Purpose of the Contract:
Implementation of a Specialized Commercial System for EP FLOPEC
Quito, 22 - Jul - 2013
CONTENTS
SECTION I ….…..……………………………………………………………………………………………………………….……… 3
INVITATION ....………………………………………………………………………………………………………………….…….. 3
SECTION II ..…………………………………………………………………………………………………………………….……… 4
PURPOSE FOR CONTRACT .……………………………………………………………………………………………….…….. 4
SECTION III ..…………………………………………………………………………………………………………………….…….. 5
GENERAL CONDITIONS ……………………………………………………………………………………………………….…. 5
3.1. Technical Board: …………………………………………………………………………………………………………...... 5
3.2 Disabilities: ………………………………………………………………………………………………………………………. 5
3.3 Obligations of the Supplier: ………………………………………………………………………………………………. 5
3.4 Questions, Answers and Explanations: …………………………………………………………………………….. 5
3.5 Language and Authenticity of Documents: ………………………………………………………………………. 5
3.6 Evaluation Process, Negotiation and Award: ……………………………………………………………………. 5
3.7 Evaluation Criteria: …………………………………………………………………………………………………………… 6
3.8 Rejection of Tenders: ..……………………………………………………………………………………………………… 9
3.9 Warranties: ……..……………………………………………………………………………………………………………… 10
3.10 Cancellation Procedure: ……………………………………………………………………………………………….. 10
3.11 Abandonment Procedure Declaration: ….……………………………………………………………………… 10
3.12 Contractor Failed: …………………………………………………………………………………………………………. 10
3.13 Contract Project: ………………………………………………………………………………………………………….. 11
14.3 Pricing Currency and Payment: …………………………………………………………………………………….. 11
15.3 Contract Administration: ………………………………………………………………………………………………. 11
3.16 Recognition of errors: ………………………………………………………………………………………….……….. 11
SECTION IV. ..………………………………………………………………………………………………………………………… 12
SPECIAL CONDITIONS .………………………………………………………………………………………………………….. 12
4.1 Process Schedule Public Competition: ……………………………………………………………………………. 12
4.2 Validity of Tender: ..………………………………………………………………………………………………………… 12
4.3 Form of payment: …………………………………………………………………………………………………………… 12
4.4 Extension of Deadlines for Submission of Tenders: ..…………………………………………………….… 13
4.5 Instructions for Preparation of Tenders: .....……………………………………………………………………. 13
4.6 Contents of Tender: ..……………………………………………………………………………………………………… 13
4.7 Weighting: ……………………………………………………………………………………………………………………… 14
4.8 Terms of reference: ..……………………………………………………………………………………………………… 14
SECTION I
INVITATION
We hereby call to offer, in the terms set out in this document and through the website of EP
FLOPEC: http://www.flopec.com.ec/index.php/licitaciones, international suppliers notified by
the Board of the Specialized Commercial System Empresa Publica Flota Petrolera Ecuatoriana
– EP FLOPEC, provided they meet the requirements of this document.
If EP FLOPEC does not receive any offers or all are rejected, the company will call again to
other providers different of the ones originally invited.
The purpose of this call is to be executed within eight months, according to what is stipulated
in the contract.
The general conditions of this invitation are:
1. Payments to contracted services will be conducted by EP FLOPEC own equity, from the
budget of the company, and will be based on the following form of payment:
• An advance payment of fifty percent (50%) of the contract value will be granted upon
signature of the contract and delivery of the invoice.
• The remaining value (50%) will be paid at the end of the implementation and
commissioning of a solution for the Specialized Commercial System, upon delivery of:
the invoice, handover report and user acceptance report, which must be fully
approved by the contracting company and the confirmation signature of the Contract
Manager and EP FLOPEC’s Manager.
2. Those interested will be able to ask questions during the 5 working days from the
publishing date of the invitation, and receive answers and clarifications from the
Contracting Authority within a period of 5 working days regarding the content of the
document published on the website of the company.
3. The tenders will be received through the e-mail: [email protected] (both technical
and financial offer) in accordance with the provisions in the schedule published (see
section 4.1 below).
4. The evaluation of the offers will be done using the parameters specified in this document.
Quito, 30-Jul-2013
DANILO MORENO OLEAS, MBA
GENERAL MANAGER
Empresa Publica Flota Petrolera Ecuatoriana
EP FLOPEC
SECTION II
PURPOSE FOR CONTRACT
This process aims the implementation of a Specialized Commercial System for Empresa Publica
Flota Petrolera Ecuatoriana - EP FLOPEC.
The project will be implemented under the supervision of a Project Task Force, comprised by
specialists of the Commercial and Operations Areas (Chartering, Operations, Postfixture and
LPG), Technicians from the IT Unit, and it will be led by the Commercial or Operations Manager
(Project Manager).
If any other specialized support is required, representatives of the Finance Area (Accounting,
Treasury and Budget), and representatives of Legal Counseling will be included.
Terms of reference:
See the documentation: "Functional and Technical Specifications" (Annexes A and B)
SECTION III
GENERAL CONDITIONS
3.1. Technical Board:
For this process a Technical Board will be nominated by the General Manager, and it will be
formed by a President and at least two additional members. The Board will be responsible for
the provider evaluation and the selection of the best software. This board will analyze the
offers, even if only one has been received, considering the qualifying parameters set forth
herein. They will recommend to award or to declare void to the maximum authority of the
contracting entity.
The Technical Board will be formed by:
• Comercial Manager
• Operacional Manager
• Information Technology Manager
3.2. Disabilities:
Any supplier whose offered solution does not meet all the functional and technical
requirements requested shall not be considered in the process.
3.3. Obligations of the Supplier: Suppliers must comply with all the requirements herein. The omission or neglect of the
supplier to review the documents will not relieve them of their obligations in relation to their
offer.
3.4. Questions, Answers and Clarifications:
Suppliers will be able to ask questions about the functional and/or technical requirements via
email to [email protected]. The contracting entity will reply and sent to the supplier’s
email and publish it on the website within the schedule program.
The Technical Board may, at the stage of questions and answers, issue any explanation, always
provided they do not change the purpose of the current process.
All explanations shall be considered as access to this document and will be posted on the
company website: http://www.flopec.com.ec/index.php/licitaciones
3.5. Language and authenticity of documents:
The documentation that includes the offer and related correspondence must be submitted in
English or Spanish. These digital documents should not have enabled change control option.
3.6. Evaluation, Negotiation and Award Processes:
At the date and time indicated in the Call or the extensions granted by the Technical Board,
each proposal will be evaluate and scored basis on a scale that will totalize one hundred (100)
points.
The Technical Board will notify the result of the evaluation duly supported in the company
website: http://www.flopec.com.ec/index.php/licitaciones
The Technical offers that do not reach 70 points will be disqualified and rejected at this stage.
The Technical Board may conduct negotiations according to the schedule established herein,
and will not call for new negotiation with the proponent with whom no agreement was
reached during the negotiation.
The Technical Board shall prepare a record of negotiation that shall be signed by members of
the Board and the proponent.
Once started the negotiation process, it will not be suspended for any reason, except in case of
force majeure. The Board and the provider will work in full days and so on until results occur,
and if these are positive. They will continue with the negotiation, uninterrupted, until an
agreement is reached.
The General Manager of Empresa Pública Flota Petrolera Ecuatoriana, reserves the right to
award or to declare void the tender once the Technical Board had finished the negotiation.
Once the Act of Negotiation and Award Resolution is signed, it will be posted on the company
website: http://www.flopec.com.ec/index.php/licitaciones
3.7. Evaluation criteria:
The Technical Board shall evaluate the technical offers under the parameters determined and
presented in this document:
Technical Evaluation Ratios
Criteria Ratio
(%)
1. Technical and administrative capacity 5
2. Specific experience 25
3. Technical personnel’s experience 25
4. Project Management Plan 5
5. Technology transfer 10
6. Functionality - Operations 12.5
7. Functionality – Chartering 12.5
8. Functionality - Other 5
Total 100
The evaluation criteria for each part as follows:
Criteria Item Description Points
1.
Tech
nic
al
an
d
ad
min
istr
ati
ve
ca
pa
city
1.1 Scope and approach of the services to be provided 0.50
1.2
Organizational and technical capacity for the
implementation of the project (business planning and
resource assignment)
1.00
1.3 Methodology to apply (in regards the services
offered) 1.50
1.4 Quality standards 1.00
1.5 Control and monitor standards to be applied 1.00
2.
Sp
eci
fic
Ex
pe
rie
nce
2
Proven experience conducting successfully
implementations of the solutions offered in previous
assignments (at least 3 cases)
25.00
3.
Ex
pe
rie
nce
of
tech
nic
al
sta
ff
3.1
Project Manager, 3 years experience leading projects,
and at least 3 successful experiences implementing
the solution.
5.00
3.2
Professional with at least 3 years experience in the
Commercial solutions who supports the configuration
and customization
5.00
3.3 Expert with 3 years experience integrating a solution
with other systems 5.00
3.4 Expert with 2 years experience in configuration and
customization of the solution offered 5.00
3.5 Occupational Rate (% allocation) of the main
technical staff 2.00
3.6 List and characteristics of resources required during
the project (human, hardware, software, etc.).
3.00
4.
Pro
ject
Ma
na
ge
me
nt
Pla
n
4.1
Project Management Plan: change control plan, plan
risk management, Monitor and control Plan,
Communication plan, Work Performance information,
others
1.00
4.2 Procedure to identify interfaces for integrating with
legally systems (external systems) 1.00
4.3 Procedure for communicate the project status and
performance reports results, to General Management 1.00
4.4 Performance integrated change control report and
Report project monitoring 1.00
4.5 Procedure to the TI technical training, and functional
training to the final users 1.00
5.
Tech
no
log
y T
ran
sfe
r
5.1
Proposal Architecture for the solution: servers
numbers, technical specifications for servers and
clients, functionality for each module, services (for
transfer information), scalability, integration (with
others systems), storage type; and conceptual design
of the proposed solution with the description for
each: components/elements/modules/options
3.00
5.2 Technical Support (7 * 24; ways to request technical
support) 1.00
5.3 Technical guarantee (year warranty and Maintenance
Support) 0.50
5.4 The designs and sources, for all products /
components customized. 3.00
5.5 GUI for web environment (Mozilla, IE, Chrome) 0.50
5.6 Integration with some document management
system 0.50
5.7 Integration with Exchange 0.50
5.8 network platform (OS) , over which can work the
solution 0.50
5.9 Servers supported databases (SQL, MySQL, Postgre
SQL, Oracle, etc.) 0.50
5.
Fun
cti
on
ali
ty -
Opera
tions
Operation records
6.1 Arrival and departure reports 0,25
6.2 Bunkes on board, ROB 0,25
6.3 Management at port 0,25
6.4 Multiple bill of lading / cargo description 0,25
6.5 Registro de Agencias 0,25
6.6 Itinerary / port rotation and modification features 0,25
6.7 Off-hire record 0,25
Commercial Calculation (invoice and payments)
6.8 Calculation of voyage charter 0,25
6.9 Deathfreight calculation 0,20
6.10 Calculation of time charter 0,25
6.11 Demurrage calculation 0,25
6.12 Dispatch function calculation 0,20
6.13 Deviation calculation 0,25
6.14 Waiting time calculation 0,25
6.15 Heating bunkers calculation 0,25
6.16 Extra bunker consumption calculation 0,25
6.17 Charterer expenses calculation 0,25
6.18 Storage calculation (time, bunkers and other
expenses) 0,25
6.19 Invoice status 0,20
6.20 Authority levels approval for payment of invoices 0,25
Agencies
6.21 Agency selection 0,20
6.22 Advances for attention of ships at ports – PDA
function 0,20
6.23 Final statement for advances - FDA function 0,30
6.24 Integration with an external Agency nomination
software 0,20
Bunkers management
6.25 Bunkers purchase 0,25
6.26 Inventary control and costs 0,25
Others
6.27 Multicompany management 0,20
6.28 Types of contracts management 0,20
6.29 Performance registry 0,40
6.30 Management of other claims 0,20
6.31 Notices reports (alarms) and task managements (i.e.
delivery notices) 0,20
6.33 Integration with e-mail for invoicing and payments 0,30
6.34 Capability to integrate with other systems (agreement
with other providers) 0,25
Trial period
6.35 Installation test 1,00
Reports
6.36 Report types (i.e. Load/Discharge, demurrage,
bunker, P&L ) 1,00
6.37 New reports tool 0,50
6.38 Report Payment / Invoice and Comparison 1,00
6.39
Integration or link with other external support
systems: Q88, DA-DESK, access via web, Financial and
Administrative Systems. 1,00
7.
Fun
cti
onali
ty -
Ch
art
eri
ng 7.1
Voyage estimation (basis current cost, hire base,
historical port expenses, speed and bunker
consumption 3,00
7.2 Sensitivity analysis (rate freight, TCE, time charter,
bunkers) 1,00
7.3 Voyage comparison 1,00
7.4 Cargo matching 0,50
7.5 Voyage charter (spot) 1,00
7.6 Voyage charter party 1,00
7.7 Time charter party 1,00
7.8 Bareboat charter party 1,00
7.9 Voyage with multi contracts and multi cargoes 1,00
7.10 Voyage management (spot voyage, time charter,
multi contract / product, sublet, relet, voyage) 2,00
8.
Fun
cti
on
ali
ty
– O
thers
8.1
At least two success cases (in the last 3 years) of the
solution offered integrated to the documentary
system.
1.00
8.2 At least 2 success cases (in the last 3 years) of the
solution offered integrated to legacy systems (SAP,
Dynamic, Open Bravo, Open ERP; NS5, AMOS, others)
4.00
Total
100.00
Note: This information should be presented in the Technical Offer, following the guidelines
established in section 4.6
3.8. Rejection of Offers:
The Technical Board will reject an offer for the following reasons:
a) Fails to fulfill the requirements of general and technical specifications related to this
document;
b) If the offer contains substantial and/or obvious errors that cannot be validated because they
are not considered an error in form;
c) Any exception, conditioning, unrequested items, or any change affecting the functional or
technical requirements of this document will not be accepted.
3.9. Guarantee:
Previous the subscription of the contract, the winner of the tender will have to give the
following guarantees.
3.9.1. Guarantee for the faithful compliance:
The supplier shall submit a faithful compliance guarantee of the contract, which will yield a
value equal to 10% of the total contract amount.
Purpose: To ensure compliance with the obligations assumed with the awarded supplier. The
execution of the guarantee will be total, and will not interested if the contract is in its early or
final stage. It considers an only exception the case that if, in a settlement agreement, there
existed a balance in favor of the contracting entity and this is not covered, then the guarantee
will be partially executed for the balance not covered.
3.9.2. Warranty for good use of the advance money
The supplier shall provide a guarantee of the advance payment to support 100% of the value
received in this connection. The renewal of these warranties shall be carried out at least 5 days
prior to expiration.
Purpose: it ensures that the resources provided in advance to the awarded supplier are
invested in performing the contract / project.
3.9.3. Technical Warranty
The supplier shall provide a 12 month period of technical warranty against technical defects of
the solution starting from the date of signing the Final Act of Delivery and Receiving.
Once the Business Management solution begins production, the supplier will locate the
technicians needed to give a 90 day accompanying support for the post-implementation which
will support the stabilization of the functionality of the solution.
The warrantees will be returned at the end of the contract.
3.10. Cancellation of Procedure:
At any time between the announcement and up to 24 hours before the date of submission of
offers, the highest authority of the contracting entity may declare the procedure canceled by
means of reasoned and motivated decision.
3.11. Declaration of Procedure Void:
The highest authority of the Contracting Entity may declare the procedure fully or partially
void before awarding. Once the procedure is declared void, the maximum authority may order
to file or reopen it.
3.12. Failed Winner:
In case the contractor does not secure the contract within the provided period for any
attributing reasons, the highest authority of the Contracting Entity will declare Failed winner.
Likewise, the contracting entity will call the supplier ranked second in the order of priority to
sign the contract, who shall comply with the requirements for the adjudicated supplier,
including the obligation to maintain the offer until signing the contract. If the supplier named
as second option does not secure the contract, the contracting process will be declared void,
without prejudice to the administrative penalty applicable to the second failed contractor.
3.13. Contract Project:
The contracting entity shall apply the project of the contract, (which is an integral part of this
document) within a period of 15 days from the date of the award notification.
3.14. Pricing Currency and Payment:
Offers must be submitted in U.S. dollars and payments will be made likewise.
3.15. Contract Administration:
The Legal Representative from the contracting entity shall appoint and explicitly designate a
member of the Commercial or Operations Areas as Contract Administrator. This person will
ensure full accomplishment with each and every one of the obligations under the contract, and
will also take any necessary action in order to avoid undue delay and impose fines and
penalties as appropriate.
The Contract Administrator should sing or endorse all documents generated with the
execution of the contract.
3.16. Validation of form errors:
If form errors are shown, offers may be validated by the supplier in a term of two days,
counted from the date of notification, and at the discretion of the contracting entity. Also,
within the validation period, suppliers may integrate additional documents as long as they do
not involve changing the subject thereof; documentation will be received by e-mail to:
The contracting entity is required to carefully analyze each of the offers received in the
qualification stage in order to identify all existing form errors which will notify by e-mail and on
the website of the company (http://www.flopec.com.ec/index.php/licitaciones) on the same
day and time to each of the bidders. Suppliers may correct such reported errors for purposes
of being qualified.
If, while analyzing the offers, the contracting entity determines the existence of one or more
form errors, the timing of the process must be reprogrammed, depending on the term granted
to suppliers to validate the form errors reported.
SECTION IV
SPECIFIC CONDITIONS
4.1. Schedule of the International Process:
DESCRIPTION DATE TIME
Publishing date 7-Aug-2013 10:00
Questions deadline 13-Aug-2013 10:00
Deadline for answers and explanation 16-Aug-2013 10:00
Deadline for delivery of Technical and Economical
offers
2-Sep-2013 10:00
Opening date for technical offer 2-Sep-2013 11:00
Technical Evaluation beginning 2-Sep-2013 11:10
Publishing of Final evaluation results of Technical
Evaluation
12-Sep-2013 10:00
Opening date for Economical offer 12-Sep-2013 11:00
Negotiation 13-Sep-2013 11:00
Estimated date of awarding 17-Sep-2013 11:00
The term for error validation is 2 days.
If EP FLOPEC, during the evaluation of the offers finds one or more form errors, the timetable
of the process should be rescheduled, depending on the term granted to suppliers for
purposes that validate the form errors reported. For which we shall consider the following
schedule that will include a new award date:
DESCRIPTION DATE TIME
Deadline to request validation of errors 5-Sep-2013 10:00
Deadline for validation of errors 9-Sep-2013 10:00
Estimated date for adjudication 17-Sep-2013 10:00
4.2. Validity of the Offer:
The validity of the offer should be 60 days; however, Empresa Publica Flota Petrolera
Ecuatoriana , EP FLOPEC may extend the term up to the date of fixing the contract.
4.3. Payment:
Payments for the acquisition of Specialized Software Solution for Commercial Management
will be made with funds of Empresa Publica Flota Petrolera Ecuatoriana, EP FLOPEC under the
Budget Certification No. 1335 "Inversiones, Sistemas de Automatización de Procesos ERP"
(Investment Process Automation Systems - ERP) issued with memorandum number GFI-UAPR-
CON-284-13, 11-jul-2013; and signed by the Financial Manager, as follows:
• An advance payment of fifty percent (50%) of the contract value will be granted upon
signature of the contract and delivery of the invoice.
• The remaining value (50%) will be paid at the end of the implementation and
commissioning of a solution for the Specialized Commercial System, upon delivery of: the
invoice, handover report and user acceptance report, which must be fully approved by the
contracting company and the confirmation signature of the Contract Administrator and EP
FLOPEC’s Manager.
It must be signed by the Contract Administrator and the CEO in order for it to have total
approval of the contracting entity.
4.4. Extension of Deadline for submission of offers:
The Technical Board may extend the term to send the offers subject to a justified reason to a
maximum of 30 working days, starting from the date of notice published on the webpage.
4.5. Instructions to Prepare the offer:
The supplier must demonstrate its experience attaching certificates provided by the
companies which have implemented the required solution from them.
4.6. Contents of Offer:
4.6.1. Technical offer: minimum requirements
i. Cover Letter and Commitment Form No. 1. ii. Provider identification, Form No. 2.
• Introduction Letter of the Firm / Company
• Appointment legal representative of the Company
• Certified copies to support Financial Situation
• Certified copy of the documents supporting the certifications obtained in
Quality Management and Software Development.
iii. Background and experience in conducting similar projects, demonstrated by the following documents, Form No. 3, No. 4-A and No. 4-B: • Two (2) certificates detailing the experience and implementation of a
commercial management system during the last three (3) years.
• Two (2) certificates detailing the experience in using project management
methodologies during the last three (3) years.
• Two (2) certificates detailing experience in integration with external systems
during the last three (3) years.
iv. List of personnel assigned to the project, Form No. 5
v. Background and experience of staff being assigned to the project, according to the specifications in the technical requirements (section 3.7
and Technical Specifications – Annex B). The adjudicated supplier can
change the initial staff of the project team up to 30%. In case it exceeds the limit of staff turnover, there will be a penalty of 5% of the contract.
• Resumes of professionals assigned: Form No. 6
vi. Work plan, approach, scope, proposed methodology, and proven
knowledge of the general and specific conditions of the project: Form No.
7
4.6.2. Financial Offer Contents:
Detailed economical proposal as according to Form No. 8.
The supplier shall specify the price of its tender for the total amount of the project (in
words and numbers). Payment for the work will be done in the same currency stated in the
offer, as stayed in the contract.
The supplier shall detail the value of the licenses (client and server), for installation and
configuration work, and other works considered in the financial proposal. Empresa Publica
Flota Petrolera Ecuatoriana, EP FLOPEC will not accept subsequent claims for values not
covered by the offer.
4.7. Weighting Coefficient:
Empresa Publica Flota Petrolera Ecuatoriana (EP FLOPEC) has determined that the weightage
for the technical evaluation is of eighty percent (80%) and the weighting for the economic
evaluation is twenty percent (20%).
4.8. Terms of Reference:
The Technical Board reserves the right to disqualify the supplier which do not comply with
what has been detailed in this item.
4.8.1. Purpose of the contract
Implementation of specialized Software for Commercial Management System for EP
FLOPEC.
4.8.2. Scope and depth of the jobs
• To implement a specialized Software for Commercial Management System for EP
FLOPEC, integrating information from each of the units of the Company
(ships and offices), and to support the management of the other areas of
the company (Administrative, Financial, Technical, Agency). It must
include the integration with the Finance-administrative system, technical-
shipping system and documentary system.
• To define and adapt specific needs for the Commercial and Operations
Areas, and to create dynamic reports.
• To training and to transfer technological and functional knowledge of the
solution.
• Integration, stabilization and release of the implemented solution.
• Comply with the functional and technical specifications.
• The direct users of the system will be served by the project, according to
the functionality of the modules implemented of the commercial system
defined, programmed and customized. The users of the system to be
considered will be: 7 read only users, and 27 read-write users.
Read only users Read-write users Administrator
• CEO
• Agency Manager
• Startegic Planning Manager
• Financial Manager
• Head of Staff on board
• Head of accountant
• Head of Treasury
• Commercial Manager
• Operations Manager
• Head of Chartering
• Head of Marketing
• Head of Operations
• Head of Postfixture
• Head of LPG Operations
• 18 Chartering, Marketing,
Operations, Postfixture and
Treasure Analysts
• Commercial Assistant
• Operations Assistant
IT Technician
The functionality that will be used by the 7 vessels of EP FLOPEC is set in the functional
requirements.
4.8.3. Expected products
i. Project Management Plan • Schedule of the full Implementation of the Solution (baseline time).
• Dully approved documentation requirements
• Change Control Plan (List of changes, validation and acceptance)
• Quality Control Plan (metric and checklists)
• Human Resources Plan (team project, functional and technical required
users from EP FLOPEC, and Supplier's team work)
• Communications Plan (stakeholders considered, information sharing about
project progress, managing expectations of stakeholders, performance
reports and project progress)
• Risk Management Plan (Registry and update of risk)
ii. Biweekly reports of the project performance. It must present the progress of implementation of the activities executed, remaining activities, motives, risks, etc.
iii. Commercial Management Solution fully installed, implemented and running in production, stabilized and integrated to the Administrative and Financial Management, Technical-shipping and Documentary Systems.
iv. Training Reports of EP FLOPEC staff v. All information resulting from meetings (minutes), explanations, progress
reports, technical manuals, and user guide manual for each module. This documentation must be provided in digital and hardcopy. The digital copy must be in both: one that can be read and edited (Word format) and the
other as a scanned legalized document in PDF format. This documentation must be provided in Spanish or English.
vi. Installation Media, designs, source code, and development programs for EP FLOPEC.
vii. Final technical report, and acceptance of the commercial solution (formal project closure), signed by the Contract Administrator of EP FLOPEC, by the users, and by the Highest Authority of EP FLOPEC.
4.8.4. Performance period
The term shall not exceed eight (8) calendar months counting from the date of deposit
or first payment.
Once the system is in production, the supplier will assign the necessary technicians for
the support of the post-implementation accompaniment for 90 working days, which
will support the functionality and stabilization of the solution.
The supplier may offer a shorter period than considered in this document, which will
be set in the schedule of activities, and which will be attached to the relevant offer.
4.8.5. Overview of the work methodology
The suppliers will present the methodology and Project Management Plan in detail
that meet the Guidelines for Project Management of international recognition.
Empresa Publica Flota Petrolera Ecuatoriana, EP FLOPEC will form a multidisciplinary
team from the company’s Commercial and Operational Departments to control,
coordinate, support and follow up the project.
4.8.6. Technology Transfer
At least, it should be included all the topics needed to give a post-implementation
support for the customizations made. The topics to be considered are:
• Architectural Design
• Safety aspects
• Parameterization tools
• Frameworks and programming interfaces for the integration with the
Administrative - Financial Management and Technical-Shipping Management
systems
• Troubleshooting: basic, intermediate and advanced
• Integration, interconnection, mediation, data transformation and applications
• Migration schemes and use of historical information contained in external systems
• Schemes and development of model of data loading (if applicable)
• And all those technological topics required and used for the implementation of
the solution
The documentation resulting from the transfer of technological knowledge should be
in Spanish or English. It will be checked, endorsed and authorized by the Contract
Administrator and Technology area.
Knowledge transfer will be for at least five (5) IT Technicians in all matters concerning
the implementation of the solution.
FORM # 1
Supplier’s Name:………………………………………………………………………………………….
COVER AND COMMITMENT LETTER
Mr. / Mrs.
…………………………
President of the Technical Board
Dear Sir / Madam,
(name of supplier), for my own rights, in my capacity as legal representative or attorney
common (name of the supplier company), I hereby certify that:
1. We agree to provide personnel, equipment, and materials required to perform (purpose of
the contract).
2. We state that the offer we make is independent and without hidden connection with
another person or persons, companies or groups involved in this process Abroad Contest
and that the offer is honest and in good faith in every aspect. Accordingly, we claim that
we have not infringed or violated any principles or standards related to the fair, just, and
free competition. We also state that we will not establish, arrange, or coordinate (directly
or indirectly), explicitly or covertly abstentions or results with one or more other suppliers,
considered or not related parties under the terms of the applicable legislation.
3. If any violation of the commitments set forth in the previous paragraph is found, EP
FLOPEC may disqualify the offer, or proceed to the unilateral termination of the contract,
as applicable.
4. The proposal is made in accordance with the requirements and conditions set forth herein.
5. We have revised this document, including the scopes issued, so that the knowledge gained
is satisfactory in relation to contractual obligations. Therefore, waive any future claims,
citing lack of knowledge of the content and requirements described in this document and
associated attachments.
6. We acknowledge that EP FLOPEC may adjudicate, declare void or cancel the contest if it is
in convenience of the national and company interests.
7. If we are awarded, we commit to signing the contract within 15 days after the
adjudication and previously we will comply the requirements asked in the invitation.
8. Declare under oath that we expressly agree not to offer any payments, loans, services,
luxury entertainment, trips, or gifts to any officer or employee of EP FLOPEC. In case of
violating this commitment, we are aware that EP FLOPEC after an internal process will end
immediately the contract, which is signed as a result of this invitation and acquiesces to
answer for the damages that these acts cause.
(Place and Date)
________________________
(Signature and Name)
(Legal Representative)
FORM # 2
Supplier’s Name:………………………………………………………………………………………….
Supplier’s Identification
1. Name of the company:
2. Headquarters Address:
Country/City
Address
Phone Numbers Fax
3. Partners
NAME ID Stock number (%)
TOTAL 100%
(Place and Date)
________________________
(Signature and Name)
(Legal Representative)
FORM # 3
Supplier’s Name:………………………………………………………………………………………….
References on experience in similar services, made in the last 3 years
Nº Project’s
Name
Company/
Institution
Amount Location
Country/City/
Address
Implementation
Period
Contact
Person
Start Finish
(Place and Date)
________________________
(Signature and Name)
(Legal Representative)
FORM # 4-A
Supplier’s Name:………………………………………………………………………………………….
ANNEXES
(For performed work)
C E R T I F I C A T I O N
I certify that ______________________________ (name of supplier), under contract
celebrated on (date) has successfully installed for ____________________________________
(name of the company) __________________________________ (object of the contract),
whose main activities were:
a) ______________________ b) ______________________ c) ______________________ The contract began on (start date) and ended on (end date).
The Professionals involved in the execution and position they played in the project execution
were:
1.
2.
3.
The value of the contract was for (value written and number) (currency) equivalent to (value
written and number) US dollars, as per the last payment done.
(Place and Date)
________________________
(Signature and Name)
(Legal Representative)
FORM # 4-B
Supplier’s Name:………………………………………………………………………………………….
Annex
(For work in progress)
C E R T I F I C A T I O N
I certify that (name of supplier), under contract dated on (date) is performing satisfactorily for
(name of company) (name of the contract), whose main activities are:
a) ______________________
b) ______________________
c) ______________________
The contract began on (start date) and completion is planned by (end date).
The Professionals involved in the execution and position in the project execution are:
1.
2.
3.
(Place and Date)
________________________
(Signature and Name)
(Legal Representative)
FORM # 5
Supplier’s Name:………………………………………………………………………………………….
LIST OF STAFF ASSIGNED TO THE PROJECT
Full Name Experience Detail Responsibility
in the Project
Participating
Time
(months)
Overall
Participating
Percentage
(Place and Date)
________________________
(Signature and Name)
(Legal Representative)
FORM # 6
Supplier’s Name:………………………………………………………………………………………….
RESUME OF THE ASSIGNED STAFF
1. Full names: _____________________________________________________________
2. Date and place of birth: ____________________________________________________________
3. Nationality: _____________________________________________________________
4. Experience in the supplier company:
# of Years Active Current position Activities Assigned to the
Project
5. Professional experience:
Company / Institution Since:
Day/Month/Year
Until:
Day/Month/Year
Country/City:
Phone Number:
Cargo:
Relevant Activities:
(Include information for each professional experience in the detailed format)
(Place and Date)
__________________________
(Signature and Name)
(Professional assigned to the project)
FORM #7
Supplier’s Name:………………………………………………………………………………………….
WORK PLAN
APPROACH, SCOPE AND METHODOLOGY OF THE JOB
The documentation shall include the following:
a) Development of: objectives, activities, actions, products, and goals;
b) Description of the approach, scope and methodology of the job that shows the knowledge
of the general, local, and particular conditions of the project on regards the contract;
c) Structural Organization Chart of the proposed service;
d) Activities’ Program/s, professional assignment and time allocation.
NOTE:
The suppliet will develop this form on sheets deemed advisable while keeping the same
format.
(Place and Date) __________________________ (Signature and Name) (Professional assigned to the project)
FORM #8
Supplier’s Name:………………………………………………………………………………………….
FINANCIAL OFFER
TOTAL COST
AMOUNT PAID
IN U.S. DOLLARS
LICENSE VALUES
IMPLENTATION VALUE
OTHER VALUES
TOTAL
TOTAL ---------------------------------------- (detailed in writing) U.S. dollars.
(Place and Date)
__________________________
(Signature and Name)
(Professional assigned to the project)