ERP Lifecycle. Different Phase of ERP implementation are- Pre-implementation Activities Project...
-
Upload
constance-may -
Category
Documents
-
view
224 -
download
0
Transcript of ERP Lifecycle. Different Phase of ERP implementation are- Pre-implementation Activities Project...
Different Phase of ERP implementation are-
• Pre-implementation Activities• Project Preparation• Business blueprinting• Realization• Final preparation and go live• Support
Company Management
ERP Vendors Pre-Evaluation Screening
Package Evaluation
Project Planning
Gap Analysis Reengineering Configuration
Implementation Team Training Testing End-User Training
Go ahead
Going Live
Post Implementation Phase
ERP implementation Lifecycle
Pre-implementation Activities
• Have crack team in place• Feasibility/ROI study• Getting budget for ERP implementation.• High level requirement definition .• High level scope definition.• RFP for implementation partner selection.• Evaluation and selection partner for imp.• RFP for package selection.• Evaluation and selection ERP package.
Project Evaluation
• Project team selection,organisation str.• Project methods,stds formulation.• Finalizing the strategy.• Detailed project scoping.• Technical preparation.• Training
Business Blueprinting
• Modelling high level AS IS process• Detailed req definition.• BPR and process redesign• Detailed TO BE modelling,TO BE process
documentation.• Identify gaps• Define roles• Blueprint audit.• Blueprint sign off.• Give core team configuration training.
Realization
• Configuration/customization.• Unit testing.• Integration testing.• Developments for gaps.• End user training.
Final Preparation and go live
• Stress and volume testing.• End user acceptance testing and signoff.• Conducting end user training.• Data migration.• Cutover planning and go live checklist.• Help desk support finalization.• Closing open project finalization.• Pre go live audit.• Go live audit.
Support
• Knowledge transfer to support team.• Transition-documents,open issues.• Regular support ,monitoring SLAs• Measuring performance improvement.• Upgrading
PROJECT PLANNING PHASE
Project schedule
Decision of phase
Team leader
DESIGN IMPLEMENTATION PROCESS
TIME SCHEDULES, DEADLINES, ETC
RESOURCES ARE NEEDED AND IMPLEMENTATION IDENTIFIED
CONTINGENCIES, MONITOR THE PROGRAM, CONTROL MEASURES , CORRECTIVE ACTIONS
PLANNING IS DONE BY TEAM LEADERS
COMMITTEE WILL BE HEADED BY INCHARGE
GAP ANALYSIS
Importance of Gap Analysis• Gap analysis is a phase in the ERP
implementation, where the organization tries to find out the gaps between the company’s existing business practices & those supported by the ERP package.
• This is the process through which companies create a complete model of where they are now & where they want to head in the future.
• Main objective• The main objective is to design a model, which
both anticipates & covers any function gap.• It has been estimated that even the best ERP
package meets only 80% of the company’s functional gaps.
• Different ways of finding gaps
a. One of the most affordable, but most difficult, solutions entails altering the business to ‘fit’ the ERP package.
b. Another solution is that the company can simply agree to live without a particular function.
c. Other solutions include:• Pinning your hopes on an upgrade or
updating of software.• Identifying a third-party product that might
fill the gap.• Designing a custom program.• Altering the ERP source code.
GAP ANALYSIS
Importance Main objective
Different ways of finding
FIND OUT THE GAPS BETWEEN BUSINESS AND ERP PACKAGE
COMPANY CREATES A MODEL
DESIGN A MODEL
COVERS ANY FUNCTIONAL GAP
ALTERING THE BUSINESS TO FIT THE PACKAGE
UPDATING SOFTWARE
IDENTIFYING A PRODUCTDESIGNING A PROGRAM
LIVE W/O A FUNCTION
ALTERING SOURCE CODE
RE-ENGINEERING:
It is in this phase that the human factors are taken into account.Two different connotations1. 1st one is the controversial, involving the use of ERP to aid in
downsizing efforts.2. There have been occasions where high level executives have
invoked the reengineering slogan & purchased an ERP package with the aim of reducing number of employees.
3. While every implementation is going to involve some change in job responsibilities, so it is the best to treat ERP as an investment as well as cost-cutting measure, rather than a downsizing tool.
4. ‘Downsizing’ is a business practice that may have its place, but it should not be cloaked within the glossier slogan of ‘reengineering’.
5. The 2nd use of the word re-engineering in the ERP field refers to an ERP implementation model initially designed & used.
• The BPR approach to an ERP implementation implies two separate, but closely linked implementations involved on an ERP site i.e. a technical implementation & a business process implementation.
• The BPR approach emphasis the human element of necessary changes within the organization, which is generally more Time consuming & has received its share of criticism for creating bloated budgets & extended projects.
• The ERP market shifts to a mid-market focus & as all implementation are becoming more cost sensitive; the BPR approach has come under some real scrutiny.
6. CONFIGURATION1. IMPORTANCE OF CONFIGURATION1. This is the main functional area of the ERP implementation.2. Business processes have to be understood & mapped in such
a way that the arrived solution matches with the overall goals of the company.
2. THE PROTOTYPE1. A prototype- a simulation of the actual business processes of
the company- will be used.2. The prototype allows for thorough testing of the ‘to be’ model
in a controlled environment.
CONFIGURATION
Main functional area
Solution match with goals
Prototype-allows for thorough testing
Attempt to solve logistical problem
Configuring reveals strengths & weaknesses
Important for success of ERP implementation
1. As the ERP consultants configure & test the prototype they attempt to solve any logistical problems inherited in the BPR before the actual go-live implementation.
2. STRENGTHS & WEAKNESSES1. Configuring a company’s system reveals not only the
strengths of a company’s business process but also- & perhaps more importantly- its weakness.
2. It is vital to the health of the company & to the success of the ERP implementation that those configuring the system are able to explain what won’t fit into the package & where the gaps in functionality
occur.
TESTING:
1. This is the phase where you try to break the system.
2. Here we reach a point where we are testing real case scenarios.
3. The system is configured & now we must come up with extreme case scenarios- system overloads, multiple users logging on at the same time with the same query, users entering invalid data, hackers trying to access restricted areas & so on.
4. The test case must be designed specifically to find the weak links in the system & these bugs should be fixed before going live.