Engineering and Operations Committee Item 6a December 10, 2018
E&O Committee Item 6a Slide 2 December 10, 2018
Demonstration project
Status of construction
Near-term regulatory testing
Potential future testing for process optimization & development of design criteria
Full-scale program planning
E&O Committee Item 6a Slide 3 June 11, 2018
MBR – Membrane
Modules
Reverse Osmosis
Chemical Feed Systems UV Light/Advanced Oxidation Process
MBR – Aerobic and Anoxic
Tanks
E&O Committee Item 6a Slide 4 December 10, 2018
Contract amount: $13,856,000
Capital budget: $17M
2-yr O&M budget: $9.8M
Construction contract approximately 85% complete
Construction complete: December 2018
Start-up and commissioning: Jan/Feb 2019
E&O Committee Item 6a Slide 5 December 10, 2018
Electrical
Building
Chemical
Storage &
Unloading
RO & UV/AOP
Equipment
MBR
Aeration
& Anoxic
Basins
E&O Committee Item 6a Slide 6 December 10, 2018
Outreach
Trailer Pad
MBR
Systems
Chemical
Storage &
Unloading
Operations
Trailer
Substation
RO &
UV/AOP
Equipment
E&O Committee Item 6a Slide 7 December 10, 2018
Membrane
Modules
Aeration
Blowers
Membrane
Scour Blower
Anoxic Basin
Aeration Basin
Drum Screen
E&O Committee Item 6a Slide 8 December 10, 2018
MBR-1
(GE/Suez)
MBR-2
(Evoqua)
E&O Committee Item 6a Slide 9 December 10, 2018
Motor Control Center
Chemical Feed Skids
RO Skid
E&O Committee Item 6a Slide 10 December 10, 2018
Air Diffuser
Bubble
Testing
E&O Committee Item 6a Slide 11 December 10, 2018
Provide data for regulatory acceptance
Confirm viability of membrane bioreactor (MBR) process
Optimize full-scale treatment process design
Establish cost clarity for treatment
Confirm operational dependencies/ interfaces with LACSD
Provide vehicle for public outreach and acceptance
INITIAL TESTING PERIOD
FUTURE TESTING PERIOD
ONGOING
E&O Committee Item 6a Slide 12 December 10, 2018
Primary focus
Demonstrate pathogen removal
Achieve regulatory acceptance of MBR
Water quality from all unit processes will be monitored to ensure treatment goals are met
LACSD will characterize JWPCP source water & brine/waste streams from the AWT process
MBR Regulatory Acceptance
E&O Committee Item 6a Slide 13 December 10, 2018
Draft plan submitted in early October
Plan incorporated input from Independent Scientific Advisory Panel
Regulatory approval of final plan anticipated in early 2019
January 2019 meeting scheduled to review final plan
Testing to begin in March 2019 for 15-month duration
E&O Committee Item 6a Slide 14 December 10, 2018
Process Optimization/Design Criteria Development
Follows initial MBR regulatory testing Future Board funding request
Similar to use of ODP for Oxidation Retrofit Program
Key areas of investigation Nitrogen management
Source control
Product water stabilization
Brine and residuals management
E&O Committee Item 6a Slide 15 December 10, 2018
Construction/Commissioning
Facility Opening Event
MBR Regulatory Testing
Process Optimization & Design Criteria Development
Construction (funded) Completion
Initial Operations and Regulatory Acceptance (funded)
Process Optimization and Design Criteria (future funding required)
E&O Committee Item 6a Slide 16 December 10, 2018
Feasibility Report (completed Nov. 2016)
Determined that 150 MGD program “could” be implemented
Did not answer questions: “how or should” program be implemented
Conceptual Report (scheduled Feb. 2019)
Examines and refines approaches as to “how” program could be implemented
Update to Board in March 2019
E&O Committee Item 6a Slide 17 December 10, 2018
Refines approach to overall program configuration
Examines potential options for phasing program
Presents cost estimate in 2018 dollars, and cost comparison between alternatives
Provides early assessment of potential future opportunities for DPR
E&O Committee Item 6a Slide 18 December 10, 2018
Conceptual Planning Studies Report
Assessment of IRP, Rates, and Terms
Board Workshops on RRWP
Studies Completion
Assessment Board Action
Board Workshops Board Update
E&O Committee Item 6a Slide 19 December 10, 2018
Outreach trailer for visitors
Exhibits & displays
Facility opening event on March 21, 2019
Tours for public & stakeholders