European capacity building initiativeecbi Options for increasing the level of mitigation ambitions...

17
european capacity building initiative ecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special Envoy for MEAs Grenada e u r o p e a n c a p a c i t y b u i l d i n g i n i t i a t i v e é e n n e d e ecbi for sustained capacity building in support of international climate change negotiations 06/17/22 1

Transcript of European capacity building initiativeecbi Options for increasing the level of mitigation ambitions...

Page 1: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiOptions for increasing the level of

mitigation ambitions in the short term

Spencer Thomas, Ph.D Ambassador, Special Envoy for MEAsGrenada

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive

initia

tive e

uro

péen

ne d

e re

nfo

rcem

en

t des

cap

acité

s ecbi

for sustained capacity building in support of international climate change negotiations

04/21/23 1

Page 2: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiArgument

• Well below 1.5 degrees Celcius: We can do it.

04/21/23 2

Page 3: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Impact of 1m SLRUNDP

• 1300 sq km Caribbean

• Coastal infrastructure, transport, communication

• 5 % of Bahamas

• 21 of 64 airports

• 35 of 44 ports

• 149 multi million dollar resorts

04/21/23 3

Page 4: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Science

• Rising emission levels

• Rising sea levels: 1-2 m 2100

• Rising temperatures: 4-5 degree pathway– 2 degrees?

• Cost of inaction and delay

04/21/23 4

Page 5: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Emissions gap

• Real and significant

• 13-18% : 1990 levels

• LULUCF credits: 10 - 15 %

• Surplus AAUs: 5-10 %

• Both : 1-7%

• Science

• AOSIS: 45% by 2020 with 2015 peaking 04/21/23 5

Page 6: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Achievable? Yes

04/21/23 6

Page 7: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

2C vs 1.5C in 2020

04/21/23 7

Page 8: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

SLR not stabilized at 2 degRohmstorf (2007): Church and White (2011)

04/21/23 8

Page 9: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiCoral reefs

Silverman et al (2009)

04/21/23 9

Page 10: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Ocean acidification Lowe et al (2010)

04/21/23 10

Page 11: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Annex 1 Reductions: not enough

04/21/23 11

Page 12: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiCosts factors

• Economic costs for higher ambition are feasible – OECD, IEA, IIASA estimates

• Costs of inaction and delay are formidable

04/21/23 12

Page 13: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Short term responses

• Increased levels of ambitions and actions

• Cap LULUCF credits

• Remove exceptions

• No carryover of surplus AAUs

• The Kyoto protocol

04/21/23 13

Page 14: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiResponses

• Renewable energy options are available and feasible

• Identify and support EE and RE mitigation potential

• Support expedited uptake of renewables

• Overcome barriers to deployment

04/21/23 14

Page 15: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiSIDSDOCK

• Transformation of the energy sector

• Technology and finance mechanism for low carbon development

• By 2030, 50% power needs by renewables

• 30% cut in importation of fossil fuels

04/21/23 15

Page 16: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbi

Unhelpful

• Agenda fights

• Bad faith negotiations

• Delays

• Conditionalties

• Unilateralism

• Focus on voluntarism

• Pledge and review 04/21/23 16

Page 17: European capacity building initiativeecbi Options for increasing the level of mitigation ambitions in the short term Spencer Thomas, Ph.D Ambassador, Special.

eu

rop

ean

cap

acity

bu

ildin

g

initia

tive e

cbiFurther Needs

• Global leadership

• Cost effective global mitigation potential

• Enhanced access to international ETS under KP

• Rio plus 20: new model for development

04/21/23 17