UCO STEM TEACHING AND RESEARCH CENTER...
Transcript of UCO STEM TEACHING AND RESEARCH CENTER...
DN
UP DN
FEC
FEC
UP DN
DN
PSPSPS
M M
N N
8
8
10
10
12
12
13
13
14
14
16
16
17
17
20
20
H H
J J
K K
L L
9
9
11
11
15
15
18
18
19
19
13.5
13.5
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
PLUMBING GENERAL PLAN NOTES:
1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.
2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.
3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.
4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.
5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.
6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
P2.20
SECOND FLOORPLUMBING REFERENCEPLAN
0 8' 16' 24' 32'NORTH
1/8" = 1'-0"
ASECOND FLOOR PLUMBING REFERENCE PLAN
NORTH
KEY PLAN (2ND FLR.)
AREA "1"
AREA "2"
AREA "3"
AREA "4"
PLUMBING GENERAL PLAN NOTES:
1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.
2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.
3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.
4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.
5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.
6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
8
8
10
10
BIOMEDICALENGINEERING
RESEARCHLAB249
CELLCULTURE
COREFACILITY
241
RESEARCHCELL/MOLECULAR
BIO. LAB248
STUDENTAREA
242
DARKROOM
247
BIOMEDICALEQUIPMENT
COREFACILITY
246
CORECORRIDOR
245
RESEARCHMICROBIOLOGY
LAB243
STERILIZATIONAREA
244
VEND 2209
2ND FLOORCORRIDOR
200
OFFICE219
OFFICE218
JAN.216
OFFICE217
OFFICE214
OFFICE210
OFFICE212
S. STUDYSPACE
201
(OPEN TOBELOW)
(OPEN TOBELOW)
9
9
11
11
P-5
P-6
A A
C CD D
E E
F F
G G
B B
1
1
2
2
3
3
4
4
5
5
6
6
7
7
SCW
HW
TSW
SCW
HW
(HT)
TSW
SCW
HW
(HT)
TSW
TSW
HW
SCW
HW(HT)SCW
TSW
HW
(HT)
SCW
HW(HT)SCW
HW
(HT)
SCW NG
TSW
HW
TSW
SCW
NG
NG
NG
PW PW
PWPW
PW
PW
PWPW
PWPW
PW
PW
PW
PW
PW
PW
PWPW
PWR
PW
1 1/2"1 1/2"1 1/2"
1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/
2"1
1/2"
1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"1 1/2"1 1/2"
1 1/2"1 1/2"
N
NN
N
N
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
CO2
CO
2
CO
2
CO
2
CO2
CO2
CO
2
CO2
CO2
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
LA
LA
LA
LA
LA
LA
LA LA
LA
LA
LA
3/4"
1/2"3/4"1/2" 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
LV
LV
LV
LVLV
LV
LV
LV
LV
LV
LV
LV
2"
2"
1"
2"
2"
3/4"
3/4" 1"
2"
2"
1 1/2"
1 1/2"
3/4"
1"
1 1/4"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1"
3/4"
3/4"
3/4"
3/4"
1 1/2"
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
AW
AW
4"3"
3"
3"
2"
HT-
246
(25'
- 0"
)
N15
HT-
243
(80'
- 0"
)
N15
HT-241 (24' - 0")
N15
HT-245 (141' - 0")N15
HT-249 (80' - 0")
N15
AW
2"
2"
MECH.SHAFT
BBB
AV
AV
AV
AV
AV
AV AV
AV
AV
AV
AV
AV
AV
AV
1 1/2"
2"
2"1 1/2"
1 1/2"
2"
1 1/2"
3"3"
1 1/2"
1 1/2"
1 1/2"
1 1/
2"1
1/2"
3"
2"
1 1/2"1 1/2"
1 1/2"1 1/2"
1 1/
2"1 1/2"
1 1/2"
1 1/2"
1 1/2"
3"
3"
W. OFFICECORR.
203
N58
N58
N58
N59
N59
N59
N59
N59
N60
N60
N60
N60N60
3" FS-A
N54N54
SV
SV
2"
2"
N31
2" S.S. VENT DOWN
2" S.S.VENT UP
2" S.S. VENT DOWN
3" ACIDVENT UPSV
SV SV
SV
SV2"
2"
2"
2"2"
2"
AV
1 1/2"3"
1 1/2"N5
N47
SCW
SCW
SCW
TSW
SCW
TSW
TSW
SCW
SCW
SCW
TSW
TSW
HW
SCW
PW LA
NG
CO
2 N
1 1/2"
2"2"
1 1/2"
1"1/2"
1/2"1/2"
3/4"1"
1 1/4"
1 1/2"
1/2"
3/4"3/4"3/4"
N16
N17N16
N46
N16
N9N9
1/2"1/2"
1 1/4"
1/2"1/2" SCW
1/2"
1 1/2"
1 1/2"N16
N161 1/4"
1"1"2"
1 1/2"
1 1/4"
1 1/4"1 1/2"2"
1 1/2"1 1/2"
1/2"1/2"
3/4"
N16 N16
N16
1/2"1/2"
1/2"
1 1/4"1 1/4"
1 1/
2"1 1/2" N9
N9
1 1/2"
1 1/2"
N48
1/2"1/2"
3/4" 1 1/2"
1"3/4" 1"1/2"
1 1/2"
1/2"1/2"
1 1/2"
3/4"
N5TS
W
1 1/2"
1 1/
2"1
1/2"
1 1/4"
1"
3/4"
1"
1/2"1/2"
1 1/2"1 1/4"
1 1/2"
1/2"1/2"
1/2"3/4"
3/4"3/4"3/4"
1/2"
3/4"
N16
N16
SCW
1/2"1/2"
1/2"
2"
3"
3"
3/4"
1 1/2"
1 1/2"
1/2"1/2" 3/4"
1/2"1/2" N16
3"3"
3/4"
1 1/2"1 1/2"
3/4"
N9
3/4"3/4"
1 1/2"1 1/2"
1/2"1/2"
3"
N16
3"
3"
3"
4"
2"
3"
2"
3"
N163/4"
3/4"
N16
3/4"
1"
3/4"
2"1 1/2"1 1/2"
2"2"
1 1/2"1 1/2"
1 1/2"1 1/2"
1"
LV
LV
HW
TSW
SCW
1/2"1/2"
2"2"2"2"
2"
1 1/2"1 1/4"1 1/4"
HW
3"
3"
1/2"
1 1/2"1 1/2"
AV
2"
2"
PW
2"
N62 N63
N63
N62 N63
N63
N63
N64
1/2"
LA
1/2"NG
TSW
3/4"
NG, LV, & LA PIPING INCHASE OF LAB TABLE
NG, LV, & LA PIPING INCHASE OF LAB TABLE
NG, LV, & LA PIPING INCHASE OF LAB TABLE
LV1 1/4"
1/2"
N62
N63
NG
HW(HT)
TSW
LAN
HW(HT)
1 1/2"
AX02
BX02
1 1/2"
1"
3/4"
3/4"
1 1/2"
SCW
1/2"1/2"
1/2"
1/2"
PW LA
N, LA, SCW, & AW/AVDOWN FOR LAB HOOD
PW
PWHW(HT)
LV
CO2
LV
LV
LV
3/4"
3/4"3/4"
1"
1"
1"
AV
1/2" 3/4"
1-1/2" PW DOWN TO TYPE 3 OUTLET AT LAB SINK& 1-1/2" PW BACK UP; 1/2" HW, 1/2" SCW & 1-1/2"AV/AW DOWN TO SERVE LAB SINK; & 3/4" TSWDOWN TO EYEWASH AT LAB SINK.
1 1/
2"
N161 1/
2" A
V
N45
N16
N46
N19
N44
NG N
TSW
SCWLV
LV
HW(HT)
TSW
3/4" TSW
3/4"
HW
(HT)
MOLECULARBIO.
STUDENTAREA248B
LV
CO2
PW1 1/2"
PW
TSW
SCW
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
P2.21
ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 1
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 1
PLUMBING SHEET PLAN NOTESN46 ACID VENT UP FROM FIRST FLOOR.N47 NITROGEN LAB GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE NITROGEN (N) OUTLETS IN
THE LAB. REFER TO DETAIL “D” ON SHEET M4.05.N48 P.W. DOWN TO SERVE GLASS WASHER & TYPE 3 OUTLET AT LAB SINK.N54 S.C.W., & H.W. DOWN TO SERVE BOTH AUTOCLAVES WITH 1/2" RUNOUTS WITH ISOLATION VALVES. INSTALL
DRAIN LINES FROM BOTH AUTOCLAVES TO FLOOR SINK. PROVIDE UNISTRUT BRACING TO SUPPORT VERTICALPIPING.
N58 ACID WASTE OR SANITARY SEWER UP TO FLOOR CLEANOUT ABOVE.N59 ACID WASTE UP TO FLOOR SINK ABOVE.N60 SANITARY SEWER UP TO FLOOR DRAIN ABOVE.N62 L.A., N.G., & L.V. PIPING DOWN WITHIN LAB BENCH UMBILICAL SERVICE CHASE FROM ABOVE-CEILING TO
BELOW-COUNTER & ROUTE PIPING TO LAB GAS NEEDLE VALVES (BY OTHERS) WITHIN THE CHASE OF THE LABTABLE.
N63 1/2” L.A., 3/4" N.G., & 1” L.V. PIPING ROUGH-INS STUBBED UP FROM PIPING MAINS WITHIN THE CHASE OF THELAB TABLE FOR FINAL CONNECTION TO LAB GAS NEEDLE VALVES (BY OTHERS) AT COUNTER-TOP LEVEL.
N64 1/2" L.A., 1” N.G., & 1” L.V. PIPING WITHIN THE CHASE OF THE LAB TABLE.
PLUMBING SHEET PLAN NOTESN5 NATURAL GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE GAS OUTLETS IN LAB. REFER TO
DETAIL “D” ON SHEET M4.05.N9 NORMALLY CLOSED BYPASS VALVE BETWEEN P.W. & P.W.N15 POWER CONNECTION FOR HOT WATER TEMPERATURE MAINTENANCE CABLE. THE LENGTH OF CABLE
SERVED THROUGH THIS POWER CONNECTION IS INDICATED IN PARENTHESIS. THE H.W. PIPING INDICATEDWITH HEAVY DARK LINEWORK SHALL RECEIVE H.W. TEMPERATURE MAINTENANCE CALBE. REFER TOSPECIFICATION SECTION 22 05 33 FOR SELF-REGULATING, PARALLEL RESISTANCE HEATING CABLES.
N16 TRACE ALL THE DEAD LEGS OF THE POTABLE HOT WATER (H.W.) SUPPLY LINES WITH A “TEMPERATUREMAINTENANCE CABLE SYSTEM”. THIS PIPING INDICATED WITH HEAVY DARK LINEWORK.
N17 P.W. DOWN TO SERVE WATER POLISHER “WP” & TYPE 3 OUTLET AT LAB SINK.N19 THIS SET OF UTILITY DROPS ARE FOR THE SINK, BUT DUE TO GLASS THEY DROP HERE & ROUTE TO SINK IN
CABINET SPACE.N31 SANITARY VENT UP THRU ROOF.N44 WATER POLISHER, REFER TO LAB DRAWINGS, EXTEND DRAIN FROM POLISHER TO DRAIN INTO THE ADJACENT
LAB SINK.N45 ACID VENT UP THRU ROOF.
NORTH
KEY PLAN
AREA "1"
(2ND FLR.)
DNDN
PLUMBING GENERAL PLAN NOTES:
1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.
2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.
3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.
4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.
5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.
6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
M M
N N
8
8
10
10
MATH/BIOL.255
PROJECTSCHOLAR
254
TEACHINGLAB CELL
GEN/HIST/EXPERIMENTALBIOCHEMISTRY
250
TEACHINGLAB
CELL/VIROLOGY/DEVELOPMENTBIO253
VEST.251B
TEACHINGLAB PREP
252
REFRIG.ROOM
251
SOUTHSTAIR105-2
VEND 2209
2ND FLOORCORRIDOR
200
OFFICE233
OFFICE231
OFFICE229
S. STUDYSPACE
201
(OPEN TOBELOW)
(OPEN TOBELOW)
H H
J J
K K
L L
9
9
11
11
RD
SRD
RD
SRD SRD
RDSLOPE
SLOPE
G G
1
1
2
2
3
3
4
4
5
5
6
6
7
7
TSW H
W
SCW
TSWHW(HT)
SCW
TSWHW
SCW
HW
(HT)
SCW
TSW
SCW
NG
NG
PWPW
PWPW
PWPW
PW
1 1/2"1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"1 1/2"
N
N
NN
1/2"1/2"
1/2"
CO2
CO
2
CO
2
1/2"
1/2"
1/2"
4"RD @ .5"/FT6"SRD @ .25"/FT
4"RD @ .5"/FT6"SRD @ .5"/FT
4"RD @ .5"/FT6"SRD @ .5"/FT
LA
LA
LA
LA
LA
1/2"
1/2"
1/2"
1/2"
1/2"
LV
LV
LV
LV
LV
1 1/2"
1 1/2"
3/4"
3/4"
3/4"
1 1/2"
3/4"3/4"1"
1 1/4"
3/4"
3/4"3/4"
3/4"
E. OFFICECORR.
204
MATCHLINE (E./W.)
MAT
CH
LIN
E (N
./S.)
HT-250 (127' - 0")N15
HT-253 (26' - 0")N15
HT-252 (40' - 0")N15
AV
AV
AV
AV
AV
AV
AV
1 1/2"
1 1/2"
1 1/2"1 1/2"
2"
1 1/2"
1 1/2"1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/
2"
1 1/2"
OFFICE276
HW(HT)
SCWPW
PW
LV
N9
1/2"1/2"
1 1/2"
TSW
TSW
AV2"
ISLAND SINK VENTUP FROM BELOW
ISLAND SINK VENTUP FROM BELOW
N45
2"
N46
1 1/2"
1 1/2"
1 1/4"
1 1/2"
2"
3/4"N16
1 1/2"
1/2"
1"
1 1/4"
N33
N36
1/2"1/2"
N36
N19
1 1/4"1"1"
3/4"3/4"
1" 1/2" N42
LV
NG
NG
N33
N9
1/2"
1/2"
NG PIPING IN CHASEOF LAB TABLE
3/4"
1 1/4"
1 1/4"
SCW
2"
NG
3/4"3/4" 1 1/4"
3/4"N40
N16
N32
1/2"1/2"
N16N16
N48
N37
1/2"
1/2"
1 1/4"
NG NG
LVLV
NG PIPING IN CHASEOF LAB TABLE
1"
1"
1"
1 1/4"1 1/4"
1 1/2"1 1/2"
N33 N33
1/2"
1/2"
2 1/2"
1 1/2"
3"
LV
N16
N32 N9 N41
N47
3/4"
1 1/4"
2"1/2"
1/2"1/2"
NG
N
1/2"
LV
PW LA
NG
CO
2 N
3/4"
N16
N16
N45
NG
CO2N
LVLA
1/2"1/2" 3"
1 1/2" 1/2"
1/2"
N.G. UP FROMBELOW
CO
2
N.G. UP FROMBELOW
1/2"
LASCW
1 1/4"
1"
1 1/2"
LALV
SCW
1/2"
3/4"
1 1/2"1 1/2"
1 1/2"1 1/2"
HW
(HT)
PW
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
P2.22
ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 2
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 2
PLUMBING SHEET PLAN NOTESN36 S.C.W. & H.W. UP FROM FIRST FLOOR TO ISLAND LAB TABLE SINK & CONNECT TO SINK FAUCETS WITH
ISOLATION VALVE.N37 THE UTILITIES IN THIS DROP SERVE TWO (2) FUME HOODS.N40 3/4” S.C.W. & 3/4” H.W. DOWN TO SERVE ISLAND BENCH SINKS FROM UNDERFLOOR.N41 1-1/2" P.W. DOWN TO FIRST FLOOR.N42 1-1/2" H.W. DOWN TO FIRST FLOOR.N45 ACID VENT UP THRU ROOF.N46 ACID VENT UP FROM FIRST FLOOR.N47 NITROGEN LAB GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE NITROGEN (N) OUTLETS IN
THE LAB. REFER TO DETAIL “D” ON SHEET M4.05.N48 P.W. DOWN TO SERVE GLASS WASHER & TYPE 3 OUTLET AT LAB SINK.
PLUMBING SHEET PLAN NOTESN9 NORMALLY CLOSED BYPASS VALVE BETWEEN P.W. & P.W.N15 POWER CONNECTION FOR HOT WATER TEMPERATURE MAINTENANCE CABLE. THE LENGTH OF CABLE
SERVED THROUGH THIS POWER CONNECTION IS INDICATED IN PARENTHESIS. THE H.W. PIPING INDICATEDWITH HEAVY DARK LINEWORK SHALL RECEIVE H.W. TEMPERATURE MAINTENANCE CALBE. REFER TOSPECIFICATION SECTION 22 05 33 FOR SELF-REGULATING, PARALLEL RESISTANCE HEATING CABLES.
N16 TRACE ALL THE DEAD LEGS OF THE POTABLE HOT WATER (H.W.) SUPPLY LINES WITH A “TEMPERATUREMAINTENANCE CABLE SYSTEM”. THIS PIPING INDICATED WITH HEAVY DARK LINEWORK.
N19 THIS SET OF UTILITY DROPS ARE FOR THE SINK, BUT DUE TO GLASS THEY DROP HERE & ROUTE TO SINK INCABINET SPACE.
N32 NATURAL GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE GAS OUTLETS IN ROOM 250 OR253, REFER TO DETAIL “D” ON SHEET M4.05. THE NATURAL GAS (NG) PIPING TO THE ISLAND LAB TABLES ISLOCATED IN THE FIRST FLOOR CEILING SPACE BELOW.
N33 NATURAL GAS UP FROM FIRST FLOOR. ROUTE PIPING IN LAB TABLE CHASE & CONNECT TO THE QUADOUTLETS.
NORTH
KEY PLAN
AREA "2"
(2ND FLR.)
UP DN
FEC
FEC
UP DN
PLUMBING GENERAL PLAN NOTES:
1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.
2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.
3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.
4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.
5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.
6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
12
12
13
13
14
14
16
16
17
17
20
20
CONFERENCE261
NORTHSTAIR104-2
FACULTYKITCHEN
208
STOR.257
TEACHINGLAB &PREP.
BIOMED.ENGINEERING
256
RESEARCHNANO
FABRCTN.260
WOMEN'S206 MEN'S
207
GOWN259
RESEARCHNANO BIO
LAB258
OFFICE219
OFFICE217
OFFICE215
OFFICE211
OFFICE213
OFFICE227
OFFICE224
OFFICE225
OFFICE221
OFFICE220
OFFICE222
OFFICE223
WORKROOM
228 ELEV.
(OPEN TOBELOW)
(OPEN TOBELOW)
P-4
P-4
P-2
P-2
P-3
P-2
P-2
P-1 P-1 P-1
P-3P-7
15
15
18
18
19
19
13.5
13.5
A A
C CD D
E E
F F
G G
B B
HW
R
HW SC
W
CW
NG
SCWHW(HT)TSW
TSW
SCW
HW
(HT)
HW
R
HW
SCW
SCW
SCW
HW
TSW
TSW
HWR
SCW
HW
TSW
HW
SCW
HW(HT)SCW
TSW
SCW
HW
(HT)
CW
CW
SCW
HW(HT)
PWR
PW
PWR
PW
PW
PW
PWPWR
PWR PW
PWPW
1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"1 1/2"
N
NN
N N
N5
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
CO
2
CO2
CO
2
1/2"
1/2"
1/2"1/2"
1/2"
1/2"1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
LA
LA
LA
LA
REFER TO SHEET P3.01 FOR WATERAND WASTE & VENT PIPING ISOMETRICSFOR THE MEN'S AND WOMEN'S TOILETS.
1"
(OPEN TOBELOW)
2ND FLOORCORRIDOR
200
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
JAN. STOR.274
RD
RD
3" UP TO GUTTEROUTLET ABOVE,RE: ROOF PLAN
AW
4"
3"
4"
HT-256 (50' - 0")
N15
HT-258 (70' - 0")N15
HT-260 (50' - 0")N15
HT-207 (70' - 0") N15
N50N50N50
CF4 O2
2" FD-A
MECH.CHASE
AAA
ELEC./I.T.CHASE
226
W. OFFICECORR.
203
N58
N58
N58
N58
N59
N60
N60 N60
N60
N60N60 P-5
2" FD-A
SV
SVSV
SV
SVSV
2"
2"
2"
3"2"
2"CW
P-1 P-1 P-1
N43
1 1/2"1 1/2"
LV
2"2"2"2" 2"
2"
2"
1/2"
2"2"
2 1/2"
2"
3/4"
1 1/2" 2"1 1/4"1 1/4"
HW
SCW
TSW
HW
R
LA
TSW
TSW
TSW
TSW
SCW
HW
HW
RC
O2N CW NG
FP
CW
HW
SCW
SCWHW
FP
CW
NG
NLA
SCW
NG
NG
LA
LA
N
LASCW
AV
N
4"
4"
4"
3"
4"
3"
4"
3"
3"4"
4"4"4"
3"3"
2"
2" 2"
3"
3"
4" AW & 4" SSDOWN AND 3"AV & 3" SV UP.
1 1/4"
1 1/4"1 1/2"
1/2"
3/4"1 1/4"2"2"
1 1/2"
2"2"
1 1/4"
3/4"
1 1/2"
1/2"
3/4"
1/2"1/2"
1"
1 1/2"
1 1/4"
3/4"
1/2"1/2"
1 1/2"
1 1/4"
1/2"1/2"1 1/2"1 1/2"
N9
N16
N16 N45
2"2"
1 1/2"1/2"1/2"1/2"
3/4"
1 1/2"
1 1/2"
1 1/2"
3/4"
1 1/4"
1/2"
N16
N5
N47
3/4"
3/4"
4"
3"
1"1"1"1"
1 1/4"
1 1/2"
1"
1/2"
3/4"
1/2"
1 1/2" AV
1/2" SCW
N16
N16 N17
1 1/2" AV1/2"1/2"
3/4"
3/4"
N16
1"
1"1"
2"
2"
2"2"
1"
1/2"1/2"
3/4" 1"1"
2 1/2"2 1/2"
N38 N16
N39
N16
N16
3/4"
2"
3/4"3/4"3/4"
3/4"
1/2"
1/2"
1 1/2"1 1/2"
1 1/2"1 1/4"
1"
1"
1"
1" 1 1/4"
C
N16
N57
1/2"1/2" 3/4"1 1/2"1 1/2"
1/2" LA
3/4"
1/2"
3/4"
1/2"1/2"
N47N16
N9
N1 1/2"
1"
1 1/2"
1 1/2"1 1/4"
1/2"
1 1/2"
1 1/2"
HUM-1
2" FD-B
SCW
1 1/2"
1 1/2"1 1/2"
1/2"
1 1/2"
1 1/
4"
2"
1 1/2"
TSW
LA
LA
NG N
CO2
LALA
HW
(HT)
SCWHW(HT)TSW
AV
AV
AVAVAVAV
AV
AV
1 1/2"
3"4"
4" 4"
NG
4"4"
3"
FCU
-104
-2
FP
FP
FP
3/4"
3/4"
1/2"
B02
N16
N19
N16
N52
N52
N52
N16
N16
N53
N53N53N53
N53
CO2
CO2
N49
N49
N44
3/4"
OFFSET SINK AV/AW RISERTO AVOID BEAM BELOW
1/2"1/2"1/2"1/2"
1/2"1/2"
3/4" COND. DOWN IN WALL TO1ST FLR. CEILING SPACE
3/4" COND. DRAIN FROM UNIT
2"
LGR
V
N66
N30
LGR
V
2"
HW(HT)SCW
2" SV
3/4"
1/2"
HW(HT)
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
P2.23
ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 3
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 3
PLUMBING SHEET PLAN NOTESN44 WATER POLISHER, REFER TO LAB DRAWINGS, EXTEND DRAIN FROM POLISHER TO DRAIN INTO THE ADJACENT
LAB SINK.N45 ACID VENT UP THRU ROOF.N47 NITROGEN LAB GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE NITROGEN (N) OUTLETS IN
THE LAB. REFER TO DETAIL “D” ON SHEET M4.05.N49 CARBON DIOXIDE (CO2) SENSOR, TO BE MONITORED & ALARMED.N50 MANIFOLDS FOR O2, CF4, & N5 – REFER TO SHEET M4.01 FOR MANIFOLD SCHEDULE.N52 PIPING UP TO PENTHOUSE. REFER TO SHEETS M2.30 & M2.31 (ENLARGED).N53 CAPPED FOR EXTENSION TO FUTURE NF5. PRIOR TO INSTALLING THE ROUGH-IN FOR THIS FUTURE UNIT,
OBTAIN A SUBMITTAL DRAWING OF THE UNIT FROM THE OWNER & ROUGH-IN ACCORDINGLY.N57 WALL MOUNTED HUMIDIFIER #1 MOUNTED WITH THE TOP 24” DOWN FROM THE CEILING. PIPE S.C.W. TO UNIT
WITH ISOLATION VALVE & STRAINER CLOSE TO UNIT. PIPE THE TWO (2) DRAINS (1/2” & 3/4") TO THE FLOORDRAIN. UNIT TO BE CONTROLLED FROM HUMIDITY SENSOR IN SOUTHEAST CORNER OF THE SPACE.
N58 ACID WASTE OR SANITARY SEWER UP TO FLOOR CLEANOUT ABOVE.N59 ACID WASTE UP TO FLOOR SINK ABOVE.N60 SANITARY SEWER UP TO FLOOR DRAIN ABOVE.N66 CONNECT RELIEF VALVE DISCHARGE FROM O2, CF4, & N5 CYLINDER MANIFOLDS TO RELIEF VENT PIPE &
ROUTE UP THRU THE ROOF.
PLUMBING SHEET PLAN NOTESN5 NATURAL GAS ISOLATION VALVE IN WALL MOUNTED VALVE BOX TO SERVE GAS OUTLETS IN LAB. REFER TO
DETAIL “D” ON SHEET M4.05.N9 NORMALLY CLOSED BYPASS VALVE BETWEEN P.W. & P.W.N15 POWER CONNECTION FOR HOT WATER TEMPERATURE MAINTENANCE CABLE. THE LENGTH OF CABLE
SERVED THROUGH THIS POWER CONNECTION IS INDICATED IN PARENTHESIS. THE H.W. PIPING INDICATEDWITH HEAVY DARK LINEWORK SHALL RECEIVE H.W. TEMPERATURE MAINTENANCE CALBE. REFER TOSPECIFICATION SECTION 22 05 33 FOR SELF-REGULATING, PARALLEL RESISTANCE HEATING CABLES.
N16 TRACE ALL THE DEAD LEGS OF THE POTABLE HOT WATER (H.W.) SUPPLY LINES WITH A “TEMPERATUREMAINTENANCE CABLE SYSTEM”. THIS PIPING INDICATED WITH HEAVY DARK LINEWORK.
N17 P.W. DOWN TO SERVE WATER POLISHER “WP” & TYPE 3 OUTLET AT LAB SINK.N19 THIS SET OF UTILITY DROPS ARE FOR THE SINK, BUT DUE TO GLASS THEY DROP HERE & ROUTE TO SINK IN
CABINET SPACE.N30 2” LAB GAS RELIEF VENT UP THRU ROOF & TURNED DOWN WITH INSECT COVER. CONNECT THE DISCHARGE
OF THE CYLINDER MANIFOLD RELIEF VALVES TO THIS VENT THRU ROOF.N38 2-1/2" C.W. DOWN TO FIRST FLOOR WATER CLOSETS & URINALS.N39 1-1/4" H.W. & 1” S.C.W. DOWN TO SERVE FIRST FLOOR LAVATORIES.N43 3” SANITARY VENT UP FROM FIRST FLOOR & 3” SANITARY VENT UP THRU ROOF.
NORTH
KEY PLAN
AREA "3"
(2ND FLR.)
PS PS PS
PLUMBING GENERAL PLAN NOTES:
1. ALL UTILITIES TO A LAB SHALL HAVE MANUAL ISOLATION VALVES. THEY TYPICALLY WILL BE LOCATED ABOVE THE CEILINGNEAR THE ENTRANCE DOOR TO THE LAB, EXCEPT FOR ALL THE NATURAL GAS & NITROGEN VALVES, & THE NURSING LABWING MEDICAL GAS VALVES, WHICH WILL BE LOCATED IN ACCESSIBLE WALL VALVE BOXES & ARE INDICATED BY PLANNOTES N5, N32, N34, OR N47. REFER TO PLANS FOR THE MANUAL VALVE & VALVE BOX LOCATIONS. TO FACILITATEISOLATING A LAB UTILITY WITHOUT GETTING ABOVE THE CEILING, INSTALL TWO-POSITION AUTOMATIC VALVESDOWNSTREAM OF THE MANUAL SHUT-OFF VALVES FOR EACH UTILITY (THESE AUTOMATIC VALVES ARE NOT SHOWN ON THEPLUMBING DRAWINGS). THE AUTOMATIC VALVES SHALL BE CONTROLLED BY SWITCHES LOCATED IN A LOCKABLERECESSED CONTROL PANEL NEAR THE ENTRY DOOR, REFER TO CONTROL DRAWING M4.09 FOR DETAILS OF THEAUTOMATIC CONTROL VALVES & ASSOCIATED SWITCHING CONTROL PANELS. THERE ARE SEVENTEEN (17) GROUPS OFCONTROL VALVES & PANELS.
2. WHERE WATER (CW, HW, HWR, SCW, TSW) IS DROPPED IN AN OUTSIDE WALL IT MUST BE ON THE INSIDE OF THE WALLINSULATION.
3. WHERE 1-1/2" PURIFIED WATER (PW) DROPS DOWN TO SERVE AN OUTLET IT SHALL FORM A 180° TURN AND RETURN UP THEWALL WITH A 1/2" TAKE-OFF TO THE PW OUTLET WITH AN ACCESSIBLE ISOLATION VALVE IN THE 1/2" RUNOUT. WHERE APLAN NOTE INDICATES SERVING TWO OUTLETS (FAUCET, WATER POLISHER, OR GLASS WASHER) THERE SHALL BE TWOSEPARATE 1/2" RUNOUTS WITH VALVES.
4. SLOPE ALL HORIZONTAL SANITARY WASTE & ACID WASTE PIPING THAT ARE 2" & SMALLER @ 0.25"/FT & ALL 3" & LARGERPIPING @ 0.125"/FT, UNLESS INDICATED OTHERWISE ON THE PLANS.
5. THE COMBINATION EMERGENCY SHOWER/EYE WASH UNITS LOCATED IN MOST OF THE LABS WILL BE FURNISHED &INSTALLED LAB EQUIPMENT (DIVISION 11). DIVISION 22 WILL ROUGH-IN & MAKE FINAL CONNECTION OF TSW, SANITARY/ACIDWASTE & VENT REQUIRED BY THE UNITS INCLUDING THE PIPING FROM THE SHOWER VALVE TO THE SHOWER HEAD.
6. ALL CONTRACTORS SHALL REFER TO THE LAB DRAWINGS ("L" SERIES) & PROVIDE FOR ROUGH-IN & FINAL CONNECTION OFPIPING & DUCTWORK TO LABORATORY EQUIPMENT, FITTINGS, & FAUCETS AS INDICATED ON THE LAB DRAWINGS. REFER TOTHE FIRST PAGE OF THE FOLLOWING SPECIFICATION SECTIONS FOR INSTRUCTIONS WITH REGARD TO CONNECTION OFPIPING & DUCTWORK TO LAB EQUIPMENT, FAUCETS, & FITTINGS: 22 11 16, 22 62 13, 22 63 00, 22 63 13, 22 66 00, & 22 67 00.
M M
N N
12
12
13
13
14
14
16
16
17
17
20
20
DEBRIEFINGROOM
262
ADULT 1272
CNTRL. 2271
ADULT 2270
ISO.273
MATERNITY267
PEDIATRIC269CNTRL. 1
268
ELEC.263
WARD LAB265
STOR.264
NURSINGCORRIDOR
266
OFFICE234
OFFICE232
OFFICE230
OFFICE240
OFFICE239
OFFICE237
OFFICE238
OFFICE235
NURSINGSUITE
MANAGER236
STUDENTINTERACTIVE
SPACE205
N. STUDYSPACE
202
(OPEN TOBELOW)
(OPEN TOBELOW)
H H
J J
K K
L L
15
15
18
18
19
19
RD
SRD
RD
SRD
RD
SRD
13.5
13.5
P-9
G G
HWRHW
SCW
HWRHW
SCW
CW NG
FP
NGNG
N
1/2"
1/2"CO2
3/4"
1/2"1/2"
1/2"
4"RD @ .25"/FT6"SRD @ .25"/FT
4"RD @ .5"/FT6"SRD @ .5"/FT
5"[email protected]"/FT
4"[email protected]"/FT
A
A
A
A
A
A
1/2"
1/2"
1/2"
1/2"
V
V
V
V
V V
AA
V
V
1 1/4"1 1/4"
1 1/4"
1"
1/2"
3/4"
1"
3/4"3/4"
1/2" 1/2"
1 1/4" 1" 3/4"1/2"
1 1/4"
1" 1" 3/4"
(OPEN TOBELOW)
2ND FLOORCORRIDOR
200
E. OFFICECORR.
204
MAT
CH
LIN
E (N
./S.)
MATCHLINE (E./W.)
OFFICE275
N30
N31N56
4"SV UP FROM BELOW
4"4"
SV
SCW
HW
HW
RC
O2N CW NG
RD
SRD
RDSRD
ROOF DRAIN & SECONDARYDOWN IN FURRING SPACE,AVOID BEAM BELOW
1/2"1/2"
3/4" 1"1"
1/2"1/2" 3"
1 1/2" 1/2"
O
O
N34
1 1/2" N55
OO
O
O
O
1/2"
1/2"
1/2"1/2"
O
SCW
HWSC
W
N35
1"
1/2"
3/4"
1"
1/2"1/2"
3/4"
1/2"
1/2"
3"
4"1 1/2"
1/2"1/2"
1 1/2" SV
4" 4"
N
LVLA
CO
2
3"3"
NG
CO2N
LVLA O
A
V
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"1/2"
6"
4"
5" 8"
1/2"1/2"
1/2"
3/4"1/2"1/2"
3/4" 1/2"1/2"
3/4" 1/2"1/2"
V
O
OA
1/2"
1 1/2"
1" 1"
3/4"
1/2"1/2"
SV
SS 1 1/2"
2"
4"
SCW
HW
HW
RC
O2N
3/4"
1"1"
1/2"1/2"
V
A O
1/2"1/2"
1 1/2"
SV
1"
3/4"
1 1/2"
BM4.05
6"[email protected]"/FT
8"[email protected]"/FT
5"RD & 8"SRD DOWNINTO SHELTER CEILINGSPACE BELOW
4"RD & 6"SRC DOWN TO1ST FLR. CEILING SPACE
N51
PANEL, RE: ELEC.
N65N65N65
N65
N65N65
N65 N65 N65 N65
N65 N65 N65N65
1"
VA
1"
NCO2
CW NG
NG
1/2"3/4"N
CO2
4"NG UP FROM BELOW
4"CW UP FROM BELOW
FP MAIN UP FROM BELOW
1/2"N UP FROM BELOW3/4"CO2 UP FROM BELOW
2"SS DOWNINTO SOFFITSPACE BELOW
HW
N56
MGAAP-1
3/4"
NORMALLY CLOSED BYPASSVALVE BETWEEN HW & HWR
BRIAN J.DETERMAN
20912
HAO OLK MA
OFESSIONAL
RP
DERE T SI GE R
ENIGNEER
DETERMAN SCHEIRMAN, INC.CONSULTING ENGINEERSCERTIFICATE OF
#38,06/30/2018EXPIRES
AUTHORIZATION5749 NW 72ND STREETOKLAHOMA CITY, OK 73132PHONE:405.603.4820 FAX:405.603.4810
Sheet:
Job No.
Date Issued:
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Aven
ueC
ity,
04173
OK
Revisions:
10-21-16
+11
798
Nor
th L
aker
idge
Pkw
y.A
shla
nd, V
A 23
005
Tel.
804.
228.
7473
ww
w.m
wla
rchi
tect
s.co
m
McCl
aren
, Wils
on &
Lawr
ie, In
c.
C:\R
evit
Loca
l File
s\15
013
UC
O S
TEM
-MEP
cent
ral_
v15_
Dav
id.rv
t
ADD. #2 11/28/161
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
GA
RLA
ND
GO
DFE
Y D
RIV
E ED
MO
ND
, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
1543
P2.24
ENLARGED SECONDFLOOR PLUMBINGPLAN - AREA 4
0 4' 8' 12' 16'NORTH
1/4" = 1'-0"
AENLARGED SECOND FLOOR PLUMBING PLAN - AREA 4
PLUMBING SHEET PLAN NOTESN30 2” LAB GAS RELIEF VENT UP THRU ROOF & TURNED DOWN WITH INSECT COVER. CONNECT THE DISCHARGE
OF THE CYLINDER MANIFOLD RELIEF VALVES TO THIS VENT THRU ROOF.N31 SANITARY VENT UP THRU ROOF.N34 MEDICAL GAS VALVE BOX.N35 MEDICAL GAS AREA ALARM PANEL.N51 MEDICAL GAS PRESSURE SENSOR IN EACH OF THE THREE SERVICE LINES (V, O, & A). PROVIDE LOW-VOLTAGE
CONTROL WIRING FROM SENSORS BACK TO THE MEDICAL GAS AREA ALARM PANEL AS PER SPECIFICATIONSECTION 22 62 13.
N55 LAB AIR PRESSURE REDUCING VALVE (6 C.F.H. – 100 PSI TO 55 PSI). PROVIDE AN ISOLATION VALVE UPSTREAMOF P.R.V. & A RELIEF VALVE DOWNSTREAM.
N56 OFFSET SINK WASTE LINE ABOVE FLOOR TO CLEAR COLUMN & TURN DOWN TO CLEAR LECTUREHALL/SHELTER BELOW.
N65 1/2" O., 1/2" A., & 3/4" V. DOWN AT MEDICAL HEADWALL (BY OTHERS).
NORTH
KEY PLAN
AREA "4"
(2ND FLR.)
Sheet:
Job No.
Date Issued:
Revisions:
11-28-16
1543
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Ave
nue
City
,041
73O
K+
1179
8 N
orth
Lak
erid
ge P
kwy.
Ash
land
, VA
230
05Te
l. 80
4.22
8.74
73w
ww
.mw
larc
hite
cts.
com
McCl
aren
, Wils
on &
Lawr
ie, In
c.
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
100 N
ORT
H U
NIV
ERSI
TY D
RIV
E E
DM
ON
D, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
P3.01
PLUMBING ISOMETRICS
1 ADD. #2 11-28-16
Sheet:
Job No.
Date Issued:
Revisions:
11-28-16
1543
ates
Arc
hE
ott +
Ass
ocl
iil
tect
si
Okl
ahom
a35 40
523
2H
arris
on 9554
Ave
nue
City
,041
73O
K+
1179
8 N
orth
Lak
erid
ge P
kwy.
Ash
land
, VA
230
05Te
l. 80
4.22
8.74
73w
ww
.mw
larc
hite
cts.
com
McCl
aren
, Wils
on &
Lawr
ie, In
c.
UN
IVER
SITY
OF
CEN
TRA
L O
KLA
HO
MA
100 N
ORT
H U
NIV
ERSI
TY D
RIV
E E
DM
ON
D, O
K 7
3034
UC
O S
TEM
TEA
CH
ING
AN
D R
ESEA
RCH
CEN
TER
P3.02
PLUMBING SCHEMATICS& DETAILS
1 ADD. #2 11-28-16