ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS...

44
ESS – Status and Prospects Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator Driven Neutron and Muon Sources’ Workshop RAL, 14 August 2018 www.europeanspallationsource.se

Transcript of ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS...

Page 1: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

ESS – Status and Prospects

Ciprian Plostinar,

on behalf of ESS Accelerator Collaboration

‘The Future and Next Generation Capabilities of Accelerator Driven Neutron and Muon Sources’ Workshop

RAL, 14 August 2018

www.europeanspallationsource.se

Page 2: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Overview

• The ESS Project

• Recent Accelerator Highlights

• The New Baseline

• Some Lessons Learned (so far)

2

Page 3: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

A European Research Centre

3

Page 4: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Campus

4

Page 5: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

ESS Design

5

High Power Linear Accelerator:• Energy: 2 GeV• Rep. Rate: 14 Hz• Current: 62.5 mA

15 Instruments in Construction budget

Peak flux ~30-100 brighter than the ILL

Target Station:• He-gas cooled rotating

W-target ( 5 MW averagepower)

• 42 beam ports

Ion Source

Page 6: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

High Power Machines

Page 7: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Neutron Facilities

7

Year

Berkeley 37-inch cyclotron

350 mCi Ra-Be source

Chadwick

1930 1970 1980 1990 2000 2010 2020

105

1010

1015

1020

1

ISIS

Particle driven pulsed

ZING-P

ZING-P’

KENSWNR

IPNSILL

X-10

CP-2

Fission reactors

HFBR

HFIR

NRU

MTR

NRX

CP-1

1940 1950 1960

Effe

ctiv

e th

erm

al n

eu

tro

n fl

ux

n/c

m2-s

(Updated from Neutron Scattering, K. Skold and D. L. Price, eds., Academic Press, 1986)

FRM-IISINQ

SNS

J-PARC

LANSCE

OPALPIK

2030

CARR

CSNS

Dhruva

IBR-II

NIST

RSGLVR JRR-3

Particle driven steady statePulsed reactor

HANAROHIFAR

SAFARI-1

SALAM

ETERR-2

MARIA

HOR JEEP II

ORPHEE

Reactor Sources Spallation SourcesESS

Page 8: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Science Drivers for the Reference Instrument Suite

Multi-Purpose ImagingODIN

General-Purpose SANSSKADI

Broadband SANSLOKI

Surface Scattering

Horizontal ReflectometerFREIA

Vertical ReflectometerESTIA

Thermal Powder Diffractometer HEIMDAL

Bispectral Powder Diffractometer DREAM

Monochromatic Powder Diffractometer

Materials Science Diffractometer BEER

Extreme Conditions Diffractometer

Single-Crystal Magnetism Diffractometer MAGICS

Macromolecular Diffractometer NMX

Cold Direct Geometry Spectrometer C-SPEC

Wide Bandwidth Direct Geom. Spectrometer VOR

Bispectral Direct Geometry Spectrometer TREX

Cold Crystal-AnalyserSpectrometer CAMEA

Vibrational SpectrometerVESPA

Backscattering Spectrometer MIRACLES

High-Resolution Spin-Echo

Wide-Angle Spin-Echo

Fundamental & Particle Physics

life sciences magnetism & superconductivity

soft condensed matter engineering & geo-sciences

chemistry of materials archeology & heritage conservation

energy research fundamental & particle physics

Larg

e-Sc

ale

Stru

ctu

res

Dif

frac

tio

n

Spec

tro

sco

py

Co

urt

esy

of

A. H

iess

Page 9: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

The European Spallation Source

9

Length (m) W_in (MeV) F (MHz) β Geometric No. Sections T (K)

LEBT 2.38 0.075 -- -- 1 ~300

RFQ 4.6 0.075 352.21 -- 1 ~300

MEBT 3.81 3.62 352.21 -- 1 ~300

DTL 38.9 3.62 352.21 -- 5 ~300

LEDP + Spoke 55.9 89.8 352.21 0.50 (Optimum) 13 ~2

Medium Beta 76.7 216.3 704.42 0.67 9 ~2

High Beta 178.9 571.5 704.42 0.86 21 ~2

Contingency 119.3 2000 704.42 (0.86) 14 ~300 / ~2

Ion Species Protons

Output Energy 2 GeV

Frequency 352.21/704.42 MHz

Pulse Length 2.86 Ms

Peak Current 62.5 mA

Protons per Pulse 1.1 x 1015

Repetition Rate 14 Hz

Duty Cycle 4 %

Average Beam Power 5 MW

Accelerating Structures RFQ, DTL, SC

Spokes/Elliptical

Accelerator Length ~365 m

- Construction scope: 1.3 GeV with 11 powered High b cryomodules (44 x 1.5 MW klystrons)- Nominal scope: 2 GeV with 10 more powered High b cryomodules (+40 x 1.5 MW klystrons)

Page 10: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

ESS Partners

10

Aarhus University

Atomki - Institute for Nuclear Research

Bergen University

CEA Saclay, Paris

Centre for Energy Research, Budapest

Centre for Nuclear Research, Poland, (NCBJ)

CNR, Rome

CNRS Orsay, Paris

Cockcroft Institute, Daresbury

Elettra – Sincrotrone Trieste

ESS Bilbao

Forschungszentrum Jülich

Helmholtz-Zentrum Geesthacht

Huddersfield University

IFJ PAN, Krakow

INFN, Catania

INFN, Legnaro

INFN, Milan

Institute for Energy Research (IFE)

ISIS - Rutherford-Appleton Laboratory, Oxford

Laboratoire Léon Brilouin (LLB)

Lund University

Nuclear Physics Institute of the ASCR

Oslo University

Paul Scherrer Institute (PSI)

Polish Electronic Group (PEG)

Roskilde University

Tallinn Technical University

Technical University of Denmark (DTU)

Technical University Munich (TUM)

Science and Technology Facilities Council

University of Copenhagen (KU)

University of Tartu

Uppsala University

Wigner Research Centre for Physics

Wroclaw University of Technology

Warsaw University of Technology

Zurich University of Applied Sciences (ZHAW)

Page 11: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Accelerator Collaboration

11

11

Page 12: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

ESS – July 2018

12

Page 13: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights: Ion Source and LEBT (INFN Catania)

• Ion Source and LEBT delivered and installed – In-Kind Delivery from INFN Catania.

• Commissioning will soon begin.

• First major accelerator milestone.

• #IonSourceAdventure

13

Page 14: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights: Ion Source and LEBT

14

Page 15: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights: Accelerator Cryoplant

15

Page 16: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

16

Recent Highlights: Accelerator Cryoplant

Page 17: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent highlights – RFQ (CEA)

• Manufacturing underway• Current estimated delivery is end of 2018• Cooling skid delivered and installed

17

Page 18: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent highlights – MEBT (ESS Bilbao)

18DIAGNOSTIC

VESSELS QUADRUPOLES

BUNCHERS &RF COUPLER

ProtonBeamInstrumentation FAST CHOPPER

Page 19: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent highlights – DTL (INFN Legnaro)

19

Page 20: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights: Spokes (CNRS – IPNO)

20

Page 21: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights – MB Prototype Cryomodule (CEA)

21

Page 22: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights: Elliptical HB cavities: DL Vertical Test-Stand is becoming operational.

22

Page 23: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights: FREIA at Upsala UniversityInfrastructure for Spoke CM Testing is Operational

23

cryogenics- liquid helium- liquid nitrogen

control room- equipment controls- data acquisition

radio-frequency (RF) power sources

3 bunkerswith test stands

horizontal cryostat

vertical cryostat

State-of-the-art Equipment

HB package at FREIA

Page 24: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights – Linac Warm Units (LWUs)

24

Page 25: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Recent Highlights – El Pais

25

Page 26: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

2018 Re-Baselining

• Significant delays experienced since 2013

– Both at ESS and IK Partners (cash-flow issues, VAT issues, procurement issues, technical issues, etc.)

• We now have a much better understanding of the manufacturing and installation complexity.

• Installation sequences have been optimised.

• Many contracts have been signed and tenders launched.

• A new plan was therefore developed to reflect these changes

– Risks for delays still exist.

26

Page 27: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Key Assumptions

Installation

• In-Kind Model

• Ready for Installation Dates (RFI):

• Some contractual

• Others “best estimate”

• Optimised Sequence:

• Logic

• Safety

• Flexibility

• Parallel Installation and Commissioning:

• Shielding Wall

• Demanding Schedule

• Coordinated Installation of Utilities/Services

• No Internal Float

Testing

• Realistic time allocation

• Relevant Permits

• SSM

• Safety Measures

• Correct Gateways

• Suitable Reviews

Commissioning

• Hardware

• Beam

• Key Dependencies

• Other Divisions

• Critical Parameters

27

Page 28: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

The Big Picture – The ESS Timeline

28

2018 2019 2020 2021 2022 2023 2024 2025

ISrc to LEBT

ISrc to DTL1

ISrc to DTL4

Beam on Dump (BOD)

Accelerator Ready for Beam on Target (RBOT)

Beam on Target (BOT)End of Construction

Start Of User Program (SOUP)

Page 29: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Accelerator Milestones

29

2018 2019 2020 2021

ISrc to LEBT

28/6/2018

ISrc to DTL1

4/11/2019

ISrc to DTL4

27/4/2020

ISrc to Beam Dump (BOD)

8/2/2021

RBOT

24/5/2021

Page 30: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Critical Path for Accelerator

• The ACCSYS Critical Path to RBOT goes through four intermediate milestones.

• The Ion Source to LEBT beam commissioning (Summer 2018) is not on the critical path, but an important transition to initial operations milestone.

30

2018 2019 2020 2021

ISrc to DTL1

4/11/2019

ISrc to DTL4

27/4/2020

ISrc to Beam Dump (BOD)

8/2/2021

RBOT

24/5/2021

Page 31: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

PSS/SRR

SC Linac, HEBT, A2T

NC Linac

Beam Commissioning

2018 2019 2020 2021

ISrc to DTL14/11/2019

ISrc to DTL427/4/2020

ISrc to Beam Dump (BOD)8/2/2021 RBOT

24/5/2021

17/12/18 - 12/07/19 RFQ + DTL 1 RF System15/07/19 - 26/07/19 PSS1 Validation

29/07/19 - 18/10/19 RFQ, MEBT, DTL1 RF Conditioning21/10/19 - 01/11/19 SRR2

04/11/19 - 31/01/20 ISrc to DTL1 Beam Commissioning

27/05/19 - 31/01/20 Full NC Linac RF System

03/02/20 - 14/02/20 PSS1 Re-Validation

17/02/20 - 10/04/20 DTL2, 3, 4 RF Conditioning

13/04/20 - 24/04/20 SRR3

27/04/20 - 17/07/20 ISrc to DTL4 Beam Commissioning

20/07/20 - 21/08/20 DTL5 Installation

03/12/18 - 15/11/19 Elliptical CDS Installation

19/08/19 - 15/11/19 SPK CDS Installation

18/11/19 - 07/08/20 SPK CM Installation

18/11/19 - 01/06/20 MBL CM Installation

01/06/20 - 07/08/20 HBL CM Installation

12/08/19 - 13/12/19 HBL1 LWU Installation

16/12/19 - 27/03/20 A2T LWU Installation

30/03/20 - 19/06/20 MBL/HBL2 LWU Installation

22/06/20 - 07/08/20 SPK LWU Installation

10/08/20 - 25/09/20 Final HBL/SPK LWU Installation

12/08/19 - 25/09/20 SPK RF Power Stations

28/09/20 - 16/10/20 Full PSS Validation

19/10/20 - 13/11/20 DTL5 and SC Linac - Warm RF Conditioning

16/11/20 - 11/12/20 CDS and CMs Cooldown and Tests

14/12/20 - 22/01/21 SC Linac - Cold RF Conditioning

25/01/21 - 05/02/21 SRR4

08/02/21 - 07/05/21 ISrc to DMPL Beam Comm.

10/05/21 - 21/05/21 SRR5

ISrc to LEBT

28/6/2018

Page 32: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

(Some) Lessons Learned

• A greenfield project has significant advantages, but also challenges– Building a facility while setting up a new laboratory is not easy.

• IK Model is a powerful concept, but it has its challenges.

• The design, procurement and installation time needed for infrastructure and utilities should not be underestimated.

• Anticipate the need for various permits well in advance.

• Develop the right installation organisation.

• Be adaptable.

• Etc. (a lot more to come)

32

Page 33: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

Thank you!

33

Page 34: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

34

Page 35: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

35

Page 36: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

36

Page 37: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

37

Page 38: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

38

Page 39: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

39

Page 40: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

40

Page 41: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

41

Page 42: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

42

Page 43: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

43

Page 44: ESS – Status and Prospects - ESS - Ciprian Plostinar.pdf · Ciprian Plostinar, on behalf of ESS Accelerator Collaboration ‘The Future and Next Generation Capabilities of Accelerator

44