EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008

description

EMCAL Calibration & Assembly at Yale University. Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008. Status. Facilities for Assembly and Calibration are ready Cosmic scintillator trigger parts are scheduled for delivery by July 31. - PowerPoint PPT Presentation

Transcript of EMCAL Calibration & Assembly at Yale University

EMCAL Calibration & Assembly at Yale University

Mark Heinz, Project Mgr

EMCAL Meeting NantesJuly 15, 2008

Mark Heinz EMCAL Meeting July 2008 2

Status• Facilities for Assembly and Calibration are ready• Cosmic scintillator trigger parts are scheduled for delivery by July

31. – Subsequently configuration and testing for signals and position

resolution can start. Final electronics configuration will be determined after first tests with final scintillators setup.

– Goal: Be ready for triggering cosmics by Sep 15.

• EMCAL DAQ (incl FEE, DCS): Configured at CERN and ready to be shipped to Yale (thanks to David & Terry)

• Software for data-taking: available from test-beam (CERN CVS D.Silvermyr) and further development in Aliroot by offline group

• Software for triggering and analysis: first analysis tools available by Grenoble (Sebastien) and WSU (Aleksei). Further development in collaboration with Grenoble/WSU

• SM Shipping contract (Yale-CERN): Initial bids by 2 international logistics firms expected. Negotiation stage to start soon.

Mark Heinz EMCAL Meeting July 2008 3

Yale Calibration Lab

• Facilities are adjacent to RHI offices, and within 50m of truck loading dock.

Room 1: Main Calibration Lab Room 2: Storage & Packaging

Mark Heinz EMCAL Meeting July 2008 4

Scintillator triggers• 16 scintillator slats ordered for each site (Yale/Grenoble) from

EljenTechnology (Texas, US).• Each slat will be read-out by 2 PMT’s on opposite ends.• Configuration will allow to accumulate data & calibrate ¼

(Yale), 1/3 (LPHC) SM during one run (12 hours)• Coincidence signal between 2 slats (up & down) will be

organized (1 strip module).• PMT Timing and Amplitude information will be processed

CAD by JFM

Mark Heinz EMCAL Meeting July 2008 5

Other Trigger Components

• Power Supplies for PMT (32 channels)– Custom-Made (N.Smirnov)

Cockroft-Walton (CW) power base separately at Yale

– Grenoble uses different PMT’s

1 unit for 2x4 channels shown

Mark Heinz EMCAL Meeting July 2008 6

Trigger Electronics (version 1)

Meeting Yale-Grenoble , March 11, 2008

Mark Heinz EMCAL Meeting July 2008 7

PS710

PS710

PS710

PS710

4 channels

4 channels

4 channels

4 channels

4 channels

4 channels

PS754

PS754

PS705

PS715

PS794

PS715

D.L.

OUT

VETO

BUSY

“FAST” OR

START TDC

ADC GATE

D.L.24 channels 24 channels

STOP TDC

24 “A” channels

ADC

24

“D

” c

ha

nn

els

PS776 CR2000.25 µs

“FAST” OR

“FAST” OR

“FAST” OR

OR

IN REGISTOR, 6 channels

Trigger Setup (version 2)Thanks to University Houston & BNL for temporary donation of critical components

Shaper/Discriminator

4-fold coincidence

Gate Generator

Mark Heinz EMCAL Meeting July 2008 8

Time-Difference Measurement• Goal is to be able to get position measurement of cosmic track along strip-

module coordinate using timing difference. Can be used during offline analysis.

• Additional possibility maybe to use ADC information • Nikolai did a preliminary study (using available scintillator, different

dimensions)• This needs to be repeated with final scintillator and incorporated into

datastream.

Mark Heinz EMCAL Meeting July 2008 9

Handling Tools

• Grenoble has designed and manufactured a set of strip handling tools for Yale. These will be shipped by the end of the month.

• This also includes support structures for Scintillator positioning for cosmic test.

• In return Yale has purchased Scintillator strips for the Grenoble lab.

Mark Heinz EMCAL Meeting July 2008 10

SM Calibration Procedure

• Common Yale/Grenoble approach has been agreed upon and a draft documentation is available on web:

– http://rhig.physics.yale.edu/~heinz/alice/cosmic_calibration/

• Most important steps are:1. Mount SM-crate on shipping platform2. Test each Strip-Module with LED before insertion3. Install strip modules 1-8(6)4. First LED&pedestal run with nominal gain5. Cosmic trigger aligned with strip 1-8(6) & start 1st cosmic

run6. Analyze data and obtain MIP peaks, determine new APD

bias7. Remove any bad strips found.8. Repeat with strips 9-16, and 17-24

Mark Heinz EMCAL Meeting July 2008 11

Summary

• On track:– Cosmic trigger parts available for installation by July 31.

Configuration and setup thereafter will take 1-2 months.– EMCAL DAQ will be in place at Yale/Grenoble labs by end

of July. Needs to be tested.

• Next steps (Yale/Grenoble):– Software needs to be developed/adapted to the cosmic

trigger setup. Analysis tools need to be streamlined.

• Outstanding Issues (Yale): – HV EMCAL supply needs to be ordered for Yale– EMCAL Test-modules need to be made available at Yale by Mid-

August to commence realistic trigger testing.