Engineering and PSG Holdings acknowledge and pay respect ...

12
Lendlease Engineering and PSG Holdings acknowledge and pay respect to the Kamilaroi people and their Elders, both past and present, as the traditional custodians of this land

Transcript of Engineering and PSG Holdings acknowledge and pay respect ...

Page 1: Engineering and PSG Holdings acknowledge and pay respect ...

1

Lendlease Engineering and PSG Holdings acknowledge and pay respect to the Kamilaroi people and their Elders, both past and present, as the traditional custodians of this land

Presenter
Presentation Notes
[1min] – Jim starts then hands over to Mariah
Page 2: Engineering and PSG Holdings acknowledge and pay respect ...

•The Team

•The Project

•Working Together

•What Makes us Different

•Next Steps

2

AGENDA

Presenter
Presentation Notes
[30sec] - Jim
Page 3: Engineering and PSG Holdings acknowledge and pay respect ...

3THE TEAM

Jim Maniord- Project Director

David Houston - Construction Manager

Steve Cruwys- Production Manager

Alli Devlin - Local Industry Rep

Mariah Gordon - Indigenous Partner Rep

Presenter
Presentation Notes
[3min] – Jim followed by the team Each person 30secs Name Role Background Regional experience/highlight
Page 4: Engineering and PSG Holdings acknowledge and pay respect ...

Global PPT Deck June 2019

We are tendering for the N2NS Inland Rail Project

4THE PROJECT – N2NS SP1

Presenter
Presentation Notes
[30sec] - Jim Narrabri to North Star – Separable Portion 1 is a brownfield section and involves upgrading works within the existing ARTC rail corridor. �Description of works involved:  Upgrading approximately 171km of track and formation within the existing rail corridor  Constructing 2 new road over rail bridges at Moree (Jones Ave) and Bellata (Newell Highway)  Constructing 5 new crossing loops with associated maintenance sidings  Constructing 220 rail culverts, 98 road culverts, 3 irrigation crossings.  Constructing 8 under - bridges,1 of which are major super-T structure to 30TAL  Upgrading, relocating or consolidating 76 level crossings including 5 pedestrian crossings  Relocating utilities and mitigating impacts at 470 locations  Modifying Moree and Narrabri stations.
Page 5: Engineering and PSG Holdings acknowledge and pay respect ...

Global PPT Deck June 2019

WE TRAIN AND RECRUIT LOCALLY

LET’S WORK TOGETHER

5

Presenter
Presentation Notes
[30sec] - David We train and recruit locally. This is not just a 2-year project, it’s a lifelong relationship. There is a major pipeline of work; this is not just a one-off. We are committed to providing opportunities to stimulate the local economy. We want you to benefit from a: Steady income Lifelong skills Industry connections
Page 6: Engineering and PSG Holdings acknowledge and pay respect ...

6

WHODOWENEED?

Presenter
Presentation Notes
[1min] - David
Page 7: Engineering and PSG Holdings acknowledge and pay respect ...

7

WHATBUSINESSESDOWENEED?

Presenter
Presentation Notes
[1min] - David …We will be bringing $ into the community. Kids will go to your schools, people will eat at your restaurants…
Page 8: Engineering and PSG Holdings acknowledge and pay respect ...

Global PPT Deck June 2019 8

WHAT MAKES US DIFFERENT?1. Proven Track Record

2. Commitment to working with local people

Presenter
Presentation Notes
[30sec] – Jim
Page 9: Engineering and PSG Holdings acknowledge and pay respect ...

WE HAVE DONE THIS BEFORE… 9

Item Project Name Location Value Client

1 Wiggins Island Rail Project Dingo to Bluff, QLD $72m Aurizon Holding Ltd

2 Ballarat Line Upgrade Western Suburbs, Melbourne, VIC $500m Rail Projects Victoria

3 Epping to Thornleigh Third Track

Epping, NSW $334m TfNSW

4 Level Crossing Removal Project

Caulfield to Dandenong, VIC $2.7bn Level Crossing Removal Authority

5 Blue Mountains Route Clearance

Blue Mountains, NSW $74.5m TfNSW

6 Hunter Expressway Hunter Valley, NSW $611m RMS

7 Regional Rail Link City to Maribyrnong River, VICDeer Park to West Werribee, VIC

$500m$505m

Regional Rail Link Authority

8 Pacific Highway Oxley Highway to Kundabung, NSW $612m RMS

9 Southern Program Alliance South Eastern Melbourne Suburbs, VIC $588m Metro Trains Melbourne

Presenter
Presentation Notes
[2min] - Jim LLE has a proven history of successfully and safely delivering large scale, complex infrastructure projects. LLE works across NSW, Queensland, Victoria and South Australia. Works includes the design, construction and maintenance of: Rail in urban and regional environments Road infrastructure Bridges over land and marine environments Tunnels in rural and urban environments for road and rail This includes…
Page 10: Engineering and PSG Holdings acknowledge and pay respect ...

Benefits for the Region…

1. Business Opportunity - onboarding support, mentoring, capacity-building, capability development, networking events.

2. Employment - training centres, connect and upskill job seekers, internship & apprenticeship programs, career development, mentoring, regular performance reviews.

10

Presenter
Presentation Notes
[2min] – Alli We want you to benefit from the incredible opportunities this project will provide. It is in our interests to work with you to develop the skills of individuals and businesses so that we can successfully deliver this project, as well as many thereafter. We invest in you because we want to create long-lasting relationships and work on project after project with you. We are investing now for the future. Our workforce stays with us. It is not uncommon to hear people saying that they have worked with LLE for 10, 20 years. Providing employment opportunities that help local economies thrive is not news to us. We have a positive track record when it comes to employing local people and businesses. In past projects we have achieved well beyond the client’s expectations; in fact we have achieved over 80% of total spend to local and regional businesses (<125km) and 90% total employment to local and regional people. Our precast yard in Macksville is the largest local employer and has been for the past 10 years. We need you and will invest in you. Ultimately, we care about our people.
Page 11: Engineering and PSG Holdings acknowledge and pay respect ...

Global PPT Deck June 2019 Next Steps

21st & 22nd Jan: Share your contact details and capability statements with us. Submit ROI on ICN gateway.

26th June: Contract awarded.

1st Sep: Planned site mobilisation.

Key contact

[email protected]+61 447 172 168

11

Presenter
Presentation Notes
[1min] - Jim
Page 12: Engineering and PSG Holdings acknowledge and pay respect ...

Thank You