Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term...

31
Electricity Markets & Power System Operation in Australia Hugh Outhred, Presiding Director, CEEM Presented at the KPX International Workshop on Electricity Markets and Power System Operation, 5-7 July, 2005

Transcript of Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term...

Page 1: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Electricity Markets & Power System Operation in Australia

Hugh Outhred, Presiding Director, CEEMPresented at the KPX International Workshop on Electricity Markets and Power System Operation, 5-7 July, 2005

Page 2: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Outline

The process of electricity industry restructuringImplementation of restructuring in AustraliaLessons from the Australian experienceConclusions

Page 3: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Electricity industry restructuring:

Is like deciding to change from driving on the right hand side of the road to driving on the left hand side of the road. Without stopping the traffic.It is better not to do it at all unless:– You are sure you want to do it– You know what you want to do and how to get it done– You don’t stop halfway

Australia took its time to plan what to do & decide it wanted to do it. It then did the job sufficiently well.However, the outcome remains at risk

Page 4: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

The electricity industry restructuring process: diversifying decisions, broadening options, spreading risks

Variable RE energy flowsEnd-user participation;Accountability

From direct costTo full costs

Regulatory Decision-making(environmental)

Multiple objectives;Measuring outcomes;Accountability

From rate of return ToIncentive Regulation

Regulatory Decision-making(economic)

Market power;Market design fidelity;Accountability

From cost recovery To market prices

CommercialDecision-making framework

Cultural change;Adequate competition;Accountability

From monopoly To competing firms Plus system operator(s)

Structural disaggregation

Key challengesTransitionIssue

Page 5: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Challenges in electricity industry restructuringUnderstanding & managing industry risks:– From short-term operation to long-term investment

Consistency in the decision-making framework:– From the short-term to the long-term future– From primary energy providers to end-users– Across the full scope of the electrical network

Decision-making compatibility:– Centralised: governance & regulation; system operation– Decentralised: participants as individuals and in groups

Decision-maker autonomy & accountability:– Participants, system operators, regulators, governments

Page 6: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Governance & institutions:- as seen by Allens Arthur Robinson, December 2003

Page 7: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Policy & regulatory context

Trading in electricity:- an abstraction from reality

Physical electricity industry(equipment; centralised; concrete)

Ancillaryservices;

Governance;Regulation(centralised)Engineering models

(equipment; centralised; abstract)

Commercial model: spot & derivative markets(humans; decentralised; abstract)

Economic models(humans; centralised; abstract)

Externalities

Page 8: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

An electricity trading framework

transmissionnetwork

distributionnetwork

Interchange to other

wholesale market regions

WholesaleMarket region

distributionnetwork

distributionnetwork Retail

Market 3RetailMarket 1

Retail Market 2large consumer

• Wholesale & retail market designs should be compatible• Both should include network models

Primary energy markets

• Small consumers, embedded generators & storage should be supported by energy service advisers

risks to end-useenergy service

delivery

most consumers

large generators

embedded generators

Page 9: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Managing supply-demand balance in the Australian National Electricity Market

Spot market forecast &derivative markets

Frequency controlancillary service

markets for period tSupply/demand

projections & FCASderivative markets

FCAS marketsfor period t+1

Spot marketfor period t

Spot marketfor period t+1

time

spotperiod t

spotperiod t+1

increasing uncertainty

Physical issues

Commercial issues

Page 10: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Scope of the NEM

• Queensland• New South Wales & ACT• Victoria• South Australia• Tasmania (DC link to the

mainland in 2006)NEM regions are indicated, and their boundaries need not be on state borders (e.g. two regions in NSW)

Page 11: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Basslink DC link MNSP (2006?)600MW short term rating (north)

Murraylink DC link, now regulated, formerly MNSP

Directlink DC link, currently MNSP

180

National Electricity Market market regions(Securing Australia’s Energy Future, 2004)

Page 12: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Electricity industry structure in SE Australia

Gen 1

Gen 2

Gen X

GenerationSector:-

largegenerators

Gen 3

TransmissionSector

NSWVictoria

South Aust.Queensland& possiblyTasmania

TransmissionSector

NSWVictoria

South Aust.Queensland& possiblyTasmania

Electricity

Financial instrument& REC (emission) trading

Distributor 1

Distributor 2

Distributor Y

Distributionsector

Electricity

Multi-regionNational

ElectricityMarket(NEM)

Intentionsoffers &

paymentsRetailer Z

Retailer 2

Retailer 1

Retailsector

Intentionsbids &

payments

Tx networkpricing

Tx networkpricing

Networkaccess End-use

Equipment&

DistributedresourcesElectricity

End-usesector

Contestableend-users

FranchiseEnd-users

RetailMarkets

Embeddedgenerators

Page 13: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Average weekly price & demand, SA, Q1 2005(NECA, 05Q1 Stats, 2005)

Page 14: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Spot price duration curve, SA, Jan-Mar 05 (NECA, 04Q4 Stats, 2005; half-hour spot prices)

Page 15: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Weekly avg. NEM spot prices since market inception (NECA, 05Q1 Stats, 2005)

Page 16: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Running weekly accumulation of (336) RRPs & cumulative price threshold (CPT) (NECA, 05Q1Stats, 2005)

S10,000/MWH price cap reduced if CPT is reached

Page 17: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Distribution of NEM spot prices & revenues(Federal Government: Securing Australia’s Energy Future, 2004)

Page 18: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Flat contract prices, Q1 2005(NECA, 05Q1 Statistics, 2005)

Page 19: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

D-cyhpaTrade exchange-traded call options for NSW peak period (www.d-cyphatrade.com.au)

0200400600800

100012001400160018002000

65 70 75 80 85 90Strike price $/MWH

05Q106Q107Q1

Page 20: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

NEMMCO Statement of Opportunities, 2004

Page 21: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Changing generation offer to raise spot market price (2/8/03) graph courtesy of Stuart Thorncraft &Intelligent Energy Systems EMIS facility (www.iesys.com.au)(possible demand-side responses: derivative contract or reduce demand)

Region Supply Curve (NSW1)(02/08/2003 - 02/08/2003)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

$/MWh

Region Supply Curve (NSW1)(02/08/2003 - 02/08/2003)

3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500

MW

Delta Electricity Sithe Redbank Macquarie Generation

Eraring Energy

Price_30Min (NSW1)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

11000

MWPrice_30Min (NSW1)

Demand

Price

0

10

20

30

40

50

60

70

80

90

100

110

120

$/MWh

00 02 04 06 08 10 12 14 16 18 20 22Sat, 02 Aug 03

10:30

16:30

18:30

~95 $/MWH

Page 22: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

~600MW

Robustness example:Transformer failure at 2142, 13 Aug 04:3,100MW gen lost;Frequency 48.9Hz; 2,100 MW load shed in NSW, Qld, Vic, SA(www.nemmco.com.au)

~900MW

~600MW

Page 23: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Robustness example: NEM energy revenue, 13/8/04

Page 24: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Robustness example: NEM FCAS revenue 13/8/04

Page 25: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Conclusions on the Australian experienceSuccessful electricity restructuring required:– Care in developing & maintaining consensus– A high level of professionalism in key roles– Extensive peer-review, auditing & testing of market design

Experimental economic techniques used to test design

Australian NEM uses a coherent design approach:– Decision making & risk management framework – Applied consistently to engineering & commercial issues,

recognising strengths & weaknesses of each– Design works successfully with a weak network, weather-

sensitive demand & a growing level of wind generation

Page 26: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

1995 NEM rules trading experimentsImplemented key features of the NEM rules:– NEM bid and offer structure & network loss functions– Multi-region spot market with embedded network model– 1 & 2 day ahead STFMs with embedded network model– Short term PASA with broadcast warnings of constraints

Provided a sufficiently realistic trading environment:– Key participant characteristics– Uncertainty in availability, weather– Reporting on trading activity & simple decision support

Operated faster than real time:– 2 weeks of trading per day with 3 hour spot market period

NEM rules use a half-hour spot market interval

Used for education as well as formal experiments:– >1,000 participants prior to actual market start

Page 27: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Technology types in ‘95 NEM simulation modelSeven thermal generator portfolios (subject to outages):– Fast start generators (instantaneous start)– Slow start generators:- all other thermal plant (self commitment)

Max & min load; hot, warm & cold start-up timesStart-up costs; fixed & variable operating costsMean time to fail, mean time to repair, cost of repair

One hydro generator:– Headpond capacity & initial level, inflow rate, pumping

Seven demand side participants (uncertain temperature):– Retail tariff load (daily & weekly patterns, temp. coef’t)– Demand management (psuedo generator with op. cost)

One reserve participant (small thermal plant)

Page 28: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Simulation results: single region pricesPrices S2311

05

101520253035404550

Wed

03W

ed15

Thu0

3Th

u15

Fri0

3Fr

i15

Sat0

3Sa

t15

Sun0

3Su

n15

Mon

03M

on15

Tue0

3Tu

e15

Wed

03W

ed15

Thu0

3Th

u15

Fri0

3Fr

i15

Sat0

3Sa

t15

Sun0

3Su

n15

Mon

03M

on15

Tue0

3Tu

e15

$/M

Wh Spot Price

STFM1 PriceSTFM2 Price

Occasional zero spot prices. After the initialisation phase, theSTFM prices provide reasonable predictions of average spot prices

Page 29: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Simulation results: single region quantitiesSummary MW S2311

-10000

0

10000

20000

30000

40000

50000

Wed

03W

ed15

Thu0

3Th

u15

Fri0

3Fr

i15

Sat0

3Sa

t15

Sun0

3Su

n15

Mon

03M

on15

Tue0

3Tu

e15

Wed

03W

ed15

Thu0

3Th

u15

Fri0

3Fr

i15

Sat0

3Sa

t15

Sun0

3Su

n15

Mon

03M

on15

Tue0

3Tu

e15

MW

Contract CoverCommitted MWDemand

Contract cover is a compromise between generator interests and demand side interests. Some contract speculation evident on the final Monday. Generators de-committing at weekends but not overnight.

Page 30: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Outcomes from trading experimentsA sophisticated simulation package can adequately represent NEM market trading conditions:– Operational focus; two weeks of simulated trading per day– Suitable for exploring operation of market rules & for training

Experiments demonstrate that generators can exercise market power if insufficient competition:– Only under outage conditions for single region experiments:

Largest generation participant then had ‘must run’ plant– Most of the time in each region for five region experiments:

Single or larger generation participant in each region had ‘must run’ plant because of tie-line flow constraints

– Forward contract cover can protect a buyer from the effectsof spot market power

Page 31: Electricity Markets & Power System Operation in Australia · 2013. 7. 30. · 600MW short term rating (north) Murraylink DC link, now regulated, ... Seven thermal generator portfolios

Key references (these & other publications at www.ceem.unsw.edu.au):1. H R Outhred & R J Kaye (1996), “Incorporating Network Effects in a Competitive Electricity Industry: An Australian Perspective”, Chapter 9 in M Einhorn & R Siddiqi (eds), Electricity Transmission Pricingand Technology, Kluwer Academic Publishers.2. H R Outhred (2003), “Some Strengths and Weaknesses of Electricity Industry Restructuring in Australia”, Paper 235, Proceedings of IEEE PowerTech ’03 Conference, Bologna, 23-26 June, ISBN 0-7803-7968-3.3. H R Outhred (2004), “The Evolving Australian National Electricity Market: An Assessment” in Power Progress: An Audit of Australia’s Electricity Reform Experiment edited by Graeme Hodge, Valarie Sands, David Hayward and David Scott, Australian Scholarly Publishing, Melbourne,ISBN 1 74097 034 9, 2004.