ELLIOTT + ASSOCIATES ARCHITECTS ADDENDUM 2 35 Harrison Avenue Oklahoma City, Oklahoma 73104 405.232.9554 University of Central Oklahoma UCO STEM Teaching and Research Center Edmond, Oklahoma November 28, 2016 ADDENDUM 2 _____________________________________________________________________________________ This addendum is hereby made part of the Contract Documents to the same extent as though it were originally included therein. Refer to “Bid Form” for acknowledgment of Addenda. All Contractors, Subcontractors and suppliers are reminded that they shall review and be familiar with all Addenda items (as well as all parts of the Construction Documents) so, as to understand the extent of their work and its interrelation with other trades. To all bidders for furnishing all labor and materials necessary for the following contract: UCO STEM Teaching and Research Center University of Central Oklahoma, Edmond, Oklahoma Prepared and Issued by: Elliott + Associates Architects This addendum includes: (7) 8.5 x 11 pages (Including this sheet) (35) 24 x 36 Drawing Sheets MECHANICAL ITEM AD2-M01 Refer to page 23 82 19 - 3, and add the following sub-paragraph: "3.2.D - Suspend the fan-coil units from spring isolators. Refer to specification section 23 05 48 and the "Vibration Isolation Schedule" on drawing M4.01. Refer to page 23 82 19 - 3 and add the following sub-paragraph: "3.3.E - Install flexible duct connectors at the unit in the supply and return air duct connections. ITEM AD2-M02 Refer to page 23 36 00 - 4, sub-paragraph 3.1.C and add the following sentence: "Refer to specification section 23 05 48 and the "Vibration Isolation Schedule" on drawing M4.01." Refer to page 23 36 00-5 and add the following sub-paragraph: "3.1.E - Install flexible duct connectors at the FPT unit. ITEM AD2-M03 Refer to page 22 62 13 - 5, and add the following sub-paragraph: "2.7.C.3 Wiring - 120/1/60 power to the alarm panel will be provided under Division 26. The low voltage wiring between the pressure sensors and the control panel shall be furnished and installed in accordance with manufacturer's instructions, as work under Section 22 62 13."

Transcript of ELLIOTT + ASSOCIATES ARCHITECTS ADDENDUM 2 35...

ELLIOTT + ASSOCIATES ARCHITECTS ADDENDUM 2 35 Harrison Avenue Oklahoma City, Oklahoma 73104 405.232.9554 University of Central Oklahoma UCO STEM Teaching and Research Center Edmond, Oklahoma November 28, 2016 ADDENDUM 2 _____________________________________________________________________________________ This addendum is hereby made part of the Contract Documents to the same extent as though it were originally included therein. Refer to “Bid Form” for acknowledgment of Addenda. All Contractors, Subcontractors and suppliers are reminded that they shall review and be familiar with all Addenda items (as well as all parts of the Construction Documents) so, as to understand the extent of their work and its interrelation with other trades. To all bidders for furnishing all labor and materials necessary for the following contract: UCO STEM Teaching and Research Center University of Central Oklahoma, Edmond, Oklahoma Prepared and Issued by: Elliott + Associates Architects This addendum includes: (7) 8.5 x 11 pages (Including this sheet) (35) 24 x 36 Drawing Sheets

MECHANICAL ITEM AD2-M01 Refer to page 23 82 19 - 3, and add the following sub-paragraph:

"3.2.D - Suspend the fan-coil units from spring isolators. Refer to specification section 23 05 48 and the "Vibration Isolation Schedule" on drawing M4.01. Refer to page 23 82 19 - 3 and add the following sub-paragraph: "3.3.E - Install flexible duct connectors at the unit in the supply and return air duct connections.

ITEM AD2-M02 Refer to page 23 36 00 - 4, sub-paragraph 3.1.C and add the

following sentence: "Refer to specification section 23 05 48 and the "Vibration Isolation Schedule" on drawing M4.01." Refer to page 23 36 00-5 and add the following sub-paragraph: "3.1.E - Install flexible duct connectors at the FPT unit.

ITEM AD2-M03 Refer to page 22 62 13 - 5, and add the following sub-paragraph:

"2.7.C.3 Wiring - 120/1/60 power to the alarm panel will be provided under Division 26. The low voltage wiring between the pressure sensors and the control panel shall be furnished and installed in accordance with manufacturer's instructions, as work under Section 22 62 13."

ITEM AD2-M04 The following mechanical sheets have been revised: M1.00 MECHANICAL SITE PLAN, SYMBOLS, & GENERAL

NOTES M2.10 FIRST FLOOR HVAC REFERENCE PLAN M2.11 ENLARGED FIRST FLOOR HVAC PLAN - AREA 1 M2.12 ENLARGED FIRST FLOOR HVAC PLAN - AREA 2 M2.13 ENLARGED FIRST FLOOR HVAC PLAN - AREA 3 M2.14 ENLARGED FIRST FLOOR HVAC PLAN - AREA 4 M2.20 SECOND FLOOR HVAC REFERENCE PLAN M2.21 ENLARGED SECOND FLOOR HVAC PLAN - AREA 1 M2.22 ENLARGED SECOND FLOOR HVAC PLAN - AREA 2 M2.23 ENLARGED SECOND FLOOR HVAC PLAN - AREA 3 M2.24 ENLARGED SECOND FLOOR HVAC PLAN - AREA 4 M2.30 MECHANICAL PENTHOUSE PLAN M2.31 ENLARGED MECHANICAL PENTHOUSE PLAN M2.40 MECHANICAL ROOF PLAN M3.01 FIRST FLOOR HVAC PIPING PLAN M3.02 SECOND FLOOR HVAC PIPING PLAN M4.01 MECHANICAL SCHEDULES M4.02 MECHANICAL SCHEDULES M4.03 MECHANICAL SCHEDULES M4.04 MECHANICAL SCHEMATICS M4.05 MECHANICAL ENLARGED PLANS, ELEVATIONS, & DETAILS M4.09 TEMPERATURE CONTROLS - AUTO ISOLATION VALVES P1.00 UNDERFLOOR PLUMBING PLAN P2.10 FIRST FLOOR PLUMBING REFERENCE PLAN P2.11 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 1 P2.12 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 2 P2.13 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 3 P2.14 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 4 P2.20 SECOND FLOOR PLUMBING REFERENCE PLAN P2.21 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 1 P2.22 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 2 P2.23 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 3 P2.24 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 4 P3.01 PLUMBING ISOMETRICS P3.02 PLUMBING SCHEMATICS & DETAILS

ITEM AD2-M05 Refer to Section 21 13 13 "Wet-Pipe Sprinkler System" - A second

flow test was conducted in a portion of the water distribution system more relevant to the STEM building. A report of this second flow test and a partial site plan locating fire hydrants are attached at the end of this addendum. The elevation of the fire-line tap is approximately 9' below the flow test hydrant elevations, so the available pressure should be adjusted accordingly. If possible to eliminate a requirement for a fire pump, upsize the fire protection piping to reduce the pipe friction head.

SCALE B

SCALE ASCALE BSCALE C

DATE: 11-04-2016 CONDUCTED BY: E. Baze TIME: 12:42 PM JOB #:CONTRACT NAME: UCO STEM

BID INFORMATION:

WATER DISTRICT: EdmondFIRE DISTRICT: Edmond

WATER FLOW TEST SUMMARYHYDRANT #

DESIGN BASE: X

#1

TOTAL FLOW

STATIC PSI RESIDUAL PSI PITOT PSI FLOW GPMOUTLET I.D.INCHES

OUTLETCOEFFICIENT

ADJUSTEDGPM

AREAMAP

NOTES:Test #1Hydrant #1 produced a static of 48 psi and a residual of 38 psi with hydrant #2producing a pitot of 48 psi.

PRES

SUR

E PS

I

48 2.5"38 ~

ADDRESS:UCO Campus, Edmond, Oklahoma BAZEDRAFTING DESIGN

#2 2.5" 0.901291.68 1162.5148~

SEE ATTACHED

~

AutoCAD SHX Text
0
AutoCAD SHX Text
10
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
40
AutoCAD SHX Text
50
AutoCAD SHX Text
60
AutoCAD SHX Text
70
AutoCAD SHX Text
80
AutoCAD SHX Text
90
AutoCAD SHX Text
100
AutoCAD SHX Text
110
AutoCAD SHX Text
120
AutoCAD SHX Text
130
AutoCAD SHX Text
140
AutoCAD SHX Text
150
AutoCAD SHX Text
160
AutoCAD SHX Text
170
AutoCAD SHX Text
180
AutoCAD SHX Text
190
AutoCAD SHX Text
200
AutoCAD SHX Text
210
AutoCAD SHX Text
220
AutoCAD SHX Text
230
AutoCAD SHX Text
240
AutoCAD SHX Text
200
AutoCAD SHX Text
300
AutoCAD SHX Text
400
AutoCAD SHX Text
500
AutoCAD SHX Text
600
AutoCAD SHX Text
700
AutoCAD SHX Text
800
AutoCAD SHX Text
900
AutoCAD SHX Text
1000
AutoCAD SHX Text
400
AutoCAD SHX Text
600
AutoCAD SHX Text
800
AutoCAD SHX Text
1000
AutoCAD SHX Text
1200
AutoCAD SHX Text
1400
AutoCAD SHX Text
1600
AutoCAD SHX Text
1800
AutoCAD SHX Text
2000
AutoCAD SHX Text
800
AutoCAD SHX Text
1200
AutoCAD SHX Text
1600
AutoCAD SHX Text
2000
AutoCAD SHX Text
2400
AutoCAD SHX Text
2800
AutoCAD SHX Text
3200
AutoCAD SHX Text
3600
AutoCAD SHX Text
4000
AutoCAD SHX Text
SYSTEM DEMAND
AutoCAD SHX Text
CITY WATER CURVE
AutoCAD SHX Text
PSI
AutoCAD SHX Text
GPM
AutoCAD SHX Text
0 GPM @ 48 PSI
AutoCAD SHX Text
STATIC
AutoCAD SHX Text
1162.51 GPM @ 38 PSI
AutoCAD SHX Text
RESIDUAL

SGDI

TG=1192.78

FL(W)=1187.18

FL(E)=1187.23

SGDI

TG=1192.80

FL(W)=1188.00

FL(E)=1188.10

SGDI

TG=1188.49

FL=1185.99

1312"RCP

24"RCP

Storm Inlet

TG=1184.86

FL(N)=1176.66

FL(W)=1176.56

SGDI

TG=1187.92

FL=1179.12

Storm Inlet

TG=1185.38

FL(N)=1178.98

FL(E)=1178.88

FL(W)=1179.28

SGDI

TG=1188.17

FL=1178.97

Storm Inlet

TG=1185.15

FL=1180.50

(No Outlet Found

For Inlets in This Area)

8"V

CP

8"V

CP

SSMH

TR=1189.11

FL(N)=1172.96

FL(S)=1172.91

24724"RCP

SGDI

TG=1188.02

FL(E)=1181.22

FL(W)=1181.17

253

SGDI

TG=1187.96

FL(E)=1181.01

FL(W)=1180.96

SDMH

TR=1194.11

FL(N)=1188.66

FL(W)=1188.56

LP

FH

(SEALED)

TR=1189.86

SDMH

FL=1184.43

TG=1189.53

DGDI

3'x3'Box

FL(W)=1184.35

FL(E)=1184.40

TG=1189.65

DGDI

3'x3'Box

8"V

CP

8"V

CP

vault

comm

E 2125612.98

N 238580.74

DO

DO

DO DO

DOSS

SS

GM

XFMR

GE

NE

RA

TO

R

EM

DRAWING DATED 5/17/2016

PER EDMOUND ELECTRIC

ELECTRICAL CONDUIT

OF END OF EXISTING

CONFIRM LOCATION

FF 1197.00

FF 1200.00

trees

plastic

plastic

pine

LP

Do Not Enter

pine

Stop

pine

GPGP

DSBUSH

rcp

treestrees

(x3)

GP

DS

1x1.5

ICVGP

SGDI

d

SG

DI

GP

SGDI

LP

Visitor Parking

LPLPLP

14"

LP

Motorcycle ParkingMotorcycle ParkingMotorcycle Parking

GP

W WM

trees

pine

8"

auto spkr

WV

ICV

10"

1x1.5

No Parking

12"

Map

12"

10"

BUSH

SignSignSign

LP

BUSH

GV

1x1.5

LP

HC HC

ICV

HC

GP

HC

GP

BUSH

LPLPLP

Reserved

Tree

8"PVC88"PVC

No ParkingNo ParkingNo Parking

Reserved

ICV

1x1.5

GP

BUSH

GP

WV

W WM

auto spkr

2"2"2"

1.5x11.5x1

1.5x1

ICV

10"

ICV

1 x 11 x 11 x 1

LPLPLP

LP

10"

GP

GP

com mh

GPGP

Do Not Enter

E 2125919.79

N 238374.84

14

24"R

CP

24"R

CP

24"RCP24"RCP

4"

4"

1x1.5

LP

Stop

GP

No Parking

GP

1x1.5

GP

GP

Visitor

Com Parking

WVWWM

12"

vault

1x1 box

4"

GP

1x1.5 boxGP GP

GP

com mh

WV

1x1.5 box

LP

1x1.5 box

GP

GP

No Parking

LP

4" LP

GP

DO

DD

DD

GP

DO

10"

WV

Pedestrian X

WV

WV

FH

LP

12"

8"P

VC

WV

FH

No Parking

LP

10"

moto parking only

FLOW TESTING

HYDRANTS FOR

PROPOSED FIRE

E 2125362.66

N 238665.71

E 2125636.85

N 238914.02

Dayne Moreton
Ellipse
Dayne Moreton
Ellipse
Dayne Moreton
Callout
PROPOSED POT HOLE LOCATION FOR EXISTING 8" WATER LINE
Dayne Moreton
Callout
PROPOSED POT HOLE / LOCATION BY EXCAVATION OF END OF EXISTING ELECTRICAL CONDUIT
Dayne Moreton
Rectangle
Dayne Moreton
Snapshot
eric.baze
Text Box
FIRE HYDRANT #1 CAPPED STATIC PRESSURE: 48 PSI RESIDUAL PRESSURE: 38 PSI
eric.baze
Text Box
FIRE HYDRANT #2 FLOW PITOT PRESSURE: 48 PSI FLOW: 1291.68 GPM 1162.51 GPM ADJUSTED

ELLIOTT + ASSOCIATES ARCHITECTS ADDENDUM 2

35 Harrison Avenue Oklahoma City, Oklahoma 73104 405.232.9554 University of Central Oklahoma UCO STEM Teaching and Research Center Edmond, Oklahoma November 28, 2016

ELECTRICAL

ITEM AD2-E01 Refer to Spec Section 270528, Pathways for Communication Systems. In Section 3.2.I.5, revise statement to read “Change from RNC, Type EPC-40-PVC to GRC before rising above the floor.

ITEM AD2-E02 Refer to Drawing E1.10, Electrical Site Plan, Plan Note *11 and E5.01,

First Floor Communications and Data Plan, Keynote E51. Delete the requirement to provide Maxcell innerduct inside the 4” I.T. conduits. Provide just the conduit and pull strings without the innerduct.

ITEM AD2-E03 Refer to Drawing E2.01, First Floor Lighting Plan. The following placement of devices should be noted to provide the correct coordination with the drawing’s revised floorplan background:

1. In Lecture Hall 134, the Type “K” step lights in the center of the

room need to be shifted into the middle of the open walkway and not under the east tables.

2. In Beresford Endowed Chair 127, the dimming light switch is to be on the wall east of the door opening into the room.

3. In I.T. 131, the dimming light switch is to be inside the room just to the east of the door opening.

4. In Computer Simulation 137, the dimming light switch is to be just to the west of the revised door opening and not behind the door.

ITEM AD2-E04 Refer to Drawing E2.01, First Floor Lighting Plan. The “unnamed” circuit for the Type “G” fixture in the Elevator 000 pit is “LSBD”-8.

ITEM AD2-E05 Refer to Drawing E2.01, First Floor Lighting Plan. The “unnamed”

circuit for the LV1 panel in Electrical Room 142 is “1HSB”-30. ITEM AD2-E06 Refer to Drawing E2.01, First Floor Lighting Plan. In Lecture Hall 147,

homerun indicated as “1HN”-1,7 should just be “1HN”-7.

ITEM AD2-E07 Refer to Drawing E2.02, Second Floor Lighting Plan. In Work Room

228, delete the row of undercabinet fixtures on the north wall above the copy machine.

ITEM AD2-E08 Refer to Drawing E2.02, Second Floor Lighting Plan. In E. Office Corr.

204, note the missing circuit connection shown below between the two Type “T” fixtures.

ITEM AD2-E09 Refer to Drawing E2.02, Second Floor Lighting Plan. In E. Office Corr.

204, note the missing circuit connection shown below between the two Type “T” fixtures.

ITEM AD2-E10 Refer to Drawing E2.03, Penthouse Lighting Plan. In Penthouse 301,

the low-voltage relay panel on the north wall should be labeled “LVP” and not “LV3”.

ITEM AD2-E11 Refer to Drawing E4.02, Second Floor Motors and Equipment Plan, E7.06, Motor Equipment Schedule-1, and E8.05, Panelboard Schedules. In Ward Lab 265, Division 22 has added a Medical Gas Alarm Panel that needs 120V power. Provide circuit “2LLN6”-32 and update panelboard schedule accordingly.

ITEM AD2-E12 Refer to Drawing E7.01, Electrical Riser Diagram and panelboard

schedules for “MSBD”, “1HSB”, “1LND”, “1HSB”, “2LND”, “PHN”, and Generator. Provide 100% rated breakers for the L-frame circuit breakers indicated on the drawings and in the panelboard schedules.

END OF ADDENDUM 2

FEC

FEC

FEC

FEC

FEC

S P

DUMPSTER

INTAKE

EXISTING SIDEWALK

NEW

SIDEWALK

GAS

1500KVAUTIL TRFM

NG 400KW GEN

285LX96.02WX112.5HG

CW

CS

GF

CSCR

HSH

R

G

8"5"

4"

3" - BASE BID

4" - ALTERNATE #6

6"

IW

IW

IW CW F

6"4"2"

2"

6" 4" 2"

M

M

N

N

88

1010

1212

1313

1414

1616

1717

2020

H

H

J

J

K

K

L

L

99

1111

1515

1818

1919

NEW UCO STEM BUILDING

13.513.5

A

A

C

C

D

D

E

E

F

F

G

G

B

B

11223344

5566

77

6" SS

4" AW

4" SS

NEUTRALIZINGTANK

SAMPLINGMANHOLE

REFER TO CIVIL DRWGS.

REFER TO CIVIL DRWGS.FOR CONTINUATION

REFER TO CIVIL DRWGS.FOR CONTINUATION

REFER TO CIVIL DRWGS.FOR CONTINUATION

REFER TO CIVIL DRWGS.FOR CONTINUATION

6" SD6" SD

6" SD

6" SD

6" SD

6" SD

6" SD

P-8

P-8

P-8

P-8

P-8

P-8

P-8

P-8

4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION

4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION

4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION

4"SD, REFER TO CIVIL DRWGS.FOR CONTINUATION

REFER TO CIVIL DRWGS.FOR CONTINUATION

4" SD

*1

*1

*1

*1

*1

*1

FIRE DEPT.CONNECTION

GAS SERVICE LINE,REFER TO CIVIL DWGS.

GAS METER AS REQUIRED BYOKLAHOMA NATURAL GAS CO.,BLDG. DEMAND - 2180 CFHGENERATOR DEMAND - 2115 CFH (BASE BID)GENERATOR DEMAND - 4230 CFH (ALT #6)

COLD WATER MAXDEMAND = 230 GPM

REFER TO PLAN "A" ON SHEET M4.05FOR LARGE SCALE PLAN OFMECHANICAL ROOM & UTILITY YARD

ALL IN-GROUND UTILITIESSHALL HAVE A TRACER WIRE.

CONTRACTOR SHALLCOORDINATE THEELEVATIONS OF THEUTILITIES AT THECROSSING POINTS.

C.O.

AV

NOTE: ALL SYMBOLS DO NOTNECESSARILY APPEAR ON PLANS.

ACID VENT ATV ATMOSPHERIC VENT (STEAM)CR CHILLED WATER RETURNCS CHILLED WATER SUPPLY

CHR CHILLED-HEATING WATER RETURNCHS CHILLED-HEATING WATER SUPPLYCDR CONDENSING WATER RETURNCDS CONDENSING WATER SUPPLY

HR HEATING WATER RETURN

HS HEATING WATER SUPPLY

RHG REFRIGERANT HOT GASRL REFRIGERANT LIQUID

RS REFRIGERANT SUCTIONSMR SNOW MELTING HEATING WATER RETURNSMS SNOW MELTING HEATING WATER SUPPLYHSR STEAM RETURN - HIGH PRESSURESR STEAM RETURN - LOW PRESSURE

MSR STEAM RETURN - MEDIUM PRESSUREHSP STEAM - HIGH PRESSURE

S STEAM - LOW PRESSUREMS STEAM - MEDIUM PRESSURE

AW ACID WASTE

FIRE PROTECTION, PRE-ACTION SYSTEM

DWR CHILLED DRINKING WATER RETURNDWS CHILLED DRINKING WATER SUPPLY

A [COMPRESSED] AIR

CW DOMESTIC COLD WATERHW DOMESTIC HOT WATER

HW 140 DOMESTIC HOT WATER - 140°FHWR DOMESTIC HOT WATER RETURN

HWR 140 DOMESTIC HOT WATER RETURN - 140°FFCW FILTERED COLD WATERFP FIRE PROTECTION

NG NATURAL GAS - LOW PRESSURENG-M NATURAL GAS - MEDIUM PRESSURE

D INDIRECT DRAIN

O [COMPRESSED AIR] "OXYGEN" GAS

PDL PERFORATED DRAIN LINE

PW PURE WATERPWR PURE WATER RETURNRWS RAIN WATER SUPPLY

RD ROOF DRAIN

SRD SECONDARY ROOF DRAIN

SV SANITARY VENTSS SANITARY SEWER (WASTE)

SD STORM DRAIN

TW TEMPERED WATERTWR TEMPERED WATER RETURN

V VACUUM PIPING

BALL VALVE

GATE VALVEGLOBE VALVECHECK VALVE

MOTOR OPERATED VALVEBUTTERFLY VALVE

GEAR OPERATED BUTTERFLY VALVE

MOTOR OPERATED BUTTERFLY VALVEUNIONPLUG COCKBALANCING COCK

CALIBRATED BALANCING COCK

GAS PRESSURE REGULATORPRESSURE REDUCING VALVE

FLOW SWITCHSTRAINER - WYE TYPE

STRAINER - BASKET TYPECONCENTRIC REDUCERPIPE ANCHOREXPANSION JOINT

BACK FLOW PREVENTER

PIPE SLEEVE

X

FLEXIBLE CONNECTORTHERMOMETER

THERMOMETER WELL

PRESSURE RELIEF VALVEPRESSURE GAUGE WITH SHUT-OFF COCK

YARD HYDRANTWALL HYDRANTAIR ELIMINATOR - AUTOMATICWATER HAMMER ARRESTORS

CLEANOUTFLOAT AND THERMOSTATIC TRAP

PRESSURE AND TEMPERATURECONNECTOR PLUG

Y.H.W.H.

THERMOSTATIC TRAPD.A. DRIP ASSEMBLY (REFER TO DETAIL)T.A. TRAP ASSEMBLY (REFER TO DETAIL)

PITCH DOWN IN DIRECTION OF ARROWFLOW IN DIRECTION OF ARROWFLOOR DRAIN TYPE "A" INDICATEDAREA DRAIN TYPE "A" INDICATED

THERMOSTAT

F.D."A"A.D."A"

HUMIDISTATCONNECT TO EXISTING

F.D.C. FIRE DEPARTMENT CONNECTIONF.F. FINISHED FLOORG.C. GENERAL CONTRACTORM.C. MECHANICAL CONTRACTORP.C. PLUMBING CONTRACTOR

T

H

V.T.R. VENT THROUGH ROOFV.C.T. VITRIFIED CLAY TILES.A. SOUND ABSORBER

ICW INDUSTRIAL COLD WATER

FPPRR REFRIGERANT RELIEF

HR 180 HEATING WATER RETURN - 180°F SYSTEMHR(SB) HTG. WTR. RETURN - SUMMER SETBACK SYS.

HS 180 HEATING WATER SUPPLY - 180°F SYSTEMHS(SB) HTG. WTR. SUPPLY - SUMMER SETBACK SYS.

FUTURE PIPING, ACCESSORIES & EQUIP-MENT (FINE DASHED)

PRIMARY ROOF DRAINSECONDARY ROOF DRAINPRIMARY SYPHONIC ROOF DRAINSECONDARY SYPHONIC ROOF DRAINS

S

IW IRRIGATION WATER

NON-SLAM CHECK VALVE

PIPE GUIDE

T.W.

TEMPERATURE SENSORT

AUTOMATIC GAS SHUTOFF VALVE

E.C. ELECTRICAL CONTRACTOR

C.I. CAST IRONB.G. BELOW GRADE

A.F.G. ABOVE FINISHED GRADE

MECHANICAL SYMBOLS

D.N. DOWNSPOUT NOZZLE (ROOF DRAIN ORSECONDARY ROOF DRAIN DISCHARGE)

ERR ENERGY RECOVERY RETURN (GLYCOL)ERS ENERGY RECOVERY SUPPLY (GLYCOL)

CO2 CARBON DIOXIDE LAB GASCF4 CARBON TETRAFLUORIDE LAB GAS

LA COMPRESSED LAB AIR

O2 [PURE] OXYGEN LAB GAS

LGRV LAB GAS RELIEF VENT

LV LAB VACUUM PIPING

N NITROGEN GASN5 [PURE] NITROGEN LAB GAS

RO REVERSE OSMOSIS WATER

SCW SOFTENED COLD WATER

TSW TEMPERED SAFETY WATER

FIRE PROTECTION, CLEAN-AGENT SYSTEMFPC

HW(HT) DOMESTIC HOT WATER, HEAT TRACED

BALL VALVE (IN VERTICAL PIPE)

PD PUMPED (PRESSURIZED) DRAIN

SSD SUB-SOIL DRAIN

C CONDENSATE DRAIN

PRESSURE SENSORPS

GENERAL NOTES (APPLIES TO ALL HVAC PLANS)

CONDENSATE DRAINS TO BE INSTALLED WITH 1/8" PER FOOT SLOPEMINIMUM.

1.

COORDINATE WITH ALL TRADES TO PROVIDE MAINTENANCE ANDOPERATIONAL CLEARANCES OF ALL MECHANICAL EQUIPMENT.

2.

GENERAL NOTES (APPLIES TO ALL PLUMBING PLANS)

ALL PIPE SIZES ARE IN INCHES UNLESS OTHERWISE NOTED.1.

REFER TO ARCHITECTURAL FLOOR PLANS FOR FINAL LOCATION OFPLUMBING FIXTURES.

2.

DO NOT ROUTE PIPING OVER THE ELECTRICAL ROOMS OR ELECTRICALPANELS.

3.

4. PROVIDE ACCESS PANELS IN GYP. BOARD CEILINGS FOR ACCESS TOISOLATION VALVES.

THE FINAL LOCATION OF ALL "V.T.R." SHALL BE LOCATED A MINIMUM OF10 FT. FROM THE NEAREST PORTION OF THE OUTSIDE AIR INTAKESUNLESS OTHERWISE NOTED.

5.

INSTALL ACCESSIBLE WATER HAMMER ARRESTORS IN DOMESTIC C.W.AND H.W. LINES AT EACH BATTERY OF PLUMBING FIXTURES.

6.

INSTALL CHECK VALVES IN THE C.W. AND H.W. BRANCH LINES SERVINGEACH MOP BASIN.

7.

GENERAL DELINEATION POINT: MECHANICAL/PLUMBING CONTRACTORSHALL INSTALL PIPING TO A POINT 5 FT. BEYOND THE BUILDING OR ASOTHERWISE INDICATED. EXTENSION OF SITE PIPING SHALL BEFURNISHED UNDER ANOTHER DIVISION.

8.

SHEET PLAN NOTES SYMBOL = *

SECONDARY ROOF DRAIN TERMINATION WITH OVERFLOW DOWNSPOUTNOZZLE AT 1'-6" ABOVE FINISHED GRADE & SPLASH BLOCK

*1

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M1.00

MECHANICAL SITEPLAN, SYMBOLS, &GENERAL NOTES0 60'20' 80'40'

NORTH

1" = 20'-0"

AMECHANICAL SITE PLAN

MECHANICAL DRAWING INDEXSHEET

NUMBER DESCRIPTIONM1.00 MECHANICAL SITE PLAN, SYMBOLS, & GENERAL NOTESM2.10 FIRST FLOOR HVAC REFERENCE PLANM2.11 ENLARGED FIRST FLOOR HVAC PLAN - AREA 1M2.12 ENLARGED FIRST FLOOR HVAC PLAN - AREA 2M2.13 ENLARGED FIRST FLOOR HVAC PLAN - AREA 3M2.14 ENLARGED FIRST FLOOR HVAC PLAN - AREA 4M2.20 SECOND FLOOR HVAC REFERENCE PLANM2.21 ENLARGED SECOND FLOOR HVAC PLAN - AREA 1M2.22 ENLARGED SECOND FLOOR HVAC PLAN - AREA 2M2.23 ENLARGED SECOND FLOOR HVAC PLAN - AREA 3M2.24 ENLARGED SECOND FLOOR HVAC PLAN - AREA 4M2.30 MECHANICAL PENTHOUSE PLANM2.31 ENLARGED MECHANICAL PENTHOUSE PLANM2.40 MECHANICAL ROOF PLANM3.01 FIRST FLOOR HVAC PIPING PLANM3.02 SECOND FLOOR HVAC PIPING PLANM4.01 MECHANICAL SCHEDULESM4.02 MECHANICAL SCHEDULESM4.03 MECHANICAL SCHEDULESM4.04 MECHANICAL SCHEMATICSM4.05 MECHANICAL ENLARGED PLANS, ELEVATIONS, & DETAILSM4.06 TEMPERATURE CONTROLSM4.07 TEMPERATURE CONTROLSM4.08 TEMPERATURE CONTROLSM4.09 TEMPERATURE CONTROLS - AUTO ISOLATION VALVES

P1.00 UNDERFLOOR PLUMBING PLANP2.10 FIRST FLOOR PLUMBING REFERENCE PLANP2.11 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 1P2.12 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 2P2.13 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 3P2.14 ENLARGED FIRST FLOOR PLUMBING PLAN - AREA 4P2.20 SECOND FLOOR PLUMBING REFERENCE PLANP2.21 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 1P2.22 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 2P2.23 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 3P2.24 ENLARGED SECOND FLOOR PLUMBING PLAN - AREA 4P3.01 PLUMBING ISOMETRICSP3.02 PLUMBING SCHEMATICS & DETAILS

UP

UP

FEC

FEC

FEC

UP

UP ATS

SB

SB

F/S

F/S

F/S

F/S

F/S

FF

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

M M

N N

8

8

10

10

12

12

13

13

14

14

16

16

17

17

20

20

H H

J J

K K

L L

9

9

11

11

15

15

18

18

19

19

13.5

13.5

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.10

FIRST FLOOR HVACREFERENCE PLAN

0 8' 16' 24' 32'NORTH

1/8" = 1'-0"

AFIRST FLOOR HVAC REFERENCE PLAN

NORTH

KEY PLAN (1ST FLR.)

AREA "1"

AREA "2"

AREA "3"

AREA "4"

FEC

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

8

8

10

10

FSICORRIDOR

117

FSI STOR.119

FSI ALSEXAMROOM

118

AMP116

PRE PCR115

EXTRACT.PREP.

114FSI PREP.ROOM

113

FSI/MOLECULAREVOLUTIONARY

BIOLOGYTEACHING

LAB112

FSIIMPRESSION

EVIDENCELAB121

OFFICE130

BERESFORDENDOWED

CHAIR127

WHEELCHAIRSTOR.

128

WHEELCHAIRSIMULATION

PROJECT129

TL STYLECLASSROOM

120

JAN.148

9

9

11

11

MAV-113

MAV-115

MAV-116

MAV-118

MAV

-121

HEV

-112

AH

EV-1

12B

HEV-112C

HEV

-112

D

GEV

-112

GEV

-113

GEV

-115

GEV

-116

GEV-118

HEV-121

GEV

-121

A

GEV-121B

VAV-120

VAV-

114

VAV-106

FPT-101

VAV-129/128

VEND 1149

VAV-130

VAV-

107

GEV-148CP-10

CP-14(TSI)

CP-15(TSI)

CP-16(TSI)

CP-17(TSI)

HWC-113

HWC-112A

HWC-121

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

10"ø

8"ø 8"

ø15"x8"

15"x

8"

8"ø 10

14"ø 12"ø

15"x15" 12"ø

12"ø

14"ø

14"ø 22"x14"Θ

14"ø

8"ø

8"ø

8"ø

14"x

10"

12"ø

10"ø

12"ø

11"ø

10"ø

8"ø

29"x16"Θ27"x14"Θ

12"ø

8"ø 6"

ø

14"ø

29"x18"Θ

29"x18"Θ 31"x20"Θ 34"x22"Θ

14"ø10

10"ø

14"ø

30"ø

6"ø

40"x20"Θ 44"x24"Θ

6"ø

6"ø

6"ø

8"ø

18"ø

40"x2

4"Θ

28"x

28"

36"x36" 36"x36"

36"x36" 36"x36"

28"x28"

10"ø

18"ø

10"ø

14"ø

14"ø

10"ø

10"ø

10"ø10"ø

10"ø

10"ø

12"ø

14"x

13"

10"ø

10"ø

8"ø

8"ø12

31"x20"Θ 36"x20"Θ 40"x20"Θ

40"x20"Θ

33"x

18"

10"ø

10"ø

24"x12"

52"x

18"

23"x20"Θ

23"x20"Θ

12"ø

11"ø

10"ø8"ø

14"ø

8"ø

14"x

10"

8"ø8"ø8"ø

8"ø

8"ø

10"ø

24"x12" 16"ø

16"ø

14"x

13"

10"ø

14"ø

25"ø16"ø

8"ø 8"ø 8"ø

8"ø

14"ø

14"ø

8"ø

12"ø

318A10" x 24SQ

0A10" x 24SQ

706A12" x 24SQ

353A10" x 24SQ

353A10" x 24SQ

261A8" x 24SQ

0A10" x 24SQ 417A

10" x 24SQ0A

12" x 24SQ417A

10" x 24SQ0A

12" x 24SQ

199J8" x 24SQ

379J8" x 24SQ 354J

8" x 24SQ199J8" x 24SQ

379J8" x 24SQ 354J

8" x 24SQ

100A6" x 24SQ

326K12" x 48/24

50A6" x 24SQ

180A8" x 24SQ

HWC-118

180A8" x 24SQ

377J8" x 24SQ

367J8" x 24SQ

377J8" x 24SQ

377J8" x 24SQ

377J8" x 24SQ

377J8" x 24SQ

367J8" x 24SQ

177A8" x 24SQ

177A8" x 24SQ

122A6" x 24SQ

122A6" x 24SQ

122A6" x 24SQ

171A8" x 24SQ

171A8" x 24SQ

367J8" x 24SQ

367J8" x 24SQ

377J8" x 24SQ

340J8" x 24SQ

340J8" x 24SQ

377J8" x 24SQ

367J8" x 24SQ

377J8" x 24SQ

367J8" x 24SQ

180A8" x 24SQ

180A8" x 24SQ

180A8" x 24SQ

542A12" x 24SQ

542A12" x 24SQ

180A8" x 24SQ

379J8" x 24SQ

199J8" x 24SQ

199J8" x 24SQ

199J8" x 24SQ

379J8" x 24SQ

199J8" x 24SQ

223A8" x 24SQ

199J8" x 24SQ

379J8" x 24SQ

337E1S x 24"

8"

337E1S x 24"

8"

736F1S x 36"

736F1S x 36"

336E1S x 24"

10"

1,395F1S x 60" 1,395F

1S x 60"

336E1S x 24"

10"

336E1S x 24"

10"

171A8" x 24SQ

171A8" x 24SQ

10" x 10"158C

VAV-

127

VAV-119

MAV-112A

2"ø

18" x 10"450L

12"x

8"

10"ø

14"ø

H1 H1H1H1

H2

18"ø

8"ø

36"x7"36"x7"

12"x

12"

12"x

12"

HWC-112B

MAV-112B

14"x

13"

12"x

8"

12"x8" 8"ø

12"x

10"

60"x7" 60"x7"

38"x22"Θ

199J8" x 24SQ

10"ø

30"øH3

H3

H3

H1

16"x16" 16"x16"

10"ø

8"ø

6"ø

14"ø

10"ø

11"ø

10"ø

10"ø

10"ø

H10H10

H10

8"x8"

8"ø

30"x30"

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.11

ENLARGED FIRSTFLOOR HVAC PLAN -AREA 1

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H2 EXHAUST GRILLE WITH BOTTOM 12” ABOVE THE FLOOR EXHAUSTING INTO A 24”x4” DUCT IN THICKENED WALL.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER

TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED FIRST FLOOR HVAC PLAN - AREA 1

NORTH

KEY PLAN

AREA "1"

(1ST FLR.)

UP

FEC

FEC

UP

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

M M

8

8

10

10

OPERATIONSRESEARCH

CONSULTINGGROUP

126

DIGITALEVIDENCE

LAB123

DIGITALEVIDENCETEACHING

LAB124

FSI/MOLECULAR&

EVOLUTIONARYBIOLOGY

RESEARCHLAB122

VEST.101

SOUTHSTAIR

105

TL STYLECLASSROOM

125

S.CORRIDOR

106

H H

J J

K K

L L

9

9

11

11

MAV

-122

GEV

-122

HEV-122A

HEV

-122

B

HEV

-122

C

VAV-

124

VAV-

123

VAV-126

FPT-147A

VAV-109

FPT-100

FPT-147B

VAV-

125

CP-9

CP-13(TSI)

HW

C-1

22

G G

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MATCHLINE (E./W.)

MAT

CH

LIN

E (N

./S.)

8"ø

8"ø

22"x14"Θ27"x14"Θ

8"ø

8"ø

22"x

14"Θ

8"ø

8"ø

8"ø 8"ø 10"ø

8"ø

8"ø

12"ø

8"ø

8"ø

8"ø

8"ø

8"ø

8"ø 16

"ø20

"x18

"

8"ø

8"ø

29"x18"Θ

40"x

24"Θ

10"ø

10"ø

10"ø

16"x15"

14"ø

14"ø

8"ø

29"x

18"Θ

8"ø

8"ø

18"ø

8"ø8"ø

8"ø

8"ø

18"ø

10"ø

8"ø

10"ø

8"ø

8"ø

18"ø

8"ø

8"ø

14"ø

8"ø

8"ø

10"ø

10"ø

18"ø

10"ø

10"ø

10"ø

16"ø14"ø

8"ø

8"ø8"ø

8"ø

8"ø

8"ø

36"x

18"

11"ø

14"ø

337E1S x 24"

8"

337E1S x 24"

8"

736F1S x 36"

736F1S x 36"

336E1S x 24"

10"

1,395F1S x 60" 1,395F

1S x 60"

336E1S x 24"

10"

305E1S x 24"

8"

305E1S x 24"

8"

336E1S x 24"

10"

52"x

18"Θ

40"x

24"Θ

559A12" x 24SQ

279A10" x 24SQ

279A10" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

677A12" x 24SQ

677A12" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

135A8" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

825A14" x 24SQ

183A8" x 24SQ

183A8" x 24SQ

563A12" x 24SQ

160A8" x 24SQ

825A14" x 24SQ

160A8" x 24SQ

563A12" x 24SQ

160A8" x 24SQ

160A8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

160A8" x 24SQ

160A8" x 24SQ

160A8" x 24SQ

194J8" x 24SQ 194J

8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

194J8" x 24SQ

245J8" x 24SQ

245J8" x 24SQ

245J8" x 24SQ

2"ø

H1 H1H1H1

18"ø

36"x7"36"x7"

14"x

13"

60"x7" 60"x7"

14"x

13"

16"ø

14"ø

8"ø

25"x18"

25"x18"

10"ø

10"ø10"ø

12"x10"

10"ø

H3

H1

16"x16" 16"x16"

8"ø

H10H10

H10H10

H10

H10

H10

H10

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.12

ENLARGED FIRSTFLOOR HVAC PLAN -AREA 2

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED FIRST FLOOR HVAC PLAN - AREA 2

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER

TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "2"

(1ST FLR.)

UPUP

FF

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

12

12

13

13

14

14

16

16

17

17

20

20

WHEELCHAIRSTOR.

128

VEST.102

CREICCOLLABORATIVE

LAB134

OFFICE135

OFFICE136

DATAWORKROOM

133

CREICDATA

CENTER132

IT131

COMPUTERSIMULATIONS

137

COMPUTATIONALCLASSROOM

138

NORTHSTAIR

104

STOR.140

MEN'S111

WOMEN'S110

ELEV.

STOR.139

15

15

18

18

19

19

GEV

-110

/111

13.5

13.5

VAV-129/128

FPT-102

VAV-

131

VAV-

134

VAV-137

VAV-

108

FPT-103

VAV-133

VAV-

107

CRACU-1CRACU-2

CP-

7

CP-

12(T

SI)

CP-

8

A A

C CD D

E E

F F

G G

B B

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

38"x22"Θ

54"x16"Θ

38"x

22"Θ

6"ø

20"x18"

20"x18"

10"ø

8"ø

9"ø

8"ø

9"ø

8"ø

14"ø 14"ø 14"ø

14"ø

8"ø

8"ø

8"ø8"ø

8"ø

8"ø

8"ø

20"x18"

20"x18"

54"x16"Θ 46"x16"Θ 38"x16"Θ

14"ø

20"x

18"

8"ø 8"ø

8"ø

9"ø

8"ø

16"x15"

29"x

16"Θ

24"x

16"Θ

18"ø

12"ø

12"ø

12"ø

12"ø

12"ø

10"ø

8"ø12

8"ø

10"ø

10"ø

8"ø

8"ø

8"ø

9"ø9"

ø

122A6" x 24SQ

342A10" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

271A8" x 24SQ

271A8" x 24SQ

271A8" x 24SQ

271A8" x 24SQ

158A8" x 24SQ

158A8" x 24SQ

158A8" x 24SQ

237A8" x 24SQ

237A8" x 24SQ

237A8" x 24SQ

158A8" x 24SQ

158A8" x 24SQ

158A8" x 24SQ 158A

8" x 24SQ158A

8" x 24SQ158A

8" x 24SQ

237A8" x 24SQ

237A8" x 24SQ

237A8" x 24SQ

217A8" x 24SQ

217A8" x 24SQ

217A8" x 24SQ

217A8" x 24SQ

406E1S x 24"

8"

609F1S x 36"

406E1S x 24"

8"

406E1S x 24"

8"

10"Ø270H

10"Ø270H

12" x 6"26G

6" x 6"26G

30" x 10"1,002G

152A8" x 24SQ

152A8" x 24SQ

152A8" x 24SQ

520B12" x 24SQ

235B8" x 24SQ

235B8" x 24SQ

152A8" x 24SQ

518B12" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

500A15" x 24SQ

30" x 10"1,002C

368A10" x 24SQ

270E1S x 24"

8"

270E1S x 24"

8"

541E1S x 24"

10"

244A8" x 24SQ

244A8" x 24SQ

CAV

-132

VAV-135/136

609F1S x 36" FCU-104-1

VAV-

110/

111/

141

VAV-138

VAV-

127

14"x

13"

14"x

13"

12"x8"

8"x8

"

21"x13"

24"x

10"

24" x 10"800G

8"ø

541F1S x 24"

H8H8

H8H8

H8

H8

H8

H8H8

H8

44"x24"

14"ø

18"x18"

30"x

22"

18"ø

CONTROLDAMPER

10"ø

14"x

13"

12"x

8"

8"ø

10"Ø372H

10"Ø372H

10"ø

10"ø

30"ø

12"x10"

80"x24" R.A. DUCT FROMTOP OF CRACU UP TOCEILING R.A. PLENUM

NOTE: SEAL AIR TIGHT AROUND ALLDUCT PENETRATION OF THE DATACENTER WALLS AND FLOOR ABOVE.RHE DATA CENTER WILL HAVE A CLEANAGENT FIRE EXTINGISHING SYSTEM.

H9

H1

H1 H1

36"x7"

12"x10"

9"ø

12"ø

H1

36"x7"

H1

12"x

10"

9"x13"

16"x

8"

24"x7"

18" x 18"800C

18"x

18"

16"x8"

H1

H1

12"x10"

8"x8"

10"ø10"ø

19"x5"Θ TIGHT UNDER BEAM

8"ø

8"ø

6"ø

8"ø

8"ø

8"ø

14"ø

8"ø

8"ø

11"ø

10" x 10"385G

H8

H10H10

H10

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.13

ENLARGED FIRSTFLOOR HVAC PLAN -AREA 3

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED FIRST FLOOR HVAC PLAN - AREA 3

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H8 SEAL AROUND ALL DUCT PENETRATIONS THRU THE DATA CENTER WALLS FOR CLEAN-AGENT FIRE

PROTECTION SYSTEM CONTAINMENT.H9 NORMALLY OPEN TWO-POSITION AUTOMATIC CONTROL DAMPER – TO CLOSE WHEN CLEAN-AGENT FIRE

PROTECTION SYSTEM IS ACTIVATED.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "3"

(1ST FLR.)

FEC

ATS

SB

SB

F/S

F/S

F/S

F/S

F/S

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

M M

N N

12

12

13

13

14

14

16

16

17

17

20

20

OPERATIONSRESEARCH

CONSULTINGGROUP

126

VEST.100

STUDENTLOUNGE/LOBBY

109

VEST.103

LECTUREHALL/

SHELTER147

LOADING146

MECHANICAL145

ELEC.142

CYL.144

BIO WASTE143

N.CORRIDOR

108

H H

J J

K K

L L

15

15

18

18

19

19

GEV-143/144

13.5

13.5

FPT-147A

FPT-147B

VAV-

145/

146

E/WCORRIDOR

107

G G

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

10"ø

10"ø

16"x15"

10"ø

10"ø

16"ø

16"ø

16"ø

8"ø

8"ø

9"ø

9"ø

9"ø

18"ø

14"ø 16"x15"

8"ø

12"x8"

16"ø

16"ø

16"ø

16"ø

16"ø

16"ø

10"ø

10"ø

10"ø

270E1S x 24"

8"

270E1S x 24"

8"

541E1S x 24"

10"

244A8" x 24SQ

244A8" x 24SQ

250D1S x 60"

8"

250D1S x 60"

8"

250D1S x 57"

8"

250D1S x 60"

8"

250D1S x 60"

8"

250D1S x 60"

8"

250D1S x 60"

8"

250D1S x 60"

8"

250D1S x 60"

8"

250D1S x 57"

8"

250D1S x 60"

8"

250D1S x 60"

8"

10" x 8"194C

10" x 8"212C

12" x 8"156G

12" x 8"156G

10"Ø336H

10"Ø336H

10"Ø336H

10"Ø336H

279A10" x 24SQ

VAV-110/111/142

541F1S x 24"

20" x 10"806G

20" x 10"806G

10"x26"

FPPAir

Compr.-1

SP-1

HB

RET

UR

N A

IR D

UC

TU

P IN

CH

ASE

ABO

VE, D

O N

OT

POSI

TIO

N A

BOVE

ELEC

. EQ

UIP

.

F.D.C.

14"x

13"

25"x18"

25"x18"

10"ø

10"ø10"ø

12"x10"

10"ø

H1

H1 H1

BM4.0510"Ø

326H

24"x7"

H1

H1

H1

12"x10"

RETURN AIR DUCT FOR FPT-147A & B

RETURN AIR DUCT FOR FPT-147A & B

H10

H10H10

H10

H10H10

H10

H10

H10

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.14

ENLARGED FIRSTFLOOR HVAC PLAN -AREA 4

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED FIRST FLOOR HVAC PLAN - AREA 4

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "4"

(1ST FLR.)

DN

UP DN

FEC

FEC

UP DN

DN

F

F

M M

N N

8

8

10

10

12

12

13

13

14

14

16

16

17

17

20

20

H H

J J

K K

L L

9

9

11

11

15

15

18

18

19

19

13.5

13.5

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.20

SECOND FLOOR HVACREFERENCE PLAN0 8' 16' 24' 32'

NORTH

1/8" = 1'-0"

ASECOND FLOOR HVAC REFERENCE PLAN

NORTH

KEY PLAN (2ND FLR.)

AREA "1"

AREA "2"

AREA "3"

AREA "4"

8

8

10

10

BIOMEDICALENGINEERING

RESEARCHLAB249

CELLCULTURE

COREFACILITY

241

RESEARCHCELL/MOLECULAR

BIO. LAB248

STUDENTAREA

242

DARKROOM

247

BIOMEDICALEQUIPMENT

COREFACILITY

246

CORECORRIDOR

245

RESEARCHMICROBIOLOGY

LAB243

STERILIZATIONAREA

244

VEND 2209

OFFICE219

OFFICE218

JAN.216

OFFICE214 OFFICE

215

OFFICE210

OFFICE212

OFFICE213

S. STUDYSPACE

201

(OPEN TOBELOW)

(OPEN TOBELOW)

9

9

11

11

2ND FLOORCORRIDOR

200

GEV-246

GEV-244

GEV-243

HEV-243A

HEV

-243

B

HEV-248AHEV-248B

HEV

-248

D

HEV-248C

GEV-248

GEV-249

HEV

-249

GEV-247

VAV-201/209

MAV-244

MAV-243

MAV

-248

A

MAV-248B

MAV

-249

MAV-246

MAV-247

VAV-200A

VAV-203A

MOLECULARBIO.

STUDENTAREA248B

MAV-241

GEV-241

MECH.SHAFT

BBB

GEV-209

CP-1(TSI)

26"x20"Θ21"x18"Θ

18"ø

CP-2(TSI)

CP-3(TSI)CP-1

CP-4(TSI)

CP-5(TSI)

VAV-242

HW

C-2

49

HWC-248A

HWC-248B

HWC-243

HWC-241

HWC-244

HWC-246

HWC-247

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

24"x

12"

74"x36"

14"ø

10"ø 10"ø 8"

ø

14"ø

28"x24"

74"x36"74"x36"

9"ø

12"ø

10"ø

8"ø

12"ø

8"ø

11"ø

12"ø

30"x32"

21"x

18"Θ

10"ø10

10"ø

10"ø

18"ø

30"x16"

10"ø

10"ø

16"ø

14"ø

14"ø

14"ø

14"ø

10"ø

10"ø

23"x12"

10"ø

10"ø

10"ø

14"ø

10"ø

10"ø

20"ø

10"ø

24"x16"Θ 30"x24"Θ 36"x24"Θ 40"x24"Θ

16"ø

14"ø

10"ø

16"ø

10"ø

10"ø

27"x18"

12"x10"

8"ø

18"x15"

10"ø

12"ø

12"ø

10"ø

10"ø

28"x24"

28"x

24"Θ

10"ø

12"x10"

8"ø

8"ø

10"ø

10"ø

12"ø

18"ø

18"ø

24"x

16"Θ

8"ø

24"x

16"Θ

8"ø8"ø

10"ø

10"ø

8"ø

8"ø

6"ø

6"ø

6"ø

6"ø 6"

ø 6"ø

14"ø

8"ø

14"ø

8"ø

8"ø

8"ø

8"ø

18"x

18"

8"ø

36"x

24"Θ

10"ø

20"x18"

10"ø

6"ø

6"ø

6"ø

6"ø

16"x15"

50"x24"

10"ø

10"ø

10"ø

40"x24"Θ

10"ø

14"ø

10"ø

10"ø

1D

228J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

233J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

233J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

233J8" x 24SQ

233J8" x 24SQ

228J8" x 24SQ

228J8" x 24SQ

309A10" x 24SQ

309A10" x 24SQ

180A8" x 24SQ

180A8" x 24SQ

319J8" x 24SQ

319J8" x 24SQ

319J8" x 24SQ

291J8" x 24SQ

208A8" x 24SQ

233A8" x 24SQ

208A8" x 24SQ

325J8" x 24SQ

233A8" x 24SQ

233A8" x 24SQ

208A8" x 24SQ

233A8" x 24SQ

208A8" x 24SQ

440A10" x 24SQ

240A8" x 24SQ

298E1S x 24"

8"

298E1S x 24"

8"

30" x 14"819C

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

385J8" x 24SQ

385J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

291J8" x 24SQ

385J8" x 24SQ

385J8" x 24SQ

282J8" x 24SQ

282J8" x 24SQ

207J8" x 24SQ

207J8" x 24SQ

282J8" x 24SQ

282J8" x 24SQ

207J8" x 24SQ

207J8" x 24SQ

282J8" x 24SQ

0A8" x 24SQ

207J8" x 24SQ 120A

6" x 24SQ

282J8" x 24SQ

207J8" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

504E1S x 24"

10"

504E1S x 24"

10"

H3

H3

H1 H1

H1

H1

36"x

36"

68"x

24"Θ

28"x28" 28"x28"

H1

120A6" x 24SQ

120A6" x 24SQ

12"x12"

60" x 7"1,037F

H1

10"ø

27"x

18"

30"x24"Θ30"x22"Θ

45"x21"

15"x12"

24" x 14"650C

113A6" x 24SQ

12"ø 15"x15"

12"ø

12"ø170A

8" x 24SQ

24" x 14"733C

336E1S x 24"

10"

336E1S x 24"

10"

24" x 14"650C

VAV-

248B

6"ø

6"ø

H10

H10

10"ø10"ø

H10

H10

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.21

ENLARGED SECONDFLOOR HVAC PLAN -AREA 1

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR HVAC PLAN - AREA 1

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER

TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "1"

(2ND FLR.)

DNDN

M M

N N

8

8

10

10

MATH/BIOL.255

PROJECTSCHOLAR

254

TEACHINGLAB CELL

GEN/HIST/EXPERIMENTALBIOCHEMISTRY

250TEACHING

LABCELL/VIROLOGY/DEVELOPMENT

BIO253

VEST.251B

TEACHINGLAB PREP

252

REFRIG.ROOM

251SOUTHSTAIR105-2

VEND 2209

OFFICE233

OFFICE231

OFFICE229

S. STUDYSPACE

201

(OPEN TOBELOW)

(OPEN TOBELOW)

H H

J J

K K

L L

9

9

11

112ND FLOORCORRIDOR

200

GEV-250

HEV-250A

HEV-250B

HEV-253A HEV-253B

HEV-253C

HEV-253E

HEV-253F

GEV-251

VAV-

229-

234

VAV-

254

VAV-

255

MAV

-252

MAV-253

MAV-251

MAV-250

GEV

-252

HEV-253G

HEV-253D

CP-6(TSI) CP-7(TSI) CP-8(TSI)

HWC-250

HWC-253

HWC-251

HWC-252

G G

1

1

2

2

3

3

4

4

5

5

6

6

7

7

MATCHLINE (E./W.)

MAT

CH

LIN

E (N

./S.)

24"x16"Θ 29"x18"Θ

16"ø

14"ø

10"ø

14"ø

10"ø

10"ø

26"x20"Θ 36"x20"Θ

10"ø

10"ø

28"x24"

28"x

24"Θ

36"x24"Θ

10"ø

10"ø

10"ø

8"ø8"ø

20"ø

16"ø

26"x20"Θ 12"x

6"Θ

298E1S x 24"

8"

298E1S x 24"

8"

344J8" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

262A8" x 24SQ

262A8" x 24SQ

262A8" x 24SQ

262A8" x 24SQ

173A8" x 24SQ

173A8" x 24SQ

173A8" x 24SQ

173A8" x 24SQ

H3

H1 H1

H3

H1

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

20"ø

14"ø

36"x18"

36"x18"

10"ø

10"ø

10"ø

31"x20"Θ

344J8" x 24SQ

344J8" x 24SQ

29"x16"Θ

15"ø

15"ø

27"x18"

15"ø 16"ø

10"ø

14"ø

10"ø

10"ø 10

"ø 10"ø 10

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

12"x

10"

9"ø

9"ø

8"ø

12"x

8"

8"ø

36"x24"Θ

14"ø

251J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

355J8" x 24SQ

355J8" x 24SQ

355J8" x 24SQ

355J8" x 24SQ

355J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

251J8" x 24SQ

676A14" x 24SQ

576A12" x 24SQ

853A15" x 24SQ

853A15" x 24SQ

953A15" x 24SQ

953A15" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

344J8" x 24SQ

10"ø

10"ø

10"ø

10"ø

10"ø

10"ø

120A6" x 24SQ

120A6" x 24SQ

557E1S x 24"

12"

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ120A

6" x 24SQ120A

6" x 24SQ

422E1S x 24"

10"

6"ø

12"ø

6"ø

12"ø

6"ø

12"ø

16"ø

6"ø

6"ø

6"ø

6"ø

26"x10"

6"ø

6"ø

6"ø

10"ø 10"ø

6"ø

20"x18"

H1

336E1S x 24"

10"

336E1S x 24"

10"

20"x

18"

H1 68"x

24"Θ

H10H10

H10

H10

H10

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.22

ENLARGED SECONDFLOOR HVAC PLAN -AREA 2

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR HVAC PLAN - AREA 2

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER

TO LAB DRAWING L5.00, DETAIL “2”.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "2"

(2ND FLR.)

UP DN

FEC

FEC

UP DN

F

F

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

12

12

13

13

14

14

16

16

17

17

20

20

CONFERENCE261

NORTHSTAIR104-2

FACULTYKITCHEN

208

STOR.257

TEACHINGLAB &PREP.

BIOMED.ENGINEERING

256

RESEARCHNANO

FABRCTN.260

WOMEN'S206

MEN'S207

GOWN259

RESEARCHNANO BIO

LAB258

OFFICE219

OFFICE217

OFFICE215

OFFICE211

OFFICE213

OFFICE227

OFFICE224

OFFICE225

OFFICE221OFFICE

220

OFFICE222

OFFICE223

WORKROOM

228

ELEV.

W. OFFICECORR.

203

15

15

18

18

19

19

HEV

-260

A

GEV

-206

/207

GEV-260

GEV-256

HEV-256

13.5

13.5

VAV-203A

VAV-210-219

VAV-220-228

VAV-203BMAV-256/257

MAV-258

MAV-260

VAV-206/207

VAV-208

VAV-261

HEV-260B

GEV-259

GEV-258

VAV-202

MAV-259

31"x20"Θ

HU

M-1

CP-

4

CP-9(TSI)

CP-5

CP-

10(T

SI)

CP-

11(T

SI)

HWC-256/257

HWC-258

HWC-259

HWC-260

A A

C CD D

E E

F F

G G

B B

ELEC./I.T.CHASE

226

2ND FLOORCORRIDOR

200

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

12"ø

12"ø

12"ø

5"ø

22"x14"Θ

12"ø

10"ø

14"ø

20"x

12"Θ22

"x14

36"x24"

36"x

24"

24"x

12"

49"x24"Θ

16"ø

36"x

24"Θ

30"x24"

30"x

24"

30"x32"

6"ø

6"ø

6"ø 6"

ø

20"x18"

10"ø

14"ø

6"ø

6"ø6"ø

14"ø

20"x18"

10"ø 10"ø

6"ø

6"ø

12"ø16"x15"

16"x

15"

6"ø

6"ø

6"ø

44"x24"

44"x2

4"Θ

50"x24"

8"ø

12"ø

8"ø

10"ø

15"x15"

8"ø

12"ø

12"ø

24"x

10"

14"x

12"

28"x24"Θ

12"ø

8"ø

8"ø

18"ø

28"x24"Θ

16"ø

22"x14"Θ

10"ø

10"ø

10"ø

10"ø

10"ø

8"ø

14"ø

14"ø

10"ø

16"ø

20"x18"

10"ø6"ø

8"ø

8"ø

10"ø

10"ø

12"x

12"

18"ø

10"ø

10"ø 10"ø

8"ø

8"ø

8"ø

8"ø8"ø

8"ø8"ø

27"x

14"

33"x18"

10"ø

14"ø

120A6" x 24SQ

120A6" x 24SQ

285A8" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

10" x 6"100G

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

504E1S x 24"

10"

501E1S x 24"

10"

501E1S x 24"

10"120A

6" x 24SQ120A

6" x 24SQ

154A6" x 24SQ

120A6" x 24SQ

501E1S x 24"

10"

120A6" x 24SQ120A

6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

285A8" x 24SQ

169B8" x 24SQ

475B12" x 24SQ

166B8" x 24SQ

206J8" x 24SQ

206J8" x 24SQ

313J8" x 24SQ

313J8" x 24SQ

313J8" x 24SQ

206J8" x 24SQ

206J8" x 24SQ

206J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

387J8" x 24SQ

387J8" x 24SQ

387J8" x 24SQ

387J8" x 24SQ

387J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

231J8" x 24SQ

79A6" x 24SQ

253J8" x 24SQ

343J8" x 24SQ

374E1S x 24"

10"

374E1S x 24"

10"

374E1S x 24"

10"

374E1S x 24"

10"

374E1S x 24"

10"

343J8" x 24SQ

343J8" x 24SQ

343J8" x 24SQ

343J8" x 24SQ

343J8" x 24SQ

289J8" x 24SQ

89J8" x 24SQ

322A10" x 24SQ

322A10" x 24SQ

18" x 18"800C

24" x 10"800G

863E1S x 48"

12"

H1

H3

H7

H6

H4H4

H3

H1

FCU

-104

-2

8"ø

H1H1

36"x

36"

68"x

24"Θ

28"x28" 28"x28"

239B8" x 24SQ

239B8" x 24SQ

H10

H10

H10H10

14"ø

10"ø

H10

H10

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.23

ENLARGED SECONDFLOOR HVAC PLAN -AREA 3

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR HVAC PLAN - AREA 3

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H3 2” SCHEDULE 40 PVC PIPE FROM ACID CABINET BELOW HOOD UP TO & CONNECT INTO EXHAUST DUCT. REFER

TO LAB DRAWING L5.00, DETAIL “2”.H4 3” EXHAUST DUCT DOWN TO & THRU THE BACK OF THE VACUUM PUMP CABINET. A FLEXIBLE HOSE FROM THE

VACUUM PUMP DISCHARGE WILL BE INSERTED INTO THIS 3” EXHAUST DUCT. THE EXHAUST DUCT WILL THUSEXHAUST BOTH THE VACUUM PUMP DISCHARGE & THE VACUUM PUMP CABINET. REFER TO LAB DRAWINGS.

H6 CAPPED FOR EXTENSION TO FUTURE NF5.H7 WALL MOUNTED ELECTRIC HUMIDIFIER MOUNTED ON THE WALL WITH THE TOP DOWN 24” FROM THE CEILING,

PIPE DRAIN TO F.D.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "3"

(2ND FLR.)

M M

N N

12

12

13

13

14

14

16

16

17

17

20

20

DEBRIEFINGROOM

262

ADULT 1272

CNTRL. 2271

ADULT 2270

ISO.273

MATERNITY267

PEDIATRIC269

CNTRL. 1268

ELEC.263

WARD LAB265

STOR.264

NURSINGCORRIDOR

266

OFFICE234

OFFICE232

OFFICE229 OFFICE

230

OFFICE240

OFFICE239

OFFICE237

OFFICE238

OFFICE235

NURSINGSUITE

MANAGER236

STUDENTINTERACTIVE

SPACE205

N. STUDYSPACE

202

(OPEN TOBELOW)

(OPEN TOBELOW)

H H

J J

K K

L L

15

15

18

18

19

19

(OPEN TOBELOW)

13.5

13.5

VAV-

272/

273

VAV-

271

VAV-

265

VAV-

262/

264/

266

VAV-

269/

270

VAV-

268

VAV-

200B

VAV-

263

VAV-204A

E. OFFICECORR.

204

CP-2

CP-3

VAV-235-240

VAV-204B

G G

2ND FLOORCORRIDOR

200

MAT

CH

LIN

E (N

./S.)

MATCHLINE (E./W.)

36"x

24"Θ

12"ø

6"ø

10"ø

10"ø

14"ø

10"ø

7"ø

11"ø7"ø

BM4.05

H1

H1

H1 H1

557E1S x 24"

12"

557E1S x 24"

12"

120A6" x 24SQ

120A6" x 24SQ

557E1S x 24"

12"

6" x 6"100G

12" x 6"100C

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

422E1S x 24"

10"

422E1S x 24"

10"

422E1S x 24"

10"

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ

120A6" x 24SQ120A

6" x 24SQ120A

6" x 24SQ120A

6" x 24SQ120A

6" x 24SQ

330E1S x 24"

10"60" x 7"

1,037F60" x 7"

1,037F 330E1S x 24"

10" 60" x 7"1,037F

60" x 7"1,037F

230A8" x 24SQ

230A8" x 24SQ

461A12" x 24SQ

130A6" x 24SQ

130A6" x 24SQ

81A6" x 24SQ

81A6" x 24SQ

130A6" x 24SQ

130A6" x 24SQ195A

8" x 24SQ195A

8" x 24SQ

130A6" x 24SQ

130A6" x 24SQ

195A8" x 24SQ

195A8" x 24SQ 130A

6" x 24SQ

195A8" x 24SQ130A

6" x 24SQ195A8" x 24SQ

260A8" x 24SQ

260A8" x 24SQ

219A8" x 24SQ

219A8" x 24SQ

248A8" x 24SQ

248A8" x 24SQ

248A8" x 24SQ

248A8" x 24SQ

219A8" x 24SQ

219A8" x 24SQ

97A6" x 24SQ

427A10" x 24SQ

427A10" x 24SQ

113A6" x 24SQ

12"ø

12"ø

30"x24"Θ 28"x24"Θ

16"ø

6"ø

12"ø 12"ø

6"ø

6"ø

6"ø

16"ø

12"ø

6"ø

10"ø

6"ø

20"x18" 20"x18"

10"ø 10"ø

6"ø

6"ø

12"ø

28"x16"Θ

20"x18"

6"ø6"ø

12"ø

12"ø

28"x1

6"Θ

6"ø

6"ø

8"ø

6"ø

8"ø

12"x

10"

28"x16"Θ 24"x16"Θ

10"ø

6"ø

10"ø

12"x

12"

12"x12" 12"x12"

6"ø

6"ø

6"ø6"ø

16"x

15"

6"ø

16"ø 12"ø

6"ø

6"ø

6"ø

10"ø12"x

8"

14"x

13"

12"x

8"

12"x

10"8"ø

8"ø8"ø

8"ø

6"ø12"x12" 12"x12"

10"ø

6"ø

6"ø

6"ø6"ø

68"x

24"Θ

26"x10"

12"x

10"

H10H10

H1

36"x

24"

H10

H10

HVAC GENERAL NOTES:

1. REFER TO THE LABORATORY AIRFLOW SCHEDULE ON SHEET M4.02, ALL THE SPACESLISTED IN THAT SCHEDULE SHALL HAVE NEGATIVE PRESSURE RELATIVE TOADJACENT SPACES.

2. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDEFOR ROUGH-IN & FINAL CONNECTION OF PIPING & DUCTWORK TO LABORATORYEQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONSWITH REGARD TO CONNECTION OF PIPING & DUCTWORK TO LAB EQUIPMENT,FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.

3. REFER TO M3.01 & M3.02 FOR HVAC PIPING AND TEMPERATURE SENSORS.4. REFER TO DETAILS "G" & "H" ON SHEET M4.05 FOR SUPPLY DUCT CONNECTION TO

GRILLES.5. CONTROL PANELS SHALL BE LOCATED ABOVE CEILING IN AN ACCESSIBLE LOCATION.

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Jere

my.

rvt

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.24

ENLARGED SECONDFLOOR HVAC PLAN -AREA 4

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED SECOND FLOOR HVAC PLAN - AREA 4

HVAC SHEET PLAN NOTESH1 CONTINUOUS SLOT DIFFUSER – IN ARCHITECTURAL REVEAL - REFER TO ARCHITECTURAL DRAWINGS.H10 DUAL WALL DUCT.

NORTH

KEY PLAN

AREA "4"

(2ND FLR.)

DNDN

M M

N N

8

8

10

10

12

12

13

13

14

14

16

16

17

17

20

20

PENTHOUSE301

FANENCLOSURE

H H

J J

K K

L L

9

9

11

11

15

15

18

18

19

19

ELEV.

ATTIC

NORTHSTAIR104-3

2ND FLOORFLAT ROOF

N. STAIR TOPENTHOUSECORRIDOR

302

13.5

13.5

COND-2

ELEV.CONTROLLER

CLOSET

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

36"x

24"

24"x

12"

24"x

12"

24"x

12"

14"x12"

28"x24"

INSTALL RETURN AIR DUCT TOTRAVERSE STAIR/CORRIDORSPACE IN ATTIC, UP AS HIGHAS POSSIBLE TO UNDERSIDEOF STRUCTURE

M2.31A

NO ROOF ABOVE FAN AREA,2ND FLOOR FLAT ROOFEXTENDS UNDER FAN AREAFOR VENTS THRU ROOF & ROOF

DRAIN INFORMATION FOR FLATROOF AREAS, REFER TO MECHANICALROOF PLAN, SHEET M2.40

FOR VENTS THRU ROOF & ROOFDRAIN INFORMATION FOR FLATROOF AREAS, REFER TO MECHANICALROOF PLAN, SHEET M2.40

PENTHOUSE EXIT

PENTHOUSE EXIT

COND-1

AREAS UNDER SLOPED ROOF,OUTSIDE OF PENTHOUSE ROOM,UNOCCUPIED ATTIC SPACE

AREAS UNDER SLOPED ROOF,OUTSIDE OF PENTHOUSE ROOM,UNOCCUPIED ATTIC SPACE

AREAS UNDER SLOPED ROOF,OUTSIDE OF PENTHOUSE ROOM,UNOCCUPIED ATTIC SPACE

ATTIC

AV

2"ACID VENT UPFROM BELOW

RELIEF AIR LOUVER

INTAKE AIR LOUVER

M7

M7

M7M7

M7

M32M32 M33M33

M38

M38 M38 M38 M38 M38

M38

M7

8"x8"

MECHANICAL PENTHOUSE GENERAL NOTES

1. ALL PIPING THAT PENETRATES THE FLOOR OF THE PENTHOUSE SHALL BE INSLEEVES CAST IN THE FLOOR AND EXTENDED 4" ABOVE THE FLOOR TO PREVENTWATER FROM LEAKING TO THE 2ND FLOOR.

2. IN MECHANICAL ROOMS NO PIPING SHALL BE INSTALLED ACROSS THE FLOOR & NOPIPING OR DUCTWORK SHALL BE INSTALLED BELOW 7'-6".

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.30

MECHANICALPENTHOUSE PLAN0 8' 16' 24' 32'

NORTH

1/8" = 1'-0"

AMECHANICAL PENTHOUSE PLAN

MECHANICAL SHEET PLAN NOTESM7 RETURN AIR DUCT UP FROM SECOND FLOOR WHICH RETURNS THE AIR INTO THE ATTIC SPACE TO

TEMPER/CONDITION THE ATTIC SPACE. THE INSIDE-CLEAR SIZE OF THE RETURN AIR DUCT IS INDICATED ONTHE PLANS.

M32 REFRIGERANT LINES BETWEEN CRACU #1 & CONDENSER #1 ON ROOF. THERE ARE TWO SETS OF LINES FORDUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. REFER TO DRAWING M3.02 FOR CONTINUATION &REFER TO SHEET M3.01 FOR PLAN NOTE “M1” FOR R.H.G. & R.L. LINE SIZING. THE REFRIGERANT LINES SHALLPENETRATE THE ROOF THRU A PIPING PORTAL.

M33 REFRIGERANT LINES BETWEEN CRACU #2 & CONDENSER #2 ON ROOF. THERE ARE TWO SETS OF LINES FORDUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. REFER TO DRAWING M3.02 FOR CONTINUATION &REFER TO SHEET M3.01 FOR PLAN NOTE “M2” FOR R.H.G. & R.L. LINE SIZING. THE REFRIGERANT LINES SHALLPENETRATE THE ROOF THRU A PIPING PORTAL.

M38 3” ROOF DRAIN FROM GUTTER BOTTOM OUTLET. REFER TO SECOND FLOOR PLUMBING PLANS FORCONTINUATION.

8

8

10

10

12

12

13

13

H H

J J9

9

11

11

13.5

13.5

C CD D

E E

F F

G G

PENTHOUSE301

LEF-1

FANENCLOSURE

AIRHANDLING

UNIT#1

ELEV.

ATTIC

CWP-1 CWP-2

HWP-1

HWP-2

ERGP-1

40"x

24"Θ

31"x

20"Θ

44"x24"

30"x24"

ERU-1

150"x44"

28"x20"

36"x24"

40"x24"Θ

31"x20"Θ

CP-6

ELEV.CONTROLLER

CLOSET

28"x

24"

HR

HS

HR

HS

HR

CSCR

CSCS

CR

CR

CS

CRFP

CR

NG

NG

NG

TSW

TSW

HWR

HW

SCW

CW

CW

CW

CW

HW

R

ERR

ERS

ERS

ERS

ERR

ERR

ERS

ERS ER

S

ERR

ERS

ERR

RORO

3/4"

3/4"LA

LA

LV

LV

2"

2"2"

RD RD

4"RD ABOVE4"RD ABOVE

SLOPE

ROUTE R.D. PIPE DOWN TIGHT TOCORNER OF INTAKE PLENUM &SEAL THE PENETRATIONS

REFER TO ROOF PLAN ON SHEET M2.40 FORDOWNSPOUT NOZZLE DISCHARGE NOTES

REFER TO ROOF PLAN ON SHEET M2.40 FORDOWNSPOUT NOZZLE DISCHARGE NOTES

0.25"/FT SLOPE

0.25"/FT SLOPE

1"1"3/4"3/4" 1"1" 3/4"3/4"

3" FD-B

3" C.O.

4" C.O.2" FD-B

3" F

S-A

3" FS-B

3" FS-A

4" F

D-B 2" FD-B2" FD-B

3" FD-B

2" FS-B 2" FD-B

2" FS-B2" FD-B

3" FD-B

2" FD-B

4" FD-B

NO ROOF ABOVE FAN AREA,2ND FLOOR FLAT ROOFEXTENDS UNDER FAN AREA

4" C.O.

3" C.O.

4" C.O.

4" C.O.

4" C.O.

M34

M34

M34M34

M34

M34

M37M37

M37

M37

PENTHOUSE EXIT

PENTHOUSE EXIT

3" AV2" SV

M35

M36VENTS UPFROM BELOW

RO

48"x48"

2 1/2"2 1/2"

3"3" 3"3"

HR HR

HSHS

HR H

S

3"3"

3"

3"

CS

HS

CR

CS

HRC

S

CR

3"3" 5"5"

4"4"

3/4"3/4"

1"1"

RELIEF AIRLOUVER #2

15' - 0" x 10' - 0"

O.A. INTAKELOUVER #1

15' - 0" x 10' - 0"

ENERGY RECOVERY COIL

ENER

GY

REC

OVE

RY

CO

ILS

HO

T W

ATER

HEA

TIN

G C

OIL

S

CH

ILLE

D W

ATER

CO

OLI

NG

CO

ILS

M7

M17 M18

M19M19

M18

M8

M35

2"

AV

FP

5" HR5" HS

8" CR

8" CS

4" NG

3" CW

PIPING UP FROM 2NDFLR. BELOW, ALLSERVICES FROM 1STFLR. MECH. ROOM #145

PIPING DOWN TO 2ND FLOOR

M26M26

M27M27M27 M27M27M27M25M25

4' - 0"

EXIT WALK-WAY CLEAR

8"3"

4"

8"

5" HS

5" HS

3"

3"

4"4"1 1/4"1 1/4"

4" HS

40"x24"Θ

1/2" RO4" HR

2 1/2"

2" NG

1 1/

4"

2 1/2"

2 1/2" SCW

8"

3/4"

5" HS

5" HR

1 1/4"

3"

P-8EXHAUST PLENUM FOR LABEXHAUST FAN ASSEMBLY

M24

ELEC. PANELS & EQUIP., RE: ELEC.

2 1/2"2 1/2"

CS

CRHR H

S

8"8"8"8"

CS

CW

2" NG

2 1/2"

NG4"

NG

5" HS

FCU-301A

FCU-301B

M31

M31

PWH-2

PWH-1

LV

HRHS

CSCR

HRHS

M20

M20

AIRCOMPRESSOR

PACKAGE#1

VACUUMPUMP

PACKAGE#1

M9 M10

60"x

102"

78"x

102"

REL

IEF

AIR

DU

CT

O.A

.IN

TAKE

DU

CT

C

1"

1" C

VFD PANEL,RE: ELEC. VFD PANEL,

RE: ELEC.VFD PANEL,RE: ELEC.

SUPPLY FAN WALLVFD PANELS, RE: ELEC.

RETURN FAN WALLVFD PANELS, RE: ELEC.

HB 3/4"3/4"3/4"

CW

HB

WATERSOFTENERPACKAGE

#1M12

WATERPURIFICATION

SYSTEM#1

M13

GASFIRED

HUMIDIFIERPACKAGE

#1M11

2 1/2"

2"2 1/2"

2 1/2"

2 1/2"

2 1/2"

2"

2 1/2"

2"

SCW

CW3"

2 1/2"

PWR

PW

HW

RH

W

SCW

TSW NG

NG

NG

HW

CW

3/4"

CS C

R

3"1 1/2"

1 1/2"1 1/4" 2 1/2"

2 1/

2"

2"

HW 140HWR

SCW

ERS

ERR

AX02

BX02

MU

LTI-S

TEAM

DIS

PER

SIO

N H

UM

IDIF

ICAT

ION

SYS

TEM

M14

M15

M42

M28

M40

M41

M16

M21

M22

M23

FRO

M A

.H.U

.TO

PLE

NU

M

FRO

M A

.H.U

.TO

PLE

NU

M

4"

3"

5"5"

UP FROMBELOW

UP FROMBELOW

SUPPLY AIR DOWNTO 2ND FLR. CEILING

SUPPLY AIR DOWNTO 2ND FLR. CEILING

RETURNAIR DUCTUP FROMBELOW

M39 M39M39

M39M39M39

MECHANICAL PENTHOUSE GENERAL NOTES

1. ALL PIPING THAT PENETRATES THE FLOOR OF THE PENTHOUSE SHALL BE INSLEEVES CAST IN THE FLOOR AND EXTENDED 4" ABOVE THE FLOOR TO PREVENTWATER FROM LEAKING TO THE 2ND FLOOR.

2. IN MECHANICAL ROOMS NO PIPING SHALL BE INSTALLED ACROSS THE FLOOR & NOPIPING OR DUCTWORK SHALL BE INSTALLED BELOW 7'-6".

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.31

ENLARGEDMECHANICALPENTHOUSE PLAN

0 4' 8' 12' 16'NORTH

1/4" = 1'-0"

AENLARGED MECHANICAL PENTHOUSE PLAN

MECHANICAL SHEET PLAN NOTESM26 RELIEF AIR SHEET METAL PLENUM TO BE CONSTRUCTED PER SMACNA STANDARDS & EXTENDING FROM THE

FLOOR UP TO 6" ABOVE THE RELIEF LOUVER.M27 SLOPE FLOOR TO FLOOR DRAIN (F.D.) AS INDICATED & PROVIDE A 4" WIDE BY 2" HIGH OPENING IN PLENUM TO

PERMIT DRAINAGE TO F.D.M28 2-1/2" EXHAUST VENT PIPE UP THRU ROOF FROM VACUUM PUMP. PROVIDE A 180-DEGREE TURN ABOVE ROOF

WITH INSECT SCREEN.M31 FAN COIL UNIT SUSPENDED OVERHEAD ON VIBRATION ISOLATORS. UNIT NUMBER INDICATED ON PLANS.

INSTALL A 1" CONDENSATE DRAIN WITH TRAP & ROUTE TO NEAREST FLOOR DRAIN.M34 FLOOR SINK, FLOOR DRAIN, OR CLEANOUT CONNECTED TO ACID WASTE DRAINAGE SYSTEM BELOW. REFER

TO SECOND FLOOR PLUMBING PLAN FOR CONTINUATION BELOW.M35 ACID VENT UP THRU ROOF.M36 SANITARY VENT UP THRU ROOF.M37 COIL CLEARANCE SPACE REQUIRED.M39 REFER TO DETAIL “A”, “B”, & “I” ON SHEET M4.04 FOR AIR HANDLING UNIT #1 COIL PIPING SCHEMATICS &

REQUIRED VALVING.M40 48” DIAMETER PURIFIED WATER STORAGE TANK MOUNTED ON A CONCRETE HOUSEKEEPING PAD - THE

HEIGHT OF THE CONCRETE PAD SHALL BE ESTABLISHED TO LINE UP THE TANK OUTLET & THE PURIFIEDWATER BOOSTER PUMP SUCTION. REFER TO SPECIFICATION SECTION 22 67 13.

M41 PURIFIED WATER DISTRIBUTION BOOSTER PUMP MOUNTED ON AN INERTIA PAD. REFER TO SPECIFICATIONSECTIONS 22 67 13 & 23 05 48. PROVIDE THE FOLLOWING TRIM FOR THE PUMP: ISOLATION BALL VALVES,FLEXIBLE CONNECTORS, & INLET STRAINER.

M42 1-1/2” AIR INTAKE PIPE UP THRU ROOF FROM AIR COMPRESSOR PACKAGE. PROVIDE A 180-DEGREE TURNABOVE ROOF WITH INSECT SCREEN.

MECHANICAL SHEET PLAN NOTESM17 ENERGY RECOVERY GLYCOL PUMP MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 21 23

& 23 05 48. REFER TO DETAIL “I” ON SHEET M4.04 FOR PIPING SCHEMATIC.M18 HEATING WATER PUMP MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 21 23 & 23 05 48.

PUMP NUMBER INDICATED ON PLANS. REFER TO DETAIL “D” ON SHEET M4.04 FOR PIPING SCHEMATIC. PUMP#2 IS STANDBY/BACKUP.

M19 CHILLED WATER PUMP MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 21 23 & 23 05 48.PUMP NUMBER INDICATED ON PLANS. REFER TO DETAIL “C” ON SHEET M4.04 FOR PIPING SCHEMATIC. PUMP#2 IS STANDBY/BACKUP.

M20 GAS FIRED WATER HEATER MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO SPEC SECTION22 34 00. REFER TO DETAIL “E” ON SHEET P3.02 FOR PIPING SCHEMATIC. PROVIDE 4" PVC FLUE ANDCOMBUSTION AIR PIPE UP THRU ROOF COMPLETE WITH ROOF THIMBLE, FLASHING, & A WEATHER CAP.PROVIDE EXPANSION TANK FOR H.W. SYSTEM. PROVIDE CIRCULATOR PUMP (CP-1) AS INDICATED INSCHEMATIC.

M21 POTABLE HOT WATER MIXING VALVE - MOUNT ON UNISTRUT FRAMING. REFER TO DETAIL “D” ON SHEET P3.02FOR PIPING SCHEMATIC.

M22 TEMPERED SAFETY WATER (SERVING EMERGENCY SHOWERS & EYEWASHES) WATER MIXING VALVE - MOUNTON UNISTRUT FRAMING. REFER TO DETAIL “D” ON SHEET P3.02 FOR PIPING SCHEMATIC.

M23 ENERGY RECOVERY SYSTEM EXPANSION TANK. REFER TO SHEET M4.01 FOR SCHEDULE. REFER TO DETAIL “I”ON SHEET M4.04 FOR PIPING DETAIL.

M24 LAB EXHAUST FAN PACKAGE MOUNTED ON AN INERTIA PAD. REFER TO SPECIFICATION SECTIONS 23 34 15 &23 05 48. REFER TO DETAIL “C” ON SHEET M4.05 FOR DETAILS.

M25 OUTSIDE AIR (O.A.) INTAKE SHEET METAL PLENUM TO BE CONSTRUCTED PER SMACNA STANDARDS &EXTENDING FROM THE FLOOR UP TO 6" ABOVE THE INTAKE LOUVER.

MECHANICAL SHEET PLAN NOTESM7 RETURN AIR DUCT UP FROM SECOND FLOOR WHICH RETURNS THE AIR INTO THE ATTIC SPACE TO

TEMPER/CONDITION THE ATTIC SPACE. THE INSIDE-CLEAR SIZE OF THE RETURN AIR DUCT IS INDICATED ONTHE PLANS.

M8 LAB EXHAUST DUCT UP FROM THE 2ND FLOOR.M9 VACUUM PUMP PACKAGE MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 22 62 19 & 22 05 48.

REFER TO DETAIL “F” ON SHEET M4.04 FOR PIPING SCHEMATIC.M10 LAB AIR COMPRESSOR PACKAGE MOUNTED ON INERTIA PAD. REFER TO SPECIFICATION SECTIONS 22 61 19 &

22 05 48. REFER TO DETAIL “E” ON SHEET M4.05 FOR PIPING SCHEMATIC.M11 GAS FIRED STEAM HUMIDIFIER PACKAGE MOUNTED ON A 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO

SPECIFICATION SECTION 23 84 13. REFER TO DETAIL “F” ON SHEET M4.05 FOR PIPING SCHEMATIC.M12 WATER SOFTENER PACKAGE MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO

SPECIFICATION SECTION 22 67 13. REFER TO DETAIL “E” ON SHEET P3.02 FOR PIPING SCHEMATIC.M13 WATER PURIFICATION SYSTEM PACKAGE MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TO

SPECIFICATION SECTION 22 67 13. REFER TO DETAIL “E” ON SHEET P3.02 FOR PIPING SCHEMATIC.M14 6" FLUE DUCT UP THRU ROOF FROM GAS FIRED HUMIDIFIER. FLUE SHALL BE COMPLETE WITH ROOF THIMBLE,

FLASHING, & A WEATHER CAP. TYPE OF FLUE SHALL BE AS RECOMMENDED BY THE HUMIDIFIERMANUFACTURER.

M15 8" COMBUSTION AIR INTAKE DUCT UP THRU ROOF FROM GAS FIRED HUMIDIFIER. COMBUSTION AIR DUCTSHALL BE COMPLETE WITH ROOF THIMBLE, FLASHING, & A WEATHER CAP. TYPE OF COMBUSTION AIR DUCTSHALL BE AS RECOMMENDED BY THE HUMIDIFIER MANUFACTURER. TERMINATE WITH A WEATHER CAP.

M16 ENERGY RECOVERY GLYCOL SYSTEM MOUNTED ON 4" HIGH CONCRETE HOUSEKEEPING PAD. REFER TOSPECIFICATION SECTION 23 25 13. REFER TO DETAIL “I” ON SHEET M4.04 FOR PIPING SCHEMATIC.

M M

N N

8

8

10

10

12

12

13

13

14

14

16

16

17

17

20

20

H H

J J

K K

L L

9

9

11

11

15

15

18

18

19

19

13.5

13.5

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

4" RD(4" HORIZ. @ 0.5"/FT BELOW)

5" SRD(6" HORIZ. @ 0.25"/FT BELOW)

4" RD(4" HORIZ. @ 0.5"/FT BELOW)

5" SRD(6" HORIZ. @ 0.5"/FT BELOW)

4" RD(4" HORIZ. @ 0.5"/FT BELOW)

6" SRD(6" HORIZ. @ 0.5"/FT BELOW)

4" RD(4" HORIZ. @ 0.5"/FT BELOW)

6" SRD(6" HORIZ. @ 0.25"/FT BELOW)

5" RD(5" HORIZ. @ 0.5"/FT BELOW)

6" SRD(8" HORIZ. @ 0.25"/FT BELOW)

4" RD(4" HORIZ. @ 0.25"/FT BELOW)

5" SRD(6" HORIZ. @ 0.25"/FT BELOW)

4" RD(4" HORIZ. @ 0.5"/FT BELOW)

5" SRD(6" HORIZ. @ 0.5"/FT BELOW)

4" RD(4" HORIZ. @ 0.25"/FT BELOW)

4" RD(4" HORIZ. @ 0.25"/FT BELOW)

REFER TO ARCHITECTURAL ROOF PLANFOR FINAL TAPERED ROOF INSULATIONBOUNDARIES TYPICAL. ROOF DRAIN (&SECONDARY) SIZING IS PER BOUNDARIESSHOWN ON THIS PLAN, NOTIFY ENGINEERFOR REVISED PIPE CALCULATIONS IFROOF TAPER OR DRAINS ARE INSTALLEDIN DIFFERENT LOCATIONS.

6" / 12"

1/4"

/ 12

"

1/4"

/ 12

"

1/4"

/ 12

"

1/4"

/ 12

"

1/4"

/ 12

"

1/4"

/ 12

"

6" / 12"

6" /

12"

6" /

12"

6" /

12"

6" /

12"

6" /

12"

PRIMARY ROOF DRAIN FROM PENTHOUSEHIGH ROOF TO DISCHARGE ONTO 2ND FLOORROOF HERE THRU DOWNSPOUT NOZZLE (18"ABOVE LOW ROOF) ONTO A SPLASH BLOCK

4" D.N. 4" D.N.

REFER TO ARCH. ROOF PLANFOR STORM WATER DRAINAGEDETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED &DIAGONAL PATTERNED

REFER TO ARCH. ROOF PLAN FOR STORMWATER DRAINAGE DETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED & DIAGONAL PATTERNED

REFER TO ARCH. ROOF PLANFOR STORM WATER DRAINAGEDETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED &DIAGONAL PATTERNED

REFER TO ARCH. ROOF PLANFOR STORM WATER DRAINAGEDETAILS FOR THIS AUXILLIARYROOF AREA, OUTLINED &DIAGONAL PATTERNED

3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER 3"RD INLET FROM GUTTER

3"RD INLETFROM GUTTER

3"RD INLETFROM GUTTER

MIN. 10" WIDE BY 4" TALL SECONDARYROOF DRAINAGE SCUPPER OPENING,RE: ARCH. FOR FINAL LOCATION

MIN. 10" WIDE BY 4" TALL SECONDARYROOF DRAINAGE SCUPPER OPENING,RE: ARCH. FOR FINAL LOCATION

PRIMARY ROOF DRAIN FROM PENTHOUSEHIGH ROOF TO DISCHARGE ONTO 2ND FLOORROOF HERE THRU DOWNSPOUT NOZZLE (18"ABOVE LOW ROOF) ONTO A SPLASH BLOCK

THIS SET OF ROOF DRAINSALSO RECEIVES THE STORMWATER FROM THE SOUTH HALFOF THE PENTHOUSE HIGH ROOF,AS DISCHARGED THRU DOWN-SPOUT NOZZLE AT PENTHOUSEWALL ALONG COLUMN LINE "G"

THIS SET OF ROOF DRAINSALSO RECEIVES THE STORMWATER FROM THE NORTH HALFOF THE PENTHOUSE HIGH ROOF,AS DISCHARGED THRU DOWN-SPOUT NOZZLE AT PENTHOUSEWALL ALONG COLUMN LINE "G"

2" S.S. V.T.R.

2" S.S. V.T.R.

3" ACID V.T.R.

EXHAUST DUCT PLENUM

NO ROOF ABOVE FAN AREA,2ND FLOOR FLAT ROOFEXTENDS UNDER FAN AREA

RELIEF AIR LOUVER

INTAKE AIR LOUVER

PENTHOUSE EXIT

PENTHOUSE EXIT

2" S.S. V.T.R.

4" S.S. V.T.R.

2" LAB GAS RELIEF VENT UP FROMBELOW, TURN DOWNWARD & COVERWITH INSECT SCREEN

2" ACID V.T.R.

2" ACID V.T.R.

PIPING PORTALS FOR REFRIGERANTPIPING PENETRATIONS, REFER TOSHEET M2.30 FOR ADDITIONAL NOTES

TRIPLE LAB EXHAUSTFAN SYSTEM

DATA CENTER CRACU CONDENSERSP-8

2" LAB GAS RELIEF VENT UP FROMBELOW, TURN DOWNWARD & COVERWITH INSECT SCREEN

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M2.40

MECHANICAL ROOFPLAN0 8' 16' 24' 32'

NORTH

1/8" = 1'-0"

AMECHANICAL ROOF PLAN

UP

UP

FEC

FEC

FEC

UP

UP ATS

SB

SB

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

M M

N N

8

8

10

10

12

12

13

13

14

14

16

16

17

17

20

20

MAI

N 1

ST F

LR.

(SLA

B @

119

7.0'

)

UPP

ER 1

ST F

LR.

(SLA

B @

120

0.0'

)

FSICORRIDOR

117

FSI STOR.119

FSI ALSEXAMROOM

118

AMP116

PRE PCR115

EXTRACT.PREP.

114FSI PREP.

ROOM113

FSI/MOLECULAREVOLUTIONARY

BIOLOGYTEACHING

LAB112

FSIIMPRESSION

EVIDENCELAB121

OPERATIONSRESEARCH

CONSULTINGGROUP

126DIGITAL

EVIDENCELAB123

DIGITALEVIDENCETEACHING

LAB124

FSI/MOLECULAR&

EVOLUTIONARYBIOLOGY

RESEARCHLAB122

OFFICE130

BERESFORDENDOWED

CHAIR127

WHEELCHAIRSTOR.

128

WHEELCHAIRSIMULATION

PROJECT129

VEST.101

SOUTHSTAIR

105

VEST.100

TL STYLECLASSROOM

125

VEST.102

STUDENTLOUNGE/LOBBY

109

S.CORRIDOR

106

TL STYLECLASSROOM

120

CREICCOLLABORATIVE

LAB134

OFFICE135

OFFICE136

DATAWORKROOM

133

CREICDATA

CENTER132

IT131

COMPUTERSIMULATIONS

137

COMPUTATIONALCLASSROOM

138

NORTHSTAIR

104

VEST.103

LECTUREHALL/

SHELTER147

LOADING146

MECHANICAL145

ELEC.142

CYL.144

BIO WASTE143

STOR.140

MEN'S111

WOMEN'S110

N.CORRIDOR

108

ELEV.

H H

J J

K K

L L

9

9

11

11

15

15

18

18

19

19

13.5

13.5

A A

C CD D

E E

F F

G G

B B

1

1

2

2

3

3

4

4

5

5

6

6

7

7

HRHRHRHS

HR

HS

HR

HS

HR

HRHS HS

HR

HS

HR

HRHS

HR H

S

HSHR

HSHSHR

MAV-113HWC-113 VAV-114 HWC-115

MAV-115

MAV-116HWC-116

MAV-118HWC-118

VAV-119

HWC-121

MAV-121

VAV-129/128

VAV-107

VAV-120

VAV-106

FPT-101

MAV-112AHWC-112A

MAV-122HWC-122

VAV-123

VAV-124

VAV-125

VAV-126

FPT-100

FPT-147B

VAV-109

FPT-147A

VAV-145/146

FPT-103

VAV-134

VAV-137

VAV-131

CRACU-2 CRACU-1

FPT-102VAV-133

VAV-130

2 1/2"

2 1/2"1 1/4"1 1/4"

2"

2"

3/4"3/4"

3/4"3/4"

3/4"3/4"2"2"

1"

1"

1"1" 3/4"3/4"

1"1"

1"1"

3/4"3/4"

1 1/2"1 1/2"

3/4"3/4"

1 1/2"1 1/2"

1 1/4"1 1/4"

1 1/4"1 1/4"

3/4"3/4"

1"1"

3/4"3/4"

3/4"3/4"

3/4"3/4"

3/4"3/4"

1"1"

3/4"3/4"

3/4"3/4" 3/4" 3/4"

1 1/2"1 1/2"

1 1/2"1 1/2"

3/4"3/4" 3/4"3/4"

3/4"3/4"

3/4"

1 1/4"1 1/4"

1 1/4"1 1/4"

1"1"

3/4"3/4"

1 1/4"1 1/4"

3/4"3/4"

3/4"3/4"2"2"

3/4"3/4"

CP-17(TSI)

CP-16(TSI)

CP-15(TSI)

CP-10

CP-14(TSI)

CP-8CP-7 CP-12(TSI)

CP-9

CP-13(TSI)

5"5"

5"5"

1 1/4"1 1/4"

3/4"3/4"

1 1/2"1 1/2"

VAV-135/136

VAV-138

VAV-110/111/141VAV-108

VAV-127

STOR.139

3/4"

CAV-1323/4"3/4"

MAV-112B

HWC-112B

VAV-110/111/142

M3M3

REFRIGERANT PIPES UPIN CHASE ABOVE, SEALAROUND FLOOR SLABPENETRATION FORCLEAN-AGENT FIRE PROT.SYS. CONTAINMENT

M3

M1M1 M2M2

FCU-104-1

HR

HEATING WATER MAINSUP TO 2ND FLOOR

2 1/2"2 1/2"

REFER TO PLAN "A" ON SHEET M4.05FOR ENLARGED COMBINEDMECHANICAL-PLUMBING OF THIS AREA

3/4"

3/4"

3/4"3/4"

8"8"

HRHS

CR

CS

PIPES UP TO 2ND FLR.IN CHASE ABOVE,REFER TO "A"-M3.02

1"1"

M45M45

M45M45

M45M45

M3

M45M45

HS HS

3/4"3/4"

3/4"3/4"

8"8"

HS

MAIN 1ST FLR.(SLAB @ 1197.0')

UPPER 1ST FLR.(SLAB @ 1200.0')

BRIAN J.DETERMAN

20912

HAO OLK MA

OFESSIONAL

RP

DERE T SI GE R

ENIGNEER

DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF

#38,06/30/2018EXPIRES

AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810

Sheet:

Job No.

Date Issued:

ates

Arc

hE

ott +

Ass

ocl

iil

tect

si

Okl

ahom

a35 40

523

2H

arris

on 9554

Aven

ueC

ity,

04173

OK

Revisions:

10-21-16

+11

798

Nor

th L

aker

idge

Pkw

y.A

shla

nd, V

A 23

005

Tel.

804.

228.

7473

ww

w.m

wla

rchi

tect

s.co

m

McCl

aren

, Wils

on &

Lawr

ie, In

c.

C:\R

evit

Loca

l File

s\15

013

UC

O S

TEM

-MEP

cent

ral_

v15_

Dav

id.rv

t

ADD. #2 11/28/161

UN

IVER

SITY

OF

CEN

TRA

L O

KLA

HO

MA

GA

RLA

ND

GO

DFE

Y D

RIV

E ED

MO

ND

, O

K 7

3034

UC

O S

TEM

TEA

CH

ING

AN

D R

ESEA

RCH

CEN

TER

1543

M3.01

FIRST FLOOR HVACPIPING PLAN

0 8' 16' 24' 32'NORTH

1/8" = 1'-0"

AFIRST FLOOR HVAC PIPING PLAN

MECHANICAL SHEET PLAN NOTESM1 REFRIGERANT LINES BETWEEN CRACU #1 & CONDENSER #1 ON ROOF. THERE ARE TWO SETS OF LINES FOR

DUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. THE SIZE OF THE REFRIGERANT HOT GAS (R.H.G.)LINES ARE 1-1/8” FOR HORIZONTAL PIPING & 7/8” FOR VERTICAL PIPING. THE SIZE OF THE REFRIGERANTLIQUID (R.L.) LINES ARE 7/8” FOR BOTH HORIZONTAL & VERTICAL PIPING. REFER TO DRAWING M3.02 FORCONTINUATION.

M2 REFRIGERANT LINES BETWEEN CRACU #2 & CONDENSER #2 ON ROOF. THERE ARE TWO SETS OF LINES FORDUAL CIRCUIT, BUT ONLY ONE SET OF LINES ARE SHOWN. THE SIZE OF THE R.H.G. LINES ARE 1-1/8” FORHORIZONTAL & 7/8” FOR VERTICAL PIPING. THE SIZE OF THE R.L. LINES ARE 7/8” FOR BOTH HORIZONTAL &VERTICAL PIPING. REFER TO DRAWING M3.02 FOR CONTINUATION.

M3 PIPING CROSSING OVER THE DATA CENTER SHALL BE WITHOUT FITTINGS. IF FITTINGS ARE REQUIRED, SUCHAS A COUPLING, IT SHALL BE BRAZED.

M45 SEAL AROUND ALL PIPING PENETRATIONS THRU THE DATA CENTER WALLS FOR CLEAN-AGENT FIREPROTECTION SYSTEM CONTAINMENT.