Elect Bill-September 2014

40
India Habitat Centre Electricity Charges for September 2014 Name of the Institution: AIBTMF Prepared on: 9-May-2013 6 A - 3rd Due date without late charges: 24-May-2013 Total Occupied Area: 150 Sqm. S. No. Meter No. M.F. Previous Current Units Total Units 1 1047 1 6450.00 6563.00 113.00 113.00 Grand Total 113.00 9.20 1,039.60 1,040.00 Late charges @ 3% 31.20 Total Amount (1+2) 1,039.60 Arrears/ Excess - 1,039.60 1,071.00 Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director. 2. The final figures are calculated to the nearest rupee. 3. Please pay before due date to avoid disconnection. For India Habitat Centre GM - (P&FM) GM - (F,L&C) Energy Charges per unit @ Rs. Total amount to be paid on or before due date Amount w/o late charges Rounded Off (3+4) Total amount to be paid after due date

description

dfg

Transcript of Elect Bill-September 2014

Page 1: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: AIBTMF Prepared on: 9-May-20136 A - 3rd Due date without late charges: 24-May-2013

Total Occupied Area: 150 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1047 1 6450.00 6563.00 113.00 113.00 Grand Total 113.00

9.20 1,039.60 1,040.00

Late charges @ 3% 31.20Total Amount (1+2) 1,039.60

Arrears/ Excess -

1,039.60 1,071.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 2: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: AIHDA Prepared on: 9-May-20134 A - 5th Due date without late charges: 24-May-2013

Total Occupied Area: 150 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units 1 950 1 3.00 3.00 - - 2 924 1 - - 3 3301 1 3,052.00 3,144.00 92.00 92.00

Grand Total 92.00

9.20 846.40 846.00

Late charges @ 3% 25.38

Total Amount (1+2) 846.40

Arrears/ Excess -

846.40 871.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 3: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: AIAM Prepared on: 9-May-20134 B - 5th Due date without late charges: 24-May-2013

Total Occupied Area: 500 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 956 1 104172.00 104624.00 452.00 452.00

2 957 1 84909.00 85330.00 421.00 421.00

3 958 1 252281.00 269241.00 16,960.00 16,960.00 meter defectedGrand Total 17,833.00

9.20 164,063.60 164,064.00

Late charges @ 3% 4921.92

Total Amount (1+2) 164,063.60

Arrears/ Excess -

164,063.60 168,986.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 4: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: BMTPC Prepared on: 9-May-20135 A - 1st Due date without late charges: 24-May-2013

Total Occupied Area: 1067 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 918 1 208460.00 211082.00 2,622.00 2,622.00

2 919 1 73453.00 74491.00 1,038.00 1,038.00

3 920 1 0.00 0.00 - -

4 921 1 18324.00 18563.00 239.00 239.00

Grand Total 3,899.00

9.20 35,870.80 35,871.00

Late charges @ 3% 1076.13

Total Amount (1+2) 35,870.80

Arrears/ Excess -

35,870.80 36,947.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 5: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: CBRI Prepared on: 9-May-20136 A - 2nd Due date without late charges: 8-Jun-2013

Total Occupied Area: 200 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 9238 1 2552.00 2667.00 115.00 115.00 Grand Total 115.00

9.20 1,058.00 1,058.00

Late charges @ 3% 31.74

Total Amount (1+2) 1,058.00

Arrears/ Excess -

1,058.00 1,090.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 6: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: CSE Prepared on: 9-May-20136 A - 4th Due date without late charges: 24-May-2013

Total Occupied Area: 382 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 973 1 18843.00 19373.00 530.00 530.00

2 974 1 23473.00 23989.00 516.00 516.00 Grand Total 1,046.00

9.20 9,623.20 9,623.00

Late charges @ 3% 288.69

Total Amount (1+2) 9,623.20

Arrears/ Excess -

9,623.20 9,912.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 7: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: NAMCST Prepared on: 9-May-20136 A - 2nd Due date without late charges: 24-May-2013

Total Occupied Area: 500 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 982 1.0 48997.00 49556.00 559.00 559.00

2 983 1.0 30701.00 31065.00 364.00 364.00 Grand Total 923.00

9.20 8,491.60 8,492.00

Late charges @ 3% 254.76

Total Amount (1+2) 8,491.60

Arrears/ Excess -

8,491.60 8,747.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 8: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: CDSA Prepared on: 9-May-20136 A - 3rd Due date without late charges: 24-May-2013

Total Occupied Area: 70 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units 123

Grand Total -

9.20 - -

Late charges @ 3% 0.00

Total Amount (1+2) -

Arrears/ Excess -

- -

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 9: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: CII Prepared on: 9-May-20134 A - 4th Due date without late charges: 24-May-2013

Total Occupied Area: 500 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 954 1 156889.00 158067.00 1,178.00 1,178.00

2 955 1 164042.00 166743.00 2,701.00 2,701.00

3 9493 1 64920.00 81318.00 16,398.00 16,398.00 New meter w.e.f April 10,2014

4 9482 1 17173.00 17847.00 674.00 674.00 Grand Total 20,951.00

9.20 192,749.20 192,749.00

Late charges @ 3% 5782.47

Total Amount (1+2) 192,749.20

Arrears/ Excess -

192,749.20 198,531.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 10: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: CDC Prepared on: 9-May-20134 B - 2nd Due date without late charges: 24-May-2013

Total Occupied Area: 1046 Sqm.

S. No. Meter No. M.F. Previous current Units Total Units

1 908 1.0 12203.00 12356.00 153.00 153.00

2 911 1.0 71884.00 72977.00 1,093.00 1,093.00

3 912 1.0 50529.00 50999.00 470.00 470.00

4 1030 1.0 0.00 0.00 - -

5 1031 1.0 22987.00 23236.00 249.00 249.00

6 1032 1.0 120794.00 122201.00 1,407.00 1,407.00

Grand Total 3,372.00

9.20 31,022.40 31,022.00

Late charges @ 3% 930.66

Total Amount (1+2) 31,022.40

Arrears/ Excess -

31,022.40 31,953.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 11: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: CAPAR (AED) Prepared on: 9-May-20135 A - 2nd & 4 A - UG Due date without late charges: 24-May-2013

Total Occupied Area: 2377 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 922 1.0 20170.00 20474.00 304.00 304.00

2 946 1.0 40534.00 41137.00 603.00 603.00

3 947 1.0 59030.00 59854.00 824.00 824.00

4 948 1.0 63581.00 64148.00 567.00 567.00

5 949 1.0 38841.00 39619.00 778.00 778.00

6 993 1.0 79387.00 80202.00 815.00 815.00

7 994 1.0 11387.00 11571.00 184.00 184.00

8 1022 1.0 40988.00 41533.00 545.00 545.00

9 1033 1.0 37237.00 37715.00 478.00 478.00

10 1034 1.0 25786.00 26191.00 405.00 405.00

11 1035 1.0 22520.00 22777.00 257.00 257.00

12 1935 1.0 47971.00 48548.00 577.00 577.00

13 9491 Lib 1.0 2217.00 2365.00 148.00 148.00 ReplaceGrand Total 6,485.00

9.20 -

Late charges @ 3% 0.00

Total Amount (1+2) -

Arrears/ Excess -

- -

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 12: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: COA Prepared on: 9-May-20136 A - 1st Due date without late charges: 24-May-2013

Total Occupied Area: 200 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 992 1 46961.00 47680.00 719.00 719.00

2 1937 1 19232.00 19545.00 313.00 313.00 Grand Total 1,032.00

9.20 9,494.40 9,494.00

Late charges @ 3% 284.82

Total Amount (1+2) 9,494.40

Arrears/ Excess -

9,494.40 9,779.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 13: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

ilo Name of the Institution: DMA Prepared on: 9-May-2013

6 A - 1st Due date without late charges: 24-May-2013

Total Occupied Area: 200 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 989 1.0 38253.00 38876.00 623.00 623.00

2 991 1.0 2426.00 2442.00 16.00 16.00 Grand Total 639.00

9.20 5,878.80 5,879.00

Late charges @ 3% 176.37

Total Amount (1+2) 5,878.80

Arrears/ Excess -

5,878.80 6,055.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 14: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: DPG Prepared on: 9-May-20135 A - 1st Due date without late charges: 24-May-2013

Total Occupied Area: 143 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

2 1941 1.0 46585.00 47218.00 633.00 633.00 Grand Total 633.00

9.20 5,823.60 5,824.00

Late charges @ 3% 174.72

Total Amount (1+2) 5,823.60

Arrears/ Excess -

5,823.60 5,999.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 15: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: DUAC Prepared on: 9-May-20136 A UG - 1st Due date without late charges: 24-May-2013

Total Occupied Area: 1210 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 969 1.0 31144.00 31679.00 535.00 535.00

2 988 1.0 11345.00 11509.00 164.00 164.00

3 990 1.0 31111.00 31580.00 469.00 469.00

4 997 1.0 19620.00 19860.00 240.00 240.00

5 998 1.0 35446.00 35882.00 436.00 436.00

6 9498 1.0 26195.00 27603.00 1,408.00 1,408.00 Grand Total 3,252.00

9.20 29,918.40 29,918.00

Late charges @ 3% 897.54

Total Amount (1+2) 29,918.40

Arrears/ Excess -

5 29,918.40 30,816.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 16: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: FUR Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 83 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1021 1.0 11808.00 11965.00 157.00 157.00

2 1945 1.0 21675.00 21980.00 305.00 305.00 Grand Total 462.00

9.20 4,250.40 4,250.00

Late charges @ 3% 127.50

Total Amount (1+2) 4,250.40

Arrears/ Excess -

4,250.40 4,378.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 17: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: HDFC Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 405 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 925 1 32249.00 32691.00 442.00 442.00

2 926 1 0.00 0.00 - -

3 927 1 10329.00 10449.00 120.00 120.00

4 928 1 102328.00 103529.00 1,201.00 1,201.00 Grand Total 1,763.00

9.20 16,219.60 16,220.00

Late charges @ 3% 486.60

Total Amount (1+2) 16,219.60

Arrears/ Excess -

16,219.60 16,707.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 18: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: IREDA Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 1082 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 901 1.0 5719.00 5869.00 150.00 150.00

2 902 1.0 0.00 0.00 - -

3 903 1.0 2494.00 2498.00 4.00 4.00

4 904 1.0 27871.00 28637.00 766.00 766.00

5 905 1.0 17068.00 17467.00 399.00 399.00

6 906 1.0 33573.00 34352.00 779.00 779.00

6 9489 1.0 199387.00 204987.00 5,600.00 5,600.00

7 907 1.0 33194.00 34025.00 831.00 831.00

8 909 1.0 17159.00 17512.00 353.00 353.00

9 910 1.0 2908.00 3018.00 110.00 110.00 Grand Total 8,992.00

9.20 82,726.40 82,726.00

Late charges @ 3% 2481.78

Total Amount (1+2) 82,726.40

Arrears/ Excess -

82,726.40 85,208.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 19: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: IFCPAR Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 500 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1015 1 98551.00 98551.00 - -

2 1016 1 37421.00 39530.00 2,109.00 2,109.00 Grand Total 2,109.00

9.20 19,402.80 19,403.00

Late charges @ 3% 582.09

Total Amount (1+2) 19,402.80

Arrears/ Excess -

19,402.80 19,985.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 20: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: ILFS Prepared on: 9-May-20134 B - 4th Due date without late charges: 24-May-2013

Total Occupied Area: 766 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 962 1.0 130956.00 132318.00 1,362.00 1,362.00

2 963 1.0 72015.00 73270.00 1,255.00 1,255.00

3 964 1.0 14112.00 14613.00 501.00 501.00 Grand Total 3,118.00

9.20 28,685.60 28,686.00

Late charges @ 3% 860.58

Total Amount (1+2) 28,685.60

Arrears/ Excess -

28,685.60 29,547.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 21: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: ISST Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 200 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 999 1 38526.00 39125.00 599.00 599.00

2 1936 1 22562.00 22904.00 342.00 342.00

Grand Total 941.00

9.20 8,657.20 8,657.00

Late charges @ 3% 259.71

Total Amount (1+2) 8,657.20

Arrears/ Excess -

8,657.20 8,917.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 22: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: ICRIER Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 904 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 970 1 156851.00 158991.00 2,140.00 2,140.00

2 971 1 130213.00 131896.00 1,683.00 1,683.00

3 972 1 94187.00 95352.00 1,165.00 1,165.00

4 1018 4ALGF 1.0 8352.00 9385.00 1,033.00 1,033.00

5 1019 4ALGF 1.0 118376.00 120353.00 1,977.00 1,977.00 - -

Grand Total 7,998.00

9.20 73,581.60 73,582.00

Late charges @ 3% 2207.46

Total Amount (1+2) 73,581.60

Arrears/ Excess -

73,581.60 75,789.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 23: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014 Name of the Institution: ILO Prepared on: 9-May-2013

Due date without late charges: 24-May-2013

Total Occupied Area: 2500 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 914 1.0 69132.00 70015.00 883.00 883.00

2 915 1.0 107962.00 109690.00 1,728.00 1,728.00

3 916 1.0 10088.00 10213.00 125.00 125.00

4 917 1.0 7752.00 7846.00 94.00 94.00

5 965 1.0 16376.00 16376.00 - - load shif 968

6 966 1.0 103121.00 104466.00 1,345.00 1,345.00

7 967 1.0 57183.00 57183.00 - - load shif 968

8 968 1.0 26355.00 27168.00 813.00 813.00 desply defected

9 975 1.0 52803.00 53591.00 788.00 788.00

10 976 1.0 3894.00 4130.00 236.00 236.00

11 977 1.0 40596.00 41416.00 820.00 820.00 Grand Total 6,832.00

9.20 62,854.40 62,854.00

Late charges @ 3% 1885.62

Total Amount (1+2) 62,854.40

Arrears/ Excess -

62,854.40 64,740.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 24: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: NHB Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 4200 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 929 1 210091.00 213915.00 3,824.00 3,824.00

2 930 1 8512.00 8850.00 338.00 338.00

3 931 1 33421.00 33779.00 358.00 358.00

4 932 1 22964.00 22964.00 - -

5 933 1 154642.00 156723.00 2,081.00 2,081.00

6 934 1 282.00 296.00 14.00 14.00

7 935 1 39188.00 39732.00 544.00 544.00

8 936 1 3327.00 3479.00 152.00 152.00

9 937 1 87138.00 87138.00 - - close due to renov

10 938 1 15017.00 15066.00 49.00 49.00

11 939 1 22403.00 22605.00 202.00 202.00

12 940 1 49640.00 51507.00 1,867.00 1,867.00

13 941 1 42068.00 42671.00 603.00 603.00

14 942 1 47628.00 48123.00 495.00 495.00

15 943 1 14354.00 14354.00 - -

16 944 1 161841.00 164242.00 2,401.00 2,401.00

17 945 1 156765.00 159554.00 2,789.00 2,789.00

18 1036 1 1427.00 1441.00 14.00 14.00

19 1037 1 45151.00 45688.00 537.00 537.00

20 1980 1 157825.00 164765.00 6,940.00 6,940.00

21 1987 1 169230.00 169230.00 - - Grand Total 23,208.00

9.20 213,513.60 213,514.00

Late charges @ 3% 6405.42

Total Amount (1+2) 213,513.60

Arrears/ Excess -

213,513.60 219,919.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 25: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: NFI Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 500 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1020 1.0 92843.00 94306.00 1,463.00 1,463.00 Grand Total 1,463.00

9.20 13,459.60 13,460.00

Late charges @ 3% 403.80

Total Amount (1+2) 13,459.60

Arrears/ Excess -

13,459.60 13,864.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 26: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: NID Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 100 Sqm.

S. No. Meter No. M.F. Previous cureent Units Total Units

1 980 1 6390.00 6500.00 110.00 110.00

2 981 1 9942.00 10109.00 167.00 167.00 Grand Total 277.00

9.20 2,548.40 2,548.00

Late charges @ 3% 76.44

Total Amount (1+2) 2,548.40

Arrears/ Excess -

2,548.40 2,624.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 27: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: NIUA Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 2000 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 986 1.0 61229.00 61991.00 762.00 762.00

2 987 1.0 166699.00 169057.00 2,358.00 2,358.00

3 1023 1.0 0.00 0.00 - -

4 1024 1.0 52144.00 53088.00 944.00 944.00

5 1028 1.0 0.00 0.00 - -

6 1029 1.0 44616.00 44847.00 231.00 231.00

7 1947 Lib 1.0 18413.00 18646.00 233.00 233.00 - -

Grand Total 4,528.00

9.20 41,657.60 41,658.00

Late charges @ 3% 1249.74

Total Amount (1+2) 41,657.60

Arrears/ Excess -

41,657.60 42,908.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 28: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: NCRPB Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 714 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1025 1 17443.00 17696.00 253.00 253.00

2 1026 1 64872.00 65682.00 810.00 810.00

3 1027 1 11725.00 11854.00 129.00 129.00 -

Grand Total 1,192.00

9.20 10,966.40 10,966.00

Late charges @ 3% 328.98

Total Amount (1+2) 10,966.40

Arrears/ Excess -

10,966.40 11,295.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 29: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: MAF Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 72 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1939 1.0 4641.00 4725.00 84.00 84.00 Grand Total 84.00

9.20 772.80 773.00

Late charges @ 3% 23.19

Total Amount (1+2) 772.80

Arrears/ Excess -

772.80 796.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 30: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: PC Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 430 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 913 1.0 127694.00 129688.00 1,994.00 1,994.00 Grand Total 1,994.00

9.20 18,344.80 18,345.00

Late charges @ 3% 550.35

Total Amount (1+2) 18,344.80

Arrears/ Excess -

18,344.80 18,895.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 31: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: RIS Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 1046 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 9486 1.0 3900.00 4633.00 733.00 733.00

2 953 1.0 0.00 0.00 - -

3 959 1.0 45942.00 46542.00 600.00 600.00

4 960 1.0 70359.00 71365.00 1,006.00 1,006.00

5 961 1.0 20374.00 21347.00 973.00 973.00

Grand Total 3,312.00

9.20 30,470.40 30,470.00

Late charges @ 3% 914.10

Total Amount (1+2) 30,470.40

Arrears/ Excess -

30,470.40 31,384.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 32: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: SDS Prepared on: 9-May-2013798 Due date without late charges: 24-May-2013

Total Occupied Area: 200 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 984 1 30612.00 30905.00 293.00 293.00 2 985 1 - - - -

Grand Total 293.00

9.20 2,695.60 2,696.00

Late charges @ 3% 80.88

Total Amount (1+2) 2,695.60

Arrears/ Excess -

2,695.60 2,777.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 33: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: UPCASI Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 150 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 1942 1.0 31192.00 31661.00 469.00 469.00

Grand Total 469.00

9.20 4,314.80 4,315.00

Late charges @ 3% 129.45

Total Amount (1+2) 4,314.80

Arrears/ Excess -

4,314.80 4,444.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 34: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: VSF Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 150 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 923 1.0 4885.00 4931.00 46.00 46.00

2 951 1.0 228.00 231.00 3.00 3.00 Grand Total 49.00

9.20 450.80 451.00

Late charges @ 3% 13.53

Total Amount (1+2) 450.80

Arrears/ Excess -

450.80 465.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 35: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014 Name of the Institution: HUDCO Prepared on: 9-May-2013Total Occupied Area: 8600 Sqm. Due date without late charges: 24-May-2013

S. No. Meter No. M.F. Previous Current Units Total Units

1 1038 1.0 41598.00 42131.00 533.00 533.00

2 1039 1.0 24724.00 25065.00 341.00 341.00

3 1040 1.0 17102.00 17382.00 280.00 280.00

4 1041 1.0 42770.00 43722.00 952.00 952.00

5 1042 1.0 63381.00 64152.00 771.00 771.00

6 1043 1.0 132124.00 133668.00 1,544.00 1,544.00

7 1044 1.0 69127.00 69999.00 872.00 872.00

8 1045 1.0 156152.00 158642.00 2,490.00 2,490.00

9 1046 1.0 244143.00 246894.00 2,751.00 2,751.00

10 1048 1.0 362916.00 368132.00 5,216.00 5,216.00

11 1049 1.0 33902.00 34196.00 294.00 294.00

12 1050 1.0 8742.00 8932.00 190.00 190.00

13 1051 1.0 79712.00 81694.00 1,982.00 1,982.00

14 1052 1.0 18741.00 18961.00 220.00 220.00

15 1053 1.0 70121.00 71079.00 958.00 958.00

16 1054 1.0 71802.00 72579.00 777.00 777.00

17 1055 1.0 46292.00 46602.00 310.00 310.00

18 1056 1.0 139986.00 142152.00 2,166.00 2,166.00

19 1057 1.0 17630.00 17856.00 226.00 226.00

20 1058 1.0 21833.00 22062.00 229.00 229.00

21 1059 1.0 86504.00 87609.00 1,105.00 1,105.00

22 1060 1.0 2569.00 2586.00 17.00 17.00

23 1061 1.0 132649.00 134661.00 2,012.00 2,012.00

24 1925 1.0 27981.00 28046.00 65.00 65.00

25 1926 1.0 11792.00 11792.00 - - OFF

26 1928 1.0 30383.00 30727.00 344.00 344.00

27 1929 1.0 31027.00 31519.00 492.00 492.00

28 1930 1.0 15615.00 15857.00 242.00 242.00

29 1931 1.0 1086459.00 1102013.00 15,554.00 15,554.00

30 1932 1.0 82868.00 83002.00 134.00 134.00 Grand Total 43,067.00

9.20 396,216.40 396,216.00

Late charges @ 3% 11886.48

Total Amount (1+2) 396,216.40

Arrears/ Excess -

396,216.40 408,102.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 36: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: Delhi Urban Shelter Impr. Board Prepared on: 9-May-2013 Due date without late charges: 24-May-2013

Total Occupied Area: 662 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units

1 978 1 20027.00 20464.00 437.00 437.00

2 979 1 14331.00 14703.00 372.00 372.00

3 995 1 3196.00 3299.00 103.00 103.00

4 996 1 55961.00 57353.00 1,392.00 1,392.00

5 1014 1 16345.00 16740.00 395.00 395.00 Grand Total 2,699.00

9.20 24,830.80 24,831.00

Late charges @ 3% 744.93

Total Amount (1+2) 24,830.80

Arrears/ Excess -

24,830.80 25,576.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C) Addl.GM - Projects Addl. GM - Finance

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 37: Elect Bill-September 2014

India Habitat Centre Electricity Charges for September 2014

Name of the Institution: TERI Prepared on: 9-May-20136 C Ground - 6th Due date without late charges: 24-May-2013

Total Occupied Area: 5739 Sqm.

S. No. Meter No. M.F. Previous Current Units Total Units 1 1802 1.0 371,061.00 380,206.00 9,145.00 9,145.00 2 1803 1.0 183,136.00 186,181.00 3,045.00 3,045.00 3 1804 1.0 205,150.00 208,572.00 3,422.00 3,422.00 4 1805 1.0 2,671,213.00 2,709,741.00 38,528.00 38,528.00 5 1806 1.0 2,056,223.00 2,089,483.00 33,260.00 33,260.00 6 1917 1.0 54,369.00 54,629.00 260.00 260.00 7 1919 1.0 52,156.00 52,908.00 752.00 752.00 8 1920 1.0 62,107.00 62,897.00 790.00 790.00 9 1933 1.0 38,283.00 38,880.00 597.00 597.00

10 1934 1.0 48,825.00 49,646.00 821.00 821.00 11 9481 1.0 23,016.00 24,149.00 1,133.00 1,133.00

91,753.00 Less

12 1000 1.0 8,908.00 9,002.00 94.00 94.00 13 1001 1.0 13,783.00 13,988.00 205.00 205.00 14 1002 1.0 27,276.00 27,646.00 370.00 370.00 15 1003 1.0 139,889.00 142,485.00 2,596.00 2,596.00 16 1004 1.0 43,984.00 44,636.00 652.00 652.00 17 1005 1.0 29,949.00 30,478.00 529.00 529.00 18 1006 1.0 79,044.00 80,090.00 1,046.00 1,046.00 19 1007 1.0 21,285.00 21,543.00 258.00 258.00 20 1008 1.0 23,702.00 23,963.00 261.00 261.00 21 1009 1.0 101,393.00 103,284.00 1,891.00 1,891.00 22 1010 1.0 112,981.00 114,981.00 2,000.00 2,000.00 23 1011 1.0 607.00 3,647.00 3,040.00 3,040.00 24 1012 1.0 15,690.00 15,850.00 160.00 160.00 25 1013 1.0 154,017.00 157,224.00 3,207.00 3,207.00 26 1990 1.0 129,739.00 131,748.00 2,009.00 2,009.00

18,318.00 Grand Total 73,435.00

9.20 675,602.00 675,602.00

Late charges @ 3% 20268.06

Total Amount (1+2) 675,602.00

Arrears/ Excess -

675,602.00 695,870.00

Note: 1. Send your payments by cheque payable to "India Habitat Centre" to the o/o the Director.2. The final figures are calculated to the nearest rupee.3. Please pay before due date to avoid disconnection.

For India Habitat Centre

GM - (P&FM) GM - (F,L&C)

Energy Charges per unit @ Rs.

Total amount to be paid on or before due date

Amount w/o late charges Rounded Off (3+4)

Total amount to be paid after due date

Page 38: Elect Bill-September 2014

Summary of electricity charges for September 2014

S.No Name of the Institution Units Unit chgs Total Arrears Total Amt in Rs. in Rs. in Rs. in Rs.

1 AIBTMF 113.00 1,039.60 1,040.00 1,040.00 2 AIHDA 92.00 846.40 846.00 846.00 3 AIAM 17,833.00 164,063.60 164,064.00 164,064.00 4 BMTPC 3,899.00 35,870.80 35,871.00 35,871.00 5 CBRI 115.00 1,058.00 1,058.00 1,058.00 6 CSE 1,046.00 9,623.20 9,623.00 9,623.00 7 CSTNAM 923.00 8,491.60 8,492.00 8,492.00 8 CDSA - - - - 9 CII 20,951.00 192,749.20 192,749.00 192,749.00

10 CDC 3,372.00 31,022.40 31,022.00 31,022.00 11 CAPART 6,485.00 59,662.00 59,662.00 59,662.00 12 COA 1,032.00 9,494.40 9,494.00 9,494.00 13 DMA 639.00 5,878.80 5,879.00 5,879.00 14 DPG 633.00 5,823.60 5,824.00 5,824.00 15 DUAC 3,252.00 29,918.40 29,918.00 29,918.00 16 FUR 462.00 4,250.40 4,250.00 4,250.00 17 HUDCO 43,067.00 396,216.40 396,216.00 396,216.00 18 HDFC 1,763.00 16,219.60 16,220.00 16,220.00 19 IREDA 8,992.00 82,726.40 82,726.00 82,726.00 20 IFCPAR 2,109.00 19,402.80 19,403.00 19,403.00 21 ILFS 3,118.00 28,685.60 28,686.00 28,686.00 22 ISST 941.00 8,657.20 8,657.00 8,657.00 23 ICRIER 7,998.00 73,581.60 73,582.00 73,582.00 24 ILO 6,832.00 62,854.40 62,854.00 62,854.00 25 NHB 23,208.00 213,513.60 213,514.00 213,514.00 26 NFI 1,463.00 13,459.60 13,460.00 13,460.00 27 NID 277.00 2,548.40 2,548.00 2,548.00 28 NIUA 4,528.00 41,657.60 41,658.00 41,658.00 29 NCRPB 1,192.00 10,966.40 10,966.00 10,966.00 30 MAF 84.00 772.80 773.00 773.00 31 MCD - SLUM 2,699.00 24,830.80 24,831.00 24,831.00 32 PC 1,994.00 18,344.80 18,345.00 18,345.00 33 RIS 3,312.00 30,470.40 30,470.00 30,470.00 34 SDS 293.00 2,695.60 2,696.00 2,696.00 35 TERI 73,435.00 675,602.00 675,602.00 675,602.00 36 UPCASI 469.00 4,314.80 4,315.00 4,315.00 37 VSF 49.00 450.80 451.00 451.00

Page 39: Elect Bill-September 2014

248,670.00 2,287,764.00 2,287,765.00 - 2,287,765.00 13,174,434.00

Page 40: Elect Bill-September 2014

Month Units Amount Paid AverageMar-13 840720 7,659,631.57 9.111 0.091 9.202

840720 7659631.57 9.111 Add 1% admin. Charges 0.091

9.202

9.200 765963847664822893157