ENERGO Brasov - Renewable projects ed2015

2
STEEL STRUCTURES SUPPLIER STEEL CONSTRUCTION CONTRACTOR | ENGINEERING SUPPLY CONSTRUCTION | | www.energobv.ro SC ENERGO SA Zizinului Street 123, 500407 - Brasov, Romania Tel: 0040 268 333 492 Fax: 0040 268 330 652 e-mail: [email protected] www.energobv.ro Imagine your future, we will build it for you! Quality is never an accident; it is always the result of high intention, sincere effort, intelligent direction and skillful execution; it represents the wise choice of many alternatives. William A. Foster The company sees in the quality of delivered products the main goal to follow. Company conception regarding quality is proven by getting and maintaining the certified quality system SR EN ISO 9001:2008; SR EN ISO 14001:2005; SR OHSAS 18001:2008 as well the certified quality for Factory Production Control and welding EN 1090-1 and certification of our capability to manufacture welded steel structure according with DIN 18000-7. ENERGO QUALITY

Transcript of ENERGO Brasov - Renewable projects ed2015

STEEL STRUCTURES SUPPLIER STEEL CONSTRUCTION CONTRACTOR|

ENGINEERING SUPPLY CONSTRUCTION| |

www.energobv.ro

SC ENERGO SAZizinului Street 123, 500407 - Brasov, RomaniaTel: 0040 268 333 492Fax: 0040 268 330 652e-mail: [email protected]

www.energobv.ro

Imagine your future, we will build it for you!

Quality is never an accident; it is always the result of high intention, sincere effort, intelligent direction and skillful execution; it represents the wise choice of many alternatives. William A. Foster “The company sees in the quality of delivered products the main goal to follow.

Company conception regarding quality is proven by getting and maintaining thecertified quality system SR EN ISO 9001:2008; SR EN ISO 14001:2005; SR OHSAS 18001:2008as well the certified quality for Factory Production Control and welding EN 1090-1 and certification of our capability to manufacture welded steel structure according with DIN 18000-7.

“ENERGO QUALITY

ENERGY - POWER PLANTS

Boiler Plant based on circulating fluidized bed (CFB) technologyWorks included: Execution , delivery and installation at the building Site Location: DuhaujvarosClient: Valmet OyFinal Client: Hamburger Hungaria Power

II

ENERGY - POWER PLANTS

Waste Power Plant Project BydgoszczWorks included: Execution , delivery and installation at the building Site Location: Waste Steam Boiler GenerationClient: SICES group - Pensotti FCL SpAFinal Client: Aster TM.E. Ecologia

I