Exchange ezone july1 2013

52
C ontractor’s Z one weekly newspaper July 1, 2013 Vol. 7, No. 26 Placer County Contractors Association & Builders Exchange Be Safe In Triple Digit Heat This Summer Details Inside

description

Weekly publication for contractors to find bidding projects, education, networking opportunities and group discounts.

Transcript of Exchange ezone july1 2013

Page 1: Exchange ezone july1 2013

Contractor’s Zone

Contractor’s Zoneweekly newspaper

July 1, 2013Vol. 7, No. 26Placer County Contractors Association & Builders Exchange

Be Safe In Triple Digit Heat This SummerDetails Inside

Page 2: Exchange ezone july1 2013

July 1, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

SURETY DIVISION

PERFORMANCE BOND MISINFORMATION

The town of Holiday Island, Arkansas had a small roof project out to bid. According to Carrollconews.com, Holiday Island District Manager, Gerald Hartley stated, “no qualified bids were returned.” The reason given was because of the performance bond requirements the city has on all jobs over $20,000. He goes on to state that financial reporting and the “cost of $2,500 to $3,500 was just too much for small contractors to qualify for.” I cannot help but to think he got this information from small contractors that were not qualified to do a $20,000 roof job without putting the taxpayers at risk.

The job in question was just over $20,000 in size. The cost of a bond of that size would be well less than $1,000 (probably in the $600.00 range). As far as the financial reporting goes, for a job of that size, all it would take would be an owner of the construction company to have good credit and to complete an application of a couple of pages to get the surety bond. There are several surety companies that now offer “short form” performance bond programs specifically to service small and emerging contractors.

By John Page, President of Surety Solutions Insurance Services, Inc. an independent, surety bond only agency based in Rancho Cordova, CA

John founded Surety Solutions in 2003. John has over 25 years of surety bond experience and was a former Vice President of a national, top ten surety company. Along with a degree in Finance from Temple University John received his MBA from the University of San Francisco.

PHLY.comEd. 120412

Philadelphia Insurance Companies is the marketing name for the insurance company subsidiaries of the Philadelphia Consolidated Holding Corp., a Member of the Tokio Marine Group. Your insurance policy, and not the information contained in this document, forms the contract between you and your insurance company. If there is a discrepancy or conflict between the information contained herein and your policy, your policy takes precedence. All coverages are not available in all states due to state insurance regulations. Certain coverage(s) may be provided by a surplus lines insurer. Surplus lines insurers do not generally participate in state guaranty funds and insureds are therefore not protected by such funds. | © 2012 Philadelphia Consolidated Holding Corp., All Rights Reserved.

The city is considering waiving or changing the bond requirement which is short sighted. If all it takes is a contractor with good credit to get the bond, why would the city want to risk the taxpayer’s money? Without the bond, the city would potentially have to pay for materials twice and have no guarantee of the workmanship. The surety bond is a bargain for the city and the city’s tax payers.

CALL 877.550.7803 For a Builders Exchange Bond Quote

Page 3: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Inside This Issue

This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

InspirationfortheWeek Page2

YourWeeklySmile Page2

IndustryLinks Page2

TheWeek’sWeatherForecast Page3

PCCACalendarofEvents Pages4-5

ContractorYellowPages Page6

NewsBriefs Pages7-9

IndustryNews Pages10-13

ClassifiedAds Page14

WeeklySafetyMeeting Page15

CalTrans Page16

PlansOnFile Pages18-43

BidResults Page45

LegalAds Pages46-49

BottomlineLawyers Page20 WebsiteDiamondPacific Page8 WebsiteInlandBusinesSystems Page19 WebsiteJensenMasonry Page22 WebsitePhiladelphiaInsurance PageIFCStateFundInsurance Page6 Website

SUPPORT OUR ADVERTISERS!They support the PCCA

and deserve your business!

Don’t let the money ship

sail without you!A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!

Page 4: Exchange ezone july1 2013

July 1, 2013Page 2 Contractor’s Zone• .Contractor’s Zone

Association Links CSLB Contractor’s State License Board OSHA Occupational Safety & Health Administration GSBE Golden State Builders Exchange AIA American Institute of Architects AGC Associated general Contractors BIA Building Industry Association SCIF State Compensation Insurance Fund Employers Guardian Human Resources American Subcontractors Association

Projects Online DGS Contracts DOT DOT District 3 SMUD CSI Code List Fed Biz Opps

Safety OSHA Hazard Communication OSHA Safety & Health Topics Click SafetyOnline OSHA Safety Classes Employer Records of Occupational Injury & Illness Governor’s Office of Emergency Services Injury & Illness Prevention Program Risk Management – IIPP

State & Federal Links California Building Standards California Prevailing Wage Rates Federal Prevailing Wage Rates California Dept. of Industrial Relations California Environmental Protection Agency Mechanics Lien Law Information Mechanics Lien Guide

Local Government Links California Chamber of Commerce City of Auburn City of Rocklin City of Roseville City of Lincoln County of Placer

Construction Industry Links

“Just because something is easy to measure doesn’t mean it’s important.”

— Seth Godin

Life isn’t like a box of chocolates. It’s more like a jar of jalapenos. What you do today, might burn your butt tomorrow.

Page 5: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

PCCA:

PresidentPatrick RemingtonRemington Construction

Vice PresidentChris HarrisJames L. Harris Painting, Inc.

DirectorCheryl GibsonVon-Jac Development

DirectorCyndi CookCook Design Company

DirectorAdam NooraniHomewood Lumber

DirectorEdward JohnsonWarren G. Bender Co.

DirectorMaggie MarfiaMoule’s Foothill Glass

VP Public RelationsTim BuskHeritage Painting

VP Governmental AffairsJack RemingtonAndregg Geomatics

PBX:PresidentJohn BrunJohn Brun Masonry

Vice PresidentChad TwardusTwardus Construction

DirectorNick ForestiereGurnee & Daniels LLP

DirectorMike BennettBennett Tile

Staff:Chae Gale-Director of [email protected]

Jeff Henry-Director of Business [email protected]

Kellie Russell-Auburn Planroom [email protected]

Vickie Guthrie - Roseville Planroom [email protected]

Jim Couk - Scan Technician

Placer County Contractors Association10656 Industrial Ave., Ste.160, Roseville, CA 95678 - 916-771-7229

470 Nevada Street., Ste.209, Auburn, CA 95603 - 530-889-3953Open Monday-Friday: 8am-5pm

www.placerbx.com

Board of Directors

RosevilleToday111oSun111o-66o

103o

64o

Tuesday Wednesday Thursday Friday

102o

70o101o

68o92o

62o

AuburnToday107oSun107o-77o

100o

73o

Tuesday Wednesday Thursday Friday

98o

73o100o

71o90o

65o

Page 6: Exchange ezone july1 2013

July 1, 2013Page 4 Contractor’s Zone• .Contractor’s Zone

J u l y 2 0 1 311 CPRClassRosevillePCCA Classroom.9:00amto2:00pm $75.00perstudent.

17 MurphyAustinPresents ConstructionContractSeminar attheRosevillePCCAClassroom.

24 ShouldyouformaCorporation in20139:00to11:00atRoseville PCCAhostedbyBurnett& Associates.

25 ShouldyouformaCorporation in2013?1:30to3:3atRoseville PCCAhostedbyBurnett& Associates.

A u g u s t 2 0 1 35 QSP/QSDTrainingat RosevillePCCA

6 QSP/QSDTrainingat RosevillePCCA

7 QSP/QSDTrainingat RosevillePCCA

23 MeeksLumberMixerFriday Aug23rd1130am–130pm.

How to send your ad to C&S Publishing:

If you have your information ready, just email it to:

[email protected]

If you need a little helpputting the ad together, use the handy online form.

Page 7: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

JulySUNDAY MONDAY TUESDAY WED. THURSDAY FRIDAY SAT.

2 1 2 3

16 1 7 18 19

13

24 26

June 30

7

2 5

1 4

10

2722

11

2015

9

2

12

5

8

63July 1

CPRClass

MurphyAustinPresents

ConstructionContractSeminar

ShouldyouformaCorporationin2013?

9:00to11:00

ShouldyouformaCorporationin2013?

1:30to3:30

Page 8: Exchange ezone july1 2013

July 1, 2013Page 6 Contractor’s Zone• .Contractor’s Zone

Contractor Yellow Pages

MasonryJensen

Full Service Masonry ContractorLicense # 804650

Mark Jensen916.663.3429

[email protected]

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com985LincolnWay,Auburn,CA95603

Page 9: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Sacramento Gets $115 Million For Flood Control Projects

The Sacramento region’s flood-con-trol infrastructuregotafreshinfusionofcashLastweekwiththeannounce-mentofabout$115million in federalmoney for projects for FolsomDam,the American River watershed andsouthSacramento.

Under themoney,partof thealloca-tionfortheU.S.ArmyCorpsofEngi-neers2013fiscalyearworkplan,thebulk, $98.8 million, will be spent onbuildinganauxiliary spillway forFol-somDam.Other projects include$2milliontoraisethedamand$700,000to improve flood protection aroundcreeks and streams in south Sacra-mentoCounty.

Though the funding also includes$13.5million forAmericanRiverwa-tershed work, including design tosupport leveesinNatomasandelse-where,theregionstillhasabitlongerwait formoney to finishwork on theNatomasbasin,whereabuildingmor-atoriumoverpotentialfloodissuesre-mainsinplace.

Jonelle Trimmer, press secretary forU.S.Rep.DorisMatsui,D-Sacramento,saidMatsuiisoptimisticingettingcon-gressionalauthorizationthisyeartofin-ishNatomaswork. “We believewe’regoingtoseeadraftbillinthenextcoupleweeks,andthecommitteechairwantstohavehearingsthissummer,”Trimmersaid.TheU.S.Senateincludedgenericlanguagegivingsuchauthorizationinabillalreadypassedthisyear,sohavingHouseofRepresentativesauthorizationwouldthenallowlocalflood-controloffi-cialstopursuefundingtoactuallycom-pletethework.

Shopping Center Remodel Planned In Citrus Heights

The Marketplace at Birdcage retail

News Briefs

Continued on next page

center in Citrus Heights could begetting a minor makeover, with aproposaltoreconfigureaportionofthe development that went beforethecity’splanningcommission lastweek.Staff’s recommendationwasfor theplanningcommission toap-proveboththedesignreviewpermitmodificationandatreepermitforthechangesoutlinedintheproposal.

Under the proposal from Perkins,Williams, & Cotterill Architects, aportion of a former CVS store at6197 Sunrise Boulevard would betorn down and a smaller additionconstructed. The work would re-ducethebuilding’sfootprintbyanet10,000 square feet, resulting in a38,575-square-foot building intend-edforgroceryorotherretailusers.

City staff wrote that the work alsowould allow construction of a neweast-west “drive aisle” that wouldallow better access by connect-ing Sunrise Boulevard to BirdcageStreet and improve visibility fromSunrise and Sunrise Mall to theeast.Pedestrianaccesswouldalsobe increased. The project wouldalso remove and replace severaltreeswithintheshoppingcenterandadd 30 new parking spaces alongthedriveaisle.

Final EIR For $70 Million Jail Facility In Porterville Goes

To Supervisors

Anothergiantstep toward thecon-structionofa$70millioncountyjailfacility inPortervillecouldbetakensoon when the Board of Supervi-sors is asked to approve the finalenvironmentalimpactreportfortheproject.TheEIRfoundthatanypo-tential environmental impacts canbemitigated,andtheboardshouldapprovalthefinalEIRtothecountycanproceedwiththeproject.

The jail EIR is just one of severalsignificant issues before the boardtoday. Also on the agenda is theconsideration of salary increasesformore than 500 employees andtheboard itself, anappeal filedbythe Tule River Indian Reservationoverconditionsplacedon itsplanstoconstructawastewatertreatmentfacility to serve residents of thereservation and the introduction ofamendmentstothecountybusinesslicenceordinance.

The jail is in thedesignstage,andconstruction could begin next yearor as late as 2016. The county isproposingconstructinga500-bed—250-double-occupancy units— jailfacility on approximately 75 acreson Scranton Avenue just west ofNewcomb Street.According to thestaff report, the facility will employup to 172 people working aroundtheclock.

Sport Complex In Petaluma Moves Forward

AsportscomplexinEastPetalumathathaslanguishedonthesidelinesfor more than 20 yearsmay actu-allybreakgroundinthespring.The$23millionEastWashingtonPark,whichbeganasa$2.1millionpub-lic-private partnership concept in1990,couldseeconstructionbeginnextspringonanabbreviatedfoot-print.

City leaders last week approved a$210,000 contract for design andengineeringworkona$6.7millionsegment, which includes at leasttwo—maybethree—artificialturfmulti-use fields, lighting, irrigation,frontage street improvements, agravel road and parking area andprovisionsforseatingandfencing.

Page 10: Exchange ezone july1 2013

July 1, 2013Page 8 Contractor’s Zone• .Contractor’s Zone

San Francisco Condo Project Breaks Ground

Oyster Development has starteddemolition and excavation of its114-condodevelopment in theMis-sion District, a $70 million projectthat will eventually abut a refur-bishedNewMissionmovie theater.BuildGroupisthecontractor.

InadditiontotheMissionStreetsite,Oysteralsoboughtaparcelat1296Shotwell,whichwillbehandedoverto the Mayor’s Office On Housingfordevelopmentofaffordablerentalhousing. Givas said the neighbor-hoodmadeitcleartheypreferredaland dedication over on-site afford-ableunitsbecauseitgeneratesmoreaffordable units than on-site afford-able(46versus14)andprovidestheflexibility fordeeperaffordability (byallowingaffordablerentalsinsteadofonlyaffordablecondos).

Regional Forecast Exceptionally Good

During the downturn, new homeconstruction plummeted along withjobs and personal incomes.A newforecast for the Sacramento regionpredictsthesemeasuresofeconom-ichealtharepoisedtorisetogetheroverthenextfouryearsHomebuild-ing,aneconomicpowerhouseintheregionwhenit’sinfullswing,willre-turn in force, rising to levels in linewithpopulationgrowthby2017,ac-cordingtothelatestforecastbytheUniversity of the Pacific’s BusinessForecastingCenter.Thenewreportfor the four-county Sacramento re-gionpredictssizablejobgrowthoverthenextfouryears,alongwithfallingunemployment. Personal incomes,adjusted for inflation,willeventuallyriseagainataratefasterthanduringtheboomyears.

With more good news, real estateinformationfirmDataQuickreported

lastweek that themedian price forresalehomesinSacramentoCountyroseastunning42percentinthepastyear,from$160,000inMay2012to$227,500 last month. New homepriceshavebeenontherise,too.InPlacerCounty,aprimehomebuild-ing area, the median sale price ofnewhomesroseinMayto$378,500,up23.5percent comparedwith thesamemonthayearago.

Michael Strech, president of theNorthStateBIA,saidmostbuildersagree the new home market is ontracktorecover.

Tulare And Visalia Summer Projects

The Tulare City School District willbereplacingtheheating,ventilationandair conditioningunitsatCherryAvenue Middle School, as well asreplacingtheroof.Thecostsforre-placingtheairconditioningunitswillbe $119,000 and costs for the roofreplacementswillbe$205,000.

The district will also be upgradingthe refrigerator and freezer units inits central kitchen, where all of thelunchandbreakfastmealsaremadefor all 14 school locations.The up-gradewillcostthedistrict$81,000.

Other projects the district will beworking on during the summer istheremodelingprojectofthelibraryatPleasantElementarySchool, theinstallationofwindowcoversatnineschoolsitesandroutineworkordersforanything thatneeds tobefixed.PleasantElementarySchoolwill re-model theexisting libraryandcom-bineitwiththecomputerlabtocre-atemorespace.

TulareJointUnionHighSchoolDis-trictwillalsobeworkingon itsownconstruction projects this summer.

News BriefsContinued from last page

http://designcenters.paccoast.com

Page 11: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

A classroom building at both Tu-lare Union and TulareWestern highschoolswillundergoconstruction.Theplanning for the new roofing beganlastOctoberand isexpected tocostthe district $750,000 for both sites.The district decided to go with thesamecontractor,GaryInterranteCon-structionfromExeter,forbothsites.

ForVisaliaschools,summerimprove-mentswillcomebywayofMeasureE, thevoter-approvedbond initiativeused to fund ongoing constructionandrenovationprojects.

Thelargestprojectontapforthissum-mer is the installationofsolarpanelsat12schools,beginningJuly10.

RedwoodHighSchool,HighlandEl-ementary and Crowley Elementary— identified byAdministrative Ser-vicesDirectorDavidLoverinas theworst offenders in the districtwhenit comes to energy costs—will bethefirstrecipientsofthenewpanels.The remaining schools—PinkhamElementary,LinwoodElementary,LaJoyaMiddleSchool,VevaBluntEl-ementary, Willow Glen Elementary,GreenAcres Middle School, Hous-ton Elementary, Fairview Elemen-taryandIvanhoeElementary—willbefurnishedwiththenewequipmentbyNovember.

Four Porterville Projects Get District Approval

ThePortervilleUnifiedSchoolDistrictwill includewhat itconsiders tobe itsfour highest priority construction proj-ects in the2013-14budget tobeap-proved by the board at its June 27meeting. Those projects are a mod-ernization project at Roche AvenueElementary School, the replacementof portable classrooms at BelleviewSchool,theconstructionofaswimmingpool at Strathmore High and the ex-pansionofButterfieldCharterSchool.

The Roche project will cost nearly$450,000 and will include a badlyneededexpansionof restroomsand

replacing two portable classrooms.Theschoolnowhasjustonegirlsre-stroomandoneboys restroom,andtheboysrestroomhasjustoneurinal.

Itwasalsotheconsensusoftheboardtobuildapermanent,two-story,nine-classroomstructureatBelleview,asopposedtoamodularbuilding.Thatwill increase the cost of the projectfromaround$2.8milliontomorethan$4.1million.ThebuildingwillreplaceportableclassroomsacrossthestreetfromBelleview,which have been attheschoolfor35years.

TheconstructionoftheswimmingpoolatStrathmoreHighwillcost$3.3mil-lion.ThepoolwillbeusedbyHarmo-nyMagnetAcademyandStrathmoreHighstudentswhocompeteforStrath-moreHighboysandgirlswaterpoloandboysandgirlsswimteams.Thoseteamscurrentlyhave topracticeandcompeteintheirhomecontestsattheGraniteHillsswimcomplex.Thepoolcouldalsobeusedbyyouthclubsandpossiblyeventhepublicaswell.Thepool will be constructed behind thetenniscourtsbetweenSpartanStadi-umandthejuniorvarsitysoftballfieldontheSHScampus.

Alloftheconstructionprojectsshouldbe completed during the 2013-14schoolyear.

Central Valley Construction Rebounding

Construction in the Central Valleymadesomedefiniteheadwayby thesecondquarteroftheyear,withbuild-ingpermitsupmorethan30percentoverthesametimelastyear.Through-outFresno,Madera,KingsandTularecounties, 4,449 construction permitswereissuedtobuildersinthefirstsixmonths of the year, up 30.5 percentfrom3,409duringthesameperiodlastyear,accordingtoaweeklyreportbyConstructionMonitor.

The value of all construction permitsrosefrom$403.4millionbyJuneoflastyearto$547.6millionsofarthisyear.

Commercial permits rose from 644during last year’s second quarter to667sofarthisyear.Amongthose,re-tail, warehouses and dining jumpedfrom18to26,whileoffices,banksandprofessionalbuildingswentfrom22to33.Industrialandmanufacturingbuild-ings andwarehouses dipped slightlyto22,althoughthevalueofthoseper-mitsdoubledto$39.3million.

Housing Gains Document Economic Recovery

U.S. builders steppeduphomecon-struction inMayandapplied forper-mits to build single-family homes atthe fastest pace in five years. Thegains show housing remains a keysourceofgrowthfortheeconomy.Theoverall pace of homes started rose6.8percentlastmonthtoaseasonallyadjustedannual rateof 914,000, theCommerceDepartmentreported.

Overall, the report points to moreevidenceofahousingrecoverythathasbecomesustainable.New-homeconstructionhas risen28.6percentsinceMayof2012.

Construction increased in May forbothsingle-familyhomesandapart-ments and condos. And builderssoughtmorepermitstobuildsingle-familyhomes,whichmakeupnearlytwo-third of the market. The sea-sonally adjusted annual rate rose1.3percentto622,000-thehighestsinceMay 2008.That’s a sign thatconstruction will increase further inthecomingmonths.

Abetteroutlookforhousinghasmadebuilders more optimistic, leading tomore construction and jobs. TheNa-tional Association of Home Builders/WellsFargobuildersentimentindexre-leasedlastweekroseto52thismonth,upfrom44inMay.Thatwasthehigh-est reading in seven years and thelargestmonthlyincreaseinmorethanadecade.Eachhomebuiltcreatesanaverage of three jobs for a year andgenerates about $90,000 in tax rev-enue,accordingtoNAHBstatistics.

Page 12: Exchange ezone july1 2013

July 1, 2013Page 10 Contractor’s Zone• .Contractor’s Zone

Industry News

Workplace Safety And Health Heat Stress

By: Centers for Disease Control and Prevention

Workerswhoareexposedtoex-treme heat or work in hot envi-ronmentsmaybeat riskofheatstress.Exposuretoextremeheatcanresultinoccupationalillness-es and injuries.Heat stress canresultinheatstroke,heatexhaus-tion,heatcramps,orheatrashes.Heatcanalsoincreasetheriskofinjuriesinworkersasitmayresultinsweatypalms,fogged-upsafe-tyglasses,anddizziness.Burnsmayalsooccurasaresultofac-cidentalcontactwithhotsurfacesorsteam.

Workersatriskofheatstressin-cludeoutdoorworkersandwork-ers inhotenvironmentssuchasfirefighters,bakeryworkers,farm-ers, construction workers, min-ers,boiler roomworkers, factoryworkers, and others.Workers atgreaterriskofheatstressincludethosewhoare65yearsofageorolder,areoverweight,haveheartdisease or high blood pressure,or takemedications thatmaybeaffectedbyextremeheat.

Prevention of heat stress inworkers is important. Employersshould provide training to work-ers so they understand whatheatstressis,howitaffectstheirhealthandsafety,andhowitcanbeprevented.

Heat StrokeHeatstrokeisthemostseriousheat-relateddisorder.Itoccurswhenthebodybecomesunabletocontrolitstemperature:thebody’stemperaturerisesrap-idly,thesweatingmechanismfails,andthebodyisunabletocooldown.Whenheatstrokeoccurs,thebodytemperaturecanriseto106degreesFahrenheitorhigherwithin10to15minutes.Heatstrokecancausedeathorpermanentdisabilityifemergencytreatmentisnotgiven.

Symptoms of heat stroke include: Hot,dryskinorprofusesweating Hallucinations Chills Throbbingheadache Highbodytemperature Confusion/dizziness Slurredspeech

First AidTake the following steps to treat a worker with heat stroke: Call911andnotifytheirsupervisor. Movethesickworkertoacoolshadedarea. Cooltheworkerusingmethodssuchas: Soakingtheirclotheswithwater. Spraying,sponging,orshoweringthemwithwater. Fanningtheirbody.

Heat ExhaustionHeatexhaustionisthebody’sresponsetoanexcessivelossofthewaterandsalt,usu-allythroughexcessivesweating.Workersmostpronetoheatexhaustionarethosethatareelderly,havehighbloodpressure,andthoseworkinginahotenvironment.

Symptoms of heat exhaustion include: Heavysweating Extremeweaknessorfatigue Dizziness,confusion Nausea Clammy,moistskin Paleorflushedcomplexion Musclecramps Slightlyelevatedbodytemperature Fastandshallowbreathing

Page 13: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Heat CrampsHeatcrampsusuallyaffectworkerswhosweatalotduringstrenuousactivity.Thissweatingdepletesthebody’ssaltandmoisturelevels.Lowsaltlevelsinmusclescausespainfulcramps.Heatcrampsmayalsobeasymptomofheatexhaustion.

Symptoms Musclepainorspasmsusuallyintheabdomen,arms,orlegs.

First AidWorkers with heat cramps should: Stopallactivity,andsitinacoolplace. Drinkclearjuiceorasportsbeverage. Donotreturntostrenuousworkforafewhoursafterthecrampssubsidebecausefurtherexertionmaylead toheatexhaustionorheatstroke. Seekmedicalattentionifanyofthefollowingapply: Theworkerhasheartproblems. Theworkerisonalow-sodiumdiet. Thecrampsdonotsubsidewithinonehour.

Heat SyncopeHeatsyncopeisafainting(syncope)episodeordizzinessthatusuallyoccurswithprolongedstandingorsuddenrisingfromasittingorlyingposition.Factorsthatmaycontributetoheatsyncopeincludedehydrationandlackofacclimatization.

Symptoms of heat syncope include: Light-headedness Dizziness Fainting

First AidWorkers with heat syncope should: Sitorliedowninacoolplacewhentheybegintofeelsymptoms. Slowlydrinkwater,clearjuice,orasportsbeverage.

First AidTreat a worker suffering from heat exhaustion with the following: Havethemrestinacool,shadedorair-conditionedarea. Havethemdrinkplentyofwaterorothercool,nonalcoholicbeverages. Havethemtakeacoolshower,bath,orspongebath.

Heat RashHeatrashisaskinirritationcausedbyexcessivesweatingduringhot,humidweather.

Symptoms of heat rash include: Heatrashlookslikearedclusterofpimplesorsmallblisters. Itismorelikelytooccurontheneckandupperchest,inthegroin,underthebreasts,andinelbowcreases.

First AidWorkers experiencing heat rash should: Trytoworkinacooler,lesshumidenvironmentwhenpossible. Keeptheaffectedareadry. Dustingpowdermaybeusedtoincreasecomfort.

Page 14: Exchange ezone july1 2013

July 1, 2013Page 12 Contractor’s Zone• .Contractor’s Zone

Page 15: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

By Shauna Krause and David KalbCapitol Services, Inc.

Contractorswanta ‘level’fieldwhenmakingbidswithcompetition.That’swhyyourlicensenumberisrequiredin advertising, signage and otherplacesaconsumercanseeit.Hope-fully, when they check it at CSLB it‘flattens’ the ambition of unlicensedcompetitors.Wealsotakea‘shortcir-cuit’indescribingtheroutetoaddingalowvoltageclass…

Q: Can we take a contract with a“C-61” licenseand then subcontractoutaportiontoa“C”class?Forin-stance,coulda“D-28”(DoorsGatesActivating devices) take a contractand,knowingthatthereissomeelec-tricalwork,subthisportiontoaprop-erlylicensed“C-10”?

A:Itshouldnotbeaproblemaslongasthesubcontractedworkisincidentalandsupplemental(i.e.essential)tothecompletionofthe“D-28”project.Tothebestofmyknowledge,thereisnothingin the law or regulations to precludeaSpecialtyContractor fromdoing (orsubcontracting)incidentalwork.

Q:Wecurrentlyhavea“C-10”Elec-trical license and we are starting anewcorporationthatwillfocusondo-inglowvoltageelectricalwork.Canmybossobtainaseparatelicenseforthenewcompanyandgetawaiverofthe“C-7”lowvoltageexamsincehehasthe“C-10”classificationalready?Because of the certification require-mentsof“C-10”electricianshewantstohaveastand-alone“C-7”license.

A: Except inextremely rare cases,theCSLBwillnotgrantawaiverofatradeexam forabrandnew license

Capitol Connection Q&A Resource For ContractorsKalb Q & A

Shauna KrauseDavid Kalb

unless the qualifying individual haspreviouslyheldtheclassification.Hecanhoweverapplytoaddthe“C-7”toyour existing licenseand request towaive theexam. Keep inmind thatthis is only a request and in orderto be approved your bosswill needto show proof of at least five yearsofworkexperiencewithin the last 7yearswherethe“C-7”(LowVoltage)was a significant component of the“C-10”project.

Once the “C-7” has been added totheexistinglicensehecanthenapplyforastand-alonelowvoltagelicenseforthenewcompany.

Q:I’mahomeownerandfoundyournameontheInternet.Iwanttohireacontractor(forasmallbathroomremod-el)whoadvertisesinourlocalnewspa-per,butcouldnot locatehisnameontheCSLBwebsite.Hesaidhewas“li-censed,bondedandinsured”andgavemeagoodpriceforthework.YoufolksappeartoknowalotaboutcontractorsandIwashopingyoumighthavesomeadvice.Ifit’snottoomuchofaprob-lem,maybeyoucouldevencheck toseeifthisguyreallyislicensed?

A: Unfortunately many unlicensed“contractors”advertisethattheymeetallthestaterequirementswheninfacttheydonothaveavalidcontractor’slicense; bonding, orWorker’s Com-pensationcoveragefortheiremploy-ees.Inyourcase,wesearchedandcouldnotlocateavalidlicense;how-ever,wedidlocatesomeonewiththatnamewhohadalicensethatexpiredtwoyearsago.Thissameindividualhasapendingjudgmentagainsthimandotherpendinglegalactions.

Ouradviceistostaywellclearofthis“contractor”andfindsomeonewhohasanactivecontractor’slicenseingoodstanding. Also,makesure ifthecontractorhasemployees,theyare covered byWorker’sCompen-sation. While this unlicensed indi-vidualmayhavegivenyoua“goodprice”, you’ll likely end up payingmuchmore in the long run. If thisguyliedtoyouabouthavingavalidlicense,bonding,etc.canyoureallytrusthimtokeephiswordregardingyourbathroomremodel?So,noval-id license, judgments pending andless than truthful is three strikes,you’reout!

Page 16: Exchange ezone july1 2013

July 1, 2013Page 14 Contractor’s Zone• .Contractor’s Zone

Classified Ads

For Sale:CommercialGeneralContractorRETIRINGsellingeverythingfromofficefurnituretohandtools, includingplantablewithdigitizerandportabledigitizer.Toomuchtolist,callifinterested.Rick916-870-9637

For Sale:StainlessSteelThermadorDoubleOvenModel#PODC302JNewInBox$5,500.00BobHilton916-508-0723

“Surplus” Sale: GHHisdoingsomeSpringcleaning!Wehaveavarietyofconstructionmaterialsandtoolsrangingfrompipefittingstocompressorsandgenerators.Stopby,seewhatwehaveandmakeusanoffer!

Date:February15,2013Time: 9:00am-3:00pmLocation:11960HeritageOakPlace,Ste.2BAuburn,California95603Questions:(530)886-3100

Seeking:SacramentocompanylookingforExperiencedGutterInstaller.Someonewithatleast2yearsexperience.Cleancut.Workingcellphone.DrugtestandbackgroundchecksrequiredFaxResumeto916-943-0699oremailirina@soldate.netSalaryDOE

For Sale: 4planbincabinets,dimensionsare33”dx33”wx7’h24cubbiesineach,$150percabinetPleasecontactChaeGaleformoreinfo.916-771-7229

For Sale:2single(2drawer)filecabinets$35each1lateral(2drawer)filecabinet$50PleasecontactChaeGaleformoreinfo.916-771-7229

Don’t get thrown out on your way home!

DVBE/UDBE Good Faith ads are often required. This newspaper is state-certified.

Legal ads: are firms seeking bids or sub bids from DVBE/DBE/MBE/WBE/SBE companies. Legal ads are priced on the length of the ad. In general, most ads will fit into our standard ad shell which is one-column by

up to 2 1/2” tall. The price for a standard sized legal ad is $35. For this price, the ad is run in all three formats from the date the ad is placed until the bid date -- unmatched coverage and distribution, all for a rediciously low price! Ads larger than 2 1/2 column inches are priced by the size. CLICK HERE to place a legal ad. Or

Email your ad to: [email protected]

Page 17: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

‘’Beltyourwife-saveherlife”,“Clickitorticket’’,and“Buckleup–it’sthelaw”,areasayingswe’veheardfrequentlyovertheyears.

SeatbeltswerefirstofferedbyU.S.automobilemanufacturersintheearlysixties.Thosepeskyoldbeltshavebeenaroundfor40yearsnowbutwestillseepeopleoperatingmotorvehiclewithoutthem.TheNationalSafetyCouncilreportsintheir1992AccidentFactseditionthat43,500motorvehicledeathstookplacein1951;3,500ofthesedeathshappenedatwork.Thecostofthesemotorvehicleaccidentswasanastronomical96.1billiondollars!Manyoftheseinjuriesanddeathscouldhavebeenpreventedifthoseinvolvedhadtakentimeto‘’buckleup”.

Studiesby theNationalHighwayTrafficAdministrationshowthatmanual lapandshoulderbeltsareeffective inpreventingfatalities,50%effectiveinpreventingmoderatetocriticalinjuries,and10%effectiveinpreventingminorinjuries.Inearly1992over40stateshadenactedmandatorysafetybeltuselaws,butstudiesshowthatonly55%ofthemotoringpublicweartheirseatbelts.

Manynewcarsandtrucksarenowequippedwithsupplementalrestraintsystems(SRS),betterknowasairbags.FortheSRStobeeffectivetheoperatorand/orthepassengermustbewearingtheirseatbelttofullybenefitfromtheairbag.

Youmaythinkofmanyreasonswhyyoudon’torcan’twearyourbelt--“they’reuncomfortable”,‘whathappensifI’mknockedunconsciousandcan’tgetout”,“hey,I’monlygoingtothestore,nothingwillhappen”,or“neverhadanac-cidentsoIdon’tneedabelt”--allofthesearejustexcusesandindicateplainstupidityoraverypoorsafetyattitude.Remember,YOUaretheONLYONEtomakethedecisionwhetheryoudoordon’tbuckleup.Onoroffthejob,startthenewyearbymakingeverytripasafeonebybucklingup,andinsistingthatallpassengersinyourvehicledothesame.Whoknows,thelifeyousavemaybeyourown!

IT’S A PROVEN FACT - SEAT BELTS SAVE LIVES - BUCKLE UP!

Buckle Up - Save A LifeCompany Name: Job Name: Date:

Special topics for your project:

Employee Safety Recommendations:

Reviewed MSDS # Subject

Meeting attended by:

Supervisor’s Signature: Date:

Weekly Safety Meeting

Page 18: Exchange ezone july1 2013

July 1, 2013Page 16 Contractor’s Zone• .Contractor’s Zone

CDOT 21

CDOT 14

CDOT 21

CDOT 21

CDOT 7

CDOT 7

CDOT 57

CDOT 43

CDOT 14

CDOT 14

CDOT 7

CDOT 7

CDOT 21

CDOT 21

CDOT 7

07/02/2013

07/03/2013

07/11/2013

07/11/2013

07/11/2013

07/11/2013

07/16/2013

07/17/2013

07/18/2013

07/18/2013

07/23/2013

07/24/2013

07/25/2013

07/25/2013

08/08/2013

0

0 0

0

0 0

3

1 0

0

0

0

0

0

0

MENDOCINO COUNTY

MENDOCINO COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

SAN BERNARDINO COUNTY SAN BERNARDINO COUNTY

SAN JOAQUIN COUNTY

SACRAMENTO COUNTY

LOS ANGELES COUNTY

RIVERSIDE COUNTY

HUMBOLDT COUNTY

NAPA COUNTY

SAN BERNARDINO COUNTY

SAN DIEGO COUNTY

ORANGE COUNTY

CalTrans

DOT 01-364324 REPLACE DRAINAGE SYS-TEMS AND INSTALL PIPELINERS AND RSP.

DOT 01-0C3604 INSTALL HIGH FRICTION SURFACE TREATMENT

DOT 07-265904 REPLACE BRIDGE RAILING.

DOT 11-404304 CONSTRUCT OUTER SEPARA-TION BARRIER, WIDEN SHOULDER, MODI-FY DRAINAGE.

DOT 08-0K3104 REALIGN ROADWAY WITH HMA OVER AGGREGATE BASE.

DOT 08-0N5704 BRIDGE SEISMIC RETROFIT

DOT 10-0G8004 PAVEMENT REHABILITA-TION AND BRIDGE CONSTRUCTION.

DOT 03-0F2304 BRIDGE WIDENING, PCC OVERLAY AND REPLACE CONCRETE BAR-RIER.

DOT 07-278304 REHABILITATE BRIDGE.

DOT 08-491804 REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOUL-DERS

DOT 01-459704 SEISMIC RETROFIT BRIDGE COLUMNS AND ABUTMENTS, CONST CON-CRETE BARRIER.

DOT 04-2A1104 BRIDGE REMOVAL, BRIDGE REPLACEMENT AND ROADWAY WIDENING.

DOT 08-368504 CONSTRUCT COMMERCIAL VEHICLE ENFORCEMENT FACILITY (CVEF)

DOT 11-401404 REPLACE MBGR WITH CON-CRETE BARRIER AND UPGRADE CRASH CUSHIONS.

DOT 12-0C5604 WIDEN RDWY AND BRIDGE, CONST RETAINING WALLS AND NEW BY-PASS OFF-RAMP.

Page 19: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Page 20: Exchange ezone july1 2013

July 1, 2013Page 18 Contractor’s Zone• .Contractor’s Zone

Plans On FileMonday, July 01, 2013

RFP OPERATE & MAINTAIN, AND PROVIDE ENGINEERING, ADMINISTRATION AND BILLING SERVICES FOR A WATER SYSTEM WITHIN THE CITYPLAN #:63098 Bid Date: 7/1/2013 Bid Time: 5:00 PM PLANS AT: DixonOnline and Planroom OWNER: City of Dixon DESCR: Contact, [email protected] wells, one aerial storage tank, one above grade storage tank and 32 miles of pipeline to deliver approximately one and half million gallons of groundwater per day.

RFP THE MCBEAN PARKWAY BRIDGE OVER AUBURN RAVINE REPLACMENT PROJECTPLAN #: 148066 Bid Date: 7/1/2013Bid Time: 3:00 PM PLANS AT: Lincoln Online and Planroom PREBID: 6/18 @10Am OWNER: City of Lincoln DESCR: Contact, Ray Leftwich - 916-434-2457The City of Lincoln Public Services Department is seeking proposals for professional engineering and related services for the development and management of the McBean Parkway bridge over Auburn Ravine Replacement project. Services will range from project initiation through construction and project closeout.

Tuesday, July 02, 2013

2013 CAPE / SLURRY SEAL PROJECTPLAN #: 16029 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: Roseville Online & Print On Est Cost: $1,865,000.00 # OF ADDENDA: 1 Demand OWNER: City of Roseville DESCR: Contact, City of Roseville (916) 746-1300 Place roadway resurfacing application of cape seal and slurry seal utilizing California Recycled Rubber to various residential streets.BIDDERS LIST:Sub Contractor: Sierra Striping, Inc./sierra 916-652-0430 916-652-9663

TURTLE BAY EAST TRAIL HEAD PARKING AND VIEW TRAIL PROJECTPLAN #:28025 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $300,000.00OWNER: City of Redding DESCR: Contact, Redding, City of (530) 225-4170 Work consists of the construction of Turtle Bay East trail head

parking area, approximately 820 feet of AC paved View Trail, and other miscellaneous items of work.BIDDERS LIST:General Contractor: Seward L. Schreder 530-229-0001 530-229-0070

PREQUALIFICATION-TECERO STUDENT HOUSING PHASE4PLAN #: 29021 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Davis Online and Planroom Est Cost: $41,000,000.00OWNER: University Of California, Davis DESCR: Contact, Chris McGuire - 530-754-1021 All design work, labor, materials, tools, equipment, excavation, shoring, testing, inspection, commissioning and all other necessary general conditions that may be reasonably inferred from the contract documents to provide all design work and construction work for; student housing with approximately 500 beds in single and double rooms, including bathrooms, common rooms, residence assistance apartments, lounges, recreation rooms administrative offices, community space, community kitchen, music room, maintenance shop and laundry facilities. This project also includes demolition of existing wood framed student housing

LATHROP ROAD/UPRR OVERHEAD PROJECTPLAN #:31021 Bid Date: 7/2/2013 Bid Time: 2:00 PM PLANS AT: LathropOnline and PlanroomPREBID: MAND 6/13 @ 1PM PREBID: 390 Towne Centre Dr. OWNER: City of Lathrop DESCR: Contact, City of Lathrop (209) 941-7430 Lathrop Road realignment, widening, and grade separation with UPRR from west of 5th Street to the Sharpe Depot southern entrance and construction of a new residential access road. This work includes construction of a new overhead structure, retaining walls, 24” water main with fire hydrant and irrigation leads, new subsurface drainage systems and basins/ditches, BIDDERS LIST:General Contractor: Oc Jones And Sons 510-526-3424 510-526-0990

2013 PARKING LOT CAPE/SLURRY SEAL PROJECTPLAN #: 33022 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: Roseville Online & Print On Est Cost: $1,030,000.00 # OF ADDENDA: 1

Page 21: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Continued on next page

Continued on next page1500 North Market Boulevard, Sacramento, CA 95834

Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing needs and develop an individualized plan of products and services that will serve your company best.

&Dealer

Your Authorizedwww.igoinland.com

PCCA member since 2004

Demand OWNER: City of Roseville DESCR: Contact, City of Roseville (916) 746-1300 Work consists of roadway and parking lot resurfacing at the City Corporation Yard and the Dry Creek Waste Water Treatment Plant including dig-outs and replacement of concrete curb, gutter and BIDDERS LIST:Sub Contractor: Sierra Striping, Inc./sierr 916-652-0430 916-652-9663

ELDORADO LOBBY ENTRY DOOR REPLACEMENTPLAN #: 35024 Bid Date: 7/2/2013 Bid Time: 12:00 PM PLANS AT: Hayward Online and Planroom Est Cost: $60,000.00PREBID: MAND 6/5 @ 10AM PREBID: 25800 Carlos Circle OWNER: State of CA DESCR: Contact,East Bay, California State University (510) 885-3607 El Dorado Hall Lobby Entry Door Replacement & ADA Access Project. For more details, please see specifications.

2013 ARTERIAL MICROSURFACING PROJECTPLAN #: 39022 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: Roseville Online & Print On

# OF ADDENDA: 2 DemandOWNER: City of Roseville DESCR: Contact, Roseville, City of - Public Works/Eng (916) 746-1300 The scope of this project includes placing a new pavement surface of Hot Mix Asphalt Micro surfacing to various arterial and collector streets in the City of Roseville. BIDDERS LIST:Sub Contractor: Sierra Striping, Inc./sierra 916-652-0430 916-652-9663

SAFE ROUTES TO SCHOOLPLAN #: 49015 Bid Date: 7/2/2013 Bid Time: 10:00 AM PLANS AT: Location: LincolnOnline and Planroom Est Cost: $355,000.00# OF ADDENDA: 2 PREBID: MAND 6/10 @ 10AM OWNER: City of Lincoln DESCR: Contact, City of Lincoln - (916) 434-2400 Work consists of placement of clearing, grubbing roadway excavation, and construction of curb, gutter, sidewalk, driveway, landscaping, irrigation, striping and roadway appurtenances associate with such BIDDERS LIST:General Contractor: All Phase Construction & 916-771-4602 916-771-4603 C & C Construction 916-434-5280 916-434-5288

Page 22: Exchange ezone july1 2013

July 1, 2013Page 20 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 02, 2013

NEES AVENUE STREET IMPROVEMENTSPLAN #: 54013 Bid Date: 7/2/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Clovis Online & Print On # OF ADDENDA: 1 Demand OWNER: City of Clovis DESCR: Contact, Clovis, City of (559) 584-7499 Clearing and grubbing, earthwork and grading, street construction, grind and overlay, miscellaneous concrete work, street striping and signage, relocation of communication boxes and adjustment of existing facilities to

FLIGHTLINE DRIVE REHABILITATION PHASE 1PLAN #: 70081 Bid Date: 7/2/2013 Bid Time: 11:00 AM PLANS AT: Location: LincolnOnline and Planroom Est Cost: $593,600.00 # OF ADDENDA: 2PREBID: MAND 6/10 @ 11AM PREBID: 600 Sixth Street OWNER: City of Lincoln DESCR: Contact, Lincoln, City of (916) 434-2450 Work shall include Full Depth Rehabilitation of existing roadway pavement and base material, sidewalk reconstruction, driveway replacement, asphalt paving, and pavement stripingBIDDERS LIST:General Contractor: All Phase Construction & 916-771-4602 916-771-4603 Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851

CAPITAL FUND ADA SITE & ROADWAYPLAN #: 71079 Bid Date: 7/2/2013 Bid Time: 2:00 PM PLANS AT: Location: Winters

Online and Planroom # OF ADDENDA: 2PREBID: 6/11 @ 10AM PREBID: 62 Shams Way OWNER: Yolo County Housing Authority Ph: 530-669-2240 FAX: 530-669-6255DESCR: Contact - Yolo County Housing - 530-669-2240Includes demolition of existing concrete sidewalks, curbs, fences, pavement markings and asphalt concrete; install concrete curbs, sidewalks, concrete paving, asphalt paving, asphalt seal coat, wheel stops, signing, striping, detectable warning devices and rip rap and

JOHNNY CASH TRAIL UTILITIES RELOCATIONPLAN #: 81079 Bid Date: 7/2/2013Bid Time: 10:00 AM PLANS AT: Print OnDemand Location: Folsom Online & Print On Demand OWNER: City of Folsom DESCR: Contact, Jim Konopka - 916-351-3516Johnny Cash Trail Utilities Relocation, mobilization, overhead utility relocation, traffic control, furnish all labor, materials, tools, equipment and transportation necessary for the project described.

TRAVELED WAY RESTROOM FACILITY FIRE DAMAGE REPAIRPLAN #: 83078 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $55,000.00OWNER: City of Redding DESCR: Contact, Redding, City of - Public Works (530) 225-4170 Repair an existing 276 SF restroom building constructed on concrete slab with CMU framed walls and wood framed upper wall and roof structure and roofing system, including removal / replacement of roof system, wall between restrooms, restroom ceiling, damaged light fixtures and electrical meter; replacement of vandalized

Continued from last page

Plans On File

INFO CENTER

CONTACT

WEB SITE

ABOUT

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Page 23: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Continued on next page

plumbing line and fixtures; pressure washing the exterior / interior of the building; painting the exterior eave soffits, fascia and flashing and the interior ceiling / metal

GLORIA DRIVE- MEEKLAND COURT COLLECTION SYSTEM REPLACEMENT AND GLORIA DRIVE & VALERIE WAY WATER MAIN REPLACEMENTPLAN #:92080 Bid Date: 7/2/2013Bid Time: 12:00 PM PLANS AT: Sonoma Co. Online and Planroom Est Cost: $3,500,000.00PREBID: MAND 6/11 @ 10am and - or 6/13 @ 2PM DESCR: Contact, Sonoma County Water Agency (707) 547-1900 Replacing approximately 6,570 feet of existing 6-inch and 8-inch sewer main pipe and appurtenant sewer laterals, manholes, and main line cleanouts with new 8-inch PVC sewer main and appurtenant sewer laterals, manholes, and main line cleanouts; replacing approximately 2,078 feet of existing appurtenance water services; and the addition of BIDDERS LIST:General Contractor: Ghilotti Construction 707-585-1221 707-585-1601

DEPOT PARK PARKING AREA AND ADA IMPROVEMENTS PROJECTPLAN #: 97072 Bid Date: 7/2/2013 Bid Time: 11:00 AM PLANS AT: Sonoma Online and Planroom OWNER: City of Sonoma DESCR: Contact, Terrie Zwillinger- 707-236-1551Parking lot rehabilitation and improvements, including miscellaneous demolition work, edge grinding existing asphalt pavement, repairing localized pavement failures, correcting pavement grading and drainage. placing asphalt pavement and overlay, pavement markings and signing, asphalt milling of existing Class 1 bike path and placement of asphalt overlay, re grading bike path approach for ADA improvements, upgrading existing cub ramps for ADA compliance, removal and replacement of concrete curb and gutter, tree removal, traffic control, and other related work as set forth on the project plans and specifications.

NORTHGROVE WAY 6 IN AND WALNUT DRIVE 8IN WATER MAIN REPLACEMENT PROJECTPLAN #: 103091 Bid Date: 7/2/2013 Bid Time: 9:00 AM PLANS AT: Citrus Heights Online and Planroom Est Cost: $469,000.00PREBID: MAND 6/24 @ 9AM PREBID: 6230 Sylvan Road OWNER: City of Citrus Heights DESCR: Contact,Citrus Heights Water District (916) 725-6873 The scope of work for this project consists of furnishing all materials, labor, equipment, fuel, tools, transportation and services for installing and connecting

approximately 1,255 lineal feet (If) of 8-inch water main, 1,052 If of 6-inch water main, 50 If of 4-inch water main, 12 main valves, 2 fire hydrants, 40 water services, and related appurtenances along North grove Way between Westgate Drive and North lea Way and along Walnut Drive between Auburn Boulevard and Holly Drive.

MCNAMARA PARK RENOVATIONPLAN #: 107096 Bid Date: 7/2/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Merced Co. Online & Print On # OF ADDENDA: 4 DemandPREBID: 6/4 @ 10AM PREBID: 678 W. 15’th St. OWNER: City of Merced DESCR: Contact, Merced, City of - Public Works (209) 385-6892 Installation of a synthetic turf field, new fencing, new splash pad, new play equipment, new drainage facilities, new restroom, new arbor, new landscaping and irrigation, concrete work, improvements to existing electrical system, resurfacing and striping of parking lot and basketball court and all other such items as described on the plans and in these specifications BIDDERS LIST:General Contractor: Iomlan Construction Serv 209-664-9960 209-664-9979Supplier: West Coast Sand & Grav 800-734-3053 916-386-8179

Don’t get thrown out on your way home!

DVBE/UDBE Good Faith ads are often required. This newspaper

is state-certified.

Legal ads: are firms seeking bids or sub bids from DVBE/DBE/MBE/WBE/SBE companies. Legal ads are priced on the length of the ad. In general, most ads will fit into our standard ad shell which is one-column by up to 2 1/2” tall. The price for a standard sized legal ad is $35. For this price, the ad is run in all three formats from the date the ad is placed until the bid date -- unmatched cov-erage and distribution, all for a rediciously low price! Ads larger than 2 1/2 column inches are priced by the size. CLICK HERE to place a legal ad. Or Email your ad to:

[email protected]

Page 24: Exchange ezone july1 2013

July 1, 2013Page 22 Contractor’s Zone• .Contractor’s Zone

209-523-8323Construction of a new 4,500 square foot, residential fire station with separate staff and public parking lots with approximately (1) acre of site improvements and landscaping. he building shall be wood framed with pre-engineered wood trusses, concrete slab foundation, 50-year composition shingle roof, stucco wall finish, vinyl windows, insulated roll-up doors, textured drywall interior, interior and exterior paint, solid core interior wood doors and trim, metal exterior & interior doors frames and laminated cabinetry. The floor finishes shall be a combination of carpet, tile, polished concrete and smooth troweled concrete in the apparatus bay. The facility shall have a split HVAC system, a new 400 amp main electrical service and a diesel powered generator.BIDDERS LIST:Engineer: Cranmer Enginering Inc. 530-273-7284 530-273-9507General Contractor: Sierra Valley Constr 916-772-0800 916-772-0825 Design Space Modular 707-678-6100 707-678-6111 Ct Brayton & Sons, Inc. 209-838-7388 209-838-3960 Huff Construction Co. 209-545-7505 209-545-2674 Acme Construction Co 209-523-2674 209-523-0213 Diede Construction 209-369-8255 209-371-8942Sub Contractor: Precision Craft, Inc. 209-957-7263 209-957-7264 National Electric Co. 510-475-9400 510-475-9411 Mission City Rebar, Inc 925-449-6999 925-447-8797Supplier: Cummins West, Inc. 916-376-1532 916-376-1591

LAKE BOULEVARD SAFETY PROJECTPLAN #:138067 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $285,000.00OWNER: City of Redding DESCR: Contact, City of Redding (530) 225-4469 Work consists of the construction of concrete curbs, gutters, driveways, sidewalks, and center medians; slurry seal and striping per the plans and specifications. The DBE Contract goal is 13% Bidders shall meet this DBE goal and/or provide a Good Faith Effort as described in the Instruction to Bidders and the Special Provisions.

RFP NELSON LANE AT MARKHAM RAVINE BRIDGE REPLACEMENT PROJECTPLAN #: 140064 Bid Date: 7/2/2013Bid Time: 3:00 PM PLANS AT: Lincoln Online and Planroom OWNER: City of Lincoln DESCR: Contact, RayLeftwich - 916-434-3557The City

Tuesday, July 02, 2013

RIPON FIRE STATION NO.3PLAN #: 133073 Bid Date: 7/2/2013 Bid Time: 3:00 PM PLANS AT: Location: Ripon Online and PlanroomG.C.: Huff Construction Co. Ph: 209-545-7505 FAX: 209-545-2674OWNER: Ripon Fire District Ph: 2095994209 DESCR: Contact, Purchasing Department -

Continued from last page

Plans On File

[email protected]

www.Jensen-Masonry.com

Mark Jensen, Master Mason

• BBQ’s • Fireplaces • Brick • Rock • Etc.

JensenMasonry

916.663.3429

CCL#:804650

Page 25: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Continued on next page

of Lincoln Public Services Department is seeking written proposals from qualified firms to perform construction management services for the construction of the Nelson Lane at Markham Ravine Bridge, the selected consultant must have strong bridge and civil engineering construction knowledge.

DISTRICT 5 INTERCEPTOR TRUNK SEWER SECTION 2A REHABILITATIONPLAN #: 156091 Bid Date: 7/2/2013 Bid Time: 2:00 PM PLANS AT: WhittierOnline and PlanroomOWNER: County Sanitation District No. 2 Ph: 562-699-7411 FAX: 562-699-5422DESCR: Contact, Michael Tatalovich - 562-908-4288 ext 1623This project rehabilitates a portion of the District 5 Interceptor Trunk Sewer that was constructed of reinforced concrete pipe (RCP) in 1962, which is severely corroded and in need of repair. The project consists of lining approximately 9,000 feet of 57-, 63-, and 66-inch diameter RCP sewer with cured-in-place pipe (CIPP) liners and sliplining with fiberglass reinforced plastic (FRP) pipe. The project also includes the rehabilitation or replacement of sixteen (16) manholes and construction of two (2) junction structures.Several structures and approximately 10,700 feet of 57-inch and 63-inch diameter corroded RCP sewer will be sprayed with a high pH slurry and removed from service. House connections and local sewers connected to these sewers will be relocated as part of this= project and includes constructing 10 feet of 12-inch diameter vitrified clay pipe (VCP) sewer, 200 feet of 10-inch diameter VCP sewer, and one (1) manhole. The project begins in Normandie Avenue Service Road approximately 200 feet south of 214th Street (the service road is located approximately 60 feet to the west of Normandie Avenue), then continues northerly in the service road to Torrance Boulevard, then northerly in private property and public right-of-way to 90th Street, all within the City of Los Angeles

RESIDENCE HALL MODERNIZATIONPLAN #: 164081 Bid Date: 7/2/2013 Bid Time: 4:00 PM PLANS AT: TaftOnline and Planroom Est Cost: $1,750,000.00PREBID: 6/20 @ 10AM PREBID: Ash Dorms building ARCHITECT: AP Architects Ph: 661-327-1690 FAX: 661-327-7204DESCR: Contact, AP Architects, 661-327-1690Residence hall modernization, selective demolition, utility materials, site clearing, excavation support and protection, earthwork, water distribution, hot mixed asphalt paving, Portland cement

concrete paving, storm drainage, chain link fences, synthetic turf, cast in place concrete, unit masonry, cast stone, metal fabrications, woods and plastics and rough BIDDERS LIST:General Contractor: Klassen Corporation 661-324-3000 661-324-3900 Omega Construction 661-588-6905 661-588-6907 Black/hall Construction 661-763-3818 661-763-0048 Seward L. Schreder 530-229-0001 530-229-0070

POPEYE’SPLAN #: 167074 Bid Date: 7/2/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Yuba Online & Print On Demand OWNER: Tico Construction DESCR: Contact-Tico Construction- (775) 322-0700 Complete demolition of existing building, and site paving. Construction of new building and site amenities per the plan set.

LOUISE AVENUE WIDENING PROJECTPLAN #: 196095 Bid Date: 7/2/2013

Bid Time: 2:00 PM PLANS AT: Manteca Online and PlanroomDESCR: Contact, Manteca, City of - Jason DeGroot (209) 825-2346 The project consists of, in general, the reconstruction and widening of Louise Avenue, a two lane arterial roadway to a new 4-lane arterial roadway, between Cottage Avenue and Empire Avenue. Work includes excavation, grading, storm drain construction, placement of crushed aggregate base, hot mix asphalt, placement of thermoplastic striping and pavement markings, traffic signs, concrete work including curb, gutter and sidewalk, and various other items.

IOWA HILL OWNER’S ENGINEERING SERVICESPLAN #: 243055 Bid Date: 7/2/2013 Bid Time: 5:00 PM PLANS AT: Print OnDemand Location: Camino Online & Print On Est Cost: $30,000,000.00 Demand # OF ADDENDA: 3PREBID: 5/7 @ 9 AM, see bid invite for more OWNER: SMUD Ph: 888-742-7683 DESCR: Contact, Gary Van Meter ([email protected]) (916) 732-5603 Complete the functional design and assist SMUD in coordinating work to prepare the project for the design-build phase of the Iowa Hill Pumped-

Page 26: Exchange ezone july1 2013

July 1, 2013Page 24 Contractor’s Zone• .Contractor’s Zone

Wednesday, July 03, 2013

RFP CONSTRUCTION MANAGMENT SERVICES INTERMODAL PHASE 2 SACRAMENTO VALLEYPLAN #: 25028 Bid Date: 7/3/2013 Bid Time: 4:00 PM PLANS AT: SacramentoOnline and PlanroomPREBID: 6/18 @ 1-3PM PREBID: 401 I Street OWNER: City of Sacramento DESCR: Contact,Jose Ledesma [email protected] City of Sacramento (“City”) Public Works Department has prepared this Request for Proposal (RFP) for submission of qualifications and proposal to provide construction management services for the Intermodal Phase 2 Sacramento Valley Station (SVS-2) Project. The construction management services will include: pre-construction design and constructability reviews; construction oversight and coordination; construction administration services; quality assurance materials sampling and testing, and special inspections; and labor compliance. Quality assurance construction inspection will be provided on an as-

TALL CORN GREENHOUSE PROJECT & NATIVE PLANT SREENHHOUSE - SCREENHOUSE AND GREENHOUSE SITE

UTILITIES AND INTERIOR FIT UPPLAN #: 41020 Bid Date: 7/3/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Davis Online & Print On Est Cost: $125,000.00 DemandPREBID: MAND 6/20 @ 10 am PREBID: 255 Cousteau Place OWNER: University Of California, Davis DESCR: Contact, UCD Repro (reprographics.ucdavis.edu/store) (530) 752-0867 Construct site utilities and interior fit-up for the Native Plant Screen house and the Tall Corn Greenhouse, including trenching, electrical, plumbing, asphalt patching, concrete flatwork, ADA striping / signage; B) interior screen house work must take into account gravel floor and interior greenhouse work must take into account an un compacted bare earth

RFQ FIRE45 SEPTIC SYSTEM REPAIRSPLAN #: 51002 Bid Date: 7/3/2013 Bid Time: 2:30 PM PLANS AT: Durham

Online and PlanroomPREBID: 6/25 @ 10 am PREBID: 2367 Campbell Street OWNER: County of Butte FAX: 530-538-7171DESCR: Contact, Samantha Skinner - 530-538-7097Contractor shall be recognized by the County of Butte Environmental Health as a Certified Installer with experience in septic system repairs and installation. Shall remove and dispose specific concrete and lawn areas, relocate utilities, install electrical for septic tank pumps, slurry fill existing septic tanks, install, test and inspect new sanitary sewer lines and septic system. BIDDERS LIST:General Contractor: Efficient Energy Concept 530-345-5658 530-879-3034

ELK GROVE RAPID RESPONSE PILOT PROJECT - ENGINEER, PROCURE & CONSTRUCTPLAN #: 53000 Bid Date: 7/3/2013 Bid Time: 5:00 PM PLANS AT: Elk Grove Online and Planroom Est Cost: $35,000,000.00 # OF ADDENDA: 6PREBID: 5/1 @ 2 PM Online-see bid invite for more infoOWNER: Sacto Municipal Utility District Financing Au DESCR: Contact, Kiauna Norman ([email protected]) (916) 732-7443 Permit, design, procure, install, commission, test, maintain and warranty a complete and fully functioning reciprocating engine based natural fired thermal power plant.

ROLLINS LAKE ROAD SAFETY IMPROVEMENTPLAN #: 90089 Bid Date: 7/3/2013 Bid Time: 3:30 PM PLANS AT: Placer Co. Online and Planroom Est Cost: $655,391.00OWNER: County of Placer DESCR: Contact Public Works Project Manager ([email protected] the road shoulders in locations, install guardrail, replace / upgrade the existing guardrail, install speed and warning signs, improve the intersection of Rollins Lake Road and Norton Grade Road by

RFQ JOINT-USE 21ST CENTURY POST-SECONDARY EDUCATION CENTER ENVIRONMENTAL IMPACT REPORT & MITIGATION MEASURE MONITORINGPLAN #: 134065 Bid Date: 7/3/2013 Bid Time: 3:00 PM PLANS AT: MilpitasOnline and PlanroomOWNER: San Jose/Evergreen Community College

Continued from last page

Plans On File

Page 27: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

District DESCR: Contact, San Jose/Evergreen Community College District (408) 270-0498 The San Jose - Evergreen Community College District is inviting proposals from qualified firms for the preparation of an Environmental Impact Report (EIR) and Mitigation Measure Monitoring Program for the construction work being funded by the Measure G-2004 bond program for a Joint Use 21st Century Education Center in Milpitas, California. The EIR and Mitigation Measure Monitoring Program will be completed in compliance with the California Environmental Quality Act (CEQA) and all appropriate State and District requirements.

TWAIN HARTE POOL RENOVATIONPLAN #: 165082 Bid Date: 7/3/2013 Bid Time: 1:30 PM PLANS AT: Tuolumne Online and Planroom Est Cost: $280,470.00PREBID: MAND 6/19 @ 1:PM PREBID: 23075 Fuller Road OWNER: County of Tuolumne DESCR: Contact, Sonora Blueprint- 209-533-5663Furnishing of all labor, materials, equipment, transportation and services for the completion of the project. BIDDERS LIST:General Contractor: Bc Construction 209-531-1252 209-531-1254

ODOR CONTROL STUDY FOR THE EL DORADO HILLS WASTEWATER TREATMENT PLANT ODOR CONTROL PROJECT

PLAN #: 177001 Bid Date: 7/3/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: El Dorado Online and Planroom # OF ADDENDA: 1DESCR: Contact: El Dorado Irrigation District (530) 622-4513 The work shall consist of providing professional services for an odor control study located at the El Dorado Hills Wastewater Treatment Plant.

STREAM AND RESERVOIR GAGING SERVICESPLAN #: 179099 Bid Date: 7/3/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: El Dorado Online & Print On DemandDESCR: Contact: El Dorado Irrigation District (530) 622-4513.The work shall consist of stream and reservoir gaging professional services for 29 stations as described in the complete Request for

Friday, July 05, 2013

REPLACE ROOFING BUILDING 700PLAN #: 198098 Bid Date: 7/5/2013

Bid Time: 10:00 AM PLANS AT: Location: MatherOnline and Planroom Est Cost: $250,000.00PREBID: 6.21 @ 3:30 DESCR: Contact, BVB Construction, Inc. Michael Corral (805) 642-8381 Remove, repair, and replace roofing materials and faulty sub Materials on Bldg 700 at the Mather V.A. campus. The work site is located at the Sacramento V.A. Hospital, 10535 Hospital Way, Mather CA, 95655. All work shall comply with all applicable International building codes, and

BUILDING 650 PANCAKE FINISHESPLAN #: 201098 Bid Date: 7/5/2013

Bid Time: 10:00 AM PLANS AT: Location: MatherOnline and Planroom Est Cost: $250,000.00PREBID: 6/21 @ 4:30 PM DESCR: Contact, BVB Construction, Inc. Michael Corral (805) 642-8381 Upgrade finishes in primary care, to include new paint, flooring, and cove base. The work site is located at the Sacramento V.A. Hospital, 10535 hospital Way, Mather Ca., 95655, Bldg 650. Paint one prime and two finish coats in all offices, waiting rooms, and hallways, and in all areas as indicated on drawings, and in accordance with specifications. Each office / exam room will have one accent wall. Install VCT flooring in accordance with manufacturer’s recommendations. Install 6” cove base

Monday, July 08, 2013

AVAYA TELECOMMUNICATIONS EQUIPMENTPLAN #: 88071 Bid Date: 7/8/2013Bid Time: 3:00 PM PLANS AT: El Dorado Co. Online and Planroom OWNER: County of El Dorado DESCR: Contact, Rick Blake ([email protected] is a brand name specific bid, all items must be for Avaya products, new equipment. New and Used telecommunications equipment, purchase will be made on an as requested basis during the awarded 12

Continued on next page

Run your DVBE/DBE/MBE/SBE/UDBEadvertisements in this State Certified paper

CLICK HERE to place your ad online

Page 28: Exchange ezone july1 2013

July 1, 2013Page 26 Contractor’s Zone• .Contractor’s Zone

Monday, July 08, 2013

WILLOW AVENUE EXPRESSWAY BARRIER FENCINGPLAN #: 105095 Bid Date: 7/8/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Fresno Online & Print On DemandOWNER: County of Fresno Ph: 559-262-4866 DESCR: Contact, Fresno, City of - Dept Purchasing Division (559) 621-1332 Construction of sections of expressway barrier fencing as shown on the provided plan sheet in conformance with City of Fresno Standard Drawing P-74 and the Technical Conditions, including all excavation, placement of concrete, fence construction, and clean up, along with all associated and incidental work. Not included in the Contractor’s responsibilities is the construction of a concrete mow strip as shown on ARTERIAL STREETS REHABILITATION PROJECTPLAN #: 169093 Bid Date: 7/8/2013 Bid Time: 10:00 AM PLANS AT: Costa Mesa Online and Planroom Est Cost: $937,000.00DESCR: Contact, Irina Gurovich - 714-754-5324Bristol St-405 FWY to Anton Blvd, Sunflower Ave - Avenue of the Arts to Main St, Aton Blvd- Avenue of the Arts to Sakiota Dr. Town Center D r-Bristol St to Park Center Dr. Park Center Dr. -Town Center Dr. to

HIGHWAY 99 WATER MAIN PROJECTPLAN #: 186097 Bid Date: 7/8/2013

Bid Time: 2:30 PM PLANS AT: Location: GridleyOnline and Planroom Est Cost: $265,000.00DESCR: Contact, Gridley, City of . (999) 999-9999 Construction of approximately 1,693 lineal feet of 1 0-inch diameter water main and appurtenances, and destruction of an existing well, complete.

MORGAN HILL CITY COUNCIL CHAMBER RENOVATIN PROJECTPLAN #: 270048 Bid Date: 7/8/2013

Bid Time: 2:30 PM PLANS AT: Morgan Hill Online and PlanroomPREBID: MAND 6/21, 6/24, or 6/28 @ 9 am

Continued from last page

Plans On FileDESCR: Contact,Morgan Hill, City of Architect/Engineer (408) 778-6480 This project is a multi- prime project and the Scope of Work includes the following Construction packages: 1 Demolition 2 General carpentry – Framing and installation of new walls, gypsum board installation, insulation, doors and hardware, floor leveling 3 Plumbing – Fixtures, concrete saw cut, pour-back 4 Electrical – Audio/visual, telephone/data 5 Signage – Interior, exterior 6 Millwork – Trim, dais 7 Flooring – Carpet and resilient flooring 8 Tile 9 HVAC – Re-ducting of existing system and new units 10 Wallboard sound attenuation, ceiling treatment, clouds, and dropped ceiling 11 Restroom partitions and accessories 12 Painting and wall covering 13 Site Work – Minor grading, concrete, and asphalt paving 14. Storefront & Glazing

Tuesday, July 09, 2013

STATE AND CHURCH STREETS VAULT SUBSTRUCTURE PROJECTPLAN #: 52000 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: UkiahOnline and Planroom PREBID: MAND 6/25 @ 10AM OWNER: City of Ukiah DESCR: Contact, City of Ukiah (707) 463-6233 Excavation and setting of new electrical vault substructure (installed by Contractor, provided by City), remove and replace two (2) concrete ADA ramp, removal of concrete sidewalk, concrete driveway and asphalt for the installation of underground electric primary conduits and secondary conduits (provided and installed by Contractor). The installation of underground electric vault substructure shall conform to City of Ukiah Electric Utility Department specifications, project drawings and City of Ukiah Public Works Department specifications. The project location is in the 100 & 200 Block of South State Street (NW & SW Corners of West

PREQUALIFICATION- INTERNAL COMPLEX PHASE 1PLAN #: 69073 Bid Date: 7/9/2013 Bid Time: 3:00 PM PLANS AT: Davis

Page 29: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

on a .82 ac site, 24,073 square feet, including common areas. Construction Type V-B, fully sprinkler .Wood Framed Structure with Cement Plaster and Fiber-Cement Siding w/ Single-Ply Roofing. BIDDERS LIST:Sub Contractor: Ivers Electric, Inc. 916-295-4416 530-295-0423

STORYBOOK WOODS PARKPLAN #: 145071 Bid Date: 7/9/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Elk Grove Online & Print On Demand OWNER: City of Elk Grove DESCR: Contact, Elk Grove, City of - Public Works (916) 478-7111 The proposed Work shall be performed in accordance with the plans, specifications and other contract documents and shall consist of the following: construction of a 1.82 acre neighborhood park, including but not limited to grading, drainage, sewer, landscaping, irrigation, electrical, resilient surfacing, picnic tables, seating tables, play equipment, bridge, shade structure and other surfacing and appurtenances.

MERCED COUNTY OFFICE OF EDUCATIONPLAN #: 155067 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: Merced Co. Online and Planroom Est Cost: $5,000,000,000.00PREBID: 6/19 @ 10AM PREBID: 2100 Cooper Ave OWNER: CT Brayton & Sons, Inc. Ph: 209-838-7388 FAX: 209-838-3960DESCR: Greg Branch- 209-838-7388Pre manufactured metal buildings into administrative offices, site specific warehousing, conference center, and associated parking and site upgrades, scope includes selective demo, concrete removal and replacement, AC paving, landscape and irrigation, building modernization includes repair/replacement of exterior metal siding, metal stud framing and all finishes, insulation, drywall, doors and hardware, glass and glazing, polished concrete, FRP ceramic tile, carpet, acoustical ceiling tiles, painting, casework, specialty items, plumbing, HVAC and electrical including low voltage such as fire, voice and data.

Online and Planroom Est Cost: $21,500,000.00OWNER: University Of California, Davis DESCR: Contact, Vanda Rovis - [email protected] and construction for a three story classroom building, including a commons/lounge, administrative offices, outdoor courtyard, landscaping and support spaces for facility. include all design work, labor, materials, tools, equipment, shoring, testing, inspection, commissioning, and all other necessary general conditions.

INSTALLATION OF EIGHT (8) RAIN MASTER CONTROLLERS IN VARIOUS CITY PARKSPLAN #: 114088 Bid Date: 7/9/2013 Bid Time: 1:00 PM PLANS AT: VisaliaOnline and Planroom Est Cost: $80,000.00PREBID: 6/21 @ 9AM PREBID: 247 W. Ferguson OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, City of Visalia - 559-713-4820The City of Visalia is seeking bids from qualified contractors to install upgrade irrigation controllers in various city owned parks. Bids are being sought from contractors who have a proven record of experience in providing the service required for this bid.

IRVINGTON COMMUNITY CENTER HVAC AND ROOFING REPLACEMENTPLAN #: 125090 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: FremontOnline and Planroom Est Cost: $750,000.00PREBID: MAND 6/20 @ 10am PREBID: 41885 Blacow OWNER: City of Fremont DESCR: Contact, Purchasing Department - 510-494-4620HVAC and roofing replacement, specifically the HVAC work consists of replacement of five rooftop HVAC units and related ducts and plumbing lines. The roofing replacement includes removal of an existing built up roofing system and installation of a new PVC single membrane mechanically attached roofing system on all roof areas. The project also includes structural supports for HVAC units and new conduit in preparation for future installation of rooftop PV panels. BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881 Bobo Construction, Inc 916-685-2285 916-714-4850

PESCADERO LOFTSPLAN #: 143062 Bid Date: 7/9/2013

Bid Time: 12:00 PM PLANS AT: Isla Vista Online and PlanroomOWNER: Ashwood Construction, Inc. Ph: 559-253-7240 FAX: 559-253-5955DESCR: Contact,Ashwood Construction (559) 253-7240 33 Residential Dwelling Units,3 story mixed-use building Continued on next page

C&S Publishing’s exclusive Delivery Manager software will deliver this newspaper

to you every week automatically!

Click this button for more information

Page 30: Exchange ezone july1 2013

July 1, 2013Page 28 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 09, 2013

JUVENILE JUSTICE CENTER ROOFING AND HVAC PROJECTPLAN #:192083 Bid Date: 7/9/2013 Bid Time: 2:00 PM PLANS AT: ModestoOnline and PlanroomDESCR: Contact, DIEDE CONSTRUCTION (209) 369-8255 (209) 368-0600 a. Demolition of 10 roof top air handler HVAC units, b. 10 new self-contained roof top HVAC units, c. Replacing the existing HVAC controls system with a new DDC system, d .Demolition of an existing HVAC central plant system, e. Demolition of an electric boiler system, f. Replacement of approximately 35,000 SF of the Juvenile Hall roof, g. Upgrading of approximately 12,000 SF of the Probation Building roof, h. Remediation and disposal of existing, regulated hazardous building materials, BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600

BUS DROP OFF AT EISENHUT ELEMENTARY SCHOOLPLAN #: 214098 Bid Date: 7/9/2013Bid Time: 2:00 PM PLANS AT: ModestoOnline and PlanroomPREBID: MAND 6/25 @ 2Pm PREBID: 1809 Sheldon Drive OWNER: Stanislaus Union School District DESCR: Contact, Timothy P. Huff & Associates, Inc (209) 571-2232 Demolition, site clearing, earthwork, hot-mix asphalt paving, Portland cement concrete paving, storm drainage, irrigation, chain link fencing & gates, planting, sealants & caulking; Div-16-electrical systemBIDDERS LIST:General Contractor: Bc Construction 209-531-1252 209-531-1254

Wednesday, July 10, 2013

RFQ PROFESSIONAL ENGINEERING SERVICES SEPTAGE AND SUPERNATANT LIQUID DISPOSALPLAN #: 12014 Bid Date: 7/10/2013Bid Time: 4:00 PM PLANS AT: Butte Co.

Online and Planroom # OF ADDENDA: 1OWNER: Co of Butte FAX: 530-538-7171DESCR: Contact, Public Works Department- 530-538-7681The County of Butte’s Neal Road Recycling and Waste Facility is seeking qualified engineering firms to conduct feasible study for an alternative to disposing of septage supernatant at a municipal wastewater treatment

Wednesday, July 10, 2013

5TH STREET, 5TH STREET VIADUCT AND RAILYARDS BOULEVARD AT SACRAMENTO RAILYARDSPLAN #: 13028 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $23,000,000.00 # OF ADDENDA: 3 PREBID: 6/6 @ 10AM (Highly Recommended) PREBID: 5’th Street Railyards Boulevard OWNER: City of Sacramento DESCR: Contact, Job Blank - 916-808-7914Includes construction of +/- 712 LF of roadway and utility improvements from H Street north to the existing 5th Street overhead bridge, including accompanying retaining walls and embankment; +/- 391 LF of elevated viaduct; +/- 725 LF of roadway and utility improvements from the 5th Street viaduct to Railyards Boulevard, including accompanying retaining walls and embankment; +/- 2,795 LF of roadway and utility improvements from Bercut Drive to 7th Street; construction of lined retention basin and design / fabrication / installation of shade structures located at two locations on the 5th Street Overhead Bridge.BIDDERS LIST:General Contractor: Shasta Constructors 530-365-3930 530-365-5465Sub Contractor: Preston Pipelines 408-262-1418 408-262-1870Supplier: Ferguson Enterprises 916-381-6100 916-381-7445

CARMICHAEL WATER DISTRICT RUSTIC WOODS PIPELINE AND BOYER DRIVE WATER MAIN EXTENSION PROJECTPLAN #: 21026 Bid Date: 7/10/2013 Bid Time: 11:00 AM PLANS AT: CarmichaelOnline and Planroom PREBID: MAND 6/14 @ 10AM OWNER: Carmichael Water District DESCR: Contact, Sara Rogers - 916-933-1997Construction

Continued from last page

Plans On File

Page 31: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

and testing of approximately 460 Linear feet of new 8 inch diameter water main along Boyer Dive and Sarah Court, 20 linear feet of new 5 inch diameter water main, 60 linear feet of 4 inch ductile iron pipe connections in Oak Ave and Boyer drive, 450 linear feet of 3 and 430 linear feet of 2 inch diameter schedule 80 PVC within the Rustic Woods Condominiums, installation of new services, installation of new hydrants, and other appurtenances and restoration of existing surfaces. BIDDERS LIST:Supplier: Sierra Trench Protectio 530-887-9413 530-887-9112

RFQ WASTEWATER TREATMENT PLANT SECONDARY AND TERTIARY IMPROVEMENTS PROJECTPLAN #:42015 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: DavisOnline and Planroom OWNER: City of Davis DESCR: Contact, Michael Lindquist @ [email protected] Contractor will be required to design, construct, acceptance test, startup, commission, and obtain designated governmental approvals for secondary and tertiary improvements and upgrades to the City’s existing wastewater treatment plant.

DISTRICT OFFICE AUTOMATIC VERTICAL PIVOT GATES WITH REMOTE OPENERSPLAN #: 43043 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: TruckeeOnline and PlanroomOWNER: Truckee Donner Recreation & Park District DESCR: Contact,Truckee Donner Public Utility District (530) 587-3896 1.Design and build of automatic vertical pivot gates system with remote openers 2.Access controls, remotes and keypads 3.Concrete work for counterweight/pad, yokes, goosenecks and bollards4.Installation of all electrical from the building to the gate.BIDDERS LIST:General Contractor: Efficient Energy Con 530-345-5658 530-879-3034

FOOTHILL HORIZONS OUTDOOR EDUCATIONPLAN #: 131074 Bid Date: 7/10/2013

Bid Time: 3:00 PM PLANS AT: Print On DemandLocation: Modesto Online & Print On DemandPREBID: MAND 7/2 @ 3PM PREBID: 21925 Lyons Blvd OWNER: Stanislaus County Office of Education DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 571-2232 Div_02-demolition; Div_03-concrete reinforcement, cast-in-place concrete; Div_05-structural steel; Div_06-rough carpentry, composite decking; Div_09-painting.

YULUPA AVENUE MISSION BOULEVARD CLASS II BIKE LANESPLAN #: 135018 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: Santa Rosa Online and Planroom Est Cost: $150,000.00OWNER: City of Santa Rosa DESCR: Contact, Rob Sprinkle - 707-543-3817Traffic control, remove existing striping & pavement markings, remove tree/grind stump, install street sign, relocate street sign, PCC curb and gutter, PCC median curb, PCC sidewalk, PCC Valley Gutter, PCC Island Paving, Detectable warning Surface, thermoplastic edge line, thermoplastic bike lane line, thermoplastic channeling line, thermoplastic crosswalk, thermoplastic yield line, thermoplastic arrow, Thermoplastic words, Thermoplastic Bike Lane Symbol and bike lane arrow, detector symbol, painted white curb marking, raised pavement marker, type Q

RFQ ARCHITECTURAL SERVIVCS FOR FRONTIER HIGH SCHOOL CLASSROOM EXPANSION

PLAN #: 136065 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: BakersfieldOnline and PlanroomPREBID: 7/2 @ 9AM PREBID: 6401 Allen Road OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309DESCR: Contact, Kern High School District (661) 827-3122 The Kern High School District (hereinafter, “OWNER”) is issuing this “Request for Qualifications” (RFQ) and is seeking qualifications with proposals from firms interested in providing\ architectural services for the following project: Frontier High School Classroom Expansion.

RFQ ARCHITECTURAL SERVICES FOR HIGHLAND HIGH SCHOOL CLASSROOM EXPANSION

PLAN #: 168082 Bid Date: 7/10/2013 Bid Time: 2:00 PM PLANS AT: BakersfieldOnline and PlanroomPREBID: 7/1 @ 9AM PREBID: 2900 Royal Scots Way OWNER: Kern High School District Ph: 661-827-3122 FAX: 661-827-3309DESCR: Contact,Kern High School District (661) 827-3122 Full architectural services for the classroom expansion at Highland High School campus presently identified as “Highland High School

Continued on next page

Page 32: Exchange ezone july1 2013

July 1, 2013Page 30 Contractor’s Zone• .Contractor’s Zone

Wednesday, July 10, 2013

PSYCHIATRIC HEALTH FACILITY - REQUEST FOR STATEMENTS OF QUALIFICATIONSPLAN #: 190096 Bid Date: 7/10/2013Bid Time: 2:00 PM PLANS AT: Ceres Online and PlanroomDESCR: Contact, DIEDE CONSTRUCTION (209) 369-8255 Later this year, Stanislaus County intends to receive sealed Bids from Bidders pre-qualified through this Request for Statements of Qualifications (“RFSOQ”) for the construction of the Psychiatric Health Facility (“Project”) in Ceres, California. The Project will consist of constructing a 16-bed Psychiatric Health Facility (PHF) by remodeling an existing County-owned building located at 1904 Richland Avenue, Ceres, California 95307. The building is currently vacant, and was most recently used as a clean and sober living facility. Remodeling of the current facility will be needed to meet the varying code requirements of licensing a PHF within the existing building. A minor remodel was performed in 1998. The existing facility will be remodeled to meet State Department of Social Services licensing requirements and California Health and Safety Code Section 1250.2. The facility is not regulated by OSHPD. The Project generally includes the following requirements for the new PHF facility: a. 16-bed in-patient rooms with restrooms, showers, and storage lockersb. Intake & Processing Rooms and Visitors Lobby c. Offices for: 1 Psychiatrist, 2 Administrative Personnel, Patient Interview Room(s), Hearing/Conference Room and 1 Exam Room d. Nurses Station(s), 1 Group Therapy Room, 1 Day Room/Dining Room with adjacent food prep and warm-up kitchen, 1 Activity Room e. Staff support components: break room with storage lockers, restroom f. Separate client shower room g. Seclusion Rooms, Quiet Room h. Storerooms for: cleaning supplies, hygiene, food, patient records, patient personal items, miscellaneous i. Secure storage room for drugs j. HVAC system replacement or renovation, potentially including HVAC roof top package unit and ductwork k. Roofing system replacement or repair l. A new fire alarm system, subject to evaluation of the existing system BIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600

Thursday, July 11, 2013

NEW HOUSEHOLD HAZARDOUS WASTE FACILITY AT THE AMERICAN AVENUE DISPOSAL SITEPLAN #: 1029 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: FresnoOnline and PlanroomPREBID: 6/27 @ 9AM PREBID: 18950 W. American Avenue, Kerman OWNER: County of Fresno Ph: 559-262-4866DESCR: Contact, Public Works - 559-600-4399Constructing a new 15,000 square foot household hazardous waste facility at the American avenue disposal site, the construction work shall include but is not limited to the following; Native soil excavation and compaction, placement and separation geotextile fabric, placement and compaction of aggregate base cast in place steel, reinforced concrete slabs, landings and liquid recovery basins, parking painting, pre fabricated toilet building, reverse osmosis water purification plant, booster pump, drains and pipe, selective epoxy painting of concrete surfaces, shade canopy structure, electrical main panel, telephone and low voltage alarm wiring, site plumbing to include water, sewer and drain pipe, below grade liquid recovery, chain link fencing and gates, placement and electrical grounding of owner supplied shipping storage containers.

PAITING TRAFFIC SIGNL HARDWAREPLAN #: 8017 Bid Date: 7/11/2013

Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Sacramento Online & Print On Demand OWNER: City of Sacramento DESCR: Contact, Sacramento, city of (916) 808-2266 Painting of traffic signal heads, pedestrian signal heads, and related hardware located on traffic signal and pedestrian signal poles throughout the City of Sacramento.

MATHER MAINBASE ELEVATED TANK RECOATING PROJECTPLAN #: 9056 Bid Date: 7/11/2013

Bid Time: 2:00 PM PLANS AT: Sacramento Online and Planroom Est Cost: $600,000.00# OF ADDENDA: 1 PREBID: MAND 6/25 @ 2PM OWNER: County of Sacramento DESCR: Contact, Municipal Services (x 5) (916) 874-6544 Perform coating and minor repair of an elevated treated water storage tank, including surface preparation of exterior and

Continued from last page

Plans On File

Page 33: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

interior surfaces of the elevated tank, application of exterior / interior coating systems and application of two painted tank logos.

WATSONVILLE MUNICIPLE AIRPORT RECONSTRUCTION OF TAXIWAY C AND GENERALPLAN #: 11025 Bid Date: 7/11/2013 Bid Time: 11:00 AM PLANS AT: WatsonvilleOnline and Planroom Est Cost: $735,000.00PREBID: 6/26 @ 11am PREBID: 100 Aviation Way OWNER: City of Watsonville DESCR: Contact, Rayvon Williams-- 831-728-7717Reconstruction of Taxiway C(35 ft x1,350 ft) and reconstruction of General Aviation Apron Phase 1 (5,850 sq yards)

SAN JUAN NEW CONSTRUCTIONPLAN #: 17019 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Ceres Online and PlanroomOWNER: Housing Authority of County of Stanislaus Ph: 209-557-2008 FAX: 209-557-2011DESCR: Contact, Housing Authority Of Co. Of Stanislaus @ 209-557-2007Construction of two-story single family dwelling units & one single story dingle family dwelling unit, including demolition, site clearing, excavation, filling & grading, hot mix asphalt paving, Portland cement concrete paving;-rough & finish carpentry; insulation, weather resistant membrane, sealants & caulking; vinyl windows, finish hardware;lath & plaster, decorative laminate flooring, vinyl sheet flooring, carpeting, painting;-appliances; -wood casework; plumbing, HVAC;-electrical system

SAN JUAN NEW CONSTRUCTIONPLAN #: 17019 Bid Date: 7/11/2013

Bid Time: 2:00 PM PLANS AT: Ceres Online and PlanroomOWNER: Housing Authority of County of Stanislaus Ph: 209-557-2008 FAX: 209-557-2011DESCR: Contact, Housing Authority Of Co. Of Stanislaus @ 209-557-2007Construction of two-story single family dwelling units & one single story dingle family dwelling unit, including demolition, site clearing, excavation, filling & grading, hot mix asphalt paving, Portland cement concrete paving;-rough & finish carpentry; insulation, weather resistant membrane, sealants & caulking; vinyl windows, finish hardware;lath & plaster, decorative laminate flooring, vinyl sheet flooring, carpeting, painting;-appliances; -wood casework; plumbing, HVAC;-electrical system BIDDERS LIST:

General Contractor: Bc Construction 209-531-1252 209-531-1254 Diede Construction 209-369-8255 209-368-0600 Harris Builders, Inc. 209-664-9486 209-667-0738

LEASE AND MAINTENANCE OF MULTI-FUNCTION PRINTERS AND MAINTENANCE OF WIDE FORMAT AND LASER PRINTERSPLAN #: 20012 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Elk GroveOnline and Planroom OWNER: City of Elk Grove DESCR: Contact, Purchasing Manager - [email protected] purpose of this contract is to secure and establish a contract to lease Multi function printers, including full services maintenance as defined, all supplies and consumables such as toner, drums, image belts, fusers, developer, staples, user replaceable component.

RFP TRANSIT TECHNOLOGY SOLUTIONPLAN #: 22019 Bid Date: 7/11/2013

Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and PlanroomOWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, Pamela Mowry - 530-265-1692Ability to provide reports on all functions listed, a vehicle locator, including latitude, longitude, time and odometer, vehicle maintenance, ability to provide reports on activities such as mileage, bus stop boarding, fare data, driver information and productivity.

DTLL PHARM HVAC MODIFICATIONS TO CIVA ROOMPLAN #: 25028 Bid Date: 7/11/2013 Bid Time: 10:00 AM PLANS AT: DavisOnline and Planroom Est Cost: $150,000.00PREBID: MAND 6/25 @ 10AM OWNER: University of California, Davis Health System DESCR: Contact, Design and Construction - 916-734-7024Selective demolition of suspended ceiling, ductwork, and supports, relocate existing 5 ton AC unit and reconfigure ductwork. Relocate DX and hydronic piping to new location, construct new wall and infill openings. Install doors and windows, flooring patching with base, paint and patch, BIDDERS LIST:General Contractor: Bobo Construction, 916-685-2285 916-714-4850

Continued on next page

Click on the blue underline to go to the Online Planroom

Page 34: Exchange ezone july1 2013

July 1, 2013Page 32 Contractor’s Zone• .Contractor’s Zone

Thursday, July 11, 2013

KIEFER LANDFILL MULTI- PURPOSE AREA ASPHALT REHABILITATIONPLAN #: 30026 Bid Date: 7/11/2013 Bid Time: 2:30 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $417,118.00PREBID: 6/19 @ 10AM PREBID: 12701 Kiefer Boulevard OWNER: County of Sacramento DESCR: Contact, Michael Anderson ([email protected])Apply an asphalt concrete overlay with a thickness of 8” to extend the service life by 10 years, including cold milling 3” of the existing asphalt and using Caltrans hot mix asphalt Type C for the overlay.

RFP ANTELOPE ROAD SAFE ROUTES TO SCHOOLPLAN #: 34019 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: Antelope Online and PlanroomOWNER: City of Citrus Heights DESCR: Contact, Citrus Heights, City of - Eng/Gen Services/Planning (916) 727-4770 The City of Citrus Heights General Services Department (City) invites your proposal to assist us in preparing for the construction of a Safe Routes to School (SR2S) sidewalk infill project along the north side of Antelope Road between Auburn Boulevard and Interstate 80. This project is funded through a Safe Routes to School grant from the State of California

WHITE ROCK DUMP CLOSURE DUMP-1 AND DUMP-2PLAN #:37020 Bid Date: 7/11/2013Bid Time: 12:00 PM PLANS AT: SacramentoOnline and PlanroomPREBID: 6/18 @ 8AM or 6/25 @ 8AM PREBID: 10951 White Rock Road, Room 103 OWNER: County of Sacramento DESCR: Contact, Dennis Fong - 916-876-6313Clean closure of White Rock Dump 2 and consolidation of burn dump debris and contaminated soil at the White Rock dump 1. Site preparation, earthwork, excavation and transport of burn debris from WRD 2 to WRD1. installation of perimeter fence along White Rock Road and installation of temporary fencing as necessary. BIDDERS LIST:General Contractor:

Bobo Construction, Inc. 916-685-2285 916-714-4850Supplier: Blain Stumpf Sand & 916-933-1555 916-933-2925

2013 WATER PROJECTPLAN #: 73071 Bid Date: 7/11/2013 Bid Time: 3:00 PM PLANS AT: WilliamsOnline and Planroom Est Cost: $2,800,000.00PREBID: 6/28 @ 10AM OWNER: City of Williams DESCR: Contact, Project Manager PACE Engineering (530) 244-0202 Work consists of theater drive pump station, 1.0 million gallon welded steel tank, approximately 1,400 feet of 16” water main, Well 9 manganese filtration system, Supervisory Control and Data Acquisition system improvements at Wells 6, and 10.BIDDERS LIST:General Contractor: Argonaut Constructors 707-542-4862 707-542-4897Supplier: Sierra Trench Protectio 530-887-9413 530-887-9112

ASPHALT CONCRETE OVERLAY PROJECTPLAN #: 89077 Bid Date: 7/11/2013

Bid Time: 2:00 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $3,065,000.00PREBID: 6/26 @ 10AM PREBID: 9630 Conservation Way OWNER: County of Sacramento DESCR: Contact, Purchasing Department - 916-875-2700All labor, materials and equipment associated with placing rubberized asphalt concrete pavement, grinding the pavement to accommodate the overlay, adjusting manholes to grade, installing new sidewalk accessibility ramps, replacing detector loops, placing pavement striping, BIDDERS LIST:General Contractor: Teichert 916-645-4840 916-645-4801

INMAN AVENUE RECONSTRUCTIONPLAN #: 96093 Bid Date: 7/11/2013

Bid Time: 1:30 PM PLANS AT: San Joaquin Online and PlanroomOWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 Reconstructing approximately 0.36 mile of existing local road with asphalt concrete, aggregate base over soil stabilization fabric, removing and replacing portions of curb, gutter and sidewalk.

Continued from last page

Plans On File

Page 35: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

JACK TONE ROAD BRIDGE NO. 29C-163 SCOUR MITIGATION AND PILE REPAIRPLAN #: 98073 Bid Date: 7/11/2013

Bid Time: 1:30 PM PLANS AT: San Joaquin Online and Planroom Est Cost: $200,000.00OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3043 The work, in general, consists of placing rock slope protection around the piles and southern abutment of the Jack Tone Road Bridge across Mormon Slough. This project also includes, but not limited to: channel excavation,

CHRISTINA AVENUE AND DE OVAN AVENUE RESURFACINGPLAN #: 99078 Bid Date: 7/11/2013

Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On Est Cost: $200,000.00 DemandOWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3043 The work, in general, consists of removing, resurfacing, and repairing approximately 1.32 miles of existing urban roadway with asphalt concrete, and other items or details that are required by the Plans, Standard Specifications or these or these special provisions shall be performed, placed, constructed or installed.

CHIPPEWA SOUTH CSA PAVEMENT REHABILITATIONPLAN #: 109089 Bid Date: 7/11/2013

Bid Time: 3:00 PM PLANS AT: Lake County Online and Planroom Est Cost: $615,000.00PREBID: 6/27 @ 10AM PREBID: 9192 Chippewa Trail, KelseyvilleOWNER: County of Lake Ph: 707-263-2341 DESCR: Contact, County of Lake (707) 263-2341 Work consists of the rehabilitation of approx. 410,900sf of County maintained roads located in Lake County. Work includes traffic control, signage, adjusting utilities to grade, in-place pulverization and reconstruction of existing asphal surfaces and 1.5” HMA overlay.

WOODBRIDGE STREETS IMPROVEMENTS, PHASE IIPLAN #: 128075 Bid Date: 7/11/2013

Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On

Demand PREBID: 7/2 @ 1:30 PM PREBID: 1810 East Hazelton Ave OWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 The work, in general, consists of constructing curb, gutter, sidewalk, installing new water line, reconstructing roadway, installing drainage features, and performing various work as required by the plans, specifications, and these Special Provisions.

WEST COUNTRY CLUB RECONSTRUCTION, PHASE 6PLAN #: 137072 Bid Date: 7/11/2013

Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On DemandOWNER: County of San Joaquin DESCR: Contact, San Joaquin, County of (209) 468-3014 Reconstructing 0.61 mile of urban streets with asphalt concrete, aggregate base over soil stabilization fabric, replacing portions of curb, gutter, and sidewalk.

DOLLAR HILL II WATER SERVICE REPLACEMENT PROJECTPLAN #: 82079 Bid Date: 7/11/2013 Bid Time: 10:00 AM PLANS AT: Tahoe CityOnline and Planroom Est Cost: $125,000.00PREBID: MAND 6/27 @ 1pm PREBID: 221 Fairway Drive OWNER: Tahoe City Public Utility District Ph: 530-583-3796 DESCR: Contact, Tahoe City, City of - Public Utility District (530) 583-3796 Construct +/- 1,813 LF of 2” water service pipe and associated

EIGHT MILE ROAD BRIDGE AND BACON ISLAND ROAD BRIDGE

PLAN #: 142059 Bid Date: 7/11/2013 Bid Time: 1:30 PM PLANS AT: Print OnDemand Location: San Joaquin Online & Print On Demand PREBID: 7/2 @ 1:30PM PREBID: 1810 East Hazelton Ave OWNER: County of San Joaquin DESCR: Contact,San Joaquin, County of (209) 468-3043 The work, in general, consists of excavating the existing asphalt concrete approaches and placing precast reinforced concrete slabs to mitigate approach settlement

Continued on next page

Page 36: Exchange ezone july1 2013

July 1, 2013Page 34 Contractor’s Zone• .Contractor’s Zone

Thursday, July 11, 2013

DAVIS ROAD AND WAGNER HEIGHTS ROAD TRAFFIC SIGNAL INSTALLATION PROJECTPLAN #: 161066 Bid Date: 7/11/2013 Bid Time: 2:00 PM PLANS AT: Stockton Online and Planroom Est Cost: $350,000.00PREBID: MAND 6/20 @ 10am PREBID: 425 N. El Dorado Street OWNER: City of Stockton DESCR: Contact, Dennis Yep - 209-937-8825Furnish and installation, termination of fiber optic cables, conduits and accessories in Weston Ranch area and at San Joaquin Regional Transit District office.

RFQ- CMAR-COOPER COURT RESIDENCE HALLPLAN #: 166078 Bid Date: 7/11/2013

Bid Time: 2:00 PM PLANS AT: RenoOnline and PlanroomOWNER: Nevada System of Higher Ed DESCR: Contact, Melanie Lever - 775-784-6503The intent of this project is to provide pre construction services that ultimately leads to the delivery of a guaranteed maximum price for the demolition of existing multiple buildings and the follow up construction of

Friday, July 12, 2013

RFQ FEASIBILITY STUDY FOR BRUNSWICK ROAD/LOMA RICA DRIVE INTERSECTIONPLAN #: 27027 Bid Date: 7/12/2013

Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom OWNER: County of Nevada Ph: 530-265-1403DESCR: Contact, Nevada, County of (530) 265-1238 The Nevada County Purchasing Agent, on behalf of the Department of Public Works, hereinafter collectively referred to as “County,” is requesting Statements of Qualification (“SOQ”) from traffic and/or civil engineering firms interested in providing a Feasibility Study for Brunswick Road / Loma Rica Drive Intersection Improvements.

STANFORD RANCH ROAD RECONSTRUCTION & INTERSECTION MODIFICATIONSPLAN #: 50008 Bid Date: 7/12/2013 Bid Time: 3:00 PM PLANS AT: Rocklin

Online and Planroom PREBID: MAND 7/9 @ 10am PREBID: 4081 Alvis Ct OWNER: City of Rocklin DESCR: Contact, Purchasing Department - 916-625-5119Reconstructing paved roadway, constructing new sidewalks, pedestrian ramps, curbs and decorative concrete, modify existing and installing new traffic signals, applying slurry seal, applying pavement striping and related improvements.

RFQ REMOVAL AND DISPOSAL OF LEAD AND ASBESTOS- CONTAINING MATERIALS FOR SHOWER DEMOLITION AT THE CALIFORNIA MEDICAL FACILITYPLAN #: 122085 Bid Date: 7/12/2013 Bid Time: 3:00 PM PLANS AT: Vacaville Online and Planroom Est Cost: $25,000.00PREBID: MAND 6/28 @ 10am PREBID: 1600 California Drive OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Matt Prado - 707-446-9180RFQ Removal and Disposal of Lead and asbestos- Containing Materials for Shower Demolition at the California Medical Facility. Remove all ceramic tile flooring and all mortar beds to substrate. Remove all fiberglass reinforced panel, remove all conduit, remove all paint from existing 4’ waste line in ceiling, remove all concrete masonry, clean all concrete walls of loose paint and treat for mold if needed, Must be clear

RFP LANDSCAPE MAINTENANCE SERVICESPLAN #:209010 Bid Date: 7/12/2013 Bid Time: 2:00 PM PLANS AT: Marin Co. Online and Planroom OWNER: County of Marin DESCR: Contact, Ilya Filmus (415) 491-2525 The Housing Authority of the County of Marin (MHA) is requesting proposals from qualified contractors to provide landscape maintenance services at its six public housing properties and central office. The initial term of the contract is for two years with options to extend by one-year terms for up to a total of five years.

Monday, July 15, 2013

ASPEN ROAD PAVING PROJECTPLAN #: 118083 Bid Date: 7/15/2013 Bid Time: 4:30 PM PLANS AT: Mono Co. Online and Planroom PREBID: 6/25 @ 11am

Continued from last page

Plans On File

Page 37: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

PREBID: 74 North School Street OWNER: County of Mono FAX: 760-932-5441DESCR: Contact, Purchasing Department - 760-932-5440Mono County Department of Public Works calls fo bids from qualified General Engineers or Earthwork and Paving contractors for the Aspen Road Paving Project. Re paving of Aspen Road.

PROVIDE DOOR CONTRACTOR SERVICES AS REQUIRED BY FACILITIES MIANTENANCEPLAN #: 207099 Bid Date: 7/15/2013 Bid Time: 3:00 PM PLANS AT: Santa MonicaOnline and Planroom PREBID: 7/2 @ 9:30AM OWNER: City of Santa Monica DESCR: Contact,Mark Cuneo [email protected] door contractor services as required by facilities maintenance Division. Furnish and deliver materials and labor for door contractor services per the attached terms, specifications and conditions.

PROVIDE POOL MAINTENANCE AND REPAIR SERVICES AT THREE CITY OF SANTA MONICA FACILITIES AS REQUIRED BY FACILITIESPLAN #: 208017 Bid Date: 7/15/2013 Bid Time: 3:00 PM PLANS AT: Santa MonicaOnline and Planroom PREBID: 7/3 @ 9:30AM OWNER: City of Santa Monica DESCR: Contact, Purchasing Department - Mark Cuneo - [email protected] pool maintenance and repair services at three city of Santa Monica facilities as required by facilities maintenance.

Tuesday, July 16, 2013

STOCK RANCH NATURE PRESERVE RE -BIDPLAN #: 66091 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Citrus Heights Online & Print On DemandPREBID: MAND 6/19 @ 10am PREBID: Trellis Hall DESCR: Contact, Citrus Heights, City of - Eng/Gen Services/Planning (916) 727-4770 The work to be performed consists, in general, of building The Stock Ranch Nature Preserve, which is a Nature Education Facility consisting of interactive exhibits, identification and educational signage, demonstration garden, oak restoration area, and outdoor classroom area; and all other work as shown on the contract documents

COVERED WALKWAY EXTENSION AT MARY LOU DIETERICH ELEMENTARY SCHOOLPLAN #: 69073 Bid Date: 7/16/2013

Bid Time: 3:00 PM PLANS AT: ModestoOnline and Planroom PREBID: MAND 7/9 @3pm PREBID: 2412 Warm Springs Drive OWNER: County of Stanislaus DESCR: Contact,Timothy P Huff & Assoc., Inc. (209) 571-2232 Covered Walkway Extension At Mary Lou Dieterich Elementary, Cutting and patching, fitting or patching that may be required to complete the work. clean up, communications, indemnification, BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

REROOF POLICE DEPARTMENT HEADQUARTERSPLAN #: 85064 Bid Date: 7/16/2013 Bid Time: 3:00 PM PLANS AT: FresnoOnline and Planroom Est Cost: $220,000.00OWNER: City of Fresno DESCR: Contact, Mark Johnson - 559-621-1163Removal of existing roofing materials, related finishing elements, asbestos containing asphaltic felts and specific mechanical equipment, installation of two new loose laid and mechanically attached 60 mil PVC thermoplastic membrane roofing system, over layer of 3.0 loose laid, isocyanurate roof insulation and 1/2 gypsum cover board and related components. Roof systems shall include air vents as specified by primary roofing materials manufacturer install replacement roof access

RFQ NACIMIENTO WATER TREATMENT PLANTPLAN #: 112089 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: Paso De Online and PlanroomPREBID: 6/26 @ 2PM PREBID: 1600 Ramada Drive, Paso Robles OWNER: City of El Paso de Robles DESCR: Contact, City of Paso Robles Public Works Dept. (805) 237-3861The City wishes to construct a water treatment plant (WTP) to treat surface water received from Lake Nacimiento, utilizing this additional water source to increase supply reliability, particularly during the summer months. The treatment plant will be located on an 18-acre City-owned parcel within the City limits. Five City drinking water wells and the NWP pipeline flow control and metering structure are currently located on the parcel. The WTP is to provide a daily treatment capacity of approximately 2.4 MGD of potable BIDDERS LIST:General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435

Continued on next page

Page 38: Exchange ezone july1 2013

July 1, 2013Page 36 Contractor’s Zone• .Contractor’s Zone

Tuesday, July 16, 2013

LEVEE SEEPAGE REPAIR PROJECT SLURRY CUTOFF WALL SAN JOAQUIN, RIVER MILE 42.3 RIGHT BANK AT STATION 118+00 TO STATION 134+93PLAN #: 115082 Bid Date: 7/16/2013Bid Time: 2:00 PM PLANS AT: San Joaquin Online and Planroom PREBID: 7/8 @ 10Am OWNER: County of San Joaquin DESCR: Contact, Purchasing Department - 209-946-0268Clearing and grubbing, tree removal and disposal, removal of pipes and concrete standpipes, remove existing power pole, excavate levee crown, install soil bentonite slurry cutoff wall to a tip elevation of minus 23, placement and removal of 12,400 cu yd of temporary cap, settlement monitoring, install tracer wire and boxes, furnish and place import crown fill material and furnish aggregate base materials.

RFQ WATER TREATMENT PLANTPLAN #: 171002 Bid Date: 7/16/2013 Bid Time: 2:00 PM PLANS AT: El Paso De Online and Planroom PREBID: 6/26 @ 2PM OWNER: City of El Paso de Robles DESCR: Contact, Christopher Alakel- [email protected] The City of El Paso de Robles invites general contractors to apply for pre qualification in connection with the City’s upcoming Water Treatment Plant Project.

Wednesday, July 17, 2013

WHITE SLOUGH WATER POLLUTION CONTROL FACILITY DIGESTER PAINTING PROJECT

PLAN #: 7029 Bid Date: 7/17/2013 Bid Time: 11:00 AM PLANS AT: Print OnDemand Location: Lodi Online & Print On DemandPREBID: MAND 7/2 @ 10AM PREBID: White Slough WPCF OWNER: City of Lodi DESCR: Control, City of Lodi (209) 333-6740 The work consists of preparing and coating the exterior roofing and

piping components associated with Anaerobic Digesters No. 1, 2 and 3 at the White Slough Water Pollution Control Facility (WPCF).

AUBURN AREA RECREATION & PARK DISTRICT (530) 885-0611PLAN #: 75070 Bid Date: 7/17/2013 Bid Time: 3:00 PM PLANS AT: Auburn Online and PlanroomPREBID: MAND 6/27 @ 10AM PREBID: 1601 Auburn Ravine Road OWNER: Auburn Area Recreation & Park District Ph: 530-885-0611 DESCR: Contact, Pamela Vann (x 102) (530) 885-0611 Includes renovation of existing ADA parking surfaces and hardscape at the existing restrooms, new retaining walls and stairs and renovation of existing paving and pond overflow at existing pond area.BIDDERS LIST:General Contractor: Pbm Construction Inc. 916-315-2614 916-315-2619

FRANK RAINES OHV PARK WATER FILTRATION AND DISTRIBUTION SYSTEM IMPROVEMENTSPLAN #: 129072 Bid Date: 7/17/2013 Bid Time: 2:00 PM PLANS AT: ModestoOnline and Planroom Est Cost: $750,000.00OWNER: County of Stanislaus DESCR: Contact,Stanislaus, County of (209) 525-4130 Work consists of an upgrade to the water distribution system for portable and non-portable water supply for Frank Raines OHV Park Water Filtration and Distribution System Improvements.

SALIDA SIDEWALK REPAIR PROJECTPLAN #: 133074 Bid Date: 7/17/2013 Bid Time: 2:30 PM PLANS AT: ModestoOnline and Planroom Est Cost: $165,000.00OWNER: County of Stanislaus DESCR: Contact,County of Stanislaus (209) 541-2509 Work consists of repairing damaged sidewalks, and removing and replacing trees along Pirrone Road in the Town of Salida.

Thursday, July 18, 2013

HAPPY VALLEY SAFE ROUTE TO SCHOOLPLAN #: 2025 Bid Date: 7/18/2013 Bid Time: 11:00 AM PLANS AT: Shasta Co.

Continued from last page

Plans On File

Page 39: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Online and Planroom OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, County of Shasta (530) 225-5661 Work consists of constructing approx. 5,860 feet of hot mix asphalt path and approx. 1,150 feet of concrete sidewalk, curb and gutter. The path will be constructed along the West side of Oak Street, from Scout Street to approximately 530 feet north of Craig lane.

WESTERN NEVADA COUNTY 2013 OVERLAYPLAN #: 55003 Bid Date: 7/18/2013 Bid Time: 3:00 PM PLANS AT: Nevada Co. Online and Planroom Est Cost: $1,119,723.00OWNER: County of Nevada Ph: 530-265-1403 DESCR: Contact, Nevada, County of (530) 265-1766 Overlay approximately 8.2 miles of roadway in the western portion of Nevada County, place striping and pavement markers.

KIEFER LANDFILL, 2013 GAS EXTRACTION WELLS & PIPING INSTALLATIONPLAN #: 62008 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: SloughhouseOnline and Planroom Est Cost: $200,000.00PREBID:7/2 @ 10 AM PREBID: 12701 Kiefer Blvd OWNER: County of Sacramento DESCR: Contact, County of Sacramento Tim Isreal -916) 876-9431 Furnishing of all labor, materials, tools, equipment and transportation. Construct eight vertical gas collection wells and install wellheads and 3” lateral piping.

PASO ROBLES UPTOWN FAMILY PARK PROJECTPLAN #:111091 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: El Paso De Online and Planroom Est Cost: $1,861,650.00OWNER: City of El Paso de Robles DESCR: Contact,Paso Robles, City of (805) 227-7245 Furnishing all labor, materials, equipment, services, testing, permits, temporary controls and construction facilities, and all general conditions, general requirements and incidentals required to complete the Work for the Paso Robles Uptown Family Park Project, Project No. 11-13A, in its entirety as described in the Contract Documents, which includes, but is not necessarily limited to, the following: installation of entry elements, buildings, community garden, amphitheatre, pervious pavement and asphaltic concrete parking lot; play equipment, shade structures, site furnishings, hardscape, poured-in place resilient surfacing, walkways, stairs, walls, fencing, railings, drainage elements, utilities, irrigation, electrical,

and surrounding landscape areas, as more fully described in the bidding and contract documentsBIDDERS LIST:General Contractor: Sansone Company, Inc. 805-549-0667 805-549-0702

SMITH CCAAL WET WELL REHABILITATION AND MISCELLANEOUS

SITE IMPROVEMENTSPLAN #: 124084 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Stockton Online & Print On Est Cost: $1,500,000.00 DemandPREBID: 7/2 @ 10AM PREBID: 2130 Fontana Ave OWNER: City of Stockton DESCR: Contact, Public Works - 209-937-8753Concrete wet well rehabilitation(bypass pumping during construction) removal existing deteriorated concrete, surface preparation, installation of new reinforced concrete, corrosion barrier, new side gates, new isolation knife gate valves, new flow meter, new bio filter humidifier, new roofing, ceiling repair, new miscellaneous appurtenances and closed circuit televising of upstream sewers.

LANDSCAOE MAINTENANCE FOR MUNICIPLE UTILITIES DEPARTMENT FACILITIES

PLAN #: 139071 Bid Date: 7/18/2013 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Stockton Online & Print On DemandPREBID: MAND 6/25 @ 9AM PREBID: 2500 Navy Drive OWNER: City of Stockton DESCR: Contact, Deedee Antypas - 209--464-8724The Municipal Utilities Department facilities consists of its main plant, a warehouse, various storm pump stations and sanitary pump stations. The City desires to procure the services of a licensed landscape contractor to provide landscape maintenance for Municipal Utilities Department facilities. Regular scheduling mowing, edging, shrub trimming, fertilizing, litter/trash collection, graffiti, abatement, weed

Continued on next page

Click on the blue underline to go to the Online Planroom

Page 40: Exchange ezone july1 2013

July 1, 2013Page 38 Contractor’s Zone• .Contractor’s Zone

Friday, July 19, 2013

RFP PROFESSIONAL DESIGN SERVICES FOR THEMILL CREEK BANK STABILIZATION PROJECT BETWEEN STEVENSON ST. AND JOHNSON ST.PLAN #: 121084 Bid Date: 7/19/2013 Bid Time: 11:30 AM PLANS AT: VisaliaOnline and Planroom Est Cost: $411,000.00PREBID: 7/2 @ 9AM OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Department - 559-713-4334The City of Visalia is requesting design proposals from qualified consulting firms experienced in professional design services for a topographic survey and the design of cleanup and stabilization of the Mill Creek Bank between Johnson St. and Stevenson St.

RFP PROFESSIONAL DESIGN SERVICES FOR THE MILL CREEK BANK STABILIZATION PROJECT BETWEEN STEVENSON ST. AND JOHNSON ST.PLAN #: 121084 Bid Date: 7/19/2013 Bid Time: 11:30 AM PLANS AT: Location: VisaliaOnline and Planroom Est Cost: $411,000.00PREBID: 7/2 @ 9AM OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Department - 559-713-4334The City of Visalia is requesting design proposals from qualified consulting firms experienced in professional design services for a topographic survey and the design of cleanup and stabilization of the Mill Creek Bank between Johnson St. and Stevenson St.

RFP FOR VENDING SERVICESPLAN #: 123089 Bid Date: 7/19/2013 Bid Time: 11:00 AM PLANS AT: VisaliaOnline and Planroom PREBID: 7/2 @ 11AM PREBID: 707 W Acequia Ave DESCR: Contact, Purchasing Division - 559-713-4334The City of Visalia is requesting proposals for vending machines and services , the initial contract shall be 12 months. The City of Visalia desires vending machines for both drinks and snacks to be located in various City department locations including but not limited to the airport, Waste Water Treatment plant, Police Department and City Hall West.

RFP ENERGY EFFICIENCY MEASURES (EEM) RETROFIT PROJECT CONSTRUCTION MANAGEMENTPLAN #: 147066 Bid Date: 7/19/2013 Bid Time: 2:00 PM PLANS AT: VisaliaOnline and Planroom # OF ADDENDA: 1PREBID: 6/18 @ 11AMPREBID: 707 W Acequia Ave OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Division - 559-713-4802Act as a liaison with the City project Manager, review all product submittals from the construction contractor, facilitate all construction meetings, manage the overall project timeline to ensure completion within the 90 day project period. Confirm that all EEM retrofit work is conducted to applicable state and local codes.

Saturday, July 20, 2013

JANITORIAL SERVICES FOR THE WATSONVILLE DMV FIELD OFFICEPLAN #: 144069 Bid Date: 7/20/2013 Bid Time: 1:30 PM PLANS AT: WAtsonvilleOnline and PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822DESCR: Contact, Allison Stanek - 916-657-9810The Department of Motor Vehicles is inviting responses for the janitorial services bid for the Watsonville DMV field office located at 90 Alta Vista Ave. Janitorial services at the Watsonville DMV field office.

Monday, July 22, 2013

RFP BODIE CEMETARY STONE & CEMENT FEATURES CONSERVATIONPLAN #: 132074 Bid Date: 7/22/2013 Bid Time: 2:00 PM PLANS AT: BodieOnline and Planroom Est Cost: $90,000.00PREBID: MAND 6/20 @ 1PM PREBID: Bodie State Historic Park OWNER: State of CA DESCR: Contact, Betsey Leber - 916-653-9921Conservation of cemetery headstones, copings and wall, wood grave features. Seeking a firm to provide conservation 9of historic stone and cement coping, walls and monuments in the cemeteries at Bodie SHP.

Continued from last page

Plans On File

Page 41: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Tuesday, July 23, 2013

ROCK CHIPS FOR THE 2013 CHIP SEAL PROJECT

PLAN #: 32024 Bid Date: 7/23/2013 Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: Nevada Co. Online & Print On Est Cost: $103,775.00 DemandOWNER: County of Nevada Ph: 530-265-1403DESCR: Contact, Nevada, County of (530) 265-1766 The successful bidder will provide and deliver 5/16 inch X No. 8 Rock Chips to specific locations as described in the Detailed Specifications.

CONSTRUCT 10-INCH NATURAL GAS PIPELINE MODIFICATIONS FOR THE CITY OF REDDING POWER PLANT

PLAN #: 93079 Bid Date: 7/23/2013Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $735,000.00PREBID: MAND 7/9 @ 8AM PREBID: 17120 Clear Creek Road OWNER: City of Redding DESCR: Contact, City of Redding (530) 225-4170 Furnish necessary labor, material, and equipment to modify the natural gas pipeline at the City of Redding Power Plant and the Eastside Road Gas Metering Yard.

TRANSIT SERVICES 4’TH FLOOR REMODELPLAN #: 102099 Bid Date: 7/23/2013

Bid Time: 11:00 AM PLANS AT: Modesto Online and Planroom Est Cost: $67,215.00PREBID: 7/2 @11am PREBID: 1010 Tenth Street OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto - Engineering Department (209) 577-5462 Demolition, cold-formed metal framing, miscellaneous metals, interior partition acoustical insulation, sealants & caulking, interior aluminum door & window framing, flush wood doors, finish hardware, glazing, acoustic ceiling system, gypsum board, painting, plastic laminate

MANTECA GOLF COURSE DRIVING RANGE NETTING IMPROVEMENTS PROJECT

PLAN #: 189023 Bid Date: 7/23/2013 Bid Time: 10:00 AM PLANS AT: Manteca Online and Planroom Est Cost: $32,000.00DESCR: Contact, Kevin Fant (209) 456-8400 The work consists of driving range golf course netting improvements at the City of Manteca Golf Course 305 N. Union Rd. Provide

and install 500’ linear feet of 20’ foot tall (above grade) posts, netting , and other netting system components.

RFP-ENGINEERING SERVICES FOR THE TRANSFER STATION BALE STORAGE EXPANSION PROJECT

PLAN #: 193099 Bid Date: 7/23/2013 Bid Time: 3:00 PM PLANS AT: Redding Online and Planroom Est Cost: $1,300,000.00PREBID: 7/9 @ 11AM OWNER: City of Redding DESCR: Contact,Redding, City of (530) 225-4138 Provide preliminary engineering and final design services culminating in the preparation of contract documents, including plans, specifications and construction cost estimates, complete and ready for invitations for bid and assist during construction.

EDD, ALTERATIONS, ALARM AND FIRE SYSTEM, SACRAMENTO EMPLOYMENT DEVELOPMENT DEPARTMENT

PLAN #: 105096 Bid Date: 7/25/2013 Bid Time: 2:00 PM PLANS AT: SacramentoOnline and Planroom Est Cost: $520,000.00PREBID: MAND 7/2 @ 10AM PREBID: 5009 Broadway Ave OWNER: Dept of General Services - State of CA Ph: 916-376-1768 FAX: 916-376-1778DESCR: Contact, Maria Gassoumis (916) 375-4212 Demolition, new fire alarm system, replacement of security alarm system, excavation, parking lot re-pavement, new concrete walkways, landscaping, irrigation, accessibility improvements, modifications to existing restroom and signage.BIDDERS LIST:General Contractor: Younger General Contrac 916-631-8000 916-631-8293Sub Contractor: Universal Security & Fire 916-563-1700 916-563-1755

Continued from last page

ThisnewspaperhasbeencertifiedbytheStateofCaliforniaasaTRADEPAPER?ThatmeansyoucanrunyourSBEandDVBEadsrighthere!It’seasyand

inexpensivetopublishanad.

Callusat916-729-5432

Page 42: Exchange ezone july1 2013

July 1, 2013Page 40 Contractor’s Zone• .Contractor’s Zone

Friday, July 26, 2013

WASTE WATER TREATMENT PLANT EXPANSION PROJECTPLAN #: 95068 Bid Date: 7/26/2013 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Visalia Online & Print On # OF ADDENDA: 3 DemandPREBID: MAND 5/8 @ 9am PREBID: 7579 Ave 288OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, Purchasing Division - 55-713-4334 Waste water treatment plant expansion. BIDDERS LIST:Sub Contractor: C. Overaa And Co. 510-234-0926 510-237-2435Supplier: Sierra Trench Protectio 530-887-9413 530-887-9112 Ryan Process 800-839-0670 925-837-4832 Misco 925-225-1900 925-225-9200

Tuesday, July 30, 2013

RAILROAD CROSSING IMPROVEMENTS @ VARIOUS LOCATIONS

PLAN #: 119088 Bid Date: 7/30/2013 Bid Time: 2:00 PM PLANS AT: Humboldt Co. Online and Planroom Est Cost: $104,000.00OWNER: County of Humboldt Ph: 707-445-7652 FAX: 707-445-7409DESCR: Contact, County of Humboldt (707) 445-7493 Work consists of reconstructing railroad crossings including traffic control, removal and disposal of treated wood planks, asphalt concrete and road signage.

2014-2016 ON-CALL PROFESSIONAL SERVICESPLAN #: 182006 Bid Date: 7/30/2013

Bid Time: 3:00 PM PLANS AT: Print OnDemand Location: El Dorado Online & Print On DemandDESCR: Contact: El Dorado Irrigation District (530) 622-4513.RFP for the following services: 1. Appraisal Services 12. Information Technology2. Arborist/Tree Faller 13. Legal Services – Labor/HR Counsel

3. Cultural Studies4. Dam Safety Engineering5. Drafting14. Legal Services – Title Search15. Legal Services – Water RightsCounsel6. SCADA – Electrical/Instrumentation 16. Painting Inspection7. Environmental – CEQA / NEPA /Biological Studies17. Regulatory Permitting18. Surface Water Hydrology8. General Engineering9. Geographic Information Systems19. Survey20. SWPPP Development(GIS)10. Geotechnical21. Water/Wastewater LaboratoryAnalysis11. Hydroelectric Compliance

Wednesday, July 31, 2013

YARD MAINTENANCE SERVICESPLAN #: 141064 Bid Date: 7/31/2013

Bid Time: 10:00 AM PLANS AT: Location: VallejoOnline and Planroom PREBID: MAND 7/17 @ 10AM OWNER: Vallejo Sanitation and Flood Control District Ph: 707-644-8949 DESCR: Contact, Vallejo Sanitation & Flood Control District (707) 644-8949 Yard maintenance services at the District Treatment Plant at 450 Ryder Street, Vallejo, California.

Friday, August 09, 2013

CONSTRUCTIN OF WESTERN PLACERVILLE INTERCHANGES PROJECT PHASE 1APLAN #: 77072 Bid Date: 8/9/2013 Bid Time: 2:00 PM PLANS AT: PlacervilleOnline and Planroom Est Cost: $5,000,000.00PREBID: 7/19 @2pm1 PREBID: 3’rd Floor City Hall OWNER: City of Placerville DESCR: Contact, Engineering Division - 530-642-5250Construction of westbound on ramp from Ray Lawyer Drive onton Highway 50 and a westbound auxiliary lane between the new westbound on ramp and the existing westbound off ramp at Placerville Drive. Realignment of Fair Lane, retaining wall to support realigned Fair lane and auxiliary lane, and utility improvements including new storm drain and sanitary sewer facilities and a detention basin.

Continued from last page

Plans On File

Page 43: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Friday, August 16, 2013

RFP GROUND LEASE AND DEVELOPMENT OF LAND ADJACENT TO EVERGREEN VALLEY COLLEGE, SAN JOSEPLAN #: 126077 Bid Date: 8/16/2013 Bid Time: 3:00 PM PLANS AT: San Jose Online and PlanroomPREBID: 6/20 @ 10:30AM and 6/26 @ 10:30AM PREBID: 4750 San Felipe Road DESCR: Contact, San Jose Evergreen School - 408-270-6402The District welcomes proposals for the ground leasing of the land needed to site development of retail, multi family residential, and or other related compatible uses such as health care and educational uses, in a desirable urban scale environment. The size of the Property permits capitalizing on scale advantages not available elsewhere in the market

RFP GROUND LEASE AND DEVELOPMENT OF LAND ADJACENT TO EVERGREEN VALLEY COLLEGE, SAN JOSEPLAN #: 126077 Bid Date: 8/16/2013 Bid Time: 3:00 PM PLANS AT: San Jose Online and PlanroomPREBID: 6/20 @ 10:30AM and 6/26 @ 10:30AM PREBID: 4750 San Felipe Road OWNER: San Jose/Evergreen Community College District DESCR: Contact, San Jose Evergreen School - 408-270-6402The District welcomes proposals for the ground leasing of the land needed to site development of retail, multi family residential, and or other related compatible uses such as health care and educational uses, in a desirable urban scale environment. The size of the Property permits capitalizing on scale advantages not available elsewhere in the market

Tuesday, December 31, 2013

LIST OF QUALIFIED CONTRACTORS/YUBA CITYPLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City PlanroomOWNER: City of Yuba City DESCR: Contact, ([email protected]) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 223091 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Placer Co. Online and PlanroomOWNER: Placer Office Education Ph: 916-415-4424 DESCR: In accordance with the State of California Uniform Public Construction Cost Accounting Commission, The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2013. You must resubmit to be included on the 2013 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Contact, Matt Shawver, 530-889-8020. Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2013 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board.BIDDERS LIST:Sub Contractor: Kitchen Art, Inc. 916-852-8111 916-852-7981 Oxford Fire Inc. 916-865-6146 916-987-0201

CO OF TUOLUMNE - QUALIFIED BIDDERS LISTPLAN #: 247054 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Co. Online and PlanroomOWNER: County of Tuolumne DESCR: County of Tuolumne, Sharon Mikesell, ([email protected]) Inviting all licensed contractors to submit the name of their firm for inclusion on the Agency’s list of qualified bidders for 2013.

SOLANO COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LISTPLAN #: 248050 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Solano Online and PlanroomOWNER: Solano County Water Agency DESCR: Sandra McLean, 707-451-6090. Inviting contractors to submit their company’s information to be placed on the Agency’s list of qualified bidders for the following year.

Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 44: Exchange ezone july1 2013

July 1, 2013Page 42 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 31, 2013

QUALIFIED BIDDERS - CITY OF CUPERTINOPLAN #: 253057 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Cupertino Online and PlanroomOWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, City of Cupertino, 408-777-3354. City of Cupertino is in the process of updating their Contractors List to establish and maintain a list of qualified contractors to receive future public projects.

APPLICATION - CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT/2013 CALENDAR YEARPLAN #: 256052 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Carmichael Online and PlanroomOWNER: San Juan Unified School District DESCR: Aida Gonzales, ([email protected]) Complete form and return to San Juan Unified School District Purchasing Department if you wish to be included in the 2013 Calendar year California Uniform Public Construction Cost Accounting Program

FOLSOM-CORDOVA USD BIDDERS LISTPLAN #: 274042 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Ranch Online and PlanroomOWNER: Folsom Cordova USD Ph: 916-355-1111 DESCR: Contact, Folsom Cordova Unified School District, 916-294-9000. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013. BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

SUMMERVILLE UNION HIGH SCHOOL DISTRICTPLAN #: 291049 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Summerville Online and PlanroomOWNER: Summerville Union High School District Ph: 209-928-1955 FAX: 209-928-4454DESCR: ([email protected]) or 209-928-1955. Summerville Union H.S. District, Maintenance Dept. in Tuolumne Co., is requesting Contractors’s Pre-Qualification Applications for upcoming year.

TWIN RIVERS UNIFIED SCHOOL DISTRICT - QUALIFIED CONTRACTORSPLAN #: 301009 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: North Online and PlanroomOWNER: Twin River Unified School District Ph: 916-566-1600 FAX: 916-286-4959DESCR: Twin Rivers Unified School District, Facilities Planning & Construction. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

SANTA CRUZ PORT DISTRICT’S/LIST OF QUALIFIED BIDDERSPLAN #: 304012 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Santa Cruz Online and PlanroomOWNER: Santa Cruz Port District DESCR: Contact, Santa Cruz Port District, (831) 475-6161. Santa Cruz Port District is inviting licensed contractors to submit the name of their firm for inclusion on the Port Districts list of potential bidders. Provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number, the type of work in which you are interested and are currently licensed to do, the class of contractor’s licenses held and the contractor license numbers. Mail information to Santa Cruz Port District at [email protected] and reference “Contractor List” in the subject line. CITY OF LINCOLN/CONTRACTOR’S PRE-PLAN #: 311007 Bid Date: 12/31/2013Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Lincoln Online and PlanroomOWNER: City of Lincoln DESCR: City of Lincoln, 916-434-2450. City of Lincoln inviting all qualified contractors to submit their name and company for inclusion on the qualified bidders list for the year

Continued from last page

Plans On File

This newspaper has been certifiedby theState ofCalifornia as aTRADEPAPER?ThatmeansyoucanrunyourSBEandDVBEadsrighthere!It’seasyandinexpensivetopublishanad.

CLICKHERE

Page 45: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

2013.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201 Kitchen Art, Inc. 916-852-8111 916-852-7981 Guardian Environmental, 916-997-1830 916-641-5690

SIERRA COLLEGE - LIST OF QUALIFIEDPLAN #: 314007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Rocklin Online and PlanroomOWNER: Sierra Community College DESCR: Contact, Kerri Hester, 916-624-3333. Sierra Joint Community College District is updating its list of Qualified Contractors for the 2013 calendar year.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Wednesday, December 31, 2014

ARDEN PARK RECREATION AND PARK DISTRICT’S CONTRACT BID LISTPLAN #: 315005 Bid Date: 12/31/2014 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Sacramento Online and PlanroomOWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Colin Miller, ([email protected]) or 916-483-6069. Arden Park Recreation and Park District invite licensed contractors to submit their information to be included on their contract bid list.BIDDERS LIST:Sub Contractor: Oxford Fire Inc. 916-865-6146 916-987-0201

Monday, July 01, 2013

WILLIAMS GUEST HOUSEPLAN #: 10028 LOCATION: El Dorado Co. Bid Time: 5:00 PM PLANS AT: Print On Demand Online & Print On DemandDESCR: Contact, Keith Brown - 916-276-7831 Excavation, utilities, septic, paving, foundation, siding, framing, insulation, drywall, roofing, concrete, wood, fiberglass, composition, concrete, raised, doors, windows, painting, plumbing, HVAC, electrical, data cabling, cabinets, interior, custom, exterior, wood, exterior.

NICHOLS WHEELER RESIDENCEPLAN #: 501033 LOCATION: AuburnBid Time: 5:00 PM PLANS AT: Auburn Office Online and PlanroomDESCR: Contact: Tom Evans 530-308-4528 email bids to: [email protected] General Contractor seeking sub

Residental Plansbids. DO NOT contact owner. Trades to include: Drywall; Data Cabling; Concrete FlatworkBIDDERS LIST:Sub Contractor: Ivers Electric, Inc. 916-295-4416 530-295-0423

Tuesday, December 31, 2013

2012 QUALIFIED BIDDERS LISTPLAN #: 240096 LOCATION: Sutter County Bid Time: 12:00 PM PLANS AT: Roseville Office Online and PlanroomDESCR: Contact, Sutter County Public Works Department, 530-822- 7450. Requesting 2013 Qualified Bidders list. See Specifications for All published entries in this report are obtained from sources deemed reliable. Placer County Contractors Association assumes no responsibility for any inaccuracies listed in this report. It is up to the individual to verify all information.

C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts,

and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors?

For rates, call Steve at (916) 729-5432

Page 46: Exchange ezone july1 2013

July 1, 2013Page 44 Contractor’s Zone• .Contractor’s Zone

$684

billion

The Internet Accounts For 4.7%

of the U.S. Economy

Survey Says: 77% of Americans would be willing to give up chocolate for an entire year, rather than go without the Internet. Only 21% though would give up sex, and an even smaller 7% would go without a shower.

According to a recent survey conducted by CNN Money, the Internet contributes more to the American economy than the entire federal government, according to a new study by the Boston Consulting Group.

The Internet accounted for $684 billion, or 4.7% of all U.S. economic activity in 2010, Boston Consulting Group found. By way of comparison, the federal government, contributed $625 billion, or 4.3%, to the nation’s output. If it was considered its own separate industry, the Internet would also be larger than America’s education, construction or agricultural sectors.

In the retail sphere alone, e-commerce accounted for 5% of U.S. sales in 2010.

“All businesses are increasingly digital and need to think about how to take advantage of these opportunities,” said Dominic Field, a BCG partner and co-author of the report. Boston Consulting Group predicts the Internet will grow about 10% a year through 2016 in the Group of 20 nations.

Advertising HERE makes dollars, and sense!And this digital media will grow every year.

Call Steve today to get your powerfuldisplay ad started. 916.729.5432

Page 47: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Tuesday, June 18, 2013

WATERMAN ROAD CULVERT REPLACEMENTS NEAR ELK GROVE BOULEVARD AND HUDSON RANCH PROJECTS , Elk Grove

Plan 36016 Number:

F. Loduca Co. $237,992 SIERRA NATIONAL CONST $245,937 WATER IMPROVEMENTS 2013, Eureka

Plan 113076 Number:

Wahlund Construction $530,169 Cal Electro $538,075 STORM DAMAGE REPAIRS ON ALDERPOINT RD. AT P.M. 27.5, 30.63 & 41.40-41.60, Humboldt

Plan 20011 Number:

Wylatti Resource $299,499 SCHOOL ROAD SIDEWALK & REALIGNMENT PROJECT BETWEEN WASHINGTON AVE AND HWY 101 , Humboldt Co.

Plan 104093 Number: G R Sundberg, Inc $879,000 Wednesday, June 19, 2013

RANCHO SECO PV DECOMMISSIONING, Sacramento

Plan 22017 Number:

SIERRA NATIONAL CONSTRUCTION $999,925 Thursday, June 20, 2013

WATERSHED SCIENCE RESEARCH CENTER STUCCO INVESTIGATION REPAIR (PREQUALIFIED BIDDERS), Davis

Plan 47019 Number:

Ashron Construction and Restoration $908,700 Bayview Painting and Construction $935,000

OLD OASIS WATER PROJECT, Redding

Plan 102098 Number:

Henthorn Equipment $72,988 Timberworks $80,866 All Phase Construction & Engineering $87,550 VALLEY CHARTER HIGH SCHOOL EMERGENCY STAIR REPLACEMENT, Stanislaus

Plan 41019 Number:

Harris Builders, Inc. $54,450 BC Construction $61,403 FOUR SEASONS TANK AND WOODHILL- WOODVIEW WATERLINE IMPROVEMENT PROJECT, Tahoe City

Plan 189022 Number:

Vinciguerra Construction $383,998 Monday, June 24, 2013

NORTH TAHOE INDUSTRIAL TECHNOLOGY LAB , Truckee

Plan 27026 Number:

RL Brown Construction $210,700 PNP Construction, Inc. $292,974 Tuesday, June 25, 2013

2012/13 PAVEMENT SLURRY SEAL PROJECT, Danville Plan 151069 Number:

Central Valley Engineering & Asphalt $683,730.48 California Pavement Maintenace $709,956.60 CITYWIDE ROADWAY AND MEDIAN IMPROVEMENTS , Folsom

Plan 68070 Number:

Western Engineering $448,595 Martin Gen Engineering $459,577

Bid Results

Page 48: Exchange ezone july1 2013

July 1, 2013Page 46 Contractor’s Zone• .Contractor’s Zone

Legal AdsRequest for Proposals

Vacant Lot Landscape Services

RFP # 2013025-WWlg

TheSacramentoHousingandRedevelopmentAgency(SHRA)issolicitingforqualified,CSLBC-27licensedlandscapecontractorstoprovidevacantlotandpropertylandscapemaintenanceservicesatvariouslocationsthroughouttheCityandCountyofSacra-mento.

TheRequestforProposalsisavailableuponrequestbye-mailingProcurementServicesatps@shra.orgorcalling(916)440-1378,refertoRFP#2013025-WW

A Pre-Proposal meeting will be held at 10:00 A.M., Wednesday, July 3, 2013 at the SHRA Commission Room – 2nd Floor, 801 12th Street, Sacramento, CA 95814.ThePre-Proposalmeetingisnotmandatory;however,firmsinterestedinsubmittingpro-posalsareencouragedtoattend.

All proposals must be received no later than 2:00 P.M. on Tuesday, July 16, 2013 at SHRA Procurement Services – 2nd Floor, 801 12th Street, Sacramento, CA 95814.

Forinformationonotherprojects,visitourweb-siteatwww.shra.org

So many people use this newspaper for their legal ads.... Why aren’t you???

Page 49: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

ADVERTISEMENT FOR CONTRACTOR PREQUALIFICATIONSubjecttoconditionsprescribedbytheUniversityofCalifornia,DavisMedicalCenter,responsestotheUniversity’sprequalificationdocumentsforalumpsumcontractaresoughtfromprospectivebiddersforthefollowingprojects:

PROJECT NO. 9559090TOMOTHERAPY REPLACEMENT

ANDPROJECT NO. 9559090A

REMODEL FOR BRACHYTHERAPY ROOM

PREQUALIFICATION OF PROSPECTIVE BIDDERS:TheUniversityhasdeterminedthatbidderswhosubmitbidsonthisprojectmustbeprequalified.PrequalifiedbidderswillberequiredtohavethefollowingCaliforniacontractor’slicense(s):

PrequalifiedGeneral ContractorswillberequiredtohavethefollowingCaliforniacontractor’slicense:B–GeneralBuildingContractor

PrequalifiedSubcontractorswillberequiredtohavethefollowingCaliforniacontractor’slicenses:MechanicalTradeWork:C-20,Warm-AirHeating,VentilationandAirConditioningContractorPlumbingTradeWork:C-36,PlumbingContractorElectricalTradeWork:C-10,ElectricalContractor

GENERAL DESCRIPTION OF WORK FOR EACH PROJECT:

ProjectNo.9559090–TomotherapyReplacementProjectconsistsofrenovatingexistingTomotherapyvaulttoinstallanewTomotherapysystem.Thescopeincludesarchitectural,structural,mechanical,andelectricalwork.Newfinishesincludeceiling,lighting,flooring,painting,somecaseworkandconnectivity.Contractorsupportrequiredforequipmentdeliverythruanin-groundskylightsystem.Estimatedbiddate–August2013Estimatedconstructioncost–$275,000

Project No. 9559090A – Renovations for Brachytherapy Suite ProjectconsistsofrenovatinganexistingCTroomforbrachytherapyproceduresandafutureCTscanner.Roomwillbedividedbetweencontrolandtreatmentspaces.Projectincludesdoorandwallrelocations.Doors,wallsandceilingtobeshieldedtomini-mum130#/ft.sq.leadorequivalentsteelorconcrete.Newdoors,walls,ceiling,flooring,lighting,casework,allfinishes,HVAC,electrical,structuralsupport,IT,equipmentanchoring,andradiationshieldingareplanned.Estimatedbiddate–October2013Estimatedconstructioncost–$625,000

PREQUALIFICATION PROCEDURES: OnFriday,June21,2013,asetofprequalificationdocumentswillbeissuedat:FacilitiesDesign&Construction,UCDavisHealthSystem,48002ndAvenue,Suite3010,Sacramento,CA95817.Prequalificationdocu-mentscanalsobedownloadedfromourwebsiteat:http://www.ucdmc.ucdavis.edu/facilities/contractors/advertisements.html

ThePrequalificationQuestionnaireandassociateddocumentsaredueonFriday,July12,2013,at5:00p.m.,andwillbereceivedonlyat:

FacilitiesDesign&ConstructionUCDavisHealthSystem

48002ndAvenue,Suite3010,Sacramento,CA95817

Electroniccopiesarenotacceptable.NoPrequalificationQuestionnaireswillbeacceptedaftertheaboveduedateandtime.How-ever,theUniversityreservestherighttorequest,receiveandevaluatesupplementalinformationaftertheabovetimeanddateatitssoledetermination.TheUniversityreservestherighttorejectanyorallresponsestoPrequalificationQuestionnairesandtowaivenon-materialirregularitiesinanyresponsereceived.

Allinformationsubmittedforprequalificationevaluationwillbeconsideredofficialinformationacquiredinconfidence,andtheUni-versitywillmaintainitsconfidentialitytotheextentpermittedbylaw.

Dates,times,andlocationsetforreceivingandopeningofbidswillbesetforthinanAnnouncementtoPrequalifiedBidders.

EveryeffortwillbemadetoensurethatallpersonshaveequalaccesstocontractsandotherbusinessopportunitieswiththeUni-versitywithinthelimitsimposedbylaworUniversitypolicy.Eachprospectivebiddermayberequiredtoshowevidenceofitsequalemploymentopportunitypolicy.

THEREGENTSOFTHEUNIVERSITYOFCALIFORNIAUniversityofCalifornia,DavisHealthSystemJUNE2013

Page 50: Exchange ezone july1 2013

July 1, 2013Page 48 Contractor’s Zone• .Contractor’s Zone

Legal Ads

ANNOUNCEMENT TO PREQUALIFIED PROPOSERS

SubjecttoconditionsprescribedbytheUniversityofCalifornia,Davis,sealedproposalsforadesignbuildcontractareinvitedfromprequalifiedproposersforthefollowingwork:SOEFanCoilandHVACPipingReplacementREBID,ProjectNumber:9521900.

Description of Work: ProvideallDesignWork,labor,material,tools,equipment,commissioning,insurance,transportationandallnecessarygeneralconditionsthatmaybereasonablyinferredfromtheContractDocumentstoprovideallDesignWorkandCon-structionWorkfor:comprehensiveremovalandreplacementoffancoilsandHVACpiping,gypsumboardwithacousticaltilecorridorceilingremovalandplacementofT-bargridacousticalceilingtile,necessaryremovalandreplacementofhardlidceilinginofficespacestoeffectremovalandinstallationofHVACpipingandfancoils,communicationsaboveceilingandsurfaceraceway,boxesandfaceplates,includingcat5ewiringandterminationsinandthroughouttheSchoolOfEducation(SOE)building.

TheSchoolofEducationisanexistingatwostorybuilding.Theroutingofthemainhydroniclinesshallbeabovethefirstfloorcor-ridorceilingwithlaterallinesbranchingtoservetheroomsoffofthecorridorandtheroomsonthesecondfloor.Thebuildingwillbeoccupiedduringtheentireproject.

Theinstallationoftheoftheworkassociatedwiththemainhydroniclinesincludingthedemolitionoftheexistingcorridorceilingwillbedoneinoffhoursbetween7pmand6amorweekends.Attheendofeachworkshiftthecorridorsshallbecleanedandvacuumed;andfreeofconstructionmaterialsanddebris.

Theinstallationoftheoftheworkassociatedwiththelaterallinesservingtheroomsoffofthecorridorandtheroomsonthesecondfloorshallbesequenced.Startingfromthesouthwestendofthebuildingandworkingbacktowardsthemechanicalroom.RefertoMechanicalDrawingsforconstructionsequencingorder.EachworksequenceshallbecompletedtestedandacceptedbytheUni-versitypriortostartingthenextsequence.Priortoeachworksequencestartingroomsshallbevacatedduringthedurationoftheworksequenceandreoccupiedonceworksequenceiscompleted.

TargetContractAmount:$1,700,000.00MaximumAcceptanceCost:$2,000,000.00

Procedures: NOTE:Onlycreditcardorders fordocumentsareacceptedonourReprographicswebsiteathttp://reprographics.ucdavis.edu/store/DownloadableBiddingDocumentswillbeavailabletoBiddersonWednesday, July 3, 2013.Anon-refundablefeewillberequiredintheamountof$50.00.AllpaymentsmustbereceivedatUCDReprographicsbeforedocumentscanbemadeavailablefordownload.

Prequalifiedcontractorswillbeissued1setofdocumentsatnocharge.

Thefollowingdesignbuildershavebeenprequalifiedtosubmitproposalsonthisproject: Contractors Name Phone FaxAircoMechanical,Inc (916)381-4523(916)381-4925MesaEnergySystems,Inc. (916)636-1825(916)218-6307PerrymanMechanical,Inc. (916)371-8888(916)371-8990

PLEASE NOTE: Subcontractors wishing to bid on this project should contact the prequalified General Contractor directly at the numbers listed above.

AMANDATORYPre-BidConferenceandMANDATORYPre-BidJobWalkwillbeconductedonTuesday, July 9, 2013 beginningpromptlyat9:30a.m.ParticipantsshallmeetatDesignandConstructionManagement,255CousteauPlace,Davis,CA95618.BiddersmustbepresentatthePre-BidConferencenolaterthanthescheduledstarttime.OnlybidderswhoparticipateinboththeConferenceandtheJobWalkintheirentirety,willbeallowedtobidontheProjectasprimecontractors.Forfurtherinformation,contactChrisMcGuireat(530)754-1021or(530)754-1111.TheJobWalkwilllastapproximately2hours.TransportationwillbeprovidedtotheProjectSiteVisit.

Page 51: Exchange ezone july1 2013

Contractor’s ZoneContractor’s Zone

Proposalswillbereceivedonlyat: DesignandConstructionManagement,UniversityofCalifornia 255CousteauPlace,Davis,California95616 (530)754-1111

Proposalsmustbereceivedonorbefore:2:00P.M.,Tuesday,July30,2013.

ProposalSecurityintheamountof10%oftheLumpSumBaseProposal,excludingalternates,shallaccompanyeachbid.ThesuretyissuingtheBidBondshallbe,onthebiddeadline,anadmittedsuretyinsurer(asdefinedintheCaliforniaCodeofCivilPro-cedureSection995.120)

AllinsurancepoliciesrequiredtobeobtainedbyDesignBuildershallbesubjecttoapprovalbyUniversityforformandsubstance.AllsuchpoliciesshallbeissuedbyacompanyratedbyBestasA-orbetterwithafinancialclassificationofVIIIorbetter,orhaveequivalentratingbyStandardandPoor’sorMoody’s.

Thesuccessfulproposeranditssubcontractorswillberequiredtofollowthenondiscriminationrequirementssetforthintheproposaldocumentsandtopayprevailingwageratesatthelocationofthework.

ThesuccessfulproposerwillberequiredtohavethefollowingCaliforniacontractor’slicenseatthetimeoftheproposalopening:“B”GeneralBuildingand“C36”Plumbing.

EveryeffortwillbemadetoensurethatallpersonshaveequalaccesstocontractsandotherbusinessopportunitieswiththeUni-versitywithinthelimitsimposedbylaworUniversitypolicy.EachBiddermayberequiredtoshowevidenceofitsequalemploymentopportunitypolicy.ThesuccessfulBidderanditssubcontractorswillberequiredtofollowthenondiscriminationrequirementssetforthintheBiddingDocumentsandtopayprevailingwageatthelocationofthework.

THEREGENTSOFTHEUNIVERSITYOFCALIFORNIAUniversityofCalifornia,DavisJune26,2013

C&S Publishing is a state-certified SBERunning your DVBE, SBE or UDBE advertrisements here is inexpensive, easy, and will help you meet your SBE goals.

Email your ads to: [email protected]

No credit card required - net 30 days to pay

A copy of the ad with Proof of Publication Statement sent for inclusion in your bid package by first-class mail.

CS ublishingP&916-729-5432

Page 52: Exchange ezone july1 2013

July 1, 2013Page 50 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

Newspaper Rate Sheet

Ad Type Ad Size 1 run 6 runs 13 runs 26 runs 52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall $782 $639 $497 $355 $209

Full page (bleed) 8 5/8” wide by 11 1/4” tall $427 $355 $284 $213 $139

Full page (boxed) 8” wide by 9 3/4” tall $427 $355 $284 $213 $139

Half page 8” wide by 4 3/4” tall $229 $193 $158 $123 $87

One Third (V) 2 7/8” wide by 7 1/2” tall $171 $144 $118 $92 $63

One Third (H) 8” wide by 3 1/8” tall $171 $144 $118 $92 $63

Quarter Page 3 7/8” wide by 4 3/4” tall $97 $81 $64 $47

Contractor Yellow Pages (Business Card Sized Ad) $39 $32 $24 $19

Legal ads • 3 7/8” wide and up to 2 1/4” tall $50 • 3 7/8” wide and up to 3 1/2” tall $75

• 3 7/8” wide and up to 5” tall $95 • 3 7/8” wide and up to 6 1/2” tall $135

The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Upgraded format, larger ad sizes, lowered rates:

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected]. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: [email protected]. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members!

Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract.

For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected] See the news-paper onlne at www.PCCAe-Zone.com

Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.

Display Advertising Policy, Rates and InformationREVJULY2012

Our LOWEST rates