    CORPORATE OFFICE :: VISAKHAPATNAM

    COST DATA

    2013-14

  • 8/10/2019 Epdcl Cost Data 2013-14

    2/58

    Sl.

    No. Description Page No.

    A ABSTRACTof rates of 33 KV / 11 KV / LT Lines 1

    B Rates for CENTRALIZED MATERIALS 2 - 11

    C Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State 12

    1 33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs 13

    2 33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs 14

    3 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 15

    4 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 16

    5 11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs 17

    6 11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 18

    7 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs 19

    8 6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs 20

    9 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 21

    10 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 22

    11 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 23

    12 LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 24

    13 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 25

    14 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 26

    15 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 27

    16 LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs 28

    17 LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 29

    18 LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 30

    19 L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 31

    20 L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 32

    21 L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs 33

    22 L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 34

    23 L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 35

    24 L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs 36

    25 Erection of 100 KVA 11/433 KV Conventional Distribution Transformer 37

    26 Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure 38

    27 Erection of 63 KVA 11/433 KV Conventional Distribution Transformer 39

    28 Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure 40

    29 Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure 41

    30 Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole 4231 Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole 43

    32 Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole 44

    33 Release of single phase Agl. Service erected on support 45

    34 Release of poly phase Agl. Service erected on support 46

    35 Release of 1 ph ( high quality). Domestic & non-domestic service 47

    36 Release of 1 ph (electronic). Domestic & non-domestic service 48

    37 Release of 1 ph Domestic & non-domestic service 49

    38 Release of 3 ph. ( electronic meter) Domestic & non-domestic service 50

    39 Release of 3 ph. (electronic meter) Domestic & non-domestic service 51

    40 Release of poly phase ( high quality) Indl.service upto 15 HP 5241 Release of Industrial service with poly phase CT operated meter upto 15 HP 53

    42 Release of Industrial service with poly phase CT operated meter above 15 HP 55

    43 Release of Street light service (1 -ph electonic meter) 55

    44Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders

    ( with 11 KV 2 MVAR Capacitor Bank)56

    INDEX

  • 8/10/2019 Epdcl Cost Data 2013-14

    3/58

    Sl.

    No.Particulars of items

    Wind.pr.

    in kg/m2

    W.Load

    in kg.

    Type of pole

    being used

    No. of

    poles/

    KM

    Span

    in

    Mtrs.

    Size of ConductorCost in

    Rs.

    1 33 KV Line 75 280 9.1 Mtr. PSCC 12 105 100 Sqmm AAAC 377330

    2 33 KV Line 100 280 9.1 Mtr. PSCC 14 80 100 Sqmm AAA 395410

    3 11 KV Line 75 140 8 Mtr PSCC 18 60 55 Sqmm AAAC 240990

    4 11 KV Line 100 200 8 Mtr PSCC 17 65 55 Sqmm AAA 245700

    5 11 KV Line 75 140 8 Mtr PSCC 18 60 34 Sqmm AAA 194290

    6 11 KV Line 100 200 8 Mtr PSCC 17 65 34 Sqmm AAA 199000

    7 6.3 KV Line 75 140 8 Mtr PSCC 13 90 34 Sqmm AAAC 126560

    8 6.3 KV Line 100 200 8 Mtr PSCC 13 90 34 Sqmm AAA 133120

    9 L.T. 3Ph 5 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 3x55+2x34 Sqmm AAA 270360

    10 L.T. 3Ph 5 Wire Line(Horizontal) 100 200 8 Mtr PSCC 18 60 3x55+2x34 Sqmm AAA 286190

    11 L.T. 3Ph 5 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 5x34 Sqmm AAAC 223660

    12 L.T. 3Ph 5 Wire Line(Horizontal) 100 200 8 Mtr PSCC 18 60 5x34 Sqmm AAAC 239490

    13 L.T. 3Ph 4 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 3x55+1x34 Sqmm AAA 240100

    14 L.T. 3Ph 4 Wire Line(Horizontal) 100 200 8 Mtr PSCC 15 60 3x55+1x34 Sqmm AAA 244460

    15 L.T. 3Ph 4 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 4x34 Sqmm AAA 193410

    16 L.T. 3Ph 4 Wire Line(Horizontal) 100 200 8 Mtr PSCC 15 60 4x34 Sqmm AAA 197800

    17 L.T. 1Ph 3 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 34 Sqmm AAA 162460

    18 L.T. 1Ph 2 Wire Line(Horizontal) 75 140 8 Mtr PSCC 16 65 2x34 Sqmm AAA 132740

    19 L.T. AB Cable 75 140 8 Mtr PSCC 16 65 3x16+25 Sqmm 147640

    20 L.T. AB Cable 75 140 8 Mtr PSCC 16 65 2x16+25 Sqmm 131480

    21 L.T. AB Cable 75 140 8 Mtr PSCC 16 65 1x16+25 Sqmm 115630

    22 L.T. AB Cable 100 200 8 Mtr PSCC 16 65 3x16+25 Sqmm 155720

    23 L.T. AB Cable 100 200 8 Mtr PSCC 16 65 2x16+25 Sqmm 139550

    24 L.T. AB Cable 100 200 8 Mtr PSCC 16 65 1x16+25 Sqmm 123700

    25 Erection of 100KVA Conventional Distribution transformer 251040

    26 Erection of 63 KVA Conventional Distribution transformer 2,12,910

    27 Erection of 3-Ph 16KVA Conventional Distribution transformer 120770

    28 Erection of 3-Ph 25KVA Conventional Distribution transformer 138070

    29 Erection of 3-Ph 40KVA Conventional Distribution transformer 174140

    30 Erection of 15 KVA S-Ph 6.3 KV/0-240V CSP Oil Immersed Transformer 62870

    31 Erection of 15 KVA S-Ph 6.3 KV/0-240V Amorphous metal core Transformer 48270

    32 Erection of S-Ph 15 KVA CSP Transformer 9.1M PSCC Pole 51540

    33 Release of Single phase Agl. Service erected on support 3120

    34 Release of poly phase Agl. Service erected on support 6870

    35 Release of single phase domestic and non domestic service with High Quality meter 3660

    36 Release of single phase domestic and non domestic service with High Quality meter 3200

    37 Release of single phase domestic and non domestic service with High Quality meter 3520

    38 Release of single phase domestic and non domestic service with 3 Phase Energy meter 8490

    39 Release of single phase domestic and non domestic service with Electronic meter 8340

    40 Release of poly phase Industrial service upto 15 H.P with Energy meter 10530

    41 Release of poly phase industrial service upto 15 HP with CT meter 12860

    42 Release of poly phase Industrial service upto 15 H.P with C.T. operated meter 12860

    43 Release of Single Phase Street light service with Electronic Meter 3310

    44 Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders 10912000

    Abs tract of schedule of rates for 2013-14 wit h modif ied rates : Cost Data per Km of 33/11 KV/LT Lines

    DATA FOR R.E. SCHEMES

    1

  • 8/10/2019 Epdcl Cost Data 2013-14

    4/58

    Sl.

    No.Name of the Material Unit Rupees

    SUBHEAD-I : SUPPORTS AND FIXTURES, IRON, STEEL AND

    CEMENT

    1 RS Joists 150 x 150mm MT 56155

    2 RS Joists 175 x 85mm MT 56402

    3 RS Joists 150 x 75mm MT 55347

    4 11 mts. PSCC poles 365 Kgs Each 6016

    5 9.1 mts. PSCC poles 280 Kgs. Each 3105

    6 8 mts. PSCC poles 140 Kgs. Each 1504

    7 8 mts. PSCC poles 200 Kgs. Each 1844

    8 8 mts. PSCC poles 300 Kgs. Each 2006

    9 11 mts. Spun Poles Each 11000

    10 12.5 mts. Spun Poles Each 12802

    11 Rail poles upto 7 Mtrs MT 84506

    12 52 Kg (105 lb) Rails (up to 13 mtrs. length) MT 46895

    13 MS Channel 100 x 50mm MT 55000

    14 MS Channel 75 x 40mm MT 55000

    15 MS Angle 65 x 65 x 6mm MT 54500

    16 MS Angle 50 x 50 x 6mm MT 54500

    17 MS Flat 50 x 6mm MT 55200

    18 MS Flat 75 x 8mm MT 55200

    19 MS Rod 20mm MT 55536

    20 MS Rod 16mm MT 55250

    21 Cement MT 5800

    22 HT Steel wire-4mm MT 60743

    23 GI Stay wire 7/3.15 mm MT 63738

    24 GI Stay wire 7/2.5 mm MT 65104

    25 GI Wire 4 mm MT 59819

    26 GI Bolts and Nuts with Washers full thread(5/8"X6', 7', 9') MT 80628

    27 GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4') MT 80628

    28 C R Sheet 1.6mm MT 42000

    29 M S Plate 12mm/6mm MT 36600

    30 Torsteel 10mm/12mm MT 34200

    COST DATA OF CENTRALISED MATERIALS FOR

    R.E. AND DISTRIBUTION WORKS

    2013-14

    2

  • 8/10/2019 Epdcl Cost Data 2013-14

    5/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    SUBHEAD-II : INSULATORS AND HARDWARE

    1 33 KV Pin Insulator 13/1979 E 183

    2 33 KV GI Pin -do- E 156

    3 33 KV Post Insulator Stack -do- E 920

    4 33 KV String Insulator Fittings (B&S) -do- E 188

    5 33 KV polymer disc insulator/string insulator (B&S) E 649

    6 11 KV Pin Insulator 3/1971 R-1993 E 32

    7 11 KV GI Pin -do- E 53

    8 11 KV Post Insulator -do- E 226

    9 11 KV String Insulator (B&S) -do- E 224

    10 11 KV String Insulator (C&T) -do- E 192

    11 11 KV String Insulator Fittings (C&T) 3/1991(R-1993) E 80

    12 11 KV Polymer string insulator (C&T) E 137

    13 LT Pin Insulator4/1972 D-1

    R-1979E 10

    14 LT GI Pin -do- E 26

    15 LT Shackle Insulator -do- E 10

    16 LT Shackle Hardware -do- E 34

    17 HT Guy Insulator 21/1981 E 28

    18 LT Guy Insulator -do- E 15.75

    19 33 KV Solid Core Insulators -do- E 1113

    20 11 KV Solid Core Insulators for AB Switches -do- E 216

    21 11 KV Solid Core Insulators for 11 KV HG Fuse sets E 117

    22 1.53 Mts Channel Cross arms without clamp E 1418

    23 1.07 Mts Channel Cross arms without clamp E 511

    24 11KV Tapping Cross arm E 508

    3

  • 8/10/2019 Epdcl Cost Data 2013-14

    6/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    25 Top clamp with cleat (for 33 KV) E 375

    26 Top clamp with cleat (for 11 KV) E 214

    27 Top clamp for LT E 208

    28 Stay set with clamp (for 33 KV) E 1076

    29 Sta set with clam for 11 KV E 424

    30 Sta set with clam for 6.3 KV E 358

    31 Sta set with clam for LT E 394

    32 LT 3-Ph Cross arm for 5 Wire line E 487

    33 LT 3-Ph Cross arm for 4 Wire line E 416

    34 LT S-Ph Cross arm for 3 Wire line E 319

    35 LT S-Ph Cross arm for 2 Wire line E 268

    36 Back Clam for 9.1 Mts PSCC ole E 172

    37 Back Clam for 8 Mts PSCC ole E 123

    38 D Clam for 8.0 M oles E 132

    39 Bracin set with double X arms with 9.1 Mts PSCC oles set 4158

    40 Bracin set with double X arms with 8 Mts PSCC oles set 3564

    41 DPC aluminium Windin Wire 1.25 mm K 193

    42 DPC aluminium Windin Wire 1.6 mm K 193

    4

  • 8/10/2019 Epdcl Cost Data 2013-14

    7/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    SUBHEAD - III : CONDUCTORS1 ACSR Zebra Conductor KM 235223

    2 200 S .mm Panther Conductor KM 13095737/3.0 S .mm ACSR

    1/1971 R-19933 100 S .mm AAA Conductor or 33/1984 R-1993 KM 49166

    4 55 S .mm AAA Conductor or -do- KM 281497/3.15 AAAC/RABBIT

    5 34 S .mm AAA Conductor or -do- KM 178707/2.50 AAAC/Weasel

    SUBHEAD-IV : CABLES

    SUBHEAD-IV : A LT XLPE SINGLE CORE CABLES1 2.50 S .mm 26/1993 R-1987 KM 2627

    2 4.00 S .mm - do - KM 4172

    3 6.00 S .mm - do - KM 5253

    4 10.00 S .mm - do - KM 8343

    5 25.00 S .mm - do - KM 23072

    6 50.00 S .mm - do - KM 38146

    7 70.00 S .mm - do - KM 49955

    8 95.00 S .mm - do - KM 61350

    9 120.00 S .mm - do - KM 73725

    10 150.00 S .mm - do - KM 94500

    11 185.00 S .mm - do - KM 115710

    SUBHEAD-IV : B LT PVC SINGLE CORE CABLES1 25.00 S .mm KM 22104

    2 50.00 S .mm KM 40479

    3 70.00 S .mm KM 52839

    4 120.00 Sq.mm KM 77250

    SUBHEAD-IV : C LT CONTROL CABLES1 2 X 2.5 S .mm Cu KM 36889

    2 4 X 2.5 S .mm Cu KM 83997

    3 10 x 2.5 Sq.mm (Cu) KM 167596

    4 4 x 4.0 Sq.mm (AL) KM 25000

    5

  • 8/10/2019 Epdcl Cost Data 2013-14

    8/58

    Sl. No Name of the MaterialREC Specification

    No. Unit Rupees

    SUBHEAD-IV : (D) ) LT XLPE CABLES

    1 3 1/2 X 300 sqmm LT XLPE cable KM 659613

    2 3 1/2 X 185 sqmm LT XLPE cable KM 448114

    3 3 1/2 X 150 sqmm LT XLPE cable KM 358432

    4 3 1/2 X 120 s mm LT XLPE cable KM 320330

    5 3 1/2 X 95 s mm LT XLPE cable KM 242739

    6 3 1/2 X 70 s mm LT XLPE cable KM 183620

    7 3 1/2 X 50 s mm LT XLPE cable KM 143795

    8 3 1/2 X 25 s mm LT XLPE cable KM 87742

    SUBHEAD -IV: E LT AERIAL BUNCHED CABLES1 1 x 16+25 S .mm 32/1984 KM 25750

    2 2 x 16+25 S .mm XLPE AB Cable KM 36427

    3 3 x 16+25 S .mm XLPE AB Cable KM 47316

    4 3 x 70 + 1x16 +1x50 S mm XLPE AB Cable KM 167000

    SUBHEAD -IV: F LT AERIAL BUNCHED CABLE FITTINGS

    1 Sus ension Clam with e e hook 32/1984 E 175

    2 LT Connector with Insulator Cover - do - E 82

    3 Dead-end Clam with e e hooks - do - E 113

    SUBHEAD -IV: G 11 KV XLPE POWER CABLES

    1 3 x 35 Sq.mm 63/1993 KM 288226

    2 3 x 95 Sq.mm - do - KM 454303

    3 3 x 120 Sq.mm - do - KM 576934

    4 3 x 185 Sq.mm - do - KM 673986

    5 3 x 300 Sq.mm - do - KM 1001492

    611 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable for

    Indoor type.E

    5763

    711 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable for

    Outdoor type.E

    9910

    6

  • 8/10/2019 Epdcl Cost Data 2013-14

    9/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    811 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable for

    Indoor type.E

    8914

    911 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable for

    Outdoor type.E

    11958

    1011KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for

    Indoor type.E

    8775

    1111KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for

    Outdoor type.E

    13411

    1233KV 3X185Sqmm heat shrinkable cable Termination Kits suitable forOutdoor type.

    E23637

    1333KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for

    Indoor type.E

    20565

    1433KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for

    Outdoor type.E

    31176

    SUBHEAD - IV H 11 KV AB Cable Aluminum

    1 3x35+35 S mm. KM 219898

    2 3x70+70 S mm. KM 318653

    3 3x120+70 S mm. KM 476000

    4 3x185+70 S mm. KM 429020

    SUBHEAD -IV: I 33 KV XLPE POWER CABLES

    1 3 x 400 S .mm 63/1993 KM 1621767

    2 3 x 185 Sq.mm KM 1156566

    SUBHEAD -V: POWER TRANSFORMERS, CAPACITORS AND

    TRASFORMER OIL

    1 33/11 KV 3.15 MVA Power Transformer E 2856190

    2 33/11 KV 5 MVA Power Transformer 7/1974 R-1993 E 3169500

    3 33/11 KV 8 MVA Power Transformer E 4230597

    4 33/11 KV 12.5 MVA Power Transformer E 5588956

    5 Transformer Oil KL 82396

    SUBHEAD -VI: DISTRIBUTION TRANSFORMERS

    1 S-Ph 5 KVA DTR 6.3 KV/0-240 V E 23436

    2 1-Phase 10kVA 11kV/250V CSP Aluminium E 27501

    3 S-Ph 15 KVA CSP DTR 6.3 KV/0-240V Al E 34595

    4 S-Ph 15 KVA CSP DTR 6.3 KV/230-0-230V Al E 37522

    7

  • 8/10/2019 Epdcl Cost Data 2013-14

    10/58

    Sl. No Name of the MaterialREC Specification

    No.

    Unit Rupees

    5 1-Phase 25 KVA CSP Co er E 43590

    63-Ph 16 KVA Amorphous/CRGO core conventional type copper wound DTR

    with BEE 5 star rating Conventional DTR (Cu)E 60485

    73-Ph 25 KVA Amorphous/CRGO core conventional type copper wound DTR

    with BEE 5 star ratingConventional DTR (Cu)E 70115

    83-Ph 40 KVA Amorphous/CRGO core conventional type copper wound DTR

    with BEE 5 star rating Conventional DTR (Cu)E 96748

    93-Ph 63 KVA Amorphous/CRGO core conventional type copper wound DTR

    with BEE 5 star ratin Conventional DTR Cu E 103237

    103-Ph 100 KVA Amorphous/CRGO core conventional type copper wound DTR

    with BEE 5 star ratin Conventional DTR CuE 135423

    113-Ph 160 KVA Amorphous/CRGO core conventional type copper wound DTR

    with BEE 5 star rating Conventional DTR (Cu)E 211348

    12 250 KVA CSP DTR Cu E 315618

    13 315 KVA CSP DTR (Cu) Conventional E 492077

    14 500 KVA Conventional Al E 531833

    15 Sin le Phase 15 KVA Transformer Amor hous E 37522

    SUBHEAD -VII: SWITCH CONTROL AND PROTECTIVE GEAR

    (A) 33KV & 11KV VCBs

    1 33 KV VCB with CRPs & CTs ratio 400-200-100/1-1-1A 12/1979 R-1993 E 418319

    2 33KV Feeder VCBs with CTs & CR panels 413788

    4 11 KV VCB with CTs & Panels Feeder Control 22/1983 E 215550

    5 11 KV VCB with CTs & Panels LV Control without differential rotection E 234179

    6 11 KV VCB with CTs & Panels LV Control with differential rotection E 270430

    B 33KV & 11KV CTs

    1 33 KV CTs 400-200-100/1-1-1A ratio 0.2s class accuracy E 23394

    2 33 KV CTs 400-200-100/1-1A ratio 0.2S class accuracy E 19839

    3 33 KV CTs (200-100/1-1A) 0.2 class accuracy E 23394

    4 33 KV CTs (100-50/1-1A) 0.2S class accuracy E 20029

    8

  • 8/10/2019 Epdcl Cost Data 2013-14

    11/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    5 11 KV feeder CTs (400-200-100/1-1A) (0.2S class) E 16758

    6 11 KV CTs (50-25/1-1A) 59/1993 E 14640

    7 11 KV CTs 200-100/5-5A E 14463

    8 11 KV CTs 400-200/1-1A E 13564

    9 11 KV CTs 200-100/1-1A E 13125

    10 11 KV CTs (600-300/1-1-0.577A) E 14758

    (C) 33KV & 11KV PTs - CTs

    1 33 KV PT (Single Phase) class 0.5 E 18960

    2 33 KV PT (Single Phase) class 0.2 E 19570

    3 33 KV PT (Three Phase) of 0.5 class accuracy E 44263

    4 11 KV PT (3 Phase) 60/1993 E 15789

    5 11KV C.T.P.T. set 10/5A 28998

    (D) AB Switches, LAs, HG Fuse sets, Batteries, Capacitors , RMUs etc.

    1 33 KV 800 Amps AB Switch Double break with solid core insulator E 42000

    2 11 KV 800 Amps AB Switch Double break with insulators 43/1987 E 19949

    4 11 KV 400 Amps AB Switch Double break with insulators E 13738

    5 11 KV 200 Amps AB Switch (Tilting) E 8250

    6 11 KV 200 Am s AB Switch Horizontal E 7349

    7 30 KV 10 KA Metal Oxide Lightning Arrester (station type) 16/1981

    -E 3081

    8 33 KV Line t e Li htin Arrester E 1670

    9 9 KV 10 KA Metal Oxide Li htin Arrester E 1724

    10 9 KV 5 KA Metal Oxide Li htin Arrester 55/1987 E 310

    11 33 KV HG Fuse set Set 9450

    12 11 KV HG Fuse Set Set 1889

    13 6.3 KV HG Fuse Set Set 457

    14 LT HG Fuse Set Set 1313

    15 24 Volts 40 AH Batter set includin Batter char er E 15900

    9

  • 8/10/2019 Epdcl Cost Data 2013-14

    12/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    16 24V, 40 AH Batteries with chargers of conventional type E 18770

    17 24 Volts 40 AH Battery set without Battery charger E 6371

    18 12 V 40 AH SMF Batteries cells E 3244

    19 12 V, 80 AH SMF Batteries cells E 8475

    20 220 V, 80 AH SMF Batteries and Chargers & DCDB E 194054

    21 220 V 80 AH SMF Batteries E 117887

    22 LT Switched capacitors

    a 1x9 KVAR E 2548b 1x10 KVAR E 2614

    23 11 KV 2 MVAR Capacitor banks with associated equipment

    a T e A E 1000000b T e B with 40 Mtrs HT UG cable E 895869c Type C (Indoor Type) with HT UG cable E 1295000

    24 Sectionalizers E 588444

    25 Auto - Reclosures E 925206

    26 11 KV 3 Wa RMU Conventional E 171658

    27 11 KV 3 Wa RMU SF6 E 366000

    28 11 KV SF6 5 Wa RMU E 735000

    29 33 KV Indoor twin feeder control panel E 285007

    30 33KV twin feeder control and relay panel (220V DC) E 142850

    31 Indoor type VCB with control panel (LV) E 376368

    32 Indoor type VCB with control panel (feeder) E 274818

    33 11 VCB for bus coupler E 210677

    34 11KV switch Fuse unit SFU E 100000

    35 33KV switch Fuse unit SFU E 200000

    36 33KV 3-way RMU without VCB E 1020110

    37 33KV 3-way RMU with VCB E 1445325

    38 11KV metering panel with CTS& PTS (Indoor) E 150000

    39 33KV metering panel with CTS&PTS (Indoor) E 300000

    SUBHEAD -VIII: ENERGY METERS AND METERING E UIPMENT

    1 a) LT Single Phase High quality Meter Class 1 accuracy ( 5-20A) E 730

    b) 1 Ph 5-30 Meter IR port, Sup Capacitor - PP Box E 819

    c) LT Single Phase Electronic Energy Meter 2.5 - 10A E 447

    10

  • 8/10/2019 Epdcl Cost Data 2013-14

    13/58

    Sl. No Name of the MaterialREC Specification

    No.Unit Rupees

    d) LT Single Phase Class 1 accuracy (push fit type box Non push fit type TC)5-30A

    E 846

    2 a) Three Phase Electronic Meter 10 - 40A with P P Box E 1869

    b) Three Phase High Quality Meter 10 - 40A (Counter type display without

    Box)E 2150

    3 a) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 200/5A E 6899

    b) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 125/5A E 6525

    c) LT TVR METER 125/5A CTS IN PP BOX. 0.5S ACCR WITH DLMSDL 6840

    4 a) HT Trivector Meter 0.5 class accuracy(10/5A) E 4244

    b) HT Trivector Meter 0.5 class accuracy (200/1,100/1A) E 3746

    c) HTTVR3P4W11KV/110V 10/5A 0.5S 30M DLMS-C E 3401

    d) HTTVR 3P4W 33KV/110V 200/1A 0.2S 30MIN IPDLMS 10100

    5 11 KV Metering cubicles

    a) 10/5 A class 0.2S class accuracy E 39327

    b) 20/5 A/ 0.2S class accuracy E 39015

    c 30/5A 0.5S class accurac E 22977d) 40/5A 0.5S class accuracy E 30609

    e) 75/5 A 0.2S accuracy E 39015

    f) 60/5 A 0.2S accuracy E 39015

    6 Moulded Box for Single Phase service E 250

    7 Moulded Box for 3 Phase service E 420

    8 Moulded box for CT Meter(Poly phase) E 1647

    9 HT Meter Box E 5731

    10 A Type Distribution type BOX E 7558

    11 B Type Distribution type BOX E 2500

    12 SMC Meter Box with fixing clamps (3 phase meters) E 6750

    13 SMC Meter Box with fixing clamps (S- phase meters) E 408

    SUBHEAD -IX: EARTHING MATERIALS

    1 GI Earth pipe 40 mm , (1.8 mts. Length) E 418

    2 GI Earth pipe 40 mm (2.5 mts. Length) E 475

    3 CI Earth pipe 80mm dia, (2.5 mts. Length) E 2471

    SUBHEAD -X: OTHER MATERIALS

    1 Hand Held Com uters with Printer E 8145

    2 CMRI E 30700

    11

  • 8/10/2019 Epdcl Cost Data 2013-14

    14/58

    Note:

    1

    2

    3

    COST DATA FOR HILLY AND TRIBAL AREAS

    AS ADOPTED BY IRRIGATION DEPARTMENT IN THE STATE

    No extra percentage is permissible in respect of Forest produce such as Bamboo,

    Rellu grass and all materials obtained from outside the Agency/Tribal.

    The extra percentage under Agency/Tribal areas allowance may be allowed on the

    labour component and on the labour charges in the rates for conveyance of

    materials.

    The extra percentage on cost of materials in Agency/Tribal areas can be allowed on

    the labour component only, if they are manufactured in the Agency/Tribal areas

    itself except Forest produce.

    a. 25% extra is allowed for the works located within the interior Agency / Tribal limits.

    (i.e.) for the works located within and upto 16 Kilometers from any all weather route

    inside Agency/Tribal.

    a.

    40% extra is allowed for the works located within the interior Agency / Tribal Area

    i.e., for the works located beyond 16 Kilometers from any all weather route inside

    Agency/Tribal.

    For hilly and tribal areas, the following EXTRA RATES are allowed over and above

    approved cost data of labour.

    12

  • 8/10/2019 Epdcl Cost Data 2013-14

    15/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 9.1 M PSCC Pole 12 3105 Each 37260

    2 1.53M Cross Arm (Channel) without clamps 10 1418 Each 14180

    3 Top Clamp with cleat 10 375 Each 3750

    4 Back Clamp 10 172 Each 1720

    5 Stay sets with clamps 6 1076 Each 6456

    6 Bracing Set with double cross arm 1 4158 Set 4158

    7 100 Sq.mm AAA Conductor 3.06 49166 K.M. 150448

    8 33 KV Pin - Insulator with Pin 33 339 Each 11187

    9Strain Insulator set with metal parts( 3x 11 KV B&S

    Insulator with 33 KV Hard ware fitting)6 860 Set 5160

    10 Concreting of Pole, Stay sets & Base concreting LS LS LS 16940

    11Misc. Items like coil earthing, pipe earthing, danger-

    boards, bolts & nuts, etc.LS LS LS 3300

    Total Cost of Material 254559

    3% storage & handling charges on items (1) to (9) 234319 70303% Contingencies on Materials 7637

    Labour 63640

    Transport 12728

    11% Estt. & Genl. Charges On Materials 28001

    1% cess 3736

    Total 377331

    or say 3,77,330

    1. R.E.C. - Construc tion Standard No. M11/1979 (R-1989)

    Costdata per Km o f 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.

    PSCC Poles at 105 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 280 Kgs.

    13

  • 8/10/2019 Epdcl Cost Data 2013-14

    16/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 9.1 M PSCC Pole 14 3105 Each 43470

    2 1.53M Cross Arm (Channel) without clamps 12 1418 Each 17016

    3 Top Clamp with cleat 12 375 Each 4500

    4 Back Clamp 12 172 Each 2064

    5 Stay sets with clamps 6 1076 Each 6456

    6 Bracing Set with double cross arm 1 4158 Set 4158

    7 100 Sq.mm AAA Conductor 3.06 49166 K.M. 150448

    8 33 KV Pin - Insulator with Pin 39 339 Each 13221

    9 Strain Insulator set with metal parts 6 860 Set 5160

    10 Concreting of Pole, Stay sets & Base concreting LS LS LS 16940

    11Misc. Items like coil earthing, pipe earthing, danger-

    boards, bolts & nuts, etc.LS LS LS 3300

    Total Cost of Material 266733

    3% storage & handling charges on items (1) to (9) 246493 7395

    3% Contingencies on Materials 8002

    Labour 66683

    Transport 13337

    11% Estt. & Genl. Charges On Materials 29341

    1% cess 3915

    Total 395405

    or say 3,95,410

    2. R.E.C. - Construc tion Standard No. M11/1979 (R-1989)

    Costdata per Km o f 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.

    PSCC Poles at 80 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 280 Kgs.

    14

  • 8/10/2019 Epdcl Cost Data 2013-14

    17/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8.0 M PSCC Pole 18 1504 Each 27072

    2 1.07M Cross Arm (Channel) without clamps 16 511 Each 8176

    3 Top Clamp with cleat 16 214 Each 3424

    4 Back Clamp 16 123 Each 1968

    5 Stay sets with clamps 6 424 Each 2544

    6 Bracing Set with double cross arm 1 3564 Set 3564

    7 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136

    8 11 KV Pin - Insulator with Pin 51 85 Each 4335

    9 Strain Insulator set with metal parts 6 272 Set 1632

    10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556

    11Misc. Items like coil earthing, pipe earthing, danger-

    boards, bolts & nuts, etc.LS LS LS 4400

    Total Cost of Material 162807

    3% storage & handling charges on items (1) to (9) 138851 4166

    3% Contingencies on Materials 4884

    Labour 40702

    Transport 8140

    11% Estt. & Genl. Charges On Materials 17909

    1% cess 2386

    Total 240994

    or say 2,40,990

    PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    3. R.E.C. - Const ruction Standard No. A-5/1972

    Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.

    15

  • 8/10/2019 Epdcl Cost Data 2013-14

    18/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8.0 M PSCC Pole 17 1844 Each 31348

    2 1.07M Cross Arm (Channel) without clamps 15 511 Each 7665

    3 Top Clamp with cleat 15 214 Each 3210

    4 Back Clamp 15 123 Each 1845

    5 Stay sets with clamps 6 424 Each 2544

    6 Bracing Set with double cross arm 1 3564 Set 3564

    7 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136

    8 11 KV Pin - Insulator with Pin 48 85 Each 4080

    9 Strain Insulator set with metal parts 6 272 Set 1632

    10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556

    11Misc. Items like coil earthing, pipe earthing, danger-

    boards, bolts & nuts, etc.LS LS LS 4400

    Total Cost of Material 165980

    3% storage & handling charges on items (1) to (9) 142024 4261

    3% Contingencies on Materials 4979

    Labour 41495Transport 8299

    11% Estt. & Genl. Charges On Materials 18258

    1% cess 2433

    Total 245704

    or say 2,45,700

    4. R.E.C. - Construction Standard No. A-5/1972

    Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.

    PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    16

  • 8/10/2019 Epdcl Cost Data 2013-14

    19/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 18 1504 Each 27072

    2 1.07M Cross Arm (Channel) without clamps 16 511 Each 8176

    3 Top Clamp with cleat 16 214 Each 3424

    4 Back Clamp 16 123 Each 1968

    5 Stay sets with clamps 6 424 Each 2544

    6 Bracing Set with double cross arm 1 3564 Set 3564

    7 34 Sq.mm AAA Conductor 3.06 17870 K.M. 54682

    8 11 KV Pin - Insulator with Pin 51 85 Each 4335

    9 Strain Insulator set with metal parts 6 272 Set 1632

    10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556

    11Misc. Items like coil earthing, pipe earthing, danger-

    boards, bolts & nuts, etc.LS LS LS 4400

    Total Cost of Material 131353

    3% storage & handling charges on items (1) to (9) 107397 3222

    3% Contingencies on Materials 3941

    Labour 32838

    Transport 6568

    11% Estt. & Genl. Charges On Materials 14449

    1% cess 1924

    Total 194294

    or say 1,94,290

    5. R.E.C. - Const ruction Standard No. A-5/1972

    Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.

    PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    17

  • 8/10/2019 Epdcl Cost Data 2013-14

    20/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8 PSCC Pole 17 1844 Each 31348

    2 1.53M Cross Arm (Channel) without clamps 15 511 Each 7665

    3 Top Clamp with cleat 15 214 Each 3210

    4 Back Clamp 15 123 Each 1845

    5 Stay sets with clamps 6 424 Each 2544

    6 Bracing Set with double cross arm 1 3564 Set 3564

    7 34 Sq.mm AAA Conductor 3.06 17870 K.M. 54682

    8 11 KV Pin - Insulator with Pin 48 85 Each 4080

    9 Strain Insulator set with metal parts 6 272 Set 1632

    10 Concreting of Pole, Stay sets & Base concreting LS LS LS 19556

    11Misc. Items like coil earthing, pipe earthing, danger-

    boards, bolts & nuts, etc.LS LS LS 4400

    Total Cost of Material 134526

    3% storage & handling charges on items (1) to (9) 110570 3317

    3% Contingencies on Materials 4036Labour 33631

    Transport 6726

    11% Estt. & Genl. Charges On Materials 14798

    1% cess 1970

    Total 199005

    or say 1,99,000

    PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    6. R.E.C. - Const ruction Standard No. A-5/1972

    Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.

    18

  • 8/10/2019 Epdcl Cost Data 2013-14

    21/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8 M PSCC Pole 13 1504 Each 19552

    2 Top Clamp with cleat 10 214 Each 2140

    3 D clamp 10 132 Each 1320

    4 MS Stay sets 6 358 Each 2148

    5 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455

    6 11 K.V.Pin-Insulator with Pin 11 85 Each 935

    7 Strain Insulator set 4 272 Set 1088

    8 Concreting of Pole,Stay sets & Base concreting L.S. 19556

    9 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 2500

    & nuts, etc.

    Total Cost of Material 85694

    3% storage & handling charges on items (1) to (7) 63638 1909

    3% Contingencies on Materials 2571

    Labour 21423

    Transport 4285

    11% Estt. & Genl. Charges On Materials 9426

    1% cess 1253

    Total 126561

    or say 1,26,560

    PSCC Poles at 90 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    7. R.E.C. - Const ruction Standard No. A-17/1972

    Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.

    19

  • 8/10/2019 Epdcl Cost Data 2013-14

    22/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8 M PSCC Pole 13 1844 Each 23972

    2 Top Clamp with cleat 10 214 Each 2140

    3 D clamp 10 132 Each 1320

    4 MS Stay sets 6 358 Set 2148

    5 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455

    6 11 K.V.Pin-Insulator with Pin 11 85 Each 935

    7 Strain Insulator set 4 272 Set 1088

    8 Concreting of Pole,Stay sets &

    Base concreting L.S. 19556

    9 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 2500

    & nuts, etc.

    Total Cost of Material 90114

    3% storage & handling charges on items (1) to (7) 68058 2042

    3% Contingencies on Materials 2703Labour 22528

    Transport 4506

    11% Estt. & Genl. Charges On Materials 9913

    1% cess 1318

    Total 133124

    or say 1,33,120

    8. R.E.C. - Const ruction Standard No. A-17/1972

    Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.

    PSCC Poles at 90 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    20

  • 8/10/2019 Epdcl Cost Data 2013-14

    23/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 L.T. 3 Phase cross arms 18 487 Each 8766

    3 Back Clamp 18 123 Each 2214

    4 Stay sets 4 394 Each 1576

    5 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136

    6 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455

    7 Shakle Insulator set 42 44 Set 1848

    8 L.T.pin insulator with pin 48 36 Set 1728

    9 C.I. Knob 16 12 Each 192

    10 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    11 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 182495

    3% storage & handling charges on items (1) to (9) 162979 4889

    3% Contingencies on Materials 5475

    Labour 45624

    Transport 9125

    11% Estt. & Genl. Charges On Materials 20074

    1% cess 2677

    Total 270359

    or say 2,70,360

    9. R.E.C. - Const ruction Standard No. B-5/1972

    Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal fo rmation ) w ith

    3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    21

  • 8/10/2019 Epdcl Cost Data 2013-14

    24/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 18 1844 Each 33192

    2 L.T. 3 Phase cross arms 20 487 Each 9740

    3 Back Clamp 20 123 Each 2460

    4 LT Stay sets 4 394 Each 1576

    5 55 Sq.mm AAA Conductor 3.06 28149 K.M. 86136

    6 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455

    7 Shakle Insulator set 42 44 Set 1848

    8 L.T.pin insulator with pin 56 36 Set 2016

    9 C.I. Knob 18 12 Each 216

    10 Concreting of Pole,Stay sets & L.S. 16016

    Base concreting

    11 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 193155

    3% storage & handling charges on items (1) to (9) 173639 5209

    3% Contingencies on Materials 5795

    Labour 48289

    Transport 9658

    11% Estt. & Genl. Charges On Materials 21247

    1% cess 2834

    Total 286186

    or say 2,86,190

    3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.

    PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    10. R.E.C. - Construction Standard No. B-5/1972

    Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal fo rmation ) w ith

    22

  • 8/10/2019 Epdcl Cost Data 2013-14

    25/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 L.T. 3 Phase cross arms 18 487 Each 8766

    3 Back Clamp 18 123 Each 2214

    4 LT Stay sets 4 394 Each 1576

    5 34 Sq.mm AAA Conductor 5.10 17870 K.M. 91137

    6 Shakle Insulator set 42 44 Set 1848

    7 L.T.pin insulator with pin 48 36 Set 1728

    8 C.I. Knob 16 12 Each 192

    9 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    10 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 1510413% storage & handling charges on items (1) to (8) 131525 3946

    3% Contingencies on Materials 4531

    Labour 37760

    Transport 7552

    11% Estt. & Genl. Charges On Materials 16615

    1% cess 2214

    Total 223659

    or say 2,23,660

    5 x 34 Sq.mm AAAC over 8 Mts.

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    11. R.E.C. - Construction Standard No. B-5/1972

    Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal fo rmation ) w ith

    23

  • 8/10/2019 Epdcl Cost Data 2013-14

    26/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 18 1844 Each 33192

    2 L.T. 3 Phase cross arms 20 487 Each 9740

    3 Back Clamp 20 123 Each 2460

    4 LT Stay sets 4 394 Each 1576

    5 34 Sq.mm AAA Conductor 5.10 17870 K.M. 91137

    6 Shakle Insulator set 42 44 Set 1848

    7 L.T.pin insulator with pin 56 36 Set 2016

    8 C.I. Knob 18 12 Each 216

    9 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    10 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 161701

    3% storage & handling charges on items (1) to (8) 142185 4266

    3% Contingencies on Materials 4851

    Labour 40425

    Transport 8085

    11% Estt. & Genl. Charges On Materials 17787

    1% cess 2371

    Total 239486

    or say 2,39,490

    5 x 34 Sq.mm AAAC over 8 Mts.

    PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    12. R.E.C. - Construction Standard No. B-5/1972

    Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal fo rmation ) w ith

    24

  • 8/10/2019 Epdcl Cost Data 2013-14

    27/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 L.T. 3 Phase cross arms 18 416 Each 7488

    3 Back Clamp 18 123 Each 2214

    4 LT Stay sets 4 394 Each 1576

    5 55 Sqmm AAA Conductor 3.06 28149 K.M. 86136

    6 34 Sq.mm AAA Conductor 1.02 17870 K.M. 18227

    7 Shakle Insulator set 32 44 Set 1408

    8 L.T.pin insulator with pin 36 36 Set 1296

    9 C.I. Knob 16 12 Each 192

    10 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    11 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 162117

    3% storage & handling charges on items (1) to (9) 142601 4278

    3% Contingencies on Materials 4864

    Labour 40529

    Transport 8106

    11% Estt. & Genl. Charges On Materials 17833

    1% cess 2377

    Total 240104

    or say 2,40,100

    3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts .

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    13. R.E.C. - Construc tion Standard No. B-12/1981

    Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal fo rmation ) w ith

    25

  • 8/10/2019 Epdcl Cost Data 2013-14

    28/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 15 1844 Each 27660

    2 L.T. 3 Phase cross arms 17 416 Each 7072

    3 Back Clamp 17 123 Each 2091

    4 LT Stay sets 4 394 Each 1576

    5 55 Sqmm AAA Conductor 3.06 28149 K.M. 86136

    6 34 Sq.mm AAA Conductor 1.02 17870 K.M. 18227

    7 Shakle Insulator set 32 44 Set 1408

    8 L.T.pin insulator with pin 33 36 Set 1188

    9 C.I. Knob 15 12 Each 180

    10 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    11 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 165054

    3% storage & handling charges on items (1) to (9) 145538 4366

    3% Contingencies on Materials 4952

    Labour 41264

    Transport 8253

    11% Estt. & Genl. Charges On Materials 18156

    1% cess 2420

    Total 244464

    or say 2,44,460

    14. R.E.C. - Construc tion Standard No. B-12/1981

    Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with

    3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts .

    PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    26

  • 8/10/2019 Epdcl Cost Data 2013-14

    29/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 L.T. 3 Phase cross arms 18 416 Each 7488

    3 Back Clamp 18 123 Each 2214

    4 LT Stay sets 4 394 Each 1576

    5 34 Sq.mm AAA Conductor 4.08 17870 K.M. 72910

    6 Shakle Insulator set 32 44 Set 1408

    7 L.T.pin insulator with pin 36 36 Set 1296

    8 C.I. Knob 16 12 Each 192

    9 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    10 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 130664

    3% storage & handling charges on items (1) to (8) 111148 3334

    3% Contingencies on Materials 3920

    Labour 32666

    Transport 6533

    11% Estt. & Genl. Charges On Materials 14373

    1% cess 1915

    Total 193406

    or say 1,93,410

    15. R.E.C. - Const ruction Standard No. B-12/1981

    Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )

    with 4 x 34 Sqmm AAAC over 8 Mts.

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    27

  • 8/10/2019 Epdcl Cost Data 2013-14

    30/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 15 1844 Each 27660

    2 L.T. 3 Phase cross arms 17 416 Each 7072

    3 Back Clamp 17 123 Each 2091

    4 LT Stay sets 4 394 Each 1576

    5 34 Sq.mm AAA Conductor 4.08 17870 K.M. 72910

    6 Shakle Insulator set 32 44 Set 1408

    7 L.T.pin insulator with pin 33 36 Set 1188

    8 C.I. Knob 17 12 Each 204

    9 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    10 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500& nuts, etc.

    Total Cost of Material 133625

    3% storage & handling charges on items (1) to (8) 114109 3423

    3% Contingencies on Materials 4009

    Labour 33406

    Transport 6681

    11% Estt. & Genl. Charges On Materials 14699

    1% cess 1958

    Total 197802

    or say 1,97,800

    16. R.E.C. - Const ruction Standard No. B-12/1981

    Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )

    PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    with 4 x 34 Sqmm AAAC over 8 Mts.

    28

  • 8/10/2019 Epdcl Cost Data 2013-14

    31/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 L.T. 1 Phase cross arms 18 319 Each 5742

    3 Back Clamp 18 123 Each 2214

    4 LT Stay sets 4 394 Each 1576

    5 34 Sq.mm AAA Conductor 3.06 17870 K.M. 54682

    6 Shakle Insulator set 22 44 Set 968

    7 L.T.pin insulator with pin 24 36 Set 864

    8 C.I. Knob 16 12 Each 192

    9 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    10 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 109818

    3% storage & handling charges on items (1) to (8) 90302 2709

    3% Contingencies on Materials 3295

    Labour 27455

    Transport 5491

    11% Estt. & Genl. Charges On Materials 12080

    1% cess 1608

    Total 162455

    or say 1,62,460

    Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts,

    and working load of 200 kgs

    Costdata per Km of LT S-Ph 3 Wire Line(Horizontal formation )

    with 34 Sqmm AAAC over 8 Mts.

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    17. R.E.C. - Construction Standard No. B-14/1981

    29

  • 8/10/2019 Epdcl Cost Data 2013-14

    32/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 L.T. 1 Phase cross arms 18 268 Each 4824

    3 Back Clamp 18 123 Each 2214

    4 LT Stay sets 4 394 Each 1576

    5 34 Sq.mm AAA Conductor 2.04 17870 K.M. 36455

    6 Shakle Insulator set 12 44 Set 528

    7 L.T.pin insulator with pin 12 36 Set 432

    8 C.I. Knob 16 12 Each 192

    9 Concreting of Pole,Stay sets &

    Base concreting L.S. 16016

    10 Misc. Items like coil earthing,

    pipe earthings, danger-boards, bolts L.S. 3500

    & nuts, etc.

    Total Cost of Material 89801

    3% storage & handling charges on items (1) to (8) 70285 2109

    3% Contingencies on Materials 2694

    Labour 22450

    Transport 4490

    11% Estt. & Genl. Charges On Materials 9878

    1% cess 1314

    Total 132736

    or say 1,32,740

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation )

    with 2 x 34 Sqmm AAAC over 8 Mts.

    18. R.E.C. - Construction Standard No. B-14/1981

    30

  • 8/10/2019 Epdcl Cost Data 2013-14

    33/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 Suspension clamp assembly with eye hook 12 175 Each 2100

    3 Dead end clamp assembly with eye hook 6 113 Each 678

    4 LT Stay sets 4 394 Set 1576

    5 L.T. A.B. Cable 3 x 16 + 25 Sqmm 1 47316 K.M. 47316

    6 Insulated connectors with covers 56 82 Each 4592

    7 Concreting of Pole,Stay concreting &

    Base concreting L.S. 16016

    8 Misc. Items like coil earthing,

    bolts & nuts, etc. L.S. 3500

    Total Cost of Material 99842

    3% storage & handling charges on items (1) to (6) 80326 2410

    3% Contingencies on Materials 2995

    Labour 24961

    Transport 4992

    11% Estt. & Genl. Charges On Materials 10983

    1% cess 1462

    Total 147644

    or say 1,47,640

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    19. R.E.C. - Construc tion Standard No. B-32/1984

    Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.

    31

  • 8/10/2019 Epdcl Cost Data 2013-14

    34/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 Suspension clamp assembly with eye hook 12 175 Each 2100

    3 Dead end clamp assembly with eye hook 6 113 Each 678

    4 LT Stay sets 4 394 Set 1576

    5 L.T. A.B. Cable 2 x 16 + 25 Sqmm 1 36427 K.M. 36427

    6 Insulated connectors with covers 56 82 Each 4592

    7 Concreting of Pole,Stay concreting &

    Base concreting L.S. 16016

    8 Misc. Items like coil earthing,

    bolts & nuts, etc. L.S. 3500

    Total Cost of Material 88953

    3% storage & handling charges on items (1) to (6) 69437 2083

    3% Contingencies on Materials 2669

    Labour 22238

    Transport 4448

    11% Estt. & Genl. Charges On Materials 9785

    1% cess 1302

    Total 131477

    or say 1,31,480

    20. R.E.C. - Construc tion Standard No. B-32/1984

    Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    32

  • 8/10/2019 Epdcl Cost Data 2013-14

    35/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8 M PSCC Pole 16 1504 Each 24064

    2 Suspension clamp assembly with eye hook 12 175 Each 2100

    3 Dead end clamp assembly with eye hook 6 113 Each 678

    4 LT Stay sets 4 394 Set 1576

    5 L.T. A.B. Cable 1 x 16 + 25 Sqmm 1 25750 K.M. 25750

    6 Insulated connectors with covers 56 82 Each 4592

    7 Concreting of Pole,Stay concreting &

    Base concreting L.S. 16016

    8 Misc. Items like coil earthing,

    bolts & nuts, etc. L.S. 3500

    Total Cost of Material 78276

    3% storage & handling charges on items (1) to (6) 58760 1763

    3% Contingencies on Materials 2348

    Labour 19569

    Transport 3914

    11% Estt. & Genl. Charges On Materials 8610

    1% cess 1145

    Total 115625

    or say 1,15,630

    21. R.E.C. - Const ruction Standard No. B-32/1984

    Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.

    PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.

    33

  • 8/10/2019 Epdcl Cost Data 2013-14

    36/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1844 Each 29504

    2 Suspension clamp assembly with eye hook 12 175 Each 2100

    3 Dead end clamp assembly with eye hook 6 113 Each 678

    4 LT Stay sets 4 394 Set 1576

    5 L.T. A.B. Cable 3 x 16 + 25 Sqmm 1 47316 K.M. 47316

    6 Insulated connectors with covers 56 82 Each 45927 Concreting of Pole,Stay concreting &

    Base concreting L.S. 16016

    8 Misc. Items like coil earthing,

    bolts & nuts, etc. L.S. 3500

    Total Cost of Material 105282

    3% storage & handling charges on items (1) to (6) 85766 2573

    3% Contingencies on Materials 3158

    Labour 26321Transport 5264

    11% Estt. & Genl. Charges On Materials 11581

    1% cess 1542

    Total 155721

    or say 1,55,720

    Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.

    PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    22. R.E.C. - Construc tion Standard No. B-32/1984

    34

  • 8/10/2019 Epdcl Cost Data 2013-14

    37/58

    Sl.

    No.Particulars Qty.

    Rate

    in Rs.

    Per

    Unit

    Amount

    in Rs.

    1 8 M PSCC Pole 16 1844 Each 29504

    2 Suspension clamp assembly with eye hook 12 175 Each 2100

    3 Dead end clamp assembly with eye hook 6 113 Each 678

    4 LT Stay sets 4 394 Set 1576

    5 L.T. A.B. Cable 2 x 16 + 25 Sqmm 1 36427 K.M. 36427

    6 Insulated connectors with covers 56 82 Each 4592

    7 Concreting of Pole,Stay concreting &

    Base concreting L.S. 16016

    8 Misc. Items like coil earthing,

    bolts & nuts, etc. L.S. 3500

    Total Cost of Material 94393

    3% storage & handling charges on items (1) to (6) 74877 2246

    3% Contingencies on Materials 2832

    Labour 23598

    Transport 4720

    11% Estt. & Genl. Charges On Materials 10383

    1% cess 1382

    Total 139554

    or say 1,39,550

    23. R.E.C. - Construc tion Standard No. B-32/1984

    Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.

    PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    35

  • 8/10/2019 Epdcl Cost Data 2013-14

    38/58

    Sl.No.

    Particulars Qty. Ratein Rs.

    PerUnit

    Amountin Rs.

    1 8 M PSCC Pole 16 1844 Each 29504

    2 Suspension clamp assembly with eye hook 12 175 Each 2100

    3 Dead end clamp assembly with eye hook 6 113 Each 678

    4 LT Stay sets 4 394 Set 1576

    5 L.T. A.B. Cable 1 x 16 + 25 Sqmm 1 25750 K.M. 25750

    6 Insulated connectors with covers 56 82 Each 4592

    7Concreting of Pole,Stay concreting & Base

    concretinL.S. 16016

    8 Misc. Items like coil earthing, bolts & nuts, etc. L.S. 3500

    Total Cost of Material 83716

    3% storage & handling charges on items (1) to (6) 64200 1926

    3% Contingencies on Materials 2511

    Labour 20929

    Transport 4186

    11% Estt. & Genl. Charges On Materials 9209

    1% cess 1225

    Total 123702

    or say 1,23,700

    PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.

    24. R.E.C. - Construc tion Standard No. B-32/1984

    Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.

    36

  • 8/10/2019 Epdcl Cost Data 2013-14

    39/58

    Sl. No. ParticularsCost of Material

    (Rs.)

    Labour & Transport

    (Rs.)

    1 11 KV/433V 100KVA Conventional Transformer 135423 3,213

    2 Erection of 11 KV AB Switch (200A) 7349 909

    3 D.P.Structure (Including all Earthing) 28810 9,702

    4 Erection of 11 KV H.G. Fuse set 1889 388

    5Installation of L.T.H.G. Fuse sets (2 Nos.) including

    connections2626 726

    6LT Metering arrangements with CTs including cable

    connections and cleat arrangement 8895 940

    7 Installation of A type distribuion box 7558 162

    8 Installation of HT Lightening Arrestors 5172 605

    9 Misc. Items 500

    Total Cost of Material 1,98,222 16,645

    3% storage & handling charges on items (1) to (8) 5932

    3% Contingencies on Materials 5947

    Labour & Transport 16,645

    11% Estt. & Genl. Charges on Materials 21804

    1% cess 2485

    2,51,035

    or say : 2,51,040

    25. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981

    COST DATA FOR ERECTION OF 100KVA-11KV/433V CONVENTIONAL TRANSFORMER

    Total Cost in Rs.

    37

  • 8/10/2019 Epdcl Cost Data 2013-14

    40/58

    Sl. No. ParticularsCost of Material

    (Rs.)

    Labour & Transport

    (Rs.)

    111 KV/433V 63KVA Conventional Distribution

    Transformer

    103237 3,213

    2 Erection of 11 KV AB Switch (200A) 7349 909

    3 D.P.Structure (Including all Earthing) 28810 9,702

    4 Erection of 11 KV H.G. Fuse set 1889 388

    5Installation of L.T.H.G. Fuse sets (2 Nos.) including

    connections2626 726

    6LT Metering arrangements with CTs including cable

    connections and cleat arrangement

    8895 940

    7 Installation of A type distribuion box 7558 162

    8Installation of HT Lightning Arrestors with earth

    connection5172 605

    9 Misc. Items 420

    Total Cost of Material 1,65,956 16,645

    3% storage & handling charges on items 1 to 8 4,966

    3% Contingencies on Materials 4,979

    Labour & Transport 16,645

    11% Estt. & Genl. Charges on Materials 18255

    1% cess 2,108

    Total Cost in Rs. 2,12,909

    or say : 2,12,910

    26. COST DATA FOR ERECTION OF 63KVA-11KV/433V CONVENTIONAL TRANSFORMER

    38

  • 8/10/2019 Epdcl Cost Data 2013-14

    41/58

    Sl. No. ParticularsCost of Material

    (Rs.)

    Labour & Transport

    (Rs.)

    111 KV/433V 16KVA Conventional Distribution

    Transformer60485 613

    2 Erection of 11 KV AB Switch (200A) 7349 909

    3Single Pole.Structure with 9.1Mtr PSCC Pole

    (Including Earthing)13248 3,448

    4 Erection of 11 KV H.G. Fuse set 1889 388

    5CT Distribution box including CT wiring with 1x25

    sqmm XLPE cable and cleat wiring12640 253

    6Misc. Items(Danger boards,Bolts &Nuts,Concreting

    etc.)1650 214

    Total Cost of Material 97261 5825

    3% storage & handling charges on items (1) to (5) 2,868

    3% Contingencies on Materials 2,918

    Labour & Transport 5,825

    11% Estt. & Genl. Charges on Materials 10699

    1% cess 1,196

    Total Cost in Rs. 1,20,767

    or say : 1,20,770

    27. Cost Data For Erect ion of 3 Phase 16 KVA-11KV/433V

    Conventional Distribution Transformer On Single Pole Structure

    39

  • 8/10/2019 Epdcl Cost Data 2013-14

    42/58

    Sl. No. ParticularsCost of Material

    (Rs.)

    Labour & Transport

    (Rs.)

    111 KV/433V 25KVA Conventional Distribution

    Transformer70115 673

    2 Erection of 11 KV AB Switch (200A) 7349 909

    3Single Pole.Structure with 9.1Mtr PSCC Pole

    (Including Earthing)13248 3,448

    4 Erection of 11 KV H.G. Fuse set 1889 388

    5CT Distribution box including CT wiring with 1x50

    sqmm XLPE cable and cleat wiring17766 252

    6Misc. Items(Danger boards,Bolts &Nuts,Concreting

    etc.)1500 196

    Total Cost of Material 1,11,866 5,866

    3% storage & handling charges on items (1) to (5) 3,311

    3% Contingencies on Materials 3,356

    Labour & Transport 5,866

    11% Estt. & Genl. Charges on Materials 12305

    1% cess 1,367

    Total Cost in Rs. 1,38,072

    or say : 1,38,070

    28. Cost Data For Erect ion of 3 Phase 25 KVA-11KV/433V

    Conventional Distribution Transformer On Single Pole Structure

    40

  • 8/10/2019 Epdcl Cost Data 2013-14

    43/58

    Sl. No. ParticularsCost of Material

    (Rs.)

    Labour & Transport

    (Rs.)

    111 KV/433V 40KVA Conventional Distribution

    Transformer96748 542

    2 Erection of 11 KV AB Switch (200A) 7349 909

    3Single Pole.Structure with 9.1Mtr PSCC Pole

    (Including Earthing)13248 3,448

    4 Erection of 11 KV H.G. Fuse set 1889 388

    5CT Distribution box including CT wiring with 1x70

    sqmm XLPE cable and cleat wiring21781 238

    6Misc. Items(Danger boards,Bolts &Nuts,Concreting

    etc.)1500 196

    Total Cost of Material 1,42,514 5,721

    3% storage & handling charges on items (1) to (5) 4,230

    3% Contingencies on Materials 4,275

    Labour & Transport 5,721

    11% Estt. & Genl. Charges on Materials 15677

    1% cess 1,724

    Total Cost in Rs. 1,74,142

    or say : 1,74,140

    29. Cost Data For Erection of 3 Phase 40 KVA-11KV/433V

    Conventional Distribution Transformer On Single Pole Structure

    41

  • 8/10/2019 Epdcl Cost Data 2013-14

    44/58

    Sl. No. ParticularsCost of Material

    (Rs.)

    Labour & Transport

    (Rs.)

    1 9.1 Mtr PSCC Pole 3105 994

    2 15KVA Single Phase CSP Distribution Transformer 34595 285

    3 Mounting arrangements for transformer 2743 618

    4Earthing with 1No 2.5 Mts Long 75 mm CI earth

    pipe3134 431

    5

    Distribution box with 1 No 100A Fuse unit and cleat

    wiring with 50 sqmm XLPE cable & LT side arm

    with strut

    6401 303

    6Misc. Items(Danger boards,Bolts &Nuts,Concreting

    etc.)1000

    Total Cost of Material 50,978 2,631

    3% storage & handling charges on items (1) to (5) 1,499

    3% Contingencies on Materials 1,529

    Labour & Transport 2,631

    11% Estt. & Genl. Charges on Materials 5608

    1% cess 622

    Total Cost in Rs. 62,868

    or say : 62,870

    30. Cost Data For Erection of Single Phase 15 KVA-6.3KV/0-240V

    CSP Transformer(Oil immersed) On 9.1Mtr PSCC Pole Support

    42

  • 8/10/2019 Epdcl Cost Data 2013-14

    45/58

    Sl.No. Particulars Qty.

    Rate in

    Rs. Per Unit

    Amount in

    Rs.

    1 15KVA Single Phase CSP Distribution Transformer 1 No. 34,595 Each 34,595

    2 Mounting arrangements for Transformer 1 Set 2,743 Each 2,743

    3 Pipe earthing 1 No. 808 Each 808

    4 Misc. Items L.S. L.S. L.S. 500

    Total Cost of Material 38,646

    3% storage & handling charges on items (1) to (3) 1,144

    3% Contingencies on Materials 1,159

    Labour & Transport 2,592

    11% Estt. & Genl. Charges On Materials 4,251

    1% Cess 478

    Total Cost in Rs. 48,271

    Or say : 48,270

    31. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981

    COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V

    C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT

    43

  • 8/10/2019 Epdcl Cost Data 2013-14

    46/58

    Sl.No. Particulars Qty.

    Rate in

    Rs. Per Unit

    Amount in

    Rs.

    115 KVA Oil Immersed Single Phase 6.3KV/0-240V

    Amorphous Metal Core Transformer1 No. 37,522 Each 37,522

    2 Mounting arrangements for Transformer 1 Set 2,743 Each 2,743

    3 Pipe earthing 1 No. 808 Each 808

    4 Misc. Items L.S. L.S. L.S. 500

    Total Cost of Material 41,573

    3% storage & handling charges on items (1) to (3) 1,232

    3% Contingencies on Materials 1,247

    Labour & Transport 2,403

    11% Estt. & Genl. Charges On Materials 4,573

    1% Cess 510

    Total Cost in Rs. 51,539

    Or say : 51,540

    COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V

    AMORPHOUS METAL CORE C.S.P TRANSFORMER (OIL IMMERSED)

    ON EXISTING 8M PSCC SUPPORT

    32. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981

    44

  • 8/10/2019 Epdcl Cost Data 2013-14

    47/58

    Sl.No. Particulars Qty.Rate in

    Rs.Per Unit

    Amount

    in Rs.

    1 1 Phase (5-20A) Energy meter 1 730 Each 730

    2 1 Phase 15A M.C.B./Fuse Unit 1 120 Each 120

    3 P.V.C. Cable 6 Sq.mm Single Core 20 28 Each 560

    4 Moulded Distribution Box 1 250 Each 250

    5 P.V.C. Bends 38mm 1 22 Each 22

    6 Bolts, Nuts etc. L.S. L.S. L.S. 80

    Total Cost of Material 1,762

    3% Contingencies 53

    Labour & Transport 1,076

    11% Estt. & Genl. Charges 194

    1% Cess 31

    Total Cost in Rs. 3,115

    Or say : 3,120

    33. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H1&H3/1981

    COST DATA FOR SINGLE PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT

    45

  • 8/10/2019 Epdcl Cost Data 2013-14

    48/58

    Sl.No. Particulars Qty.Rate in

    Rs.

    Per UnitAmount

    in Rs.

    1 3 Phase (10A-40A ) Energy meter 1 1,869 Each 1,869

    2 3 Phase 40A M.C.B./Fuse Unit (3 Nos.) 1 729 Each 729

    3 P.V.C. Cable 6 Sq.mm Single Core 30 28 Each 840

    4 Moulded Distribution Box 1 420 Each 420

    5 Installation of 2KVAR Capacitor 1 500 1 500

    6

    Misc. items such as Bolts, Nuts & Board

    etc. L.S. L.S. L.S. 80

    Total Cost of Material 4,438

    3% Contingencies 133

    Labour & Transport 1,739

    11% Estt. & Genl. Charges 488

    1% Cess 68

    Total Cost in Rs. 6,866Or say : 6,870

    34. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H6&H8/1981

    COST DATA FOR RELEASE OF POLY PHASE AGRICULTURE SERVICE ERECTED ON

    SUPPORT

    46

  • 8/10/2019 Epdcl Cost Data 2013-14

    49/58

    Qty . Amount Qty. Amount

    1Single Phase electronic Energy Meter

    5-30A846 1 846 846

    2 15A M.C.B./Fuse Unit 120/E 1 120 120

    3 P.V.C. Cable single core 2.5 Sq.mm 20/M 60 1200 1200

    4 Moulded Distribution Box 250/E 1 250 250

    5 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    6 P.V.C. Pipe 20mm 25/M 2 M 50 50

    7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10

    8 Misc. L.S 85 85

    Total 1216 1405 2621

    3% Contingencies on Materials 36 42 79

    Labour & Transport 202 430 633

    11% Estt. & Genl. Charges 134 155 288

    1% Cess 36

    Total Cost in Rs. 1589 2032 3,657

    Or say : 3,660

    Note :Item Nos. 4 to 7 are to be borne &

    arranged by the Consumer.

    35. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981

    COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)

    WITH QUALITY METER

    Sl. No. Particulars RateChargable to Chargable to Amount in

    Rs.

    47

  • 8/10/2019 Epdcl Cost Data 2013-14

    50/58

    Qty . Amount Qty. Amount

    1Single Phase electronic Energy Meter

    2.5-10A447 1 447 447

    2 15A M.C.B./Fuse Unit 115/E 1 120 120

    3 P.V.C. Cable single core 2.5 Sq.mm 20/M 60 1200 1200

    4 Moulded Distribution Box 250/E 1 250 250

    5 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    6 P.V.C. Pipe 20mm 25/M 2 M 50 50

    7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10

    8 Misc. L.S 85 85

    Total 817 1405 2222

    3% Contingencies on Materials 25 42 67

    Labour & Transport 202 430 633

    11% Estt. & Genl. Charges 90 155 244

    1% Cess 32

    Total Cost in Rs. 1134 2032 3,197

    Or say : 3,200

    Note :Item Nos. 4 to 7 are to be borne &

    arranged by the Consumer.

    36. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981

    COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)

    WITH ELECTRONIC METER

    Sl. No. Particulars Rate

    Chargable to

    DISCOM

    Chargable to

    Consumer

    Amount in

    Rs.

    48

  • 8/10/2019 Epdcl Cost Data 2013-14

    51/58

    Qty . Amount Qty. Amount

    1Single Phase Quality Energy Meter

    5-20A730 1 730 730

    2 15A M.C.B./Fuse Unit 120/E 1 120 120

    3 P.V.C. Cable single core 2.5 Sq.mm 20/M 60 1200 1200

    4 Moulded Distribution Box 250/E 1 250 250

    5 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    6 P.V.C. Pipe 20mm 25/M 2 M 50 50

    7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10

    8 Misc. L.S 85 85

    Total 1100 1405 2505

    3% Contingencies on Materials 33 42 75

    Labour & Transport 202 430 633

    11% Estt. & Genl. Charges 121 155 276

    1% Cess 35

    Total Cost in Rs. 1456 2032 3,523

    Or say : 3,520

    Note :Item Nos. 4 to 7 are to be borne &

    arranged by the Consumer.

    37. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981

    COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)

    WITH QUALITY METER

    Sl. No. Particulars Rate

    Chargable to

    DISCOM

    Chargable to

    Consumer

    Amount in

    Rs.

    49

  • 8/10/2019 Epdcl Cost Data 2013-14

    52/58

    Qty . Amount Qty. Amount

    1Three Phase electronic Energy Meter 10-

    40A1869 1 1869 1869

    2 3 Phase 60A M.C.B./Fuse Unit 955/E 1 955 955

    3 Moulded Distribution Box 420/E 1 420 420

    4 P.V.C. Cable single core 6 Sq.mm 28/M 120 3360 3360

    5 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    6 P.V.C. Pipe 20mm 25/M 2 M 50 50

    7 P.V.C. Bends 20mm 5/E 2 Nos. 10 10

    8 Misc. L.S 95 95

    Total 3244 3575 6819

    3% Contingencies on Materials 97 107 205

    Labour & Transport 202 430 633

    11% Estt. & Genl. Charges 357 393 750

    1% Cess 84

    Total Cost in Rs. 3901 4506 8,490

    Or say : 8,490

    Note :Item Nos. 4 to 7 are to be borne &

    arranged by the Consumer.

    Rate

    Chargable to

    DISCOM

    Chargable to

    Consumer

    Amount in

    Rs.

    38. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981

    COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)

    Sl. No. Particulars

    50

  • 8/10/2019 Epdcl Cost Data 2013-14

    53/58

    Qty . Amount Qty. Amount

    13 Phase Electronic Energy Meter Housed

    in box 10-40A1869 1 1869 1869

    2 3 phase 60A M.C.B./Fuse Unit 955/E 1 955 955

    3 P.V.C. Cable single core 6 Sq.mm 28/M 120 Mts. 3360 3360

    4 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    5 P.V.C. Pipe 20mm 25/M 2 M 50 50

    6 P.V.C. Bends 20mm 5/E 2 Nos. 10 10

    7 Misc. L.S 95 95

    Total 2824 3575 6399

    3% Contingencies on Materials 85 107 192

    Labour & Transport 405 557 961

    11% Estt. & Genl. Charges 311 393 704

    1% Cess 83

    Total Cost in Rs. 3624 4632 8,339

    Or say : 8,340

    Note :Item Nos. 4 to 7 are to be borne &

    arranged by the Consumer.

    Sl. No. Particulars Rate

    Chargable to

    DISCOM

    Chargable to

    Consumer

    Amount in

    Rs.

    COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)

    WITH ELECTRONIC METER

    39. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981

    51

  • 8/10/2019 Epdcl Cost Data 2013-14

    54/58

    Qty . Amount Qty. Amount

    1Poly Phase Energy Meter housed 10 -

    40A1869 1 1869 1869

    2 3 phase 60A M.C.B./Fuse unit 955/E 1 955 955

    3 Moulded Box for CT Meter 1647/E 1 1647 1647

    4 P.V.C. Cable single core 10 Sq.mm 43/M 80 3440 3440

    5 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    6 P.V.C. Pipe 38mm 41.4/M 2 M 83 83

    7 P.V.C. Bends 38mm 22/E 2 Nos. 44 44

    8Misc. items viz. link clips, wooden box,

    Bolts & Nuts.L.S 75 125 200

    Total 4546 3752 8298

    3% Contingencies 136 113 249

    Labour & Transport 405 557 961

    11% Estt. & Genl. Charges 500 413 913

    1% Cess 104

    Total Cost in Rs. 5587 4834 10,525

    Or say : 10,530

    40. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981

    POLY PHASE SERVICE CONNECTION CHARGES FOR

    ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.)

    Sl. No. Particulars Rate Chargable toDISCOM Chargable toConsumer Amount inRs.

    52

  • 8/10/2019 Epdcl Cost Data 2013-14

    55/58

    Qty . Amount Qty. Amount

    1

    L.T. 3-Phase class-0.5 Accuracy CT

    Operated Electronic TVR Meter Housed in

    a box

    6525 1 6525 6525

    2 P.V.C. Cable single core 10 Sq.mm 43/M 80 3440 3440

    3 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    4 P.V.C. Pipe 38mm 41.4/M 2 M 83 83

    5 P.V.C. Bends 38mm 22/E 2 Nos. 44 44

    6Misc. items viz. link clips, wooden box,

    Bolts & Nuts.L.S 75 100 175

    Total 6600 3727 10327

    3% Contingencies 198 112 310

    Labour & Transport 405 557 961

    11% Estt. & Genl. Charges 726 410 1136

    1% Cess 127

    Total Cost in Rs. 7929 4805 12,861

    Or say : 12,860

    41. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981

    COST DATA FOR POLY PHASE SERVICE CONNECTION CHARGES FOR

    ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.) (C T METER)

    Sl. No. Particulars Rate Chargable toDISCOM Chargable toConsumer Amount inRs.

    53

  • 8/10/2019 Epdcl Cost Data 2013-14

    56/58

    Qty. Amount Qty. Amount

    1

    L.T. 3-Phase class-0.5 Accuracy CT

    Operated Electronic TVR Meter Housed in

    a box

    6525 1 6525 6525

    2 P.V.C. Cable single core 10 Sq.mm 43/M 80 3440 3440

    3 G.I. Wire No.8 60/Kg 1 Kg. 60 60

    4 P.V.C. Pipe 38mm 41.4/M 2 M 83 83

    5 P.V.C. Bends 38mm 22/E 2 Nos. 44 44

    6Misc. items viz. link clips, wooden box,

    Bolts & Nuts.L.S 75 100 175

    Total 6600 3727 10327

    3% Contingencies 198 112 310

    Labour & Transport 405 557 961

    11% Estt. & Genl. Charges 726 410 1136

    1% Cess 127

    Total Cost in Rs. 7929 4805 12,861

    Or say : 12,860

    42. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981

    COST DATA FOR POLY PHASE SERVICE CONNECTION FOR

    ERECTION OF 1 NO. INDUSTRIAL SERVICE (ABOVE 15 H.P.) (C.T. METER)

    Sl. No. Particulars Rate

    Chargable to

    DISCOM

    Chargable to

    Consumer

    Amount in

    Rs.

    54

  • 8/10/2019 Epdcl Cost Data 2013-14

    57/58

    Sl. No. Particulars Qty.Rate

    in Rs.Per Unit

    Amount

    in Rs.

    1 LT 1 phase Electronic Meter 5-30A 1 No. 846 Each 846

    2 1 phase 15A M.C.B./Fuse Unit 1 No. 120 Each 120

    3 Light sensitive switch 1 No. 400 Each 400

    4 P.V.C. Cable 4 Sq.mm Single Core 15 M 30 Each 450

    5 P.V.C. Pipe 25mm 2 Mts 39.5 Each 79

    6 P.V.C. Bends 25mm 2 No. 6.0 Each 12

    7 Moulded Distribution Box 1 No. 250 Each 250

    8 Wooden, plugs, clamps, bolts, L.S. L.S. L.S. 50

    nuts link clips etc

    Total 2,207

    3% Contingenics 66

    Labour & Transport 759

    11% Estt. & Genl. Charges 243

    1% Cess 33

    Total Cost in Rs. 3,308

    Or say : 3,310

    43. COST DATA FOR STREET LIGHT SERVICE CONNECTION (SINGLE PHASE)

    55

  • 8/10/2019 Epdcl Cost Data 2013-14

    58/58

    Sl.

    NoParticulars Qty.

    Rate

    (Rs. in lakhs)Unit

    Amount

    (Rs. in lakhs)

    1 (a) Lands and Rights LS

    As per local

    conditions 0.000

    (b) Plantation of Trees LS LS 0.061

    2Control Room and Consumer service centre

    (including furniture)LS LS 5.000

    3 Station Auxillaries

    a)Peripheral, Security Fencing, Approach road, retaing wall around switchward with gravel

    filling, gate and bore wellLS LS 10.000

    b) Yard lighting 0.600

    c) Fire fighting Equipment LS LS 0.660

    d) P&T Phone and wireless set LS LS 1.500

    4 Foundations for structures, PTRs & breakers LS LS 3.000

    5 Bus bars, Jumpers, Connectors claps etc. LS LS 1.200

    6 Control Cables LS LS 1.080

    7 Structural Steel 15 0.562 MT 8.423

    8 Transformers

    a) 33/11KV, 5 MVA Power Transformer 1 31.695 Each 31.695

    b) 11KV/ 415V 16KVA Stn. Transformer 1 0.605 Each 0.605

    9 Circiut Breakres (including trivector meters)

    a) 20 KA 11 kv feeder VCB including Control panel and CTs (NF=3) 3 2.156 Each 6.467

    b) 20 KA 11 kv LV VCB including Control panel and CTs 1 2.342 Each 2.342

    10 Control Circiut Panels

    a) AC Supply Panel 1 0.330 Each 0.330

    b) DC Aunnciation Panel 1 0.330 Each 0.330

    11 Instrument Transformers

    a) 11kv P.T (3 Phase) 1 0.158 Each 0.158

    12 Lightning Arrestorsa) 33KV 10KA 6 0.031 Each 0.185

    b) 11KV Line Type (NFX3) 9 0.017 Each 0.155

    c) 11KV Station Type 10 KA 3 0.017 Each 0.052

    13 Isolating Switches

    a) 33KV 800A double break centrally operated Horizantal AB Switch 3 0.420 Each 1.260

    b) 11KV 800A double break centrally operated Horizantal AB Switch (NT X 1+1) 2 0.199 Each 0.399

    c) 11KV 400A Horizantal AB Switch (NF X 2+2) 8 0.137 Each 1.099

    d) 11KV 200A Horizantal AB Switch for station transformer 1 0.073 Each 0.073

    e) 33KV Horn Gap Fuse Set (1XNT) 1 0.095 Each 0.095

    14 2MVAR 11KV Capacitor Bank along with Associated Equipment 1 10.000 Each 10.000

    15 24V, 40 AH Battery Set including Battery Charger 4 0.159 Each 0.636

    16 Earthing of PTR, VCBs, AB Swicthes, Strucutres with 75x8mm GI Flat LS 1.815

    Sub Total 89.219

    17 Erection and transport and commissioning charges on items 7 to 15 at 10% 6.430

    18 Contingencies on items 7 to 15 at 3% 1.929

    19 T&P Charges on items No. 7 to 15 at 1% 0.643

    44. DETAILED ESTIMATE FOR ERECTION OF 1No. 33/11 KV SUBSTATION

    WITH (NT) X 5 MVA POWER TRANSFORMERS AND NF = 3 NO. 11 KV FEEDERS