Case Study: Energy Audit & Energy Management System for Bangunan Sultan Iskandar, Johor Bahru Green 3 Sdn Bhd (1016942-X)
GREEN 3 SDN. BHD
THE SMARTER ENERGY MANAGEMENT COMPANY
OUR MISSION
“We strive to become a leading service provider in green technology, energy efficiency and sustainability in Malaysia and Southeast Asia”
Our Services
GREEN BUILDING INDEX
FACILITY AND ENERGY AUDIT
ENERGY MANAGEMENT SYSTEM
ENERGY PERFORMANCE CONTRACTING
ASHRAE in its publication said that 80% of the built environment that will be used in 2030 have already been constructed. The real question now is are we treating our buildings and or environment the rightful way?
Who we areAZIZAH KASSIM, PRINCIPAL DIRECTOR• 20 years experience, 17 years in Energy Management, Green Technology and Sustainability• Registered Electrical Energy Manager• Certified Energy Manager• Certified Energy Auditor (AEE)• Certified Professional In Measurement & Verification (CPMV)• GBI (Green Building Index) Facilitator• Certified HRDC Trainer• Conducted more than 50 building energy audits for building & industrial in Malaysia, Hong
Kong, Dubai & Australia• Trained more than 500 professional in energy management and energy efficiency
Who we are – Our key staffsAMIL HJ MD FUAT, SENIOR ENERGY ENGINEER• Amil has 14 years of combined experience in Energy Management, Project
Management, Metal Fabrication, Mechanical Erection & Material Handling. He is a certified Internal Auditor for ISO 9001:2008.
FAZLI MOHAMAD, ENERGY ENGINEER.• Fazli graduated in 2002 in BSs (Hons). In Chemical Engineering from University
Technology PETRONAS.Fazli’s responsibilities include Energy Audit & Development of Energy Management System and Implementation for Custom, Immigration and Quarantine Complex, Gerbang Perdana, Jalan Tengku Azizah, Bukit Chagar, Johor Bahru.
HAMED KHAJEH ARZANI – Energy AnalystASHWIN MENON – Electrical Engineer (Power Logging)
Our Track Records (2012 – present)• Energy Audit for 2G5&2G6 - Malaysian Entrepreneur Development Centre
(MEDC) & National Registration Department (NRD), Putrajaya• Energy Audit for 4G11 - Ministry of Women, Family & Community Development
building (KPWKM), Putrajaya• Training, Workshop & Consultation for 25 Resident Energy Managers of
International Islamic University Malaysia (IIUM), Kuala Lumpur• Energy Audit for 5G2 - Ministry of Higher Learning Education & Ministry of
Tourism (KPL & KPT) buildings, Putrajaya• Energy Audit for 4G9 - Ministry of Communication & Multimedia building (KPKK),
Putrajaya• Implementation of Energy Management System (EMS) for 4G8 - Ministry of Rural
and Regional Development (KKLW) building, Putrajaya
Our Track Records• Implementation of Energy Management System (EMS) for 4G11 - Ministry of
Women, Family & Community Development (KPWKM) building, Putrajaya• Development of Training Material in “Building Energy Audit” for Sustainable
Energy Development Authority (SEDA), Malaysia• Energy Audit & Development of Energy Management System and
Implementation for Custom, Immigration and Quarantine Complex, Gerbang Perdana, Jalan Tengku Azizah, Bukit Chagar, Johor Bahru, 2012 - Present
• Energy Audit for 4G4 - Kementerian Belia & Sukan, Putrajaya, 2014• Energy Management System (REEM Services) for Spirit Aerosystem (M) Sdn Bhd• Energy Audit for Kementerian Pengangkutan Malaysia (4G5), Kementerian
Kemajuan Luar Bandar & Wilayah, Kementerian Perumahan (4G8), Kerajaan Tempatan dan Kesejahteraan Bandar (4G10) and Kementerian Pembangunan Wanita, Keluarga & Masyarakat (4G11), 2015 - present
Case Study: Bangunan Sultan Iskandar
BSI BUILDING
JB SENTRAL
Also known as Customs, Immigration & Quarantine Complex (CIQ), / Gerbang Perdana
Building Information• Owner/Client: Property Management Unit, Prime Minister Department (Bahagian
Pengurusan Hartanah, Jabatan Perdana Menteri)• Gross Floor Areas 232,031 square meters• 22 agencies. Jabatan Imigresen & Jabatan Kastam Diraja Malaysia are largest users • Approximately 3,000 occupants, 400+ sub-contractors• 91 Million Public Users Per annum• Approximately 50% of the total areas operating 24 hours per day, 365 days per year.• Remaining areas operating in staggered office hours 7:00 AM to 5:30 PM, Monday – Friday. • Facility Management Company: Global Facilities Management Sdn Bhd (GFM)• Energy Consultant: Green 3 Sdn Bhd (1016942-X)
Introduction• Energy consumption has been in increasing trend since building
commissioning until 2012. • Since new facility management company taken over the building management
in Dec 2012, a new energy team has been set-up and successfully implemented Energy Management programme, with no investment needed.
• Annual energy consumption in 2014 was 30.9 Million kWh, reduced by 7.2% to 28.7 Million kWh in 2015. Average bill RM 1 Million Per Month
• Energy Management Programme started with Awareness Seminar, Training and Workshops with both End Users and Facility Management team.
• Developed Energy Policy, Energy Management Committee and Action Plan. • Energy Audit Level 2 was conducted and identified few measures which was
then implemented in stages, since August 2014.
Electricity Tariff – C1 Medium Voltage Commercial
Description July 2008 - Feb 2009
March 2009 - May 2011
June 2011 - December
2013Jan 2014 - Present Unit
1) Peak Charges 0.296 0.288 0.312 0.365 RM/kWh
2) Off Peak Charges NA NA NA NA RM/kWh
3) MD Charges 24.60 23.93 25.90 31.20 RM/kW
4) Connected Load NA NA NA NA RM/kW
Note: OPTR Tariff applicable from April 2015 onwards under certain conditions (RM0.292 per kWh) for off-peak usage
Milestone Year 1 (Dec 2013 – Nov 2014)
PLANNINGLEVEL 1 ENERGY
AUDITDEC 2013
LEVEL 2 ENERGY AUDIT
JAN - JUL
2014IMPLEMENT NO
COST MEASURESAUG 2014
ENERGY AWARENESS SEMINAR FOR END
USERSOCT 2014
ENERGY POLICY & ACTION PLAN
ENERGY SATISFACTION SURVEY (ESS)
NOV 2014
Milestone Year 2 (Dec 2014 – Nov 2015)
PROGRAMME REVIEW
DEC 2014
LEVEL 2 ENERGY AUDIT (SECOND)
JAN - JULY 2015
ESTABLISH ENERGY COMMITTEE (USER)
FEB - APRIL 2015
ENDORSE ENERGY POLICY
MAY 2015
ENDORSE ENERGY
COMMITTEE & ACTION PLAN
JULY 2015
Energy Management Initiatives (Dec 2013 – Present)• 1st Detail Energy Audit Dec 2013 – Oct 2014• Operational Energy Management Initiatives
• Chiller Temperature Reset (42 – 44 Deg C) – July 2014• Chiller & AHU Auto-Scheduling – November 2014• MD Control (Manual)
• Application of OPTR Tariff to TNB 15th Oct 2014• Submission of 1st REEM Report to Energy Commission (October 2014)• 1st Energy Awareness Seminar (October 2014)• 1st Energy Management Workshops (November 2014)• Energy Management Feedback Survey (November 2014)• Energy Management Follow-Up Workshop (February 2015 (All) & April 2015 (Immigration))• Second Energy Audit (December 2014 – July 2015)• Energy Policy Endorsed (March 2015)• Submission of REEM Report to Energy Commission (May 2015)• Development of Energy Management Committee & Action Plan (July 2015)
4-year electricity consumption records
30. 9 Million kWh in 2014
28.7 Million kWh in 2015
7.2% Savings (without
investment)
Cumulative Savings
Cumulative Savings Since Energy Management Initiatives started in July 2014 is 2.4 Million kWh (as at Nov 2015)
Energy Program Started in July 2014
Base-year
Aug 2013 – July 2014
Tariff Management (Off Peak Tariff Rider)
OPTR charges only RM0.292 instead of
RM0.365
Average savings RM70,000 per month since May 2015
Off Peak Tariff Rider – OPTR for C1 Commercial• Effective April 2015, BSI is entitled to CI OPTR after TNB approved the application• OPTR = RM0.292 per kWh instead of RM0.365 per kWh for off-peak consumption
under the following condition:-
The building’s measured Load Factor is higher than the Average Load Factor over six (6) months prior to the application (Condition 1).
No outstanding amount not more than the total deposit/bank guarantee paid. Otherwise this outstanding amount must be settled before applying (Condition 2).
Note: 1) Load Factor = Average Demand/Maximum Demand2) Off-Peak = 10:00 PM to 8:00 am following day
Energy Audit : Building Energy Accounting
Major End-Use
Annual Energy
Consumption (kWh)
%
Air- Conditioning System 10,766,434 38.3%Mechanical Ventilation 6,847,298 24.3%
Lighting 5,503,142 19.6%
Small Power 482,573 12.4%
Mechanical Pumps 1,039,844 3.7%Lift, Escalator & Travellator 493,283 1.8%
TOTAL 28,132,575 100.0%
Energy Audit : Detail Energy Accounting
Energy Audit : Building Load Profile
Baseload ~2,700 kWMaximum Demand ~ 4,400
kW
Energy Audit : Daily Load Profile
Maximum Demand Occuring consistently between 7-8 AM daily
Demand difference approximately 300 to 400 kW only
Energy Audit: Maximum Demand – When, How, How Much?
Energy Audit : Illumination
AreaUnderli
t GoodOverli
tOffices 21.9% 22.3% 55.8%Rest rooms, Waiting areas 11.1% 2.8% 86.1%Lobbies,walk ways, corridor 5.2% 11.7% 83.1%Pantry 3.5% 3.5% 93.1%
Storage Room 0.0% 0.0%100.0
%Toilets 9.1% 40.0% 50.9%
Reference: MS1525:2014
Energy Audit : Indoor Environmental Survey – Indoor Temperature & Relative Humidity
Category
Temperature &
Relative Humidity
Within Range 92.5%
Below Range (Too Cold) 6.5%
Above Range (Too Hot) 1.0%
TOTAL 100.0%
Reference: MS 1525:2014 Reference: Standard 55-2013 by ASHRAE (American Society of Heating, Refrigerating, and Air-Conditioning
Engineers)
Comfort Zone
Energy Audit: Indoor CO2 concentrationRemarks Range % of areas
surveyed
Overventilated Below 500 ppm 0.0%
Healthy Ventilation 501 to 799 ppm 13.4%
Meet Energy Efficient Ventilation
Requirement & Healthy
800 to 999 ppm 72.8%
Un-healthy Above 1000 ppm 13.7%
TOTAL 100.0%Note: ppm = parts per million
Energy Management SystemScore Energy Policy Organization Motivation Information System Marketing Investment
4 Energy Policy, action plan and regular review, have commitment of top management as part of an environmental strategy
Energy management has been fully integrated into management structure. Clear delegation of responsibility for energy consumption
Formal and informal channels of communication regularly exploited by energy manager and energy staff at all levels
Comprehensive system sets targets, monitors consumption, identified faults, quantities savings and provides budget tracking.
Marketing the value of energy efficiency and the performance of energy management both within and outside the organization.
Positive discrimination in favour of green schemes with detailed investment appraisal of all new build and refurbishment opportunities
3 Formal energy policy, but no active commitment from top management
Energy manager accountable to energy committee representing all users, chaired by a member of the managing board
Energy committee used as main channel together with direct contact with major users
M&T reports for individual premises based on sub metering, but saving not reported effectively to users
Programme of staff awareness and regular publicity campaigns
Some payback criteria employed as for all other investment
2 Unadopted energy policy set by energy manager or senior department manager
Energy manager in post reporting to ad-hoc committee, but line management and authority are unclear
Contact with major users through ad-hoc committee chaired by senior department manager
Monitoring and targeting reports based on supply meter data. Energy unit has ad-hoc involvement in budget setting
some ad-hoc staff awareness training
investment using short term payback criteria only
1 An unwritten set of guidelines
Energy management is the part-time responsibility of someone with only limited authority or influence
Informal contacts between engineer and a few users
Cost reporting based on invoice data. Engineer complies reports for internal use within technical department
Informal contacts used to promote energy efficiency
Only some low cost measures taken
0 No explicit policy No energy management or any formal delegation of responsibility for energy consumption
No contact with users No Information system. No accounting for energy consumption
No promotion of energy efficiency
No allocation of investment in increasing energy efficiency in premises
Energy Management Matrix (AEMAS standard)
Energy Policy
Energy Management Team (FM)
Energy Management Committee (Building Level)
• Proposed Organisation Chart• To identify representative• To formally appoint & assign
Roles & Responsibilites
BPHPemilik Bangunan
JKRAgensi
Pelaksana
Pengurus Fasiliti (GFM)
Pengurus Tenaga
Jabatan Kastam DiRaja
MalaysiaPengguna Bangunan
Jabatan Imigresen MalaysiaPengguna Bangunan
RU 1Pengguna Bangunan
RU 2 dan seterusnya
Pengguna Bangunan
Green 3 Sdn BhdPerunding
Tenaga
Summary of Energy Conservation Measures (ECMs)Item Categor
y Focus area ESM Status
1 A Tariff Management Tariff Management: Apply for "Off Peak Tariff Rider" to enjoy 20% cost savings during off peak period.
Implemented in March 2015. Cost Savings enjoyed by end
June 2015 totalling to approximately RM140,000
2 A Tariff Management Apply for Neon & Floodlight G1 Tariff Instead of C1 Tariff for the Compound, Fencing and Building Façade Lighting Usage Not yet implemented
3 B Lighting De-lamp over-lit areas at corridors, toilet, lift lobies, lobbies, waiting areas and other non-essential areas. In-progress
4 C LightingRetrofit 18-W & 36-W Standard Fluorescent Lamp (TLD), 18-W & 26-W Compact Fluorescent Lamps (PLC), 50-W Halogen and 400-W Metal Halide High Bay Lamps with equivalent LED type.
In-progress
5 C Chiller Plant Upgrade
Retrofit Chiller Plant and Cooling Towers with High Efficiency Variable Speed Chillers Under further study
6 C Maximum Demand Control
Install Maximum Demand Control System to reduce Maximum Demand Under further study
7 B AHU Control Reduce AHU Operation Hour At Night To propose8 B ACSU Timer to turn off ACSU periodically To propose9 B Lighting Use of Occupancy Sensors to Turn Off Lighting To propose10 C Motors Replace Motors with Premium Efficiency Motor To investigate further11 B RU Small Power &
Lighting Reduce Baseload To propose
Category of ECM & Summary • Category A - Tariff or Contract Management • Category B - No or Low Cost Measures (Best Practices)• Category C - Medium to High Cost Measures
Description Unit TotalBaseline Electrical Energy kWh 30,944,215
Potential kWh reduction kWh 5,591,033Resultant Energy kWh 25,353,182Gross Floor Areas m2 232,031Existing BEI kWh/m2/year 134Resultant BEI kWh/m2/year 109
Potential Savings ~
18.4%
Summary of ECMs - SavingsItem Description
Demand Savings
(kW)
Energy Savings
(kWh/year)
Demand Cost
Savings (RM/year)
Energy Cost
Savings (kWh/year)
Total Energy
Cost Savings
(RM/year)
% of energy savings
1 Tariff Savings:- Apply for "Off Peak Tariff Rider" Done Done Done Done Done Done
2 Tariff Savings - Apply for Neon & Floodlight G1 Tariff NA NA NA NA 38,387 0.3%
3 De-lamp over-lit areas 167 899,202 62,688 328,209 390,897 2.9%
4
Retrofit 18-W & 36-W Standard Fluorescent Lamp (TLD), 18-W & 26-W Compact Fluorescent Lamps (PLC), 50-W Halogen and 400-W Metal Halide High Bay Lamps with equivalent LED type.
414 2,435,094 154,968 888,809 1,043,777 7.9%
5 Retrofit Chiller Plant and Cooling Towers with High Efficiency Variable Speed Chillers 146 1,923,349 54,802 702,022 756,825 6.2%
6 MD Control 300 50,000 112,320 18,250 130,570 0.2%
7 Turn off AHU operating 24 hours for 3 hours per day from 7 PM to 7 AM the next morning 203,815 74,392 74,392 0.7%
8 Use timer to turn-off Air Cooled Split Units at areas operating 24 hours 79,574 29,044 29,044 0.3%
1,028 5,591,033 384,779 2,040,727 2,463,893 18.4%
Summary of ECMs – Investment & PaybackItem Description Investmen
t
Payback Period (year)
Estimated
Lifespan (year)
Rate of return (% per year)
1 Tariff Savings:- Apply for "Off Peak Tariff Rider" Completed Completed
2 Tariff Savings - Apply for Neon & Floodlight G1 Tariff 5000 0.13
3 De-lamp over-lit areas -
4 Retrofit standard lamps with LED Lamp 2,382,410 2.3 5.0 23.8%
5 Retrofit Chiller Plant and Cooling Towers with High Efficiency Variable Speed Chillers 7,300,000 9.6 30.0 7.0%
6 Maximum Demand Control 200,000 1.5 7.0 51.0%
7 Turn off AHU operating 24 hours for 3 hours per day
8 Use timer to turn-off Air Cooled Split Units at areas operating 24 hours 13,500 0.5 5.0 195.1%
9,900,910 4.0
MonthCooling Capacity (kWrh)
Total Electricity Consumption
(kWeh) – Chiller, Pump & Cooling Tower
Coefficient of Performance
(COP)
December 2014 1,623,611 724,768 2.24January 2015 1,456 659 607,268 2.40February 2015 Data error* Data error* Data error*March 2015April 2015 1,685,914 685,012 2.46Total 4,766,184 2,017,048 2.36
Chiller Plant Analysis
MonthCooling Capacity (kWrh)
Total Electricity Consumption
(kWeh) – Chiller, Pump & Cooling Tower
Coefficient of Performance
(COP)
December 2014 1,623,611 490,506 3.31January 2015 1,456,660 403,164 3.61February 2015
Data error* Data error* Data error*March 2015April 2015 1,684,017 467,687 3.60Total 4,764,289 1,361,357 3.50
Chiller Analysis
Comparison with Standards• MS 1525:2014, Table 23, “Water Chilling Packages, electrically driven: Chiller energy
performance rating”. The table provides for a new Centirfugal Chiller more than 600 RT, where the recommended efficiencies are as below:-
• COP = 5.96 minimum for chiller tested at 100% load, using the “Malaysian Test Conditions” method.
• COP = 5.58 minimum for chiller tested using the “MPLV Standard Condition” method.• COP = 6.17 minimum for chiller tested at 100% load using the “Std AHRI Test
Conditions” method.• COP = 6.51 minimum for chiller tested using the “IPLV at AHRI Standard Conditions”
method.• Conclusion: Chiller COP declined between 35 – 45%(Note: RT = Refrigerant Tonne)
ASHRAE’s Chiller Performance Indicatior
Description Unit Average
Existing Chiller's Average Efficiency kW/ton
1.01 New High Efficiency Chiller's Average Efficiency kW/ton 0.65
Average Cooling Energy kWrh
1,588,096
Expected Use of Chiller's Energy kWh 293,507
Existing Chiller's Monthly Energy kWh 453,786
Monthly Chiller's Energy Savings kWh 160,279
Annual Energy Savings kWh
1,923,349.13
Average Blended Energy Cost RM
0.425
Annual Cost Savings RM 816,542
Total Investment RM
7,300,000
Simple Payback Period Year
8.94 Chiller Expected Life Year 30Return On Investment (ROI) Per Year 8%
Maximum DemandLoad Profile for BSI in 2014 – Demand Occurs at 8 AM, 4,500 kW
Maximum Demand ControlLoad Profile in 2005
Demand Shifted to 7:15AM (Outside MD period) ; Reduced by 200 kW through manual operation only
MD Control Strategy• Strategies to control MD:-
Stage 1: Identify Critical Loads that contribute to MD (during MD hour) – done
Stage 2: Deploy manual control strategy – we are still at this stage!
Stage 3: Evaluate result and implement continuous improvement actions
Stage 4: Implement Automatic Control System
MD Control Strategy
• Stage 1 - Identify Critical Loads that contribute to MD (during MD hour)
MD occurs between at 8-9 AM
Critical Loads during this periods are Ventilation Fans, Chillers & AHUs
Ventilation Fans operation is triggered by CO (Carbon Monoxide level)
Most AHU will start on 7:00 and stop at 5:30 PM. 18 out of 36 AHU operates 24 hours per day
Second Chiller is also operating during MD period
MD Control Strategy
• Stage 1 - Identify Critical Loads that contribute to MD (during MD hour) Only 24 out of 347 Ventilation Fans are monitored by BMS
Ventilation FansInstalled Demand
(kW)
Percentage
1. EXHAUST AIR FAN 1905 Car & Motorcycle
Section 1282 43% Bus & Coach Section 313 10% Others 309 10%1. FRESH AIR FAN 1019 Car & Motorcycle
Section 447 15% Bus & Coach Section 119 4% AHU & FCU / MAIR 89 3% Make-Up Air 75 2% Others 289 10%1. SMOKE SPILL FAN No data 0%1. PRESSURIZATION FAN 78 3%
3003
MD Control Strategy• Stage 2: Deploy manual control strategy
Avoid simultaneous operation of grouped loads such as Air Handling Units and Ventilation Fans –assign staggered ON time to each AHU and Fans or Pumps which are controlled by BMS, to avoid peak demand during the 8-9 AM period.
Turn-off AHUs operating continuosly from the previous night for 1 hour, i.e. from 8-9 AM. The indoor temperature and relative humidity in a long, pre-cooled rooms are able to drift temporarily, without affecting the indoor comfort.
Issue a Guideline Note to encourage end-users to avoid turning on unnecessary electrical appliances between 7 – 8 AM.
MD Control Strategy• Stage 3: Evaluate result and implement continuous improvement actions
Use Digital Power Meters at critical loads and map the relevant reading together to understand t
• Stage 4: Implement Automatic Control SystemFeedback from Digital Power Meter is used to continuously feed demand data
information to Control System that will intelligently implement the Control Strategies. (continuous improvement required)
Maximum Demand pattern can change if you keep controlling manually
Identify the culprit again! (Jan 2016)
Turn Off AHU operating 24 hours 3 hours at night
L 2-1 (24 hours) L 2-2 (11 hours)
Obeservation 1: Return Air Temperature is almost consistent throughout the day
Turn Off AHU operating 24 hours 3 hours at night
L 2-3 when AHU turned off ½ hourObeservation 2: Indoor Air Temperature is able to drift for some time after AHU is turned off
Turn Off AHU operating 24 hours 3 hours at night
• There is opportunity to turn off the AHU for minimum half hour at night, without affecting the indoor temperature.
• Develop schedule to turn them off half an hour for every 2 hour cycle from 7 PM to 7 AM the next day.
• Proposed turn off time is 7:00 – 7:30 PM, 9:00 – 9:30 PM, 11:00-11:30 AM, 1:00 – 1:30 AM, 3:00 – 3:30 AM and 5:00 – 5:30 AM.
• Therefore a total of 3 hours per day could be reduced. • By implementing this strategy, energy reduction potential is 203,815 kWh with
annual cost savings of RM74,392 per annum.
Total Savings Achieved for BSI
Energy Savings ~ 7% per annumTariff Management ~ 7% per annum
Total Savings (with no investment) ~ 14% per annum
Energy Audit
Energy Audit Process
Energy Audit MethodologyDesktop Data Collection & Analysis
Desktop Data
Monthly utility bills – electricity,
chilled water, water
Building & Room
Layout Plan
Building architectural
elevation drawing
Design Manuals & Drawings (As-built) Operation
Manuals & Drawings
Asset List (CMMS)
Condition Assessment
Report
56
MethodologyField Data Collection (Site Survey & Measurement)
• To audit energy consuming equipment - type, power, how many, loading, how they are used, etc
Equipment Survey
• To understand how buildings / equipment are operated, start-stop, variable speed, timers, sensors, scheduling,etc
Operation Survey
• Measurement of lighting brightness, air-conditioning performance (temperature, RH, flow), building energy input profile, etc
Energy Measurement
•To obtain end-users feedback on their practices when operating equipment, comfort level, etc
Interviews with End Users
57
Methodology Field Data Collection / Measurement: Energy Input Profiling
BTU Energy Meter
- Measure chilled water energy input
Power Logger
- Measure electrical power input
58
Portable Energy Audit Equipment
Lux-meter -Measure
lighting brightness
-To measure (snapshot) the
indoor & outdoor light
level (lux)
Thermo -hygrometer
- Measure ambient air temperature & relative humidity
CO2 sensor
- Measure indoor CO2 concentration-To measure
(snapshot) the CO / CO2 level for indoor
air quality
Portable Multi Power Meter with Memory /
Data Logger* (based on BMS data)
-To measure & monitor (log) A, V, W, power
factor, frequency, THD (single & 3-phase
59
Clamp-On Power Meter (Snapshot)
-To measure (snapshot) A, V, W,
power factor, frequency, THD
(single & 3-phase)
BTU Clamp-On Meter with Flow & Temperature
Sensors-To measure chilled water cooling load
(flow-rate sensors and temperature
loggers; immersion type)
Anemometer-To measure
(snapshot) air-conditioning
ventilation rate (CFM)
60
Energy Saving Measures Tariff / Rate
ManagementUtilization
Management (Conservation)
Energy Efficiency Technologies
•Peak Reduction Control•Switch to lower fuel / utility cost
•Shift consumption from Peak to Off Peak period (Thermal Storage)
•Avoiding Power Factor Penalty•Turn off when not in use•Load scheduling•Set-point optimization•Optimal Start-Stop•Routine Maintenance•Building envelope improvement•High Efficient ACMV•High Efficient Lighting•High Efficient Pumps / Motors•Building Management System
0-5% Cost Reduction
1-10% Cost Reduction
5-25% Cost
Reduction
61
Energy Saving Measures
Categorization of ESMs according to financial return attractiveness, level of savings or ease of implementation
62
Preparation for Site Survey:- What energy auditors should know?
• Safety / Protocol in the building / Work Permit ?• Planning for measurement; prioritizing areas, work
load/area segregation, equipment usage.• Access & escort to offices, utilities rooms & common
areas for survey & measurement exercise – during office hours & after office hours?
• Interviews / end-users’ feedbacks on Energy Management System & Indoor Environmental Condition
• Is intermittent interruptions to office operation acceptable (due to room survey work)? And if not, please indicate which areas.
63
Green 3 Sdn Bhd310, Level 3, Block B, Kelana Jaya, Jalan SS 7/26B, 47301 Petaling Jaya
Tel: 03-7887 6088Email: [email protected] / [email protected]
Thank You