Exam HP0-G11 preparation questions

10
Exam HP0-G11 study material Made available by Testkingprep.com Free HP0-G11 Exam Preparation Questions Exam HP0-G11 : CCI Fundamentals for Solution Architects For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

description

Testkingprep is the leader in providing certification solution to the seekers and testking certification study guide is more authentic than others. Testking HP0-G11 practice exam and tests have constantly strived for excellence to make sure that our clients receive up-to-date study materials and support for all kind of certification exams.

Transcript of Exam HP0-G11 preparation questions

Page 1: Exam HP0-G11 preparation questions

Exam HP0-G11 study material

Made available by Testkingprep.com

Free HP0-G11 Exam Preparation Questions

Exam HP0-G11: CCI Fundamentals for Solution Architects

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

Page 2: Exam HP0-G11 preparation questions

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

Page 3: Exam HP0-G11 preparation questions

Question:1 Remote connectivity with RGS is feasible over which types of networks? (Select two.) A. Local Area Network (LAN) B. Wide Area Networks (WAN) C. Personal Area Network (PAN) D. Very Small Aperture Terminal (VSAT) E. Wireless Wide Area Network (WWAN)

Answer: A, B Question:2 What are critical factors for a large and successful CCI engagement? (Select two.) A. an effective site assessment B. use of desktop PCs for grid computing C. well defined success criteria for the pilot D. HP storage must be included in the solution

Answer: A, C Question:3 Your customer is very happy with the results of the CCI pilot. They want to migrate 2400 users to CCI, and also plan to migrate their end users to HP thin clients. There are a number of tasks that must be accomplished to do this successfully. What must you address with the customer when creating this migration plan? (Select two.) A. reserialization of company USB keys B. assigning all users new passwords C. cooling requirements at the end user's worksite D. end-user training on the blade PC login process E. how each end user's data files are to be collected and stored

Answer: D, E Question:4 You have successfully installed the RGS Sender on a blade PC running Microsoft Windows XP. If a user is unable to establish a connection using the RGS Receiver, what is the possible cause? A. the firewall is not enabled B. network latency is too low C. the NICs are bound incorrectly D. the Active Directory is not functioning

Answer: C Question:5 Which FastEthernet ports does the PC Blade Switch tray include? A. 20 dedicated internal 10/100 Mb/s FastEthernet ports B. 40 dedicated internal 10/100 Mb/s FastEthernet ports C. 42 dedicated internal 10/100 Mb/s FastEthernet ports D. 40 dedicated internal 10/100/1000 Mb/s FastEthernet ports

Answer: C Question:6 If no license key is entered, how many blade PCs can be registered in SAM? A. none B. 30 C. 50 D. 100 E. unlimited

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

Page 4: Exam HP0-G11 preparation questions

Answer: B Question:7 Your customer is interested in deploying CCI, but their network team has standardized on a third-party switch. Because of this, they are reluctant to take ownership of the HP Blade PC Switch. They have asked if any of the HP Blade PC Switch's features can be removed or turned off. What can you recommend to satisfy the customer? A. Configure the switch to act as a port aggregator. B. Offer to send the customer to CCI training for network engineers. C. Offer to use the third-party vendor's compatible Interconnect switch. D. Explain to the customer that this cannot be done, then offer to work with their engineers.

Answer: A Question:8 Click the Task button. A customer wants to put Ethernet ports 45 and 46 in a Link Aggregation Group (IEEE 802.3ad) and redundantly connect each of them to two separate stacked distribution switches. VLAN tagging will not be used. From the switch command line interface (console>), which commands must you enter (in order) to reconfigure the HP PC Blade Switch?

Answer:

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

Page 5: Exam HP0-G11 preparation questions

Question:9 How does CCI enable Business Continuity for end users? (Select two.) A. Blade PCs consume only about 25-40 watts per blade; this power savings is a benefit to data center

managers responsible for the budget. B. CCI enables image replacement and rebalancing, so all blade PC users will have the same

network performance no matter where they login from. C. CCI makes full use of the Active Directory schema; therefore, users are always guaranteed to be

directed to the same blade PC regardless of what location they login from. D. CCI uses Microsoft free Remote Desktop Connection (RDC) software, so end users can install it on

their personal computer to access their blade PC. E. CCI blade PCs are distributed, so if power is lost to one enclosure, rack or data center, users can

quickly be reallocated to blade PCs in another enclosure, rack, or data center. Answer: D, E Question:10 By design, which benefit does the CCI solution provide over a traditional PC? A. improved resource security B. improved off-line experience C. increased total cost of ownership D. improved video streaming performance

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

Page 6: Exam HP0-G11 preparation questions

Answer: A

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html

Page 7: Exam HP0-G11 preparation questions

For complete Exam HP0-G11 Training kits and Self-Paced Study Material

Visit:http://www.testkingprep.com/HP0-G11.html

http://www.testkingprep.com/

For Latest HP0-G11 Exam Questions and study guides- visit- http://www.testkingprep.com/HP0-G11.html