ELEVATION II D€¦ · Our policy of continued attention to design and construction requires that...

2
www.shodeenhomes.com DENVER ELEVATION III ELEVATION II ELEVATION IV OPTIONAL RAILING

Transcript of ELEVATION II D€¦ · Our policy of continued attention to design and construction requires that...

Page 1: ELEVATION II D€¦ · Our policy of continued attention to design and construction requires that specifications, equipment and dimensions be subject to change without notice.

www.shodeenhomes.com

De

nv

er

ELEVATION III

ELEVATION II

ELEVATION IVOPTIONAL RAILING

Page 2: ELEVATION II D€¦ · Our policy of continued attention to design and construction requires that specifications, equipment and dimensions be subject to change without notice.

Our policy of continued attention to design and construction requires that specifications, equipment and dimensions be subject to change without notice.

“Moving toward the future with values from the past”www.shodeenhomes.com

© 030920

DENVER1,920 SQ. FT.

SECOND FLOOR839 SQ. FT.

MASTERBEDROOM

13’-10” X 15’-0”OPT. VAULT

CEILING

BEDROOM10’-9” X 11’-5”

OPT. VAULTCEILING

M. B

ATH

WIC

BEDROOM10’-9” X 11’-5”

OPT. VAULTCEILING

BATH

HALL

OP

T. S

EAT

ROUGH-IN(3) DRAINS &

(1) VENT ONLYFOR FUTURE BATH

OPTIONALFINISHED

UN

FINISH

ED

OPT. PARTIAL FINISHED BASEMENT684 SQ. FT.

GARAGE20’-0” X 21’-0”

DINETTE11’-0” X 14’-0”

CONCRETEPATIO

109 SQ. FT.

KITCHEN8’-6” X 11’-6”

FAMILY ROOM13’-4” X 18’-5”

LIVING ROOM13’-8” X 11’-4”

FOYER

PR

DINING ROOM13’-8” X 11’-5”

UP

DN

CONCRETE PORCH

OPT.D

OPT. W

OP

T.R

EF.

ISLA

ND

36”

X 7

2”

DW

BR

EAK

FAST

BA

R

FIRST FLOOR1,072 SQ. FT.

DN

OP

T.

OP

T.