14.09.12 EVREST – Presentation
EVREST: Electric Vehicle with Range Extender as a Sustainable Technology.
Eranet Electromobility+ launching seminar
Paris, 13-14 September 2012
Rochdi TRIGUIIFSTTAR
Project coordinator
![Page 2: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/2.jpg)
2
• Context and objectives• The consortium• WPs and interactions• WP1-3 • Planning• Budget
Outline
![Page 3: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/3.jpg)
Context
• Electromobility has still many difficulties to solve before its wide diffusion
• The issues are : economical, technological, psychological, environmental
• Batteries of present EVs are oversized regarding many cases of use in Europe
• Possible solution: EREV: Extended Range EV– To downsize the battery
– To give psychological insurance to users
– To provide more flexible use ?
3
![Page 4: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/4.jpg)
Project objectives
• To identify actual needs of European mobility through existing data• To define and optimize the size of different possible solutions based
on EREV from uses’ specifications• To build scenarios of use cases• To evaluate the scenarios (use + techno)
– Environmental aspects (LCA)– Acceptability (sociological, economical, …)
– Recharging facilities
4
![Page 5: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/5.jpg)
Project objectives
• To identify actual needs of European mobility through existing data• To define and optimize the size of different possible solutions based
on EREV from uses’ specifications• To build scenarios of use cases• To evaluate the scenarios (use + techno)
– Environmental aspects (LCA)– Acceptability (sociological, economical, …)
– Recharging facilities
Expected outputs - Achieve and disseminate the global evaluation results of the studied solutions - Provide coupled technical and human elements for car manufacturersand policy makers
5
![Page 6: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/6.jpg)
ConsortiumEnginneering&Human Science
French Partners German Partners Austrian Partner
LTE&DEST
LETENTPE/Lyon univ.
6
University of Natural Resources and Life Sciences Vienna
![Page 7: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/7.jpg)
ConsortiumEnginneering&Human Science
French Partners German Partners Austrian Partner
LTE&DEST
LETENTPE/Lyon univ.
7
University of Natural Resources and Life Sciences Vienna
Part of the project management substructing
![Page 8: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/8.jpg)
WPs and interactions
WP1 User needs analysis of existing data
WP2Simulated sizing and optimization of technologies
WP3 Development of scenarios for electromobility
WP4 Impact on grid and charging
facilities
WP5 Environmental
Impact
WP7 Synthesis, Sustainable Development Analysis
and recommendations
Specifications
Solutions
Evaluation
WP6 Assessment of
the user perspective
WP
8: M
anag
emen
t, ex
ploi
tatio
n an
d di
ssém
inat
ion
8
![Page 9: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/9.jpg)
WP1- Analysis of car uses
Gathering and aggregation of information of travel behaviour and car useageData from Existing and ongoing surveys from France, Germany and Austria
9
According to different scenarios of use , we will analyze/simulate the potentialof car fleet that can be switched to EV or Range extended EV.
![Page 10: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/10.jpg)
DD.MM.YY 10
ObjectivesDefine and optimize by simulation different solutions based on EV with Range Extender and corresponding to the different types of use specified in WP1.
WP 2- Simulated sizing and optimization of technologies
The resulting potential vehicles will be declined in terms of:
•performance (range, power, energy consumption, possible pollutant emission)
•optimal sizes and characteristics of components (battery, Internal Combustion Engine, Fuel Cell)
![Page 11: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/11.jpg)
3.1 Trends of mobility
3.2 Framework conditions
3.3 Users’ needs +
3.4 Trends in car technology
further wps
Expert workshop
3.5 SCENARIOS INCLUDING EV and EREV
wp 1
WP3 – Development of scenariosfor establishing electromobility
11
![Page 12: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/12.jpg)
WPs- timetable
![Page 13: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/13.jpg)
WPs- timetable1st of Jully 2102
![Page 14: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/14.jpg)
WPs- timetable1st of Jully 2102
2 ICE provided by Peugeot Scooter
![Page 15: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/15.jpg)
Budget/Duration/Grant agreements
Requested funding
Accepted funding
Total funding per
country« Signing » date
IFSTTAR 175 380 € 175 380 €
249 164 € ADEMECNRS-LET 26 215 € 26 215 €
PMTC 47 569 € 47 569 €
KIT-IFV-DFIU 347 291 € 298 559 €605 169 €
BMWi, DLR/TUC 154 423 € 134 786 €
LBP-Gabi 198 811 € 171 824 €
BOKU 151 357 € 133 600 € 133 600 € BMVIT, FFG
TOTAL 1 101 046 € 987 933 € Total cost : 1 445 719 €
• Start date : 1st of July 2012 Duration : 36 months
15
![Page 16: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/16.jpg)
DD.MM.YY 16
Advisory boardRole : provide strategic guidance and support to th e consortium Partcicpate to workshops and annual meetings.
Company Status
Toyota Europe Agreed
PSA In progress
BMW group In progress
EDF To be contacted
![Page 17: EVREST: Electric Vehicle with Range Extender as a ...electromobility-plus.eu/wp-content/uploads/electro... · 14.09.12 EVREST – Presentation EVREST: Electric Vehicle with Range](https://reader036.fdocuments.in/reader036/viewer/2022071003/5fc01dfcdb61740beb4fdf1e/html5/thumbnails/17.jpg)
DD.MM.YYEVREST – Presentation WPn
17
Thank you for you attention.
Rochdi TRIGUIEVREST project coordinator