Enabling Information Sharing thru Common Services...(International) NOTAM Trends 0 100,000 200,000...

19
Digital Briefing Concepts Presented To: Applying Common Servics Presented By: Eddy Porosnicu, Eurocontrol Date: 31 August 2011 Enabling Information Sharing thru Common Services

Transcript of Enabling Information Sharing thru Common Services...(International) NOTAM Trends 0 100,000 200,000...

  • Digital Briefing Concepts

    Presented To: Applying Common Servics

    Presented By: Eddy Porosnicu, Eurocontrol

    Date: 31 August 2011

    Enabling Information Sharing

    thru Common Services

  • Current Briefing Concept

    • NOTAM

    – as means of announcing latest sudden changes

    • Briefing

    – as means of communicating NOTAM to the pilot

    • Pre-Flight Information Bulletin (PIB) = List of NOTAM

    • Verbal

    • On-line briefing – initial attempts, limited by NOTAM text capabilities

  • (International) NOTAM Trends

    0

    100,000

    200,000

    300,000

    400,000

    500,000

    600,000

    700,000

    800,000

    900,000

    2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

    Nu

    mb

    er

    / year

    Europe (L+E+B)

    Pacific (A+N+Y)

    Asia (R+V+W+Z)

    Russia + Central Asia (U)

    Africa (D+F+G+H)

    Mid Asia (O)

    North America (C+K+P)

    South + Central America (M+S+T)

    TOTAL

    Source: European AIS Database (EAD)

    Why long PIB

  • NOTAM problems

    … runway shortenings when the NOTAM simply gives a new TORA and does not really say WHERE the runway have been shorter (in what end)

    … complex restricted area boundaries that take hours to put on a map!

    … obstacles with imprecise positions

    … irrelevant information

    … typing errors

    … very long and complex to read!!!

    10%of the NOTAM have errors

    according to a study done by GroupEAD

    on randomly selected messages!

  • Solution

  • Digital data:

    • clearer / more precise than free text

    • enables validation

    • automatic by the system

    • visually by the operator

    Digital NOTAM – improved data quality

  • Digital NOTAM – improved briefing

    Positive impact on safety

  • Current PIB problems

    • too long• cumbersome to build

    • NOTAM not prioritized

    • irrelevant NOTAM• format difficult to read

    – ALL CAPS– abbrv.– pour Inglesh

    • no grouping per feature• missing data in case of

    significant re-routing or due to inappropriate selection criteria

    Source: HindSight - Aviation Safety Magazine for Air Traffic Controllers - Skybrary

  • Expectations

    • Merging aeronautical, MET, flight information

    • Only the relevant information… but also in case of re-routing

    • Easy to understand– Graphical (where appropriate)

    – Organized per phase of flight

    – Critical information highlighted

    • Interactive– Available for EFB

  • SESAR Work Breakdown StructureSESAR Work Breakdown Structure

    NetworkOperation

    TMAOperation

    En RouteOperation

    AirportOperation Aircraft

    WP 7 WP 5 WP 8

    WP 6WP 4

    WP 14

    WP 9

    WP 10

    WP 11 WP 15 WP 13

    WP 12

    ValidationInfrastructure

    R&D TransversalAreas

    Network InformationManagement Systems(NIMS)

    InformationManagement

    SWIM F/WOC (*) GroundCNS

    Airport

    Systems

    WP 16WP 3

    Master PlanMaintenance

    En-route

    APPATC

    Systems

    Target Concept &

    Architecture MaintenanceATM Network R&D

    Programme

    SESAR Programme

    WP B WP C WP D

    NetworkOperation

    TMAOperation

    En RouteOperation

    AirportOperation Aircraft

    WP 7 WP 5 WP 8

    WP 6WP 4

    WP 14

    WP 9

    WP 10

    WP 11 WP 15 WP 13

    WP 12

    ValidationInfrastructure

    R&D TransversalAreas

    Network InformationManagement Systems(NIMS)

    InformationManagement

    SWIM F/WOC (*) GroundCNS

    Airport

    Systems

    WP 16WP 3

    Master PlanMaintenance

    En-route

    APPATC

    Systems

    Target Concept &

    Architecture MaintenanceATM Network R&D

    Programme

    SESAR Programme

    WP B WP C WP D

    B

    C

    5

    7

    316

    15

    13

    4

    6

    8

    14

    9 10 12

    AcronymsAcronymsAPP ApproachCNS Communications Navigation SurveillanceF/WOC Flight & Wing Operations Centre / Meteorological Services

    NIMS Network Information Management SystemsSESAR Single European Sky ATM Research

    SWIM System Wide Information Management

    TMA Terminal Manoeuvring Area(S)WP (Sub-)Work Package

    Ph. Sacré, EUROCONTROL, June 2010, V2

    OPERATIONAL Thread

    SYSTEMS Thread

    SWIM Thread

    TRANSVERSE Thread

    En Route Operation

    TMA Operation

    Airport Operation

    Network Operation

    Information Management

    SWIM

    NIMS

    AircraftEn-route APP ATC Systems Airport systems

    Ground CNS

    R&D Transversal Areas

    Validation InfrastructureTarget Concept and Architecture Maintenance

    Master Plan Maintenance

    (*) WP 11 – no details available

    Partners:

    • Frequentis (lead), Thales

    • EUROCONTROL (requirements)

    • NORACON, DFS, ENAV

    + end user representatives

  • Digital Briefing System

    Flight Trajectory

    Management

    System

    (WP 13.2.1)

    Digital Briefing

    Application

    (WP 13.2.2)

    SWIM

    Data Pool

    Get data

    AI/MET/Flow/etc.

    Get data

    AI/MET/Flow/etc.

    Get flight data

    trajectory/FPLProvide flight data

    trajectory/FPL

    Integrated Briefing Portal

    Flight planning

    functionality

    PIB

    functionality

    PilotDispatcher/ARO

    ATM Operator

    On-board

    briefing device

  • Pilot Briefing

    • ePIB

    • Interactive

    BriefingFlight Trajectory

    Management

    System

    (WP 13.2.1)

    Digital Briefing

    Application

    (WP 13.2.2)

    * get request

    * filter data

    * (format data)

    * send data

    SWIM

    Data Pool

    Get data

    AI/MET/Flow/etc.

    Get data

    AI/MET/Flow/etc.

    Pilot

    [P.2] Departure

    Briefing

    [P.3] Debriefinig

    Get flight data

    trajectory/FPLProvide flight data

    trajectory/FPL

    [P.1] Flight Planning

    Briefing

    Integrated Briefing Portal

  • On-board briefing device

  • SESAR ePIB Prototype

  • ePIB Prototype

  • Other briefing application

    Graphical SNOWTAM

  • Summary / Conclusion

    • Digital Briefing enabled by AIXM/WXXM/FIXM– Service adapted to the end user needs

    – Various forms• ePIB

    • Interactive (local, Web)

    • EFB

    – Common aspects• Graphical

    • Organized per phase of flight

    • SESAR (WP 13.2.2) contribution– Digital Briefing research & prototypes

  • Questions & Answers /

    Feedback