2 esbnetworks.ie
Agenda
• Storm EMMA
• Post Meter Exchange Phase (Legacy)
• Smart Update
• Retail Program Update
• I-SEM Update
Footer
3 esbnetworks.ie
Storm EMMA
Footer
At the peak of the faults around 1.30am on
Friday 2nd March, there were 117,000
homes and businesses without electricity.
4 esbnetworks.ie
Post Meter Exchange Phase (Legacy)
• Text for letter for the Legacy Exchange Meters LEMs
ESB Networks became aware that there was a potential recording accuracy issue with one of its electricity meter types (Model: Ampy) in late 2016. We immediately commenced an exchange programme of all 27,000 meters of this type.
The exchanged meters were tested and recording accuracy was found to be a problem in 2.5% of them.
However our records show that a meter of this type was previously exchanged at your address on …………..
Having now reviewed your consumption/usage records and compared these with the records for the Ampy meter which was removed on ………….. we estimate, in your case, the number of units over-recorded to be XXX. ESB Networks
has advised your supplier of the units to be credited and these will be reflected on your electricity account in due course.
Meter accuracy is extremely important to us and it is essential that you have confidence in the electricity meter. We apologise for any inconvenience this meter recording accuracy issue may have caused you.
There is no action required on your part but if you have any questions on this please do not hesitate to contact us on ………………………..
Yours sincerely,
Seamus Gray | Manager, Metering Database Services | ESB Networks
T: +353 61 430443 / +353 87 2267681 | www.esb.ie
• Issue to sample of 20 people first
• File of 400 identified has been prepped and is ready to send to Suppliers
Footer
Smart Metering Project – Industry Governance Group (IGG) Update
Wednesday 7th March 2018
Elaine Sexton, SMART Project
6 esbnetworks.ie
SMART Phased Delivery Approach
2019 2020 2024
Phase 1 Phase 2 Phase 3
2022
Market Release 1
(April 19)
Market Release 2
(December)
Market Release 4
(December)
2018
• Procure, build & test new solution
• Two Market Schema releases to facilitate Smart
Metering (non -Smart MCRs also incl)
• Daily collection & processing of interval data.
• The opportunity for Suppliers to offer new Time-of-Use
based tariffs
• Enable remote operation of the
service switch in Smart
Electricity Meters
• Smart Pre-Payment services
with secure remote de-
energisation/energisation
• Advanced meter alerts & events
• Gas Meter integration
• Commence installation of
gas smart meters
• In-Home Channel (HAN)
• In-Home Displays for real-
time customer information
250K Smart Meters safely installed by
December 2020
1 million Smart Meters
installed by 2022
Remaining Smart Meters
installed by end of 2024
20232021
Market Release 3
(December)
2017
7 esbnetworks.ie
SMART Project - Progress since last meeting
Project team mobilised (~ 150 people now on project)
Governance Groups initiated
High Level Design complete
Detailed Design In Progress
AMI and Communications Procurement underway
Technical upgrades underway
8 esbnetworks.ie
MCRs 2018 – Non-Schema MCRs
MCR Description Schema
Or
Non-schema
Go-Live Date Comments
MCR1176
Version
2.0
Extranet message order Non-Schema Sun 25th March 2018 • Planned Outage on RMP Extranet
• The RMP Extranet is the only Central
Market System impacted.
MCR1179
Version
3.0
Cessation of Eligible Cust Files
on ESB Extranet
Non-Schema Sun 25th March 2018
9 esbnetworks.ie
ROI Market Release 2019 - Overview• Schema Version of this release will be 12.00.00
• Planned go-live date for this release is April 2019 (Easter Bank Holiday - Monday 22nd April 2019)
• Test Schema will be made available 3 Months before go-live
• Market Messages :
o No new Market Messages are being added
• 3 Data Codes are being modified to include additional or updated values:
o ‘RejectReasonCode’ - 9 new values (MCR0175)
o ‘CustomerServiceDetailsCode’ - 3 new values for ROI CoBL – 2 of which will be added to schema (MCR1173)
o ‘LoadProfileCode’ – 11 new values (MCR1167)
• 3 Downloadable Files will be changed – (MCR1173, MCR1140, MCR1169 & MCR1167)
• RMP Extranet will be changed - (MCR1173,MCR1140 & MCR1167)
• Additions to the Retail Market Design:
o 11 new Standard Profiles - (MCR1167)
o 25 new Burn Hour Calendars - (MCR1167)
• Effective wattage for every lamp type will be published by ESBN (MCR1167), CoBLCR changes as needed
Note: ESBN awaiting full details of NI Schema Changes
10 esbnetworks.ie
ROI Market Release 2019 – Schema MCRs
MCR Description Change Details Comments
MCR0175**
Version 5.0
New Reject Reasons for Address
Change Rejection
Nine New code values are
being added (I.e. AD1-
>AD9)
• Market Message (MM): 014R
• 9 New Data Codes – Appendix – MCR0175 refers
MCR1173**
Version 2.0
Vulnerable Customer
Implementation in ROI of SI 463
Change existing Code 0008
to be valid in ROI
&
Two new code values (I.e.
0009 & 0010)
• Market Messages (MM): 010, 013 , 016 & 017
• 3 New Data Codes for ROI CoBL, 2 of which will be added to schema – Appendix – MCR1173 refers
• Data Code values will now be used on Extranet and Downloadable files – not the Central Market System Codes as per current
design
• Code 0010 should not be used at this time – it’s being introduced for future proofing and will be rejected. Rejection reasons and
associated rejection messages will be communicated at a future IGG.
• The codes will appear in confirmation messages in line with current market rules
• Modified downloadable files will be available to Suppliers from May 2019 – Appendix MCR1173 refers
• ROI Webforms :code 0010 will be selectable, not display only as originally communicated – Appendix MCR1173 refers
MCR1167**
Version 3.0
Facilitate energy efficiencies in
Local Authority Public Lighting
Eleven New code values are
being added
(I.e.
U13->U23)
• Market Messages (MM): 591, 700, 700W, 701 & 701W
• 11 New Data Codes & 11 New Standard Profiles – Appendix MCR1167 refers
• 25 New Burn Hour Calendars – Appendix MCR1167 refers
• Effective wattage for every lamp type will be published by ESBN (when available)
• CoBLCR changes will be raised, as needed
• Downloadable file with new data values and structure will be available to Suppliers from May 2019 – Appendix MCR1167 refers
MCR1183 010 Customer Validation
Agreement (NI)
NI Requirements <<Placeholders>>
Exact details of NI Schema changes are yet TBC.
MCR1154 New Unmetered Tariff for NI
** Pending IGG approval for re-versioning, version numbers above will change
11 esbnetworks.ie
ROI Market Release 2019 – Non-Schema MCRsMCR Description Comments
MCR1140
Version 3.0
Introduction of Eircodes into
the Retail Market Design in
Ireland
• Eircodes can be submitted on MMs in the existing Postal Code field : 010, 012, 012W,013 & 021
• Eircodes where available will be returned in the existing Postal Code fields on MM: 014R, 101, 101P, 101R, 102, 102P, 102R, 105, 105L, 110, 112, 112R, 112W,
114, 301, 301N& 330
• ESBN will agree schedule for mass uploads of Eircodes into the Meter Point Address Postal Code field in the Central Market System at a future IGG.
• ESBN intend to update these in batch – mechanism and schedule to be discussed at a future IGG
• Once the Postal Code field has been populated it will be visible on the Retail Market Participant Extranet – Appendix MCR1140 refers
Note: Existing Market Defect originally intended to go-live with MCR1187 will now be implemented alongside this MCR.
MCR1169
Version 2.0
Addition of Postal Code to
two Downloadable Meter
Point Details Files
• Modified downloadable files will be available to Suppliers from May 2019 – Appendix MCR1169 refers
• However, population of field will be determined by the Eircode upload schedule for MCR1140
• ESB Networks intend to discuss the upload schedule for these two files at future IGGs
MCR1175**
Version 3.0
Provide Market Participant
Business Reference
(MPBusinessReference) for
Reading
• The Market Participant Business Reference (MPBusinessReference) on the 300MM will be populated with that from the associated original 210MM (i.e. where it
populated a periodic meter reading order)
• Read Reason 95/’Not for COS’ is the only case for which the above applies
o If the customer reading which populates the open Meter Reading Order is implausible and is estimated populate the MPBusinessReference on the
corresponding 305MM
o If the customer reading which populates the open Meter Reading Order is withdrawn populate the MPBusinessReference on the corresponding 300WMM
MCR1180
Version 4.0
New Registration Default
Supplier
• For sites with MIC <30kVa, the Customer must now register with a Supplier
• The 010MM must be received by the Central Market system before a connection point can be energised
** Pending IGG approval for re-versioning, version numbers above will change
12 esbnetworks.ie
Next IGGs
• IGG - Thu 3rd May 2018
• ROI Retail Market Program (2019) – MCRs: Progress Update
• Future IGGs
• ROI Retail Market Program (2019)– MCRs - Implementation Details:
o MCR1180 - New Registration Default Supplier - Work In Progress items will be discussed
o MCR1173 - Vulnerable Customers – Reconciliation with suppliers for new codes & Rejection Reasons
o MCR1167 - Public Lighting – The Standard Profiles, Burn Hour Calendars & Effective Wattages will require publication
o MCR1140 - Eircodes - Upload mechanism and schedule for circa 1.5 Million Eircodes
o MCR1140, MCR1173, MCR1167 & MCR1169 – Downloadable Meter Point Files
o MCR1140, MCR1173 & MCR1167 - Samples of RMP Extranet screenshots
o MCR1167 - Samples of 700 Series Messages
o Cutover & Contingency Planning
• Release 2020
o Re-versioning of SMART MCRs1157-1160 & DR1161 for the Phased Approach
o Other Prioritised Items (TBC)
Appendix
MCRs - Detailed Information
14 esbnetworks.ie
MCR1167 – ROI Release 1 - Schema Related – CoBL Changes
Code Value Code Value Description Valid in
NI?
Valid
in
ROI?
ROI
Web
form
Impact
13 Public Lighting - Dusk/Dawn with Extra Trimming No Yes N/A
14 Public Lighting - Dusk/Dawn with Extra Trimming and 75% dimming between midnight and 06.00 hrs
15 Public Lighting - Dusk/Dawn with Extra Trimming and 67% dimming between midnight and 06.00 hrs
16 Public Lighting - Dusk/Dawn with Extra Trimming and 50% dimming between midnight and 06.00 hrs
17 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to 75% from 21:00 through to 07:00 next day
18 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to 67% from 21:00 through to 07:00 next day
19 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to 50% from 21:00 through to 07:00 next day
20 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to 75% from 20:00 to 22:00 then to 50% until 07:00 next day
21 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to 67% from 20:00 to 22:00 then to 50% until 07:00 next day
22 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to64% from 20:00 to 22:00 then to 47% until 07:00 next day
23 Public Lighting - Dusk to Dawn with Extra Trimming, dimmed to 64% from 20:00 to 22:00 then to 36% until 07:00 next day"
MCR1167 – Public Lighting:
• List of 11 additional code values for the ‘LoadProfileCode’ Data Item and their Usage in each Jurisdiction
15 esbnetworks.ie
MCR1167 - Downloadable Meter Point Files Changes
Note: ESBN intend to share samples of the updates file structure(s) at future IGGs.
MCR Description Change Required
1167 Facilitate
energy
efficiencies in
Local Authority
Public Lighting
• The structure of the UNMT_CUST file will be extended to
cater for the assignment of up to three different Burning
Hour Calendar codes per TMPRN.
• The UNMT_CUST file currently displays existing Burn
Hour Calendar values in the existing Burn Hour Calendar
column.
• In addition to any of the three Burn Hour Calendar values
that are currently valid for ROI, this Change Request will
allow for the population of the 25 new Burn Hour
Calendar values, in the Burn Hour Calendar field in the
UNMT_CUST file – next slide refers.
• One of the five Downloadable Meter Point files will be changed for MCR1167
• Unmetered Details (UNMT_CUST.csv)
16 esbnetworks.ie
MCR1167 – New Burn Hour Calendars
Code Description
U13
Public Lighting Profile 13 - Dusk/Dawn with Extra Trimming
U14A
Public Lighting Profile 14 - Hours not dimmed
U14B
Public Lighting Profile 14 – Hours dimmed to 75% between midnight and 06.00
U15A
Public Lighting Profile 15 - Hours not dimmed
U15B
Public Lighting Profile 15 – Hours dimmed to 67% between midnight and 06.00
U16APublic Lighting Load Profile 16 -_ Hours not dimmed
U16B Public Lighting Profile 16 – Hours dimmed to 50% between midnight and 06.00
U17A
Public Lighting Profile 17 - Hours not dimmed
U17B
Public Lighting Profile 17 - dimmed to 75% from 21:00 through to 07:00 next day
U18A
Public Lighting Profile 18 - Hours not dimmed
U18B
Public Lighting Profile 18 - dimmed to 67% from 21:00 through to 07:00 next day
U19A
Public Lighting Profile 19 - Dusk to Dawn with Extra Trimming Hours not dimmed
U19B
Public Lighting Profile 19 dimmed to 50% from 21:00 through to 07:00 next day
Code Description
U20APublic Lighting Profile 20 - Hours not dimmed
U20B
Public Lighting Profile 20 – Hours dimmed to 75% from 20:00 to 22:00
U20C
Public Lighting Profile 20 – Hours dimmed to 50% from 22:00 to 50% until 07:00 next day
U21A
Public Lighting Profile 21 - Hours not dimmed
U21B
Public Lighting Profile 21 – Hours dimmed to 67% from 20:00 to 22:00
U21C
Public Lighting Profile 21 – Hours dimmed to 50% from 22:00 until 07:00 next day
U22APublic Lighting Profile 22 - Hours not dimmed
U22B
Public Lighting Profile 22 – Hours dimmed to 64% from 20:00 to 22:00
U22C
Public Lighting Profile 22 – Hours dimmed to 47% from 22:00 until 07:00 next day
U23APublic Lighting - Hours not dimmed
U23B
Public Lighting – Hours dimmed to 64% from 20:00 to 22:00
U23C
Public Lighting – Hours dimmed to 36% from 22:00 until 07:00 next day
• There will be 25 new Burn Hour calendars created for MCR1167
17 esbnetworks.ie
MCR1173 - ROI Release 1 - Schema Related – CoBL Changes
Code Value Code Value Description Valid in
NI?
Valid in
ROI?
ROI WebForm Impact
0008 Dexterity Impaired Yes Yes These three codes need to be added to
ROI Webforms - next slide refers0009 Mental Health No
0010 Other No
MCR1173 – Vulnerable Customers
• List of additional ROI code values for the ‘CustomerServiceDetailsCode’ Data Item and their Usage in each Jurisdiction:
18 esbnetworks.ie
MCR1173 - ROI Webform Changes
• Webforms for ROI will need to be changed to accommodate the new Customer Service Special Needs Details.
• The Webforms affected by these changes are those associated with the following MM: 010, 013, 016, 017
• Code 0010(Other) will be added to Schema and Webforms and will be selectable, not display only as originally communicated
• This 0010 (Other) code is currently not authorised to be used as part of Market Processes, and therefore should not be selected
MCR1173 – Changes to ‘CustomerServiceDetailsCode’ Data Item
Code Value Code Value Description Valid in NI? Valid in ROI? ROI Webform Impact
0008 Dexterity Impaired Yes Yes These three codes need to be added
(010,013,016,017 )0009 Mental Health No
0010 Other No
19 esbnetworks.ie
MCR1173 - Downloadable Meter Point Files Changes
• Two of the five Downloadable Meter Point files will be changed for these MCRs:
MCR Description Change Required
MCR1173 Vulnerable Customers
Implementation in ROI of SI 463• Vulnerable Customer codes from the Co-ordinated Baseline (Customer Services Special Needs Details and Medical
Equipment Special Needs details Data Codes) will now be used on the downloadable files and not the Central Market System
Codes as per current design.
• This applies to all Vulnerable Customer codes, and not only those being added for MCR1173.
• These two files will be changed to accommodate the existing and new SSR and PSR values.
• The 0005 Code for Medical Institution will be retained.
• ESBN intend for the new information to be available in these files for Suppliers from May 2019 (i.e. based on the assumption
that Suppliers have first populated the data for new codes )
1. Domestic MRPN Details (domS_CUST.csv) 2. Commercial MPRN Details (COMM_CUST.csv)
Note: ESBN intend to share samples of the updates file structure(s) at future IGGs.
20 esbnetworks.ie
MCR1173 – Mapping of CoBL VC Code vs CMS Codes
Note: ESBN intend to share samples of the updates file structure(s) at future IGGs.
Commercial MPRN Details (COMM_CUST.csv)
Central Market System Code
Current
0001 0002 0003 0004 0005 0006 0007 0008 0009 0010 0012 0013
VC Category SSR SSR SSR SSR SSR SSR SSR PSR PSR MI SSR SSR
CoBL - Vulnerable Customer Codes (i.e. Customer Services Special Needs Details and
Medical Equipment Special Needs details Data
Codes)
Revised by MCR1173
0001 0002 0003 0004 0005 0006 0007 0003 0004 0005 0008 0009
21 esbnetworks.ie
MCR1173 - Downloadable Meter Point Files Changes
Note: ESBN intend to share samples of the
updates file structure(s) at future IGGs.
In the COMM_CUST.csv file, CA10 will contain
0005 and not 0010 as it currently contains
1. Domestic MPRN Details (domS_CUST.csv) 2. Commercial MPRN Details (COMM_CUST.csv)
Current
HeadingsCurrent
Central Market System Code
MCR1173 Revision
Headings
MCR1173 Revision
Codes to be
Displayed in File New or Existing
field?
Heading Name being
changed? Description
MPRN MPRN Existing No
Meter Point Status Meter Point Status Existing No
House No House No Existing No
House No 2 House No 2 Existing No
street2 street2 Existing No
street street Existing No
street3 street3 Existing No
street4 street4 Existing No
street5 street5 Existing No
City City Existing No
Region Region Existing No
Country Country Existing No
Class Class Existing No
MIC MIC Existing No
Voltage Voltage Existing No
MCC MCC Existing No
Cycle Day Cycle Day Existing No
Estimate Estimate Existing No
Profile Profile Existing No
CA01 0001 SSR1 0001 Existing Yes Visually Impaired
CA02 0002 SSR2 0002 Existing Yes Speech Impaired
CA03 0003 SSR3 0003 Existing Yes Hearing Impaired
CA04 0004 SSR4 0004 Existing Yes Elderly
CA05 0005 SSR5 0005 Existing Yes Language Difficulty
CA06 0006 SSR6 0006 Existing Yes Learning Difficulty
CA07 0007 SSR7 0007 Existing Yes Mobility Impaired
0012 SSR8 0008 New No Dexterity Impaired
0013 SSR9 0009 New No Mental Health
0014 SSR10 0010 New No Other
0011 DIS_ON_EXT Y or N New No Display on Extranet
CA08 0008 PSR1 0003 Existing Yes Life Support
CA09 0009 PSR2 0004 Existing Yes Non-Life Support
CA10 0010 MED_INST 0005 Existing Yes Medical Institution
22 esbnetworks.ie
MCR1173 - Retail Market Participant Extranet (RMP) Changes
MCR Description Change Required
MCR1173 Vulnerable Customers 3 Labels will appear on the RMP Extranet MPRN Enquiry Tab viz
• PSR (Containing a list of all* life and non life Medical Equipment Special Needs details Data Codes for MPRN)
• SSR (Containing a list of all existing and new Customer Service Special Needs Details Data Codes for MPRN)
• MI (Containing 0005 from Medical Equipment Special Needs details Data Codes where valid for MPRN)
• Vulnerable Customer codes from the Co-ordinated Baseline (Customer Services Special Needs Details and Medical Equipment
Special Needs details Data Codes) will be used on the RMP Extranet not the Central Market System Codes as per current design.
This applies to for all Vulnerable Customer codes, and not only those being added for MCR1173.
Note:
The PSR code values will only be displayed on the RMP Extranet if customer permission has been granted and where this has
been advised by the Supplier.
• RMP Extranet changes for this MCR:
Note: ESBN intend to share samples of the revised screen(s) at future IGGs.
23 esbnetworks.ie
MCR1140 - Retail Market Participant Extranet (RMP) Changes
MCR Description Change Required
MCR1140 Introduction of Eircodes into
the Retail Market in Ireland
• Once a Meter Point Address Postal Code field has been populated it will be visible on the Retail Market Participant
Extranet MPRN, New Connections , View Appointments , and PMP Tabs
• It will appear in a 7 alpha/numeric character format without a blank between the 3rd and 4th value
• RMP Extranet changes for this MCR:
Note: ESBN intend to share samples of the revised screen(s) at future IGGs.
24 esbnetworks.ie
MCR0175 – ROI Release 1 - Schema Related – CoBL Changes
Code Value Code Value Description Valid in
NI?
Valid in
ROI?
ROI Webform Impact
AD1 AD1 Duplicate street address/numbering exists in the city/street proposed No Yes N/A
AD2 AD2 Approval not received in writing from Local Authority to change street/dev. Name
AD3 AD3 DUoS group conflict here
AD4 AD4 MPRN stated either terminated or disconnected
AD5 AD5 Being dealt with as a bulk address correction for the development
AD6 AD6 Requested address change does not conform to the regional structure
AD7 AD7 No payment for DMR
AD8 AD8 Other Address reason
AD9 AD9 Invalid Postal Code
MCR0175 – Reject Reason Code
• List of additional ROI code values for ‘RejectReasonCode’ data item and their Usage in each Jurisdiction:
25 esbnetworks.ie
1. Domestic MRPN Details (domS_CUST.csv) 2. Commercial MPRN Details (COMM_CUST.csv)
• Postal Code field will be added to each of these files as shown below
MCR1169 - Downloadable Meter Point Files Change
Note: ESBN intend to share samples of the updates file structure(s) at future IGGs.
26 esbnetworks.ie
MCR1169 - Downloadable Meter Point Files Changes
• Two of the five Downloadable Meter Point files will be changed for these MCRs:
MCR Description Change Required
MCR1169 Addition of Postal Code field to
Downloadable files• The Postal Code field will be available to suppliers in the file from May 2019.
• However, population of field will be determined by the Eircode update schedule for MCR1140
• In each of the two proposed changed files, a 7 digit alpha numeric Postal Code will be populated in a new Postal Code Column
for the Meter Point Address, where it is available in the Central Market System.
• The new Postal Code column will be added after the Region column.
• The Eircode has a structure A65F4E2 (there is one allowable exception for the first three characters viz.D6W). Each Eircode is
comprised of seven alpha/numeric characters that are unique to each mailing address.
1. Domestic MRPN Details (domS_CUST.csv) 2. Commercial MPRN Details (COMM_CUST.csv)
Note: ESBN intend to share samples of the updates file structure(s) at future IGGs.