Burke and Goshen Avenues in Visalia, CA. Bidders are bidding on all materials and will be sold to the highest bidder. Awarded Bidder will be responsible for removal of materials.

SMITH CCAAL WET WELL REHABILITATION AND MISCELLANEOUS SITE IMPROVEMENTSPLAN #: 124084 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Stockton Online & Print On Est Cost: $1,500,000.00Demand PREBID: 7/2 @ 10AM PREBID: 2130 Fontana OWNER: City of Stockton DESCR: Contact, Public Works - 209-937-8753Concrete wet well rehabilitation(bypass pumping during construction) removal existing deteriorated concrete, surface preparation, installation of new reinforced concrete, corrosion barrier, new side gates, new isolation knife gate valves, new flow meter, new bio filter humidifier, new roofing, ceiling repair, new miscellaneous appurtenances and closed circuit televising of upstream sewers. BIDDERS LIST:General Contractor: Andrew L. Lee, Inc. 209-369-8077 209-368-2435 Diede Construction 209-369-8255 209-368-0600Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

LANDSCAOE MAINTENANCE FOR MUNICIPLE UTILITIES DEPARTMENT FACILITIESPLAN #: 139071 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Stockton Online & Print On DemandPREBID: MAND 6/25 @ 9AM PREBID: 2500 Navy Drive OWNER: City of Stockton DESCR: Contact, Deedee Antypas - 209--464-8724The Municipal Utilities Department facilities consists of its main plant, a warehouse, various storm pump stations and sanitary pump stations. The City desires to procure the services of a licensed landscape contractor to provide landscape maintenance for Municipal Utilities Department facilities. Regular scheduling mowing, edging, shrub trimming, fertilizing, litter/trash collection, graffiti, abatement, weed

HVAC MAINTENANCE @ CHP DONNER COMMERCIAL VEHICLE ENFORCEMENT FACILITYPLAN #: 163079 Bid Date: 7/18/2013 Bid Time: 4:00 PM PLANS AT: Print On DemandLocation: Truckee Online & Print On Est Cost: $28,000.00 DemandPREBID: MAND 7/9 @10AM PREBID: 12800 Interstate 80 OWNER: Dept. of California Highway Patrol Ph: 916-375-2940 FAX: 916-375-2944DESCR: Contact- Department of CA Highway Patrol (916) 843-3819 Contractor agrees to provide all personnel, labor, tools, equipment, materials, permits and license necessary to provide HVAC maintenance at the CHP Donner commercial Vehicle Enforcement Facility.

REPAIR POOLPLAN #: 174008 Bid Date: 7/18/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Eldridge Online & Print On Est Cost: $50,000.00 DemandPREBID: MAND 7/12 @ 10AM PREBID: Plant Operations Building 15000 Arnold Drive OWNER: Sonoma Development Center DESCR: Contact, Tammy Davis - (707) 938-6000 The contractor shall provide all materials, labor, tools, transportation, equipment, supervision and any other services or items necessary to renovate one (1) outdoor swimming pool. This may involve, but not be limited to removing existing pool surfaces and equipment hardware, drains, inlet fittings, skimmers or covers and replace with new code compliant materials resulting in a fully renewed interior surface of the pool and all appurtenances, in essentially like-new condition.

Continued on next page

Page 42: Exchange ezone july8 2013

July 8, 2013Page 40 Contractor’s Zone• .Contractor’s Zone

Friday, July 19, 2013

RFQ CA DMV SECURITY AND ACCESS CONTROL MAINTENANCEPLAN #: 58018 Bid Date: 7/19/2013Bid Time: 12:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $200,000.00 DemandOWNER: State of CA - Dept. of Motor Vehicles DESCR: Contact, Rafael Gonzales - 916-648-8591Provide quarterly preventative maintenance, inspections and remedial services for DMV Headquarters Complex Security and Access Controls System, including a one-time purchase of additional security

RFP PROFESSIONAL DESIGN SERVICES FOR THEMILL CREEK BANK STABILIZATION PROJECT BETWEEN STEVENSON ST. AND JOHNSON ST.PLAN #: 121084 Bid Date: 7/19/2013 Bid Time: 11:30 AM PLANS AT: VisaliaOnline and Planroom Est Cost: $411,000.00PREBID: 7/2 @ 9AM OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Department - 559-713-4334The City of Visalia is requesting design proposals from qualified consulting firms experienced in professional design services for a topographic survey and the design of cleanup and stabilization of the Mill Creek Bank between Johnson St. and Stevenson St.

RFP PROFESSIONAL DESIGN SERVICES FOR THE MILL CREEK BANK STABILIZATION PROJECT BETWEEN STEVENSON ST. AND JOHNSON ST.PLAN #: 121084 Bid Date: 7/19/2013 Bid Time: 11:30 AM PLANS AT: Location: VisaliaOnline and Planroom Est Cost: $411,000.00PREBID: 7/2 @ 9AM OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Department - 559-713-4334The City of Visalia is requesting design proposals from qualified consulting firms experienced in professional design services for a topographic survey and the design of cleanup and stabilization of the Mill Creek Bank between Johnson St. and Stevenson St.

RFP FOR VENDING SERVICESPLAN #: 123089 Bid Date: 7/19/2013

Bid Time: 11:00 AM PLANS AT: VisaliaOnline and Planroom PREBID: 7/2 @ 11AM PREBID: 707 W Acequia Ave DESCR: Contact, Purchasing Division - 559-713-4334The City of Visalia is requesting proposals for vending machines and services , the initial contract shall be 12 months. The City of Visalia desires vending machines for both drinks and snacks to be located in various City department locations including but not limited to the airport, Waste Water Treatment plant, Police Department and City Hall West.

RFP ENERGY EFFICIENCY MEASURES (EEM) RETROFIT PROJECT CONSTRUCTION MANAGEMENTPLAN #: 147066 Bid Date: 7/19/2013 Bid Time: 2:00 PM PLANS AT: VisaliaOnline and Planroom # OF ADDENDA: 1PREBID:6/18 @ 11AM PREBID: 707 W Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Division - 559-713-4802Act as a liaison with the City project Manager, review all product submittals from the construction contractor, facilitate all construction meetings, manage the overall project timeline to ensure completion within the 90 day project period. Confirm that all EEM retrofit work is conducted to applicable state and local codes.

Saturday, July 20, 2013

JANITORIAL SERVICES FOR THE WATSONVILLE DMV FIELD OFFICEPLAN #: 144069 Bid Date: 7/20/2013 Bid Time: 1:30 PM PLANS AT: WAtsonvilleOnline and PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822DESCR: Contact, Allison Stanek - 916-657-9810The Department of Motor Vehicles is inviting responses for the janitorial services bid for the Watsonville DMV field office located at 90 Alta Vista Ave. Janitorial services at the Watsonville DMV field office.

Monday, July 22, 2013

RFQ-QUALIFIED DEVELOPERS FOR MHSA HOUSINGPLAN #: 91072 Bid Date: 7/22/2013 Bid Time: 4:00 PM PLANS AT: Print On DemandLocation: San Joaquin Online & Print On

Continued from last page

Plans On File

Page 43: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

DemandOWNER: County of San Joaquin DESCR: Contact, San Joaquin Co Purchasing (209) 468-2074 The intent of this Request for Qualifications (RFQ) is to identify qualified developers and borrowers, as defined in the Mental Health Services Act (MHSA) Housing program guidelines, to develop permanent, affordable rental housing units, including shared housing, with supportive services for individuals who have a mental illness and are homeless or at risk of homelessness. Through the MHSA Housing Program, $6,339,500 was allocated to San Joaquin County to support capital development and capitalized operating subsidies associated with the development, acquisition, construction and/or rehabilitation, and operation of permanent supportive housing.

RFP BODIE CEMETARY STONE & CEMENT FEATURES CONSERVATIONPLAN #: 132074 Bid Date: 7/22/2013 Bid Time: 2:00 PM PLANS AT: BodieOnline and Planroom Est Cost: $90,000.00PREBID: MAND 6/20 @ 1PM PREBID: Bodie State Historic Park OWNER: State of CA DESCR: Contact, Betsey Leber - 916-653-9921Conservation of cemetery headstones, copings and wall, wood grave features. Seeking a firm to provide conservation 9of historic stone and cement coping, walls and monuments in the cemeteries at Bodie SHP.

Tuesday, July 23, 2013

BICENTENNIAL PARK ACCESSIBILITY UPGRADES PHASE II

PLAN #: 44030 Bid Date: 7/23/2013 Bid Time: 2:00 PM PLANS AT: ClovisOnline and Planroom OWNER: City of Clovis DESCR: Contact, Clovis, City of (559) 324-2382 Furnishing all labor, materials, services and equipment, and performing all work necessary as specified for but not be limited to, removal of concrete and asphalt concrete, construction of ADA compliant concrete sidewalk, curb ramp, and asphalt concrete, purchase and installation of a park shelter and amenities, purchase and installation of playground boulders and safety surface, volleyball courts, park benches, electrical and lighting, modifications to the existing landscape and irrigation system, and other associated improvements.

CURVE REALIGNMENT AND REPLACE BRIDGEPLAN #: 61086 Bid Date: 7/23/2013 Bid Time: 2:00 PM PLANS AT: San Joaquin Online and Planroom Est Cost: $2,470,000.00DESCR: Contact, Denise Silva - 916-354-8535San Joaquin County near Bellota from .3 miles West of Sandstone Creek Bridge to Shelly Road.

CONSTRUCT 10-INCH NATURAL GAS PIPELINE MODIFICATIONS FOR THE CITY OF REDDING POWER PLANTPLAN #: 93079 Bid Date: 7/23/2013Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $735,000.00PREBID: MAND 7/9 @ 8AM PREBID: 17120 Clear Creek Road OWNER: City of Redding DESCR: Contact, City of Redding (530) 225-4170 Furnish necessary labor, material, and equipment to modify the natural gas pipeline at the City of Redding Power Plant and the Eastside Road Gas Metering Yard.

TRANSIT SERVICES 4’TH FLOOR REMODELPLAN #: 102099 Bid Date: 7/23/2013 Bid Time: 11:00 AM PLANS AT: Modesto Online and Planroom Est Cost: $67,215.00PREBID: 7/2 @11am PREBID: 1010 Tenth Street OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto - Engineering Department (209) 577-5462 Demolition, cold-formed metal framing, miscellaneous metals, interior partition acoustical insulation, sealants & caulking, interior aluminum door & window framing, flush wood doors, finish hardware, glazing, acoustic ceiling system, gypsum board, painting, plastic laminate BIDDERS LIST:General Contractor: Iomlan Construction 209-664-9960 209-664-9979

MANTECA GOLF COURSE DRIVING RANGE NETTING IMPROVEMENTS PROJECTPLAN #: 189023 Bid Date: 7/23/2013 Bid Time: 10:00 AM PLANS AT: Manteca Online and Planroom Est Cost: $32,000.00DESCR: Contact, Kevin Fant (209) 456-8400 The work consists of driving range golf course netting improvements at the City of Manteca Golf Course 305 N. Union Rd. Provide and install 500’ linear feet of 20’ foot tall (above grade) posts, netting , and other netting system components.

RFP-ENGINEERING SERVICES FOR THE TRANSFER STATION BALE STORAGE EXPANSION PROJECTPLAN #: 193099 Bid Date: 7/23/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $1,300,000.00PREBID: 7/9 @ 11AM OWNER: City of Redding DESCR: Contact,Redding, City of (530) 225-4138 Provide preliminary engineering and final design services culminating in the preparation of contract documents, including plans, specifications and construction cost estimates, complete and ready for invitations for bid and assist during construction.

Continued from last page

Page 44: Exchange ezone july8 2013

July 8, 2013Page 42 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 23, 2013

EDD, ALTERATIONS, ALARM AND FIRE SYSTEM, SACRAMENTO EMPLOYMENT DEVELOPMENT DEPARTMENTPLAN #: 105096 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $520,000.00PREBID: MAND 7/2 @ 10AM PREBID: 5009 Broadway Ave OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778DESCR: Contact, Maria Gassoumis (916) 375-4212 Demolition, new fire alarm system, replacement of security alarm system, excavation, parking lot re-pavement, new concrete walkways, landscaping, irrigation, accessibility improvements, modifications to existing restroom and signage.BIDDERS LIST:General Contractor: Younger General Contrac 916-631-8000 916-631-8293Sub Contractor: Universal Security & Fire 916-563-1700 916-563-1755

Wednesday, July 24, 2013

POLICE FIREARMS PRACTICE RANGE ELECTRICALPLAN #: 3024 Bid Date: 7/24/2013

Bid Time: 2:00 PM PLANS AT: Location: Tracy Online and PlanroomPREBID: 7/17 @10AM PREBID: 6649 S Tracy Blvd OWNER: City of Tracy DESCR: Contact,Tracy, City of - Development & Engineering (209) 831-6400 Installation of 400 amp electrical service, including overhead service and subpanels to various buildings on 14 acre police firing range.

CLOSED CIRCUIT TELEVISION INSPECTIONSPLAN #: 28020 Bid Date: 7/24/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $165,000.00 DemandOWNER: City of Sacramento DESCR: Contact,Sonia Lopez ([email protected] Special Provisions cover closed circuit television (CCTV) inspection for approximately 48,000 lineal feet of

sewer pipes using the NASCSCO’s PACP defect coding system. Maps showing the locations of sewer pipes are located in Appendix A of these Special Provisions

CURED-IN-PLACE-PIPE REHABILITATIONPLAN #: 29022 Bid Date: 7/24/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $566,000.00 DemandOWNER: City of Sacramento DESCR: Contact, City of Sacramento (916) 808-1437 Work consists of the rehabilitation of several 6-inch and 8-inch diameter sewer pipeline segments, and one 10-inch diameter storm drain pipeline segment, at various locations within the City. The work includes cleaning pipeline segments and manholes, pre- and post-lining CCTV documentation, performing required point repairs, installing cured-in-place pipe liners, reinstating all live sewer service connections and rehabilitating specified manholes.

WESTERN WAY PS TEMPORARY BYPASS PIPING, PHASE 2 2013

PLAN #: 127072 Bid Date: 7/24/2013 Bid Time: 11:00 AM PLANS AT: Print On DemandLocation: Perris Online & Print On DemandPREBID: MAND 7/9 @ 9am PREBID: Western Way and Harley Knox Blvd OWNER: Eastern Municipal Water District Ph: 951-928-3777 FAX: 951-928-6111DESCR: Contact, Beatriz Pillow - [email protected] steel and PVC piping, fittings and valves as well as constructing the associated electrical services/distribution for the temporary bypass piping facilities and temporary pump station facilities including panels, conduit, wiring, pull boxes, instrumentation, controls, and related grading, concrete, fencing and site work.

KERN HIGH SCHOOL DISTRICT AG FARM: NEW POULTRY BUILDINGPLAN #: 153074 Bid Date: 7/24/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Bakersfield Online & Print On DemandPREBID: 7/2 @ 9AM PREBID: 3800 East Belle Terrace OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309DESCR: Contact, Kern High School District (661) 827-3122 Selective site demolition; concrete; rough & finish carpentry,

Continued from last page

Plans On File

Page 45: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

sheathing, solid polymer fabrications; building insulation, joint sealers; steel doors & frames, storm doors & frames, access doors & panels, finish hardware; painting; toilet & bath accessories; pre-engineered structures; plumbing; HVAC; electrical; earthwork, site clearing, excavation & backfill for structures, trench excavation & backfill for utilities, erosion & sediment control; asphalt concrete paving, exterior concrete pavement, pavement BIDDERS LIST:General Contractor: Jts Construction 661-835-9270 661-835-8424

Thursday, July 25, 2013

PALO CEDRO WWTP-POND REPAIRSPLAN #: 24018 Bid Date: 7/25/2013

Bid Time: 11:00 AM PLANS AT: Print On DemandLocation: Shasta Co. Online & Print On Est Cost: $560,000.00 DemandPREBID: 7/12 @ 10 AM PREBID: end of Charlolais Way OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact,Shawn Ankeny ([email protected])Deconstruct a portion of an existing dike, amend the removed soil witbentonite, reconstruct the dike with the amended soil to its original dimensions and place rip-rapping on portions of an interior pond slope.

SWENSON PARK NORTH SANITARY PUMP STATION VALVE REPLACEMENT PROJECTPLAN #: 35025 Bid Date: 7/25/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Stockton Online & Print On Demand PREBID: 7/9 @ 10AM PREBID: 6803 Alexandria Place OWNER: City of Stockton DESCR: Contact, Project Manager - 209-937-8753The work includes: removal and replacement of two 24-inch gate valves and AC flatwork to its original condition.

BING KONG TONG CENTER STRUCTURALPLAN #: 36018 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Est Cost: $175,000.00 # OF ADDENDA: 1DemandPREBID: 6/27 @ 1 PM or 7/2 @ 9 AM PREBID: 29 Main Street, Isleton OWNER: Sacramento Housing & Redevelopment Agency FAX: 916-927-6963DESCR: Contact, Michael Ordonia - 916-449-6275Hazmat abatement, hazardous material and biological material, structural rehabilitation, roof replacement, restoration of a

portion of the façade of the existing building and weatherization of the building.

DELTA-MENDOTA CANAL BRIDGE SEISMIC RETROFIT ON WEST SIERRA AVENUEPLAN #: 44031 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Fresno Online & Print On DemandOWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact, County of Fresno - Public Works (559) 262-4076 The work to be done consists, in general, of seismic retrofitting of the existing Delta-Mendota Canal Bridge at West Sierra Avenue. The work includes the construction of cast-in-drill-hole piles with pile caps adjacent to bridge abutments. The work also includes replacement of asphalt concrete pavement on the 30-foot segments on each side of the bridge approaches. Restriping of the approach segments is also to be

NEVADA COUNTY THERMOPLASTIC SAFETY PROJECT 2013PLAN #: 46099 Bid Date: 7/25/2013 Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Nevada Co. Online & Print On Est Cost: $392,323.00 DemandOWNER: County of Nevada Ph: 530-265-1403DESCR: Contact, Nevada, County of (530) 265-1766 Place raised and recessed thermoplastic striping and pavement markers on various County roads.

NAPA COUNTY HALL OF JUSTICE FIRE DAMPER REPAIR PROJECTPLAN #: 56071 Bid Date: 7/25/2013 Bid Time: 3:30 PM PLANS AT: Napa Co.Online and Planroom Est Cost: $862,000.00PREBID: MAND 7/12 @ 10AM PREBID: A valid security Clearance form and a notarized bi OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact, Frank Lucido - [email protected] work involves demolition and replacement of existing Ruskin smoke damper actuators and testing the assembly, installing a damper monitoring and control system, installing electrical conduit, smoke testing, smoke and fire proofing, and interfacing with the existing fire BIDDERS LIST:General Contractor: Romkon Inc. 415-525-4432 415-529-2073 Bobo Construction, Inc. 916-685-2285 916-714-4850 A.e. Nelson Construction 707-636-1750 707-636-1755

Continued on next page

Page 46: Exchange ezone july8 2013

July 8, 2013Page 44 Contractor’s Zone• .Contractor’s Zone

Thursday, July 25, 2013

COMPUTER ROOM FIRE SUPPRESSION SECRETARY OF STATEPLAN #: 71080 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Demand PREBID: MAND 7/9 @ 9:30AM PREBID: 1500 11’th Street OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778DESCR: Contact, William Barnett - 916-375-4225Project comprises labor, material and services necessary for: Installation of a clean agent fire suppression system with related electrical work and mechanical work.

COLONY ROAD OVERLAY PROJECTPLAN #: 80071 Bid Date: 7/25/2013Bid Time: 3:00 PM PLANS AT: Location: Ripon Online and Planroom OWNER: County of San Joaquin DESCR: Contact,Purchasing Department - 209-523-8323 Conform grind 2’x8’0 at intersection, leveling course, pavement fabric, AC deep lift repairs, pavement markings, thermoplastic, adjust utilities to grade, traffic control, SWPPP, yellow centerline stripe thermo, white bike lane, white edge line thermo, bike symbol, type D11+1 sign, conform grind, grind of existing AC, leveling course, pavement fabric, asphalt overlay, adjust utilities to grade, traffic control, SWPPP.

2013 MIANTENANCE BUILDING EXPANSION PROJECTPLAN #: 90090 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Location: Ceres Online and Planroom PREBID: 7/16 @ 9AM PREBID: 3420 Harold St OWNER: City of Ceres DESCR: Contact, City Engineer (209) 538-5792 Includes a new metal building / foundation / footings, new asphalt paving, new concrete work, drainage inlets, 8” RCP storm drain line, bollards, new inside office structure, mew mechanical equipment, plumbing, fire sprinklers / connections, electrical equipment / connections, erosion controls, demolition of asphalt / concrete / existing siding and associated

EDD, ALTERATIONS, ALARM AND FIRE SYSTEM, SACRAMENTO EMPLOYMENT DEVELOPMENT DEPARTMENTPLAN #: 105096 Bid Date: 7/25/2013

Bid Time: 2:00 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $520,000.00PREBID: MAND 7/2 @ 10AM PREBID: 5009 Broadway Ave OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778DESCR: Contact, Maria Gassoumis (916) 375-4212 Demolition, new fire alarm system, replacement of security alarm system, excavation, parking lot re-pavement, new concrete walkways, landscaping, irrigation, accessibility improvements, modifications to existing restroom and signage.BIDDERS LIST:General Contractor: United Building Contract 530-345-8455 530-345-8885 Younger General Contract 916-631-8000 916-631-8293 Carter-kelly, Inc. 530-621-0950 530-621-2344Sub Contractor: Universal Security & Fire 916-563-1700 916-563-1755 T B K Electric 916-627-9857 916-684-1218

REROOF STORAGE BUILDINGPLAN #: 150066 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Alameda Co. Online & Print On Est Cost: $60,000.00 DemandPREBID: MAND /28@10AM and /12 @ 1AM6 OWNER: Dept. of Fish & Game Ph: 916-323-1587 FAX: 916-323-1622DESCR: Contact, Ruben Salvador - 916-323-1584 The project consists of removing existing composition roof materials, underlayment, remove and replace roof sheathing, install new underlayment, install new asphalt roof shingles, new roof sheathing, new TPO roofing and miscellaneous work.

RFQ-ARCHITECTURAL SERVICESPLAN #: 162070 Bid Date: 7/25/2013

Bid Time: 2:00 PM PLANS AT: Location: UkiahOnline and Planroom OWNER: County of Mendocino DESCR: Contact-Kristin McMenomey - (707) 234-6050 Provide professional architectural services on an on-going basis for a wide range of scopes from new design and construction to major and minor improvement work, including programming, site planning, development of schematic / design development / construction documents / as-built drawings, cost estimates and support during

FULL DEPTH REHABILITATION WITH CEMENT AND ASPHALT CONCRETE OVERLAY ON PAIGE AVEPLAN #: 277044 Bid Date: 7/25/2013

Continued from last page

Plans On File

Page 47: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

Bid Time: 2:00 PM PLANS AT: Location: Tulare Online and PlanroomDESCR: Contact,Tulare, City of Mike Whitlock, City Engineer (559) 684-4207 The work consists of the full depth rehabilitation of deteriorated pavements on City streets by grinding and pulverizing pavement, applying, mixing and hydrating cement to create a stabilized base section, placing asphalt concrete on the prepared base section, the application of an Asphalt Rubber CAPE Seal on Mooney Blvd., the replacement of pavement delineation, pavement markers and pavement

Friday, July 26, 2013

WASTE WATER TREATMENT PLANT EXPANSION PROJECTPLAN #: 95068 Bid Date: 7/26/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Visalia Online & Print On # OF ADDENDA: 3 DemandPREBID: MAND 5/8 @ 9am PREBID: 7579 Ave 288OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Division - 55-713-4334 Waste water treatment plant expansion. BIDDERS LIST:Sub Contractor: C. Overaa And Co. 510-234-0926 510-237-2435Supplier: Sierra Trench Protection 530-887-9413 530-887-9112 Ryan Process 800-839-0670 925-837-4832 Misco 925-225-1900 925-225-9200

RFP-LOWER KAWEAH RIVER & MILL CREEK SYSTEM FLOOD CONTROL IMPROVEMENTS

PLAN #: 130076 Bid Date: 7/26/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Visalia Online & Print On DemandPREBID: 7/10 @ 11AM PREBID: 707 W Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Visalia, City of (559) 713-4334 Engineering and Regulatory Services for the DWR Flood Corridor Program Funded Project entitled “Lower Kaweah River & Mill Creek System Flood Control Improvements.

Tuesday, July 30, 2013

TAHOMA MEADOWS MUTUAL WATER CO. METERING PROJECTPLAN #: 14024 Bid Date: 7/30/2013

Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Tahoe City Online & Print On Est Cost: $38,500.00 DemandPREBID: MAND 7/16 @ 2 PM PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact,Cory Allison ([email protected] 47 domestic water service meter pits with integrated PRVs and shutoff valves at 47 locations in the Tahoma Meadows water service

SOE FAN COIL AND HVAC PIPING REPLACEMENT

PLAN #: 40020 Bid Date: 7/30/2013Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Davis Online & Print On Est Cost: $1,700,000.00 DemandPREBID: MAND 7/9 @ 9:30am OWNER: University Of California, Davis DESCR: Contact, UC Davis (530) 752-0867 Includes the comprehensive removal and replacement of fan coils and HVAC piping, gypsum board with acoustical tile corridor ceiling removal / placement of T-bar grid acoustical ceiling tile, necessary removal / replacement of hard lid ceiling in office spaces to effect removal / installation of HVAC piping and fan coils, communications above ceiling and surface raceway, boxes / faceplates and cat5e wiring and terminations in and throughout the School of Education building.BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881

GENTERATOR REPLACEMENTPLAN #: 59011 Bid Date: 7/30/2013

Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and Planroom Est Cost: $175,000.00PREBID: MAND 7/17 @ 1PM PREBID: Between 330 and 360 Far Lane OWNER: County of El Dorado DESCR: Contact, Procurement Department- (530) 622-4513.Furnishing of all labor, material and equipment for construction of improvements for the emergency back up power system at the main government center.

ELEVATOR MAINTENANCE / REPAIR SERVICE ONLINE ONLYPLAN #: 63099 Bid Date: 7/30/2013 Bid Time: 3:00 PM PLANS AT: BakersfieldOnline and Planroom PREBID: MAND 7/18 @ 10AM PREBID: 4201 Sabodan OWNER: State of CA DESCR: Contact, Ben Nixon - 661-858-5678Contractor shall provide inspection, maintenance, testing and annual certification of two (2) passenger elevators and three (3) freight elevators

Continued on next page

Page 48: Exchange ezone july8 2013

July 8, 2013Page 46 Contractor’s Zone• .Contractor’s Zone

Continued from last page

Plans On File

Tuesday, July 30, 2013

SAFE ROUTES TO SCHOOL PHASE 2 (SRTS)PLAN #: 65007 Bid Date: 7/30/2013

Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $431,473.00OWNER: City of Redding DESCR: Contact, John Abshier - 530-245-7159Construct pedestrian and bicycle improvements including curb, gutter and sidewalk. Install storm drain improvements and bike lane signing and marking, relocate water main and reconnect water services.

LANDSCAPE AT CHPPLAN #: 68071 Bid Date: 7/30/2013

Bid Time: 4:00 PM PLANS AT: Location: Tracy Online and Planroom Est Cost: $13,000.00PREBID: MAND 7/16 @ 11AM PREBID: 385 W. Grant Line Road OWNER: State of CA DESCR: Contact, Nancy Leonard - 916-843-3800Landscape Maintenance. Contractor agrees to provide all equipment, labor, materials and supplies necessary for the performance of the work

DOWNEY TERRACE SENIOR HOUSINGPLAN #: 84087 Bid Date: 7/30/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Modesto Online & Print On DemandPREBID: 7/2 @ 10AM PREBID: 412 Downey Ave OWNER: Housing Auithority of the County of San Joaquin Ph: 209-4160-5000 FAX: 209-460-5100ARCHITECT: Timothy P. Huff & Assoc. Ph: 209-571-2232 FAX:DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 571-2232 The Project consists of the construction of eleven (11) senior housing dwelling units, community spaces, related site development, and utility BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600

RAILROAD CROSSING IMPROVEMENTS @ VARIOUS LOCATIONSPLAN #: 119088 Bid Date: 7/30/2013

Bid Time: 2:00 PM PLANS AT: Humboldt Co. Online and Planroom Est Cost: $104,000.00OWNER: County of Humboldt Ph: 707-445-7652 FAX: 707-445-7409DESCR: Contact, County of Humboldt (707) 445-7493 Work consists of reconstructing railroad crossings including traffic control, removal and disposal of treated wood planks, asphalt concrete and road signage.

2014-2016 ON-CALL PROFESSIONAL SERVICESPLAN #: 182006 Bid Date: 7/30/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: El Dorado Online & Print On DemandDESCR: Contact: El Dorado Irrigation District (530) 622-4513.RFP for the following services: 1. Appraisal Services 12. Information Technology2. Arborist/Tree Faller 13. Legal Services – Labor/HR Counsel3. Cultural Studies4. Dam Safety Engineering5. Drafting14. Legal Services – Title Search15. Legal Services – Water RightsCounsel6. SCADA – Electrical/Instrumentation 16. Painting Inspection7. Environmental – CEQA / NEPA /Biological Studies17. Regulatory Permitting18. Surface Water Hydrology8. General Engineering9. Geographic Information Systems19. Survey20. SWPPP Development(GIS)10. Geotechnical21. Water/Wastewater LaboratoryAnalysis11. Hydroelectric Compliance

Wednesday, July 31, 2013

FIBER OPTIC INSTALLATION FROM CITY HALL TO TRANSIT CENTERPLAN #: 26099 Bid Date: 7/31/2013

Bid Time: 2:00 PM PLANS AT: Location: Tracy Online and Planroom OWNER: City of Tracy DESCR: Contact, Ripon Bhatia - 209-831-6455Install fiber optic cable, conduit, boxes and related equipment to create a fiber optic connection between City Hall and the Transit Center.

Page 49: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

RFP-PURCHASE AND DEVELOP CITY OF SACRAMENTO PROPERTY AT THE SOUTHWEST CORNER OF HOWE AVENUE

AND FAIR OAKSPLAN #: 33024 Bid Date: 7/31/2013 Bid Time: 12:00 PM PLANS AT: Print On DemandLocation: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sacramento, City of (916) 808-3789 The City of Sacramento is soliciting proposals for the purchase and development of City-owned real property, located at the southwest corner of Fair Oaks Boulevard and Howe Avenue. The property is approximately 3.12 unimproved acres at the busiest intersection in the City and is designated as Assessor’s Parcel Number 295-0020-007 (the “Project Site”). It is surrounded by numerous commercial enterprises, California State University, Sacramento, and residential neighborhoods. The development sought for this location would be one that has a low traffic

IFB CNG TANK SVS 2013PLAN #: 51003 Bid Date: 7/31/2013

Bid Time: 3:30 PM PLANS AT: Location: SacramentoOnline and PlanroomPREBID:7/2 @ 1030 AM PREBID: 1416 10th Street OWNER: State of CA DESCR: Contact, Melanie Zbur- 916-928-2780Compressed Natural Gas Tank preventative maintenance, inspection, testing, repair and training services, Testing and Repair services at the Sacramento State Garage.

YARD MAINTENANCE SERVICESPLAN #: 141064 Bid Date: 7/31/2013 Bid Time: 10:00 AM PLANS AT: Location: VallejoOnline and Planroom PREBID: MAND 7/17 @ 10AM OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District (707) 644-8949 Yard maintenance services at the District Treatment Plant at 450 Ryder Street, Vallejo, California.

REPLACE FIRE DETECTION AND ALARM SYSTEM, PHASE 5

PLAN #: 53001 Bid Date: 7/31/2013 Bid Time: 2:30 PM PLANS AT: Print On DemandLocation: Atascadero Online & Print On Est Cost: $268,000.00 DemandPREBID: MAND 7/17 @ 930AM PREBID: 10333 El Camino Real OWNER: State of CA DESCR: Contact, Ann Malek - 805-468-3410Contractor shall furnish all labor, materials, tools, equipment, transportation and any other services necessary to “Replace Fire Detection and Alarm System, Phase 5” and arrange inspections by the State Fire Marshal during the course of the work.

YARD MAINTENANCE SERVICESPLAN #: 141064 Bid Date: 7/31/2013

Bid Time: 10:00 AM PLANS AT: Print On DemandLocation: Vallejo Online & Print On Demand PREBID: MAND 7/17 @ 10AM OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District (707) 644-8949 Yard maintenance services at the District Treatment Plant at 450 Ryder Street, Vallejo, California.

Thursday, August 01, 2013

2013 FISH ROCK SEDIMENT REDUCTION PROJECT

PLAN #: 152067 Bid Date: 8/1/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Ukiah Online & Print On Est Cost: $185,000.00 DemandOWNER: County of Mendocino DESCR: Contact, Mendocino, County of , Dept. of Transportation (707) 463-4363 Includes reshaping inside ditch, clearing / grubbing, U-channel sign posts, water bars, removal of culvert, installation of culverts, elbows, 24” flume, inlet treatments, RSP outlets, fiber roll and water pollution control

Tuesday, August 06, 2013

REPLACE THE EXISTING METAL BEAM GUARD RAIL WITH CONCRETE BARRIER

PLAN #: 106099 Bid Date: 8/6/2013 Bid Time: 2:00 PM PLANS AT: Location: FresnoOnline and Planroom Est Cost: $1,130,000.00OWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact, Denise Silva - 916-348-8654Fresno County in Fresno on Route 41 from the Route 180/41 connector to Olive Ave undercrossing and on Route 180 from Blackstone Ave undercrossing to Route 180/41 Connector.

JANITORIAL SERVICESPLAN #: 191092 Bid Date: 8/6/2013

Bid Time: 4:00 PM PLANS AT: Location: TruckeeOnline and Planroom Est Cost: $47,000.00PREBID: MAND 7/23 @ 10AM OWNER: State of CA DESCR: Contact, Nancy Leonard - 916-843-3800Janitorial services at Donner CVEF 12800 Interstate 80 Truckee, CA 96161. Floor maintenance, sweep, damp mop, strip, treat and buff, dust, furniture surfaces.

Continued on next page

Page 50: Exchange ezone july8 2013

July 8, 2013Page 48 Contractor’s Zone• .Contractor’s Zone

Thursday, August 08, 2013

MIRALOMA PARK AND COMMUNITY CENTER

PLAN #: 104096 Bid Date: 8/8/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Anaheim Online & Print On Demand OWNER: City of Anaheim DESCR: Contact, Stephen Stoewer - 714-765-4338Demolition, mobilization and removals of existing facilities, constructing of new facilities, site work in accordance with the project documents.

WIDEN ROADWAY AND BRIDGE, CONSTRUCT RETAINING WALLS AND NEW BYPASS OFF RAMP

PLAN #: 179000 Bid Date: 8/8/2013 Bid Time: 2:00 PM PLANS AT: AnaheimOnline and Planroom Est Cost: $19,800.00OWNER: State of CA DESCR: Contact, Denise Silva - 916-808-3564Widen Roadway and Bridge, construct retaining walls and new bypass off-ramp. In Orange County In Anaheim From 0.3 Mile West of Tustin Avenue overcrossing To 0.3 miles East Of 91/55 separation and at Lakeview Avenue overcrossing

Friday, August 09, 2013

CONSTRUCTIN OF WESTERN PLACERVILLE INTERCHANGES PROJECT PHASE 1APLAN #: 77072 Bid Date: 8/9/2013 Bid Time: 2:00 PM PLANS AT: PlacervilleOnline and Planroom Est Cost: $5,000,000.00PREBID: 7/19 @2pm1 PREBID: 3’rd Floor City Hall OWNER: City of Placerville DESCR: Contact, Engineering Division - 530-642-5250Construction of westbound on ramp from Ray Lawyer Drive onton Highway 50 and a westbound auxiliary lane between the new westbound on ramp and the existing westbound off ramp at Placerville Drive. Realignment of Fair Lane, retaining wall to support realigned Fair lane and auxiliary lane, and utility improvements including new storm drain and sanitary sewer facilities and a detention basin.

Tuesday, August 13, 2013

REPALCE PAVEMENT WITH HMA AND REHABILITATE BRIDGE DECKSPLAN #: 164082 Bid Date: 8/13/2013

Bid Time: 2:00 PM PLANS AT: Kings Co. Online and Planroom Est Cost: $4,400,000.00OWNER: State of CA DESCR: Contact, Denise Silva - 916-8085464 Kings County in and near Hanford at various locations from14th Avenue Undercrossing to 11th Avenue Undercrossing.

Thursday, August 15, 2013

EAST SIDE PUMP STATION REHABILITATIONPLAN #: 140065 Bid Date: 8/15/2013

Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Colusa Co. Online & Print On Est Cost: $1,290,000.00 DemandOWNER: City of Colusa DESCR: Contact, Colusa, City of (530) 458-4740 (530) 458-8674 Replacement of various components, both mechanical & electrical, at 4 sewer pump stations & 1 storm water pump station. Depending on the station, the replacement components include, but may not be limited to, submersible pumps, wet well covers, rails, discharge piping, valves, control panels, pump controllers, backup electrical power generators, and telemetry equipment. The work also includes the purchase, configuration and programming of a SCADA Server and base

Friday, August 16, 2013

RFP GROUND LEASE AND DEVELOPMENT OF LAND ADJACENT TO EVERGREEN VALLEY COLLEGE, SAN JOSEPLAN #: 126077 Bid Date: 8/16/2013 Bid Time: 3:00 PM PLANS AT: San Jose Online and PlanroomPREBID: 6/20 @ 10:30AM and 6/26 @ 10:30AM PREBID: 4750 San Felipe Road DESCR: Contact, San Jose Evergreen School - 408-270-6402The District welcomes proposals for the ground leasing of the land needed to site development of retail, multi family residential, and or other related compatible uses such as health care and educational uses, in a desirable urban scale environment. The size of the Property permits capitalizing on scale advantages not available elsewhere in the market

Continued from last page

Plans On File

Click on any blue underline because it’s an active link!

Page 51: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

RFP GROUND LEASE AND DEVELOPMENT OF LAND ADJACENT TO EVERGREEN VALLEY COLLEGE, SAN JOSEPLAN #: 126077 Bid Date: 8/16/2013 Bid Time: 3:00 PM PLANS AT: San Jose Online and PlanroomPREBID: 6/20 @ 10:30AM and 6/26 @ 10:30AM PREBID: 4750 San Felipe Road OWNER: San Jose/Evergreen Community College District DESCR: Contact, San Jose Evergreen School - 408-270-6402The District welcomes proposals for the ground leasing of the land needed to site development of retail, multi family residential, and or other related compatible uses such as health care and educational uses, in a desirable urban scale environment. The size of the Property permits capitalizing on scale advantages not available elsewhere in the market

Tuesday, August 20, 2013

RAHAB BRIDGES WITH POLYESTER CONC OVERLAY AND RDWY WITH HMA OVER AB

PLAN #: 67086 Bid Date: 8/20/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Shasta Co. Online & Print On Est Cost: $7,650,000.00 DemandOWNER: State of CA DESCR: Contact, Denise Silva -916-354-8534Shasta County at various locations, Rehabilitate bridges with polyester conc overlay and roadway with HMA over AB.

Thursday, August 22, 2013

CONSTRUCT FREEWAY CONNECTION TO ROUTE 905

PLAN #: 165083 Bid Date: 8/22/2013 Bid Time: 2:00 PM PLANS AT: San Diego Co.Online and Planroom Est Cost: $58,000,000.00OWNER: State of CA DESCR: Contact, Denise Silva - 916-8086456Construct freeway connection to route 905. In San Diego County In and near San Diego on route 11 from route 11/905 separation to Enrico Fermi Drive And on route 905 From 0.1 mile East of La media road undercrossing To 0.2 Mile West of airway Road undercrossing.

Tuesday, December 31, 2013

LIST OF QUALIFIED CONTRACTORS/YUBA CITYPLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City PlanroomOWNER: City of Yuba City

DESCR: Contact, ([email protected]) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 223091 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Placer Co. Online and PlanroomOWNER: Placer Office Education Ph: 916-415-4424 DESCR: In accordance with the State of California Uniform Public Construction Cost Accounting Commission, The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2013. You must resubmit to be included on the 2013 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Contact, Matt Shawver, 530-889-8020. Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2013 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board.BIDDERS LIST:Sub Contractor: Kitchen Art, Inc. 916-852-8111 916-852-7981 Oxford Fire Inc. 916-865-6146 916-987-0201

CO OF TUOLUMNE - QUALIFIED BIDDERS LISTPLAN #: 247054 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Co. Online and PlanroomOWNER: County of Tuolumne DESCR: County of Tuolumne, Sharon Mikesell, ([email protected]) Inviting all licensed contractors to submit the name of their firm for inclusion on the Agency’s list of qualified bidders for 2013.

SOLANO COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LISTPLAN #: 248050 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Solano Online and PlanroomOWNER: Solano County Water Agency DESCR: Sandra McLean, 707-451-6090. Inviting contractors to submit their company’s information to be placed on the Agency’s list of qualified bidders for the following year.

Continued on next page

Page 52: Exchange ezone july8 2013

July 8, 2013Page 50 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 31, 2013 QUALIFIED BIDDERS - CITY OF CUPERTINOPLAN #: 253057 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Cupertino Online and PlanroomOWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, City of Cupertino, 408-777-3354. City of Cupertino is in the process of updating their Contractors List to establish and maintain a list of qualified contractors to receive future public projects.

APPLICATION - CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT/2013 CALENDAR YEARPLAN #: 256052 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Carmichael Online and PlanroomOWNER: San Juan Unified School District DESCR: Aida Gonzales, ([email protected]) Complete form and return to San Juan Unified School District Purchasing Department if you wish to be included in the 2013 Calendar year California Uniform Public Construction Cost Accounting Program

FOLSOM-CORDOVA USD BIDDERS LISTPLAN #: 274042 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Ranch Online and PlanroomOWNER: Folsom Cordova USD Ph: 916-355-1111 DESCR: Contact, Folsom Cordova Unified School District, 916-294-9000. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013. BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

SUMMERVILLE UNION HIGH SCHOOL DISTRICTPLAN #: 291049 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Summerville Online and PlanroomOWNER: Summerville Union High School District Ph: 209-928-1955 FAX: 209-928-4454DESCR: ([email protected]) or 209-928-1955. Summerville Union H.S. District, Maintenance Dept. in Tuolumne Co., is requesting Contractors’s Pre-Qualification Applications for upcoming year.

TWIN RIVERS UNIFIED SCHOOL DISTRICT - QUALIFIED CONTRACTORSPLAN #: 301009 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: North Online and PlanroomOWNER: Twin River Unified School District Ph: 916-566-1600 FAX: 916-286-4959DESCR: Twin Rivers Unified School District, Facilities Planning & Construction. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

SANTA CRUZ PORT DISTRICT’S/LIST OF QUALIFIED BIDDERSPLAN #: 304012 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Santa Cruz Online and PlanroomOWNER: Santa Cruz Port District DESCR: Contact, Santa Cruz Port District, (831) 475-6161. Santa Cruz Port District is inviting licensed contractors to submit the name of their firm for inclusion on the Port Districts list of potential bidders. Provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number, the type of work in which you are interested and are currently licensed to do, the class of contractor’s licenses held and the contractor license numbers. Mail information to Santa Cruz Port District at [email protected] and reference “Contractor List” in the subject line. CITY OF LINCOLN/CONTRACTOR’S PRE-PLAN #: 311007 Bid Date: 12/31/2013Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Lincoln Online and PlanroomOWNER: City of Lincoln DESCR: City of Lincoln, 916-434-2450. City of Lincoln inviting all qualified contractors to submit their name and company for inclusion on the qualified bidders list for the year 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 Kitchen Art, Inc. 916-852-8111 916-852-7981 Guardian Environmental, 916-997-1830 916-641-5690

SIERRA COLLEGE - LIST OF QUALIFIEDPLAN #: 314007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Rocklin Online and Planroom

Plans On File

Continued from last page

Page 53: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

PLAN #: 315005 Bid Date: 12/31/2014 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Sacramento Online and PlanroomOWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Colin Miller, ([email protected]) or 916-483-6069. Arden Park Recreation and Park District invite licensed contractors to submit their information to be included on their contract bid list.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

OWNER: Sierra Community College DESCR: Contact, Kerri Hester, 916-624-3333. Sierra Joint Community College District is updating its list of Qualified Contractors for the 2013 calendar year.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Wednesday, December 31, 2014

ARDEN PARK RECREATION AND PARK DISTRICT’S CONTRACT BID LIST

Wednesday, July 24, 2013

COPPERSTONE VILLAGE II & III IN SACRAMENTOPLAN #: 317019 Location: Sacramento Bid Time: 2:00 PM PLANS AT: Print On Demand Online & Print On DemandG.C.: USA Construction Management Inc. Ph: 916-724-3856 Fax: 916-773-1931DESCR: Contact, USA Construction Management, Inc. (916) 724-3882 Copperstone Village II & III Apartments is a market rate, multi-building, three story apartment complex totaling 270 units and

featuring a single story Clubhouse, pool, carports and open parking on a 10+ acre site. The project is type V wood frame construction with stucco siding and concrete tile roofs. The project will be built utilizing Build-it-Green energy efficiencies. Excavation, demolition, utilities, septic, paving, foundation, masonry, retaining wall, siding, framing, insulation, drywall, roofing, doors, windows, painting, plumbing, HVAC, electrical, data cabling, flooring, cabinets, counter tops, finish carpentry and interior trim, gutters.BIDDERS LIST:Sub Contractor: Gadda Construction 916-425-7242 916-000-0000

Legal AdREQUEST FOR QUOTES FROM QUALIFIED DBE, MBE AND WBE- SUBCONTRACTORS AND SUPPLIERS FOR:

DingeePipeline&ClaremontCenterAqueductsReplacements

OWNER: EastBayMunicipalUtilityDistrictSubtradesincludebutnotlimitedto:

Electrical,Landscaping,PavingandTrafficControl.

BIDOPENING:7/17/2013@1:30pm

RangerPipelines,Inc.willsupplyinformationregardingplansandspecifications,bonds,linesofcreditand/orinsurancerequirementsuponrequest.Plansandspecificationsareavailableforreviewinourofficebyappointmentorbyviewingthe

EBMUDwebsitehttps://portal.ebmud.com/cbo/specifications/default.aspx

Ranger Pipelines, Inc.P.O.Box24109,SanFrancisco,CA94124

ContactPerson:DaireO’RourkeLicenseNo.:417996ClassA

Phone:(415)822-3700Fax(415)822-3703EqualOpportunityEmployer

Plans On File - Residential

Page 54: Exchange ezone july8 2013

July 8, 2013Page 52 Contractor’s Zone• .Contractor’s Zone

Wednesday, June 26, 2013

EAST ARBORETUM AREA, CALIFORNIA NATIVE PLANT GARDEN (CNPG) AND DAVIS COMMON PARKING LOT (DCP), Davis

Plan 79057 Number:

Gateway Landscape $627,000 JA Gonsalves & Son Construction, Inc. $669,669.69 TRASH COMPACTOR FOR THE NEW SCIENCE AND MATHEMATICS BUILDING, San Joaquin Co.

Plan 150065 Number:

Netbuilds $39,877 A-Vet Construction, Inc. $56,750 LOW LIFT ACCESS ROAD IMPROVEMENTS , Yuba

Plan 106098 Number:

DeWitt Bros. & Co., Inc. $126,930 Franklin Construction $140,730 R.J. Heuton Construction $148,375 Thursday, June 27, 2013

RENOVATIONS AT SENIOR HOUSING UNITS, LAWRENCE ST. CERES , Ceres

Plan 24017 Number:

California Structures $233,314.25 Alameda Construction $341,114 Iomlan Construction Services, Inc. $363,400 METHACRYLATE BRIDGE DECK SEAL 2013 PROJECT , Redding

Plan 18032 Number:

JF Shae Construction, Inc. $130,306 TAHOMA MEADOWS MUTUAL WATER CO. TRANSMISSION PIPELINE PROJECT- PHASE 2 ,

Plan 19033 Number:

Reno-Tahoe Construction $320,556.34

Friday, June 28, 2013

LIGHTHOUSE BUS SHELTER , Placer Co.

Plan 59010 Number:

Orlando Enterprises $45,454 DML Construction $46,500 Pullman Construction $94,000 Tuesday, July 02, 2013

FLIGHTLINE DRIVE REHABILITATION PHASE 1, Lincoln Plan 70081 Number:

J D Pasquetti Engineering Inc. $461,788 All Phase Construction & Engineering $463,842 Knife River Construction $468,940 SAFE ROUTES TO SCHOOL, Lincoln

Plan 49015 Number:

FBD Vanguard Construction $541,106 2013 ARTERIAL MICROSURFACING PROJECT, Roseville Plan 39022 Number:

Windsor Fuel Co. $1,449,200 Central Valley Engineering & Asphalt $1,572,326 Sierra Nevada Construction (SNC) $1,579,007 2013 CAPE / SLURRY SEAL PROJECT, Roseville

Plan 16029 Number:

Intermountain Slurry Seal, Inc. $1,979,979 Central Valley Engineering & Asphalt $2,090,256 Windsor Fuel Co. $2,126,598

FIRST NEW GROUND LEVEL TANK , Woodland

Plan 23027 Number:

Myers & Sons Construction $7,050,000 Skaer Construction, Inc $7,100,000

Bid Results

$684

billion

Page 55: Exchange ezone july8 2013

Contractor’s ZoneContractor’s Zone

$684

billion

The Internet Accounts For 4.7%

of the U.S. Economy

Survey Says: 77% of Americans would be willing to give up chocolate for an entire year, rather than go without the Internet. Only 21% though would give up sex, and an even smaller 7% would go without a shower.

According to a recent survey conducted by CNN Money, the Internet contributes more to the American economy than the entire federal government, according to a new study by the Boston Consulting Group.

The Internet accounted for $684 billion, or 4.7% of all U.S. economic activity in 2010, Boston Consulting Group found. By way of comparison, the federal government, contributed $625 billion, or 4.3%, to the nation’s output. If it was considered its own separate industry, the Internet would also be larger than America’s education, construction or agricultural sectors.

In the retail sphere alone, e-commerce accounted for 5% of U.S. sales in 2010.

“All businesses are increasingly digital and need to think about how to take advantage of these opportunities,” said Dominic Field, a BCG partner and co-author of the report. Boston Consulting Group predicts the Internet will grow about 10% a year through 2016 in the Group of 20 nations.

Advertising HERE makes dollars, and sense!And this digital media will grow every year.

Call Steve today to get your powerfuldisplay ad started. 916.729.5432

Page 56: Exchange ezone july8 2013

July 8, 2013Page 54 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

Newspaper Rate Sheet

Ad Type Ad Size 1 run 6 runs 13 runs 26 runs 52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall $782 $639 $497 $355 $209

Full page (bleed) 8 5/8” wide by 11 1/4” tall $427 $355 $284 $213 $139

Full page (boxed) 8” wide by 9 3/4” tall $427 $355 $284 $213 $139

Half page 8” wide by 4 3/4” tall $229 $193 $158 $123 $87

One Third (V) 2 7/8” wide by 7 1/2” tall $171 $144 $118 $92 $63

One Third (H) 8” wide by 3 1/8” tall $171 $144 $118 $92 $63

Quarter Page 3 7/8” wide by 4 3/4” tall $97 $81 $64 $47

Contractor Yellow Pages (Business Card Sized Ad) $39 $32 $24 $19

Legal ads • 3 7/8” wide and up to 2 1/4” tall $50 • 3 7/8” wide and up to 3 1/2” tall $75

• 3 7/8” wide and up to 5” tall $95 • 3 7/8” wide and up to 6 1/2” tall $135

The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Upgraded format, larger ad sizes, lowered rates:

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected]. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: [email protected]. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members!

Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract.

For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected] See the news-paper onlne at www.PCCAe-Zone.com

Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.

Display Advertising Policy, Rates and InformationREVJULY2012

Our LOWEST rates