ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to...

40
ERCOT Load Research Sampling ERCOT Load Research Sampling Round 2 Model Coefficient Updates Round 2 Model Coefficient Updates Additional Evaluations Additional Evaluations Presented to the PWG on July 28, 2010
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to...

Page 1: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

ERCOT Load Research Sampling ERCOT Load Research Sampling Round 2 Model Coefficient UpdatesRound 2 Model Coefficient Updates

Additional EvaluationsAdditional Evaluations

Presented to the PWG on July 28, 2010

Page 2: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Overview

• Outcomes from last month’s PWG meeting• Plots of scaled LRS means and backcasts

and for selected 4CP days• Plots of scaled LRS means, backcasts and

UFE for selected high UFE days• Summary MAPE’s by Profile Type and

Weather Zone for 4CP and high UFE days• Summary and Conclusions• Discussion points from June 24 PWG Discussion points from June 24 PWG

conference call.conference call.

2

Page 3: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Outcomes from the May PWG Meeting

• There was no interest in building completely “new” models.

• There was some interest in updating the coefficients in the existing models for selected Profile Type/Weather Zone combinations.

• PWG requested that ERCOT evaluate:• Coincident peaks (4CP) during the study period• High UFE days during the study period.

3

Page 4: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

4CP DAYS

4

Page 5: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Summary of 4CP DaysSummary of 4CP Days

• The 4CP days are as follows.• 2008

– June 16 interval ending 16:45 (Not in study period.) – July 31 interval ending 16:45 – Aug 4 interval ending 17:00 – Sept 2 interval ending 16:45

• 2009 – June 25 interval ending 16:15 – July 13 interval ending 17:00 – Aug 5 interval ending 16:00 – Sept 3 interval ending 16:00

5

Page 6: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

2

4

6

8

10

12

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day August 4, 2008BUSMEDLF COASTBUSMEDLF COAST

BackcastScaled R2 Means

6

4CP at interval ending 17:00

Page 7: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

2

4

6

8

10

12

14

16

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day August 4, 2008BUSMEDLF NCENTBUSMEDLF NCENT

BackcastScaled R2 Means

7

4CP at interval ending 17:00

Page 8: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day August 4, 2008BUSLOLF COASTBUSLOLF COAST

BackcastScaled R2 Means

8

4CP at interval ending 17:00

Page 9: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day August 4, 2008BUSLOLF NCENTBUSLOLF NCENT

BackcastScaled R2 Means

9

4CP at interval ending 17:00

Page 10: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day August 4, 2008RESLOWR COASTRESLOWR COAST

BackcastScaled R2 Means

10

4CP at interval ending 17:00

Page 11: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day August 4, 2008RESLOWR NCENTRESLOWR NCENT

BackcastScaled R2 Means

11

4CP at interval ending 17:00

Page 12: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

2

4

6

8

10

12

14

16

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day June 25, 2009BUSMEDLF COASTBUSMEDLF COAST

BackcastScaled R2 Means

12

4CP at interval ending 16:15

Page 13: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

2

4

6

8

10

12

14

16

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day June 25, 2009BUSMEDLF NCENTBUSMEDLF NCENT

BackcastScaled R2 Means

13

4CP at interval ending 16:15

Page 14: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

7

8

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day June 25, 2009BUSLOLF COASTBUSLOLF COAST

BackcastScaled R2 Means

14

4CP at interval ending 16:15

Page 15: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

7

8

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day June 25, 2009BUSLOLF NCENTBUSLOLF NCENT

BackcastScaled R2 Means

15

4CP at interval ending 16:15

Page 16: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day June 25, 2009RESLOWR COASTRESLOWR COAST

BackcastScaled R2 Means

16

4CP at interval ending 16:15

Page 17: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

4CP Day June 25, 2009RESLOWR NCENTRESLOWR NCENT

BackcastScaled R2 Means

17

4CP at interval ending 16:15

Page 18: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

HIGH UFE DAYS

18

Page 19: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Summary of High UFE DaysSummary of High UFE Days

• The UFE days were selected from the UFE Analysis Report 2009

19

Date Day Season Date Day SeasonDec. 6 Sun Winter 29,012 J un. 11 Thu Summer -28,517Mar. 1 Sun Spring 27,975 Dec. 23 Wed Winter -25,414Dec. 16 Wed Winter 23,668 J an. 3 Sat Winter -21,500Sep. 13 Sun Fall 22,150 J an. 2 Fri Winter -18,436May 20 Wed Spring 21,462 J ul. 27 Mon Summer -16,485Oct. 9 Fri Fall 21,158 J an. 23 Fri Winter -14,796May 11 Mon Spring 20,676 Apr. 2 Thu Spring -14,368Dec. 5 Sat Winter 20,214 J ul. 24 Fri Summer -13,100Sep. 7 Mon Fall 20,181 Feb. 26 Thu Winter -11,590Mar. 4 Wed Spring 20,072 Dec. 24 Thu Winter -11,491

UFE MWh UFE MWh

2009- Negative UFE -+ Positive UFE +

Page 20: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

7

8

9

10

Wed 00:00 Wed 12:00 Thu 00:00 Thu 12:00 Fri 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSMEDLF COASTBUSMEDLF COASTHigh Negative UFE – Actual Load Less Than Estimated Load December 23-24, 2009

20

BackcastScaled R2 Means Percent UFE

Page 21: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

7

8

9

10

Wed 00:00 Wed 12:00 Thu 00:00 Thu 12:00 Fri 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSMEDLF NCENTBUSMEDLF NCENTHigh Negative UFE – Actual Load Less Than Estimated Load December 23-24, 2009

21

BackcastScaled R2 Means Percent UFE

Page 22: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Wed 00:00 Wed 12:00 Thu 00:00 Thu 12:00 Fri 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSLOLF COASTBUSLOLF COASTHigh Negative UFE – Actual Load Less Than Estimated Load December 23-24, 2009

22

BackcastScaled R2 Means Percent UFE

Page 23: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

Wed 00:00 Wed 12:00 Thu 00:00 Thu 12:00 Fri 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSLOLF NCENTBUSLOLF NCENTHigh Negative UFE – Actual Load Less Than Estimated Load December 23-24, 2009

23

BackcastScaled R2 Means Percent UFE

Page 24: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

Wed 00:00 Wed 12:00 Thu 00:00 Thu 12:00 Fri 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

High Negative UFE – Actual Load Less Than Estimated Load December 23-24, 2009

RESHIWR COASTRESHIWR COAST

24

BackcastScaled R2 Means Percent UFE

Page 25: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

Wed 00:00 Wed 12:00 Thu 00:00 Thu 12:00 Fri 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

RESHIWR NCENTRESHIWR NCENTHigh Negative UFE – Actual Load Less Than Estimated Load December 23-24, 2009

25

BackcastScaled R2 Means Percent UFE

Page 26: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

7

8

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSMEDLF COASTBUSMEDLF COASTHigh Positive UFE – Actual Load Greater Than Estimated Load March 1, 2009

26

BackcastScaled R2 Means Percent UFE

Page 27: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0

1

2

3

4

5

6

7

8

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSMEDLF NCENTBUSMEDLF NCENTHigh Positive UFE – Actual Load Greater Than Estimated Load March 1, 2009

27

BackcastScaled R2 Means Percent UFE

Page 28: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSLOLF COASTBUSLOLF COASTHigh Positive UFE – Actual Load Greater Than Estimated Load March 1, 2009

28

BackcastScaled R2 Means Percent UFE

Page 29: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

-8

-6

-4

-2

0

2

4

6

8

10

12

14

%

BUSLOLF NCENTBUSLOLF NCENTHigh Positive UFE – Actual Load Greater Than Estimated Load March 1, 2009

29

BackcastScaled R2 Means Percent UFE

Page 30: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

-6

-4

-2

0

2

4

6

8

10

12

14

%

High Positive UFE – Actual Load Greater Than Estimated Load March 1, 2009

RESHIWR COASTRESHIWR COAST

30

BackcastScaled R2 Means Percent UFE

Page 31: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00

kWh

Time

-6

-4

-2

0

2

4

6

8

10

12

14

16

%

RESHIWR NCENTRESHIWR NCENTHigh Positive UFE – Actual Load Greater Than Estimated Load March 1, 2009

31

BackcastScaled R2 Means Percent UFE

Page 32: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Summary for All IntervalsSummary for All Intervals

32

Unscaled Round 2 LRS Means

COAST EAST FWEST NCENT NORTH SCENT SOUTH WEST MEAN

BUSHILF 7.8 36.7 12.6 10.6 7.3 36.2 24.3 36.0 21.4

BUSLOLF 10.9 8.7 11.1 17.4 8.9 13.4 12.7 18.5 12.7

BUSMEDLF 6.9 5.4 23.1 6.3 23.3 10.2 6.8 35.4 14.7

BUSNODEM 17.7 9.7 10.5 6.2 12.5 9.0 17.5 18.6 12.7

RESHIWR 12.8 12.9 12.1 11.4 16.3 11.7 9.6 12.5 12.4

RESLOWR 9.4 13.1 11.2 7.9 9.3 9.4 14.7 10.7 10.7

MEAN 10.9 14.4 13.4 10.0 12.9 15.0 14.3 22.0 14.1

MEAN ABSOLUTE PERCENT ERROR (MAPE)

Scaled Round 2 LRS Means

COAST EAST FWEST NCENT NORTH SCENT SOUTH WEST MEAN

BUSHILF 3.2 6.2 3.7 2.8 2.9 3.2 4.6 3.1 3.7

BUSLOLF 7.2 8.2 10.3 15.5 8.0 12.3 11.4 9.0 10.2

BUSMEDLF 5.9 4.9 10.1 4.2 6.9 5.0 5.6 4.4 5.9

BUSNODEM 27.9 9.0 8.2 5.3 12.3 8.6 16.5 13.7 12.7

RESHIWR 8.6 9.5 11.7 8.0 10.8 10.7 7.8 10.1 9.6

RESLOWR 6.9 11.4 8.7 6.1 8.5 8.6 9.5 9.9 8.7

MEAN 9.9 8.2 8.8 7.0 8.2 8.1 9.2 8.4 8.5

MEAN ABSOLUTE PERCENT ERROR (MAPE)

Page 33: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Summary for 4CP and High UFE DaysSummary for 4CP and High UFE Days

33

4CP Days for 2008-2009

COAST EAST FWEST NCENT NORTH SCENT SOUTH WEST MEAN

BUSHILF 2.1 5.8 3.4 2.2 2.4 3.2 4.4 2.3 3.2

BUSLOLF 7.9 6.0 7.2 10.2 7.2 9.8 10.4 6.5 8.1

BUSMEDLF 5.4 3.9 7.7 3.3 4.5 3.9 3.7 3.0 4.4

BUSNODEM 33.9 8.2 7.9 5.3 9.3 7.9 14.3 12.7 12.4

RESHIWR 5.6 5.6 6.8 4.2 7.1 6.5 5.3 5.4 5.8

RESLOWR 5.1 7.5 7.1 3.6 7.5 5.4 6.2 7.0 6.2

MEAN 10.0 6.2 6.7 4.8 6.3 6.1 7.4 6.2 6.7

MEAN ABSOLUTE PERCENT ERROR (MAPE)

High UFE Days from UFE Analysis Report 2009

COAST EAST FWEST NCENT NORTH SCENT SOUTH WEST MEAN

BUSHILF 3.9 6.5 4.0 3.6 2.9 3.8 4.4 3.1 4.0

BUSLOLF 10.4 10.2 11.0 17.4 10.1 12.9 11.0 11.3 11.8

BUSMEDLF 7.1 6.4 10.0 5.9 7.2 6.4 7.1 5.5 6.9

BUSNODEM 8.6 9.2 9.2 6.0 14.2 9.0 16.2 14.5 10.9

RESHIWR 11.3 11.5 13.4 12.7 12.9 13.5 9.5 11.4 12.0

RESLOWR 8.6 13.4 9.7 10.1 9.3 9.4 11.4 10.9 10.4

MEAN 8.3 9.5 9.5 9.3 9.4 9.2 9.9 9.4 9.3

MEAN ABSOLUTE PERCENT ERROR (MAPE)

Page 34: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Summary Summary • MAPE’s for scaled Round 2 Means by Profile Type and

Weather Zone range between 2.8 % (BUSHILF, NCENT) and 27.9% (BUSNODEM, COAST) with the mean for all profile types and weather zones = 8.5%.

• MAPE’s for 2008-2009 4CP days by Profile Type and Weather Zone range between 2.1 % (BUSHILF, COAST) and 33.9% (BUSNODEM, COAST) with the mean for all profile types and weather zones = 6.7%.

• MAPE’s for selected 2009 high UFE days by Profile Type and Weather Zone range between 2.9 % (BUSHILF, NORTH) and 17.4% (BUSLOLF, NCENT) with the mean for all profile types and weather zones = 9.3%.

34

Page 35: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Conclusions Conclusions • The average MAPE for the 2008-2009 4CP days

(6.7%) is less than the MAPE for the study period (8.5%) because the current models were designed and perform best during summer high-load days.

• Profiling error is a significant part of UFE so it is expected that the average MAPE for selected 2009 high UFE days (9.3%) would be greater than MAPE for the study period (8.5%).

35

Page 36: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Discussion points from June 24 PWG Discussion points from June 24 PWG • ERCOT suggested updates of the model

coefficients for the Coast and North Central weather Zones for all Profile Types.

• Coast and North Central were selected because those weather zones contain the greatest percentages of TNMP’s load. TNMP has the latest timeline for advanced meter installation.

• Should other weather zones be included whose advanced meters will be deployed later?

• How could the value from updating the model coefficients be estimated?

36

Page 37: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Discussion points from June 24 PWG Discussion points from June 24 PWG • How might MAPE’s and UFE change with the

implementation of new model coefficients?• Due to the nodal code freeze, notification and

transition to new models, the earliest new models could be implemented is July 2011.

• If a new model transition is required, it will be necessary to create a project that would go through the prioritization process.

• ERCOT is neutral on the issue of updating the model coefficients.

37

Page 38: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Discussion points from June 24 PWG Discussion points from June 24 PWG • ERCOT suggested three model transition options:

• straight cutover to new models—no transition; • linearly interpolate from current models to new

models; • cutover to new models based on start date of meter

read.

• The PWG Chair will poll market participants on whether PWG should pursue updating the model coefficients.

• An updated timeline is presented on the next slide.

38

Page 39: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Updated Timeline Updated Timeline

39

Round 2 Load Research Sampling Process Flow and Timeline

Market Approval and TransitionData Collection, VEE and Analysis; Model Build

July 2008Sample IDR installation complete. Begin data collection and VEE.

May-June 2010Report to PWG the differences between current profile models and Round 2 sample means.

October 2010Update coefficients for selected Profile Types/Weather Zones. Present to PWG. PWG approves updates and transition plan.

November 2010Updated models are presented to COPS.

December 2010Updated models are presented to TAC.

January 2011Updated models are presented to the ERCOT Board. 150-day notice begins.

June 2011150-day notice ends. Transition to updated models begins.

July 2011Transition to updated models ends.

February 2010Complete data collection and VEE.

Page 40: ERCOT Load Research Sampling Round 2 Model Coefficient Updates Additional Evaluations Presented to the PWG on July 28, 2010.

Questions and DiscussionQuestions and Discussion

40