EMR: Pakistan: Fauji Kabirwala Power Project · 2014-09-29 · Annual environmental monitoring...
46
Environmental Monitoring Report The Environmental Performance Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. Project Number: 27706 May 2012 PAK: Fauji Kabirwala Power Project Prepared by Hagler Bailly Pakistan For Fauji Kabirwala Power Company Ltd.
Transcript of EMR: Pakistan: Fauji Kabirwala Power Project · 2014-09-29 · Annual environmental monitoring...
Environmental Monitoring Report
The Environmental Performance Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.
Project Number: 27706 May 2012
PAK: Fauji Kabirwala Power Project
Prepared by Hagler Bailly Pakistan For Fauji Kabirwala Power Company Ltd.