![Page 1: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/1.jpg)
Erosion Control Strategies for Islands
![Page 2: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/2.jpg)
Upland Reforestation
Stabilize Slopes
Reduce Channel ErosionControl Construction Sites
Sediment Basins
Fi h P d R t tiFish Pond Restoration
![Page 3: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/3.jpg)
Source: Schueler and Lugbill, 1990
![Page 4: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/4.jpg)
Photo Copyright 1999, Center for Watershed Protection
![Page 5: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/5.jpg)
![Page 6: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/6.jpg)
![Page 7: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/7.jpg)
10 Elements of an Effective ESC Plan
Copyright Center for Watershed Protection, 2001
![Page 8: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/8.jpg)
Copyright Center for Watershed Protection, 2001
![Page 9: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/9.jpg)
Copyright Center for Watershed Protection, 2001
![Page 10: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/10.jpg)
1 Mi i i Si Cl i1. Minimize Site Clearing
Objectives: Prevent erosion by never clearing/grading
i f h k iportions of the work site Protect sensitive areas from grading
P t l t ti /f t Preserve natural vegetation/forestTechniques:
Sit fi i ti Site fingerprinting Clearing Restrictions
![Page 11: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/11.jpg)
Cl i R t i tiClearing RestrictionsAreas never cleared or activities sharply restricted:Areas never cleared or activities sharply restricted: Stream buffers Wetlands, springs and seepsWetlands, springs and seeps Steep slopes, highly erodible soils Drainage ways Planned areas for infiltration and bioretention Minimum % of Site (10 to 75%, depending on lot size)
ESC plans should clearly show limits of disturbance (LOD)ESC plans should clearly show limits of disturbance (LOD)And means to keep heavy equipment out
![Page 12: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/12.jpg)
Copyright Center for Watershed Protection, 2001
![Page 13: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/13.jpg)
![Page 14: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/14.jpg)
Stormwater Haiku
If your Inspectors Cannot tell brown from green Dump Infiltration!
![Page 15: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/15.jpg)
Sequencing Stormwater in C t tiConstruction
OK to install curb gutters and storm drain andOK to install curb, gutters and storm drain and discharge to sediment basin
D l l i f iDo not clear locations of stormwater practices (protect them with silt fence– outside LOD
Do not install permanent BMPs (including perforated pipes for peak discharge control) until contributing area is fully stabilized.
![Page 16: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/16.jpg)
Reforestation is proactive erosionand sediment control strategy–link violations to tree planting
Copyright Center for Watershed Protection, 2001
![Page 17: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/17.jpg)
Sit Fi i tiSite Fingerprinting
Reduce grading to building pad, roadway, utilities and septic areas
![Page 18: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/18.jpg)
Copyright Center for Watershed Protection, 2001
![Page 19: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/19.jpg)
2 P t t W t2a. Protect Waterways
Objective: Protect streams and waterways from y
sedimentation during construction
Techniques:q Restrict clearing within 25 feet of waterway Special crossings required if work is Special crossings required if work is
planned across the waterway
![Page 20: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/20.jpg)
Most Maui streams don’t have this muchMost Maui streams don’t have this muchVegetative cover– but still should be locatedWell outside LOD to prevent erosion
Copyright Center for Watershed Protection, 2001
![Page 21: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/21.jpg)
Copyright Center for Watershed Protection, 2001
![Page 22: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/22.jpg)
2b Stabilize Drainage Ways2b. Stabilize Drainage Ways
Ditches draining dirt roads are major source of sediment in most islands
Road ditches are the most important drainage-way to stabilizehTechniques: Checkdams Water Bars & Broad-based Dips Cross drains and pipe culverts
![Page 23: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/23.jpg)
It starts with good road designIt starts with good road design
Maximum grade: 10% Maximum grade: 10% Gravel cover at key points
G h l f dit h 1 t 5% l Grass channels for ditches 1 to 5% slopes Stable channels with check dams for 5 to 10% Non-eroding channels above 10% Care taken at stream crossings
![Page 24: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/24.jpg)
![Page 25: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/25.jpg)
Design of Grass ChannelsDesign of Grass Channels
G tl d d id l Gentle grades and side slopes Warm season grasses w/ some perennial
rye Erosion control fabric May need some topsoil, fertilization and
liming to get grass startedliming to get grass started
Also may be converted into permanent stormwater practice
![Page 26: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/26.jpg)
D i f h k dDesign of check dams
Stone or coir logs to reduce flow velocities in channels
Spacing similar to water bars Provide limited sediment trappingProvide limited sediment trappingIneffective on slopes > 10% or if not
regularly cleaned outregularly cleaned out
![Page 27: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/27.jpg)
Direction of Flow
Checkdams
Source: MDE, 2001
![Page 28: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/28.jpg)
Checkdams
Source: MDE, 2001
![Page 29: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/29.jpg)
Design of Water Bars
![Page 30: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/30.jpg)
Design of Water BarsDesign of Water Bars
Move shallow concentrated flows across road to Move shallow concentrated flows across road to safe discharge point Divert runoff away from ditches to reduce flow Divert runoff away from ditches to reduce flow
in downstream ditch 1 foot mound over 8 to 12 feet 1 foot mound over 8 to 12 feet 30 degree angle Spacing of bars based on road grade Spacing of bars based on road grade Crushed stone on dip and mound
![Page 31: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/31.jpg)
Recommended Spacing Between Water Bars
Grade of Road Space Between Water Bars
Recommended Spacing Between Water Bars
Grade of Road Space Between Water Bars2% 250 ft5% 135 ft10% 80 ft15% 60 ft20% 45 ft20% 45 ft25% 40 ft30% 35 ft40% 30 ft40% 30 ft
Source: HI DFW (2003) and VICS (2003)
![Page 32: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/32.jpg)
Coir Fiber Log as a Check DamCoir Fiber Log as a Check Dam
![Page 33: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/33.jpg)
What island materials cab be used to shape wetland topography (coir fiber log)
Copyright 2000, CWP
topography (coir fiber log)
![Page 34: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/34.jpg)
Design of Broad-Based Dips
![Page 35: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/35.jpg)
Design of Broad Based DipsDesign of Broad Based Dips
Similar to water bars but one foot dip occurs Similar to water bars but one foot dip occurs over 20 to 30 feet Allows vehicles to pass without jarring Allows vehicles to pass without jarring Dip also has a 30 degree angle
Tie the h mp into p g adient oad c t Tie the hump into up-gradient road cut Only works up to 10 to 12% road grades
![Page 36: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/36.jpg)
Recommended Spacing for Broad-Based Dips
Grade of Road Space Between Dips
Recommended Spacing for Broad Based Dips
Grade of Road Space Between Dips2% 300 ft4% 200 ft5% 180 ft7% 160 ft8% 150 ft8% 150 ft10% 140 ft12% Do Not Use
Source: HI DFW (2003) and VICS (2003)
![Page 37: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/37.jpg)
Design of Cross-Drain Culverts
![Page 38: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/38.jpg)
Design of Cross Drain CulvertsDesign of Cross-Drain Culverts
12 inch minimum pipe diameter 12 inch minimum pipe diameter Larger pipes may be needed above 2 acre of
contributing drainage areacontributing drainage area Pipes angled at 30 to 45%, and have 2% slope
A mo both the ent and o tlet of pipe ith Armor both the entry and outlet of pipe with stone Make sure pipe is covered with fill at last one Make sure pipe is covered with fill at last one
half its diameter
![Page 39: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/39.jpg)
Copyright Center for Watershed Protection, 2001
![Page 40: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/40.jpg)
3 Phase Const ction3. Phase Construction
Objective:Reduce soil erosion by minimizing the
amount of time and area of exposed soil
Grade only portion of site where construction is active (“just-in-time”
di )grading)15 acre threshold for phasing in MC
![Page 41: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/41.jpg)
Ph IIPhase IIPhase I
![Page 42: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/42.jpg)
3 Phase Const ction3. Phase Construction
Can reduce erosion by 40% over traditional mass grading Requires careful planning “Cut” soil matches “fill” requirementCut soil matches fill requirement temporary stockpiling and construction
access Phases should correspond to existing and
future drainage boundaries
![Page 43: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/43.jpg)
Be To ghBe Tough
Suggest lowering area threshold or increasing temporary stabilization requirements to promote more phasing No clearing on phase 2 until phase 1 o c ea g o p ase u t p ase
completed and fully stabilized. Tougher ESC requirements the longer a Tougher ESC requirements the longer a
site is open
![Page 44: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/44.jpg)
Copyright Center for Watershed Protection, 2001
![Page 45: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/45.jpg)
4 Rapid Soil Stabili ation4. Rapid Soil Stabilization
Objective: Reduce soil erosion by minimizing the y g
amount of time soil is exposed
Techniques:q Seeding/Hydroseeding “straw” mulch straw mulch Wood fiber mulch
![Page 46: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/46.jpg)
4 Rapid Soil Stabili ation4. Rapid Soil Stabilization
Establish grass or mulch cover within two weeks of soil exposure Permanently stabilize disturbed areas at
conclusion of constructionco c us o o co st uct o Contingency line item for replacing
cover that does not takecover that does not take Use native seeds and grasses
![Page 47: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/47.jpg)
N t S diNotes on Seeding
l f l d l Poor quality of some island soils may require fertilization, liming and other soil amendments Take soil test Use only warm season grasses, with some
annual ryegrass to get temporary stabilizationannual ryegrass to get temporary stabilization Grasses vary greatly in tolerance for drought,
and shade, and requirements for nitrogen , q gand maintenance See CTHAR Turf Management Note 4.
![Page 48: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/48.jpg)
S diSeeding
• Cost: $0.10/ square yard• Nearly 100% effective for established grass,
80% for sparse cover• Requires temporary irrigation to get cover• $2200 to 3200 per acre (island)• Should be considered for sensitive areas
![Page 49: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/49.jpg)
![Page 50: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/50.jpg)
W d Fib M l hWood Fiber Mulch
• Cost: $0.25 to 0.50 per square yard• Can be up to 90% effective• Typically used in combination with
hydroseeding• Can apply with seeding in one step• Not appropriate for steep slopes or long time
periods
Appears to be too thinly applied on Maui– need anAppears to be too thinly applied on Maui need an Inspection benchmark
![Page 51: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/51.jpg)
Follow Up Inspections -EarthworkEarthwork
![Page 52: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/52.jpg)
Organic MulchOrganic Mulch
• Shredded Coconut or Cane• $0.35 per square yard• Can be up to 95% effective• Must be anchored to the soil surface• Best if used in combination with seeding• Best for slopes flatter than 3:1p
![Page 53: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/53.jpg)
Copyright Center for Watershed Protection, 2001
![Page 54: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/54.jpg)
5 P otect Steep Slopes5. Protect Steep Slopes
Objective: Reduce erosion from steep slopes
Techniques: Limit clearing of steep slopes (25%)
l d fl h d k Divert upland flow using earthen dike, temporary swale or pipe slope drain
Use upslope line of silt fence Use upslope line of silt fence Erosion control blankets with seed Sod (island available?)( )
![Page 55: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/55.jpg)
St bili St SlStabilize Steep Slopes
Steeply sloping terrain is poorlySteeply sloping terrain is poorly vegetated for several thousand feet f lof elevation
Source of sediment during extreme grainstorms Steep slopes are extremely hard toSteep slopes are extremely hard to
revegetate
![Page 56: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/56.jpg)
St Sl Ch llSteep Slope Challenges
Tough planting conditionsTough planting conditions
Poor water holding capability Exposure to sun and windExposure to sun and wind Thin, nutrient poor soils
![Page 57: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/57.jpg)
St Sl S l tiSteep Slope Solutions
Some strategiesSome strategies Erosion control fabrics (small slopes) Hill Slope Bioengineering Better Design for Road Construction onBetter Design for Road Construction on
Steep Slopes
![Page 58: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/58.jpg)
Consider forAll cut/fill slopesAll cut/fill slopes15% or more
Coconut, wood fiber or coir products work better thanproducts work better than Man-made geotextiles
![Page 59: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/59.jpg)
Bioengineering to protect hillslopes from erosion
![Page 60: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/60.jpg)
Stabilizing steep gullies and guts.
![Page 61: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/61.jpg)
Poor slope drainage control results in the formation of rills andformation of rills and gullies.
Copyright Center for Watershed Protection, 2001
![Page 62: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/62.jpg)
![Page 63: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/63.jpg)
Pi Sl D iPipe Slope Drain
Cost: $5-6 per linear foot Used to convey runoff past steep slopes. Limited to <3 acres for each 24” pipe. Effective in combination with a sediment trap
or basin. Requires stable outlet.
![Page 64: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/64.jpg)
Copyright Center for Watershed Protection, 2001 Source: MDE, 2001
![Page 65: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/65.jpg)
Coconut, wood fiber or coir products work better thanproducts work better than Man-made geotextiles
![Page 66: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/66.jpg)
Bioengineering to protect hillslopes from erosion
![Page 67: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/67.jpg)
Copyright Center for Watershed Protection, 2001
![Page 68: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/68.jpg)
6 Pe imete Cont ols6. Perimeter Controls
Objective: Retain or filter runoff before it leaves the
site.
Techniques:q Earth dikes or diversions. Silt fences. Silt fences. Stabilized construction entrances.
![Page 69: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/69.jpg)
Sil FSilt FencesPopular practice due to low cost: $3.50 per linear opu a p act ce due to o cost $3 50 pe ea
foot (mainland).Between 65% and 85% TSS removal in field
distudies.Ongoing maintenance can cost as much as original
installation over project lifeinstallation over project life
![Page 70: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/70.jpg)
Sil FSilt Fences
Silt fences are often poorly located installed orSilt fences are often poorly located, installed or maintained:
Mainland data: Only 67% of silt fences on the ESC plan were
installed. Only 58% were installed correctly.
O l 34% d l i i d Only 34% were adequately maintained.
![Page 71: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/71.jpg)
Super Silt Fence (chain link fence backing)
Silt Fence
Use of a silt fence to capture runoff from this
Copyright Center for Watershed Protection, 2001
steep slope resulted in gully formation
![Page 72: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/72.jpg)
Improper installation below a pipe outlet.
Copyright Center for Watershed Protection, 2001
![Page 73: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/73.jpg)
![Page 74: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/74.jpg)
![Page 75: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/75.jpg)
Super Silt Fence
Copyright Center for Watershed Protection, 2001
![Page 76: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/76.jpg)
Copyright Center for Watershed Protection, 2001
![Page 77: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/77.jpg)
Copyright Center for Watershed Protection, 2001
![Page 78: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/78.jpg)
7 E l Ad S ttli D i7. Employ Advance Settling Devices
Objective: Trap sediment in runoff before it leaves the p
site
Techniques:q Sediment traps Sediment basins Sediment basins
![Page 79: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/79.jpg)
S li D iSettling Devices
TSS removal varies between 50% to 90% Trapping limited by Difficulty in settling fine-grained soilsDifficulty in settling fine grained soils Simplistic design of existing basins
![Page 80: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/80.jpg)
Most sites larger than 5 acres should have a trap or basin at downgradient end sized for WQv
Copyright Center for Watershed Protection, 2001
![Page 81: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/81.jpg)
Sedimentation basin with standpipe encased in gravelencased in gravel.
Copyright Center for Watershed Protection, 2001
![Page 82: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/82.jpg)
Berm dividing a multiple cell sedimentation basin.
Copyright Center for Watershed Protection, 2001
![Page 83: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/83.jpg)
8 C tif C t t d I t8. Certify Contractors and Inspectors
Objectives: Ensure proper installation and
i tmaintenance. Train contractors and inspectors
T h iTechniques: mandated ESC training.
A li t t t ibl f Applies to contractors responsible for installation and maintenance of ESC devices.devices.
Pre-construction meetings.
![Page 84: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/84.jpg)
Need for greater training for designers and contractors
![Page 85: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/85.jpg)
Copyright Center for Watershed Protection, 2001
![Page 86: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/86.jpg)
The Subcontractors Trash My Controls!
![Page 87: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/87.jpg)
Copyright Center for Watershed Protection, 2001
![Page 88: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/88.jpg)
Copyright Center for Watershed Protection, 2001
![Page 89: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/89.jpg)
Maui RecommendationsMaui Recommendations
••• More Training
• Better Inspection Benchmarksp a
• Update specs in consultation w/ engineers
• Si pl l p it f i l l t t ti• Simple general permits for single lot construction
• Tougher phasing requirements
• Investigate island mulch
![Page 90: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/90.jpg)
Reasons Silt Fences Fail
1 Slope to length ratio too high1. Slope to length ratio too high.
2 Installation does not account for construction traffic2. Installation does not account for construction traffic.
Copyright Center for Watershed Protection, 2001
![Page 91: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/91.jpg)
Reasons Silt Fences Fail
3. Edges not pointed uphill (ponding).
4. Contributing length greater than 100’ or placed in concentrated flow location.concentrated flow location.
Copyright Center for Watershed Protection, 2001
![Page 92: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/92.jpg)
Reasons Silt Fences Fail
5. Fence is not installed parallel to contours.
6 Bottom of fabric is not properly entrenched6. Bottom of fabric is not properly entrenched.
Copyright Center for Watershed Protection, 2001
![Page 93: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/93.jpg)
Reasons Silt Fences Fail
7 Di t b t t 8’7. Distance between posts > 8’.
8. Silt fence installed below a pipe outlet.8. Silt fence installed below a pipe outlet.
Copyright Center for Watershed Protection, 2001
![Page 94: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/94.jpg)
Reasons Silt Fences Fail
9. Silt fence receives concentrated flow.
10. Silt fence installed uphill of disturbed area.p
Copyright Center for Watershed Protection, 2001
![Page 95: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/95.jpg)
Reasons Silt Fences Fail
11 Sediment buildup behind fence reduces treatment capacity11. Sediment buildup behind fence reduces treatment capacity.
12. Silt fence alignment reflects property line, not ESC needs.
Copyright Center for Watershed Protection, 2001
![Page 96: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/96.jpg)
Breached Curb Inlet Protection
Copyright Center for Watershed Protection, 2001
![Page 97: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/97.jpg)
Misjudging Cuts/Fills and Stockpiling j g g / p gNeeds
![Page 98: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/98.jpg)
Follow Up Inspections -StabilizationStabilization
![Page 99: Erosion Control Strategies for Islands · Design of CrossDesign of Cross-Drain CulvertsDrain Culverts 12inchminimumpipediameter12 inch minimum pipe diameter Larger pipes may be needed](https://reader034.fdocuments.in/reader034/viewer/2022042122/5e9d6ce8e95e1e767637a670/html5/thumbnails/99.jpg)