-., ffinnvs E.l.D.- Parry (lndia) timited Hullath Village, Haliyal - 581329 Uttara Kannada District, Karnataka, lndia. Tel : +91 8284220676,221566 I 7 Fax : +91" 82842?0456 Cl N : 124211TN1975P1C006989 Website : www.eidparry.com Date 10.01.2020 No./HYL/ENV/MOEF CLt 01 t2O1 g_20 To, The Additionar principar chief conservator of Forest (c) Ministry Of Environment Forest &Climate Change Kendriya Sadan, 4th Floor,E & F Wing, il Block, Koremangala, Bangalore- 560034. Dear Sir, Sub': Submission of Six Monthly compliance report to the MoEF Clearance issued for SoKLpD Distillery plant and 24 MW Co_generation plant. Ref.: 1. EC No. F. No J-11o11r4Tt2oo7-ra,il(r)dated october l}th 2007. 2.Your office tetter No Ept12.1/640/KAR/g13g Dated gth March 2016. with reference to the above please find here with the six Monthly compliance report to the M.EF clearance issued for sOKLpD Distiilery prant and 24 Mw co-generation prant . This is submitted for your kind information and record prease. Thanking you, Sr. Associated Vice president Encl : Compliance report with all enclosures c'c' The Adviser,MoEF &cc Kendriya sadan, 4th Floor, E & F wing, il Block, Koremangala, Bangalore-S60034. Regd. Oftice: Dare House,234, N.S.C. Bose Road, Parrys Corner, Chennai - 600001, lndia fel +91 44-25306789 Fax: +9744-25347609 / 25340858 Website: www.eidparry.com * murugoPPo For E.l.D.Parry (i) Ltd, Hatiyat J.Venkata Rao

Transcript of E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to...

Page 1: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

-.,ffinnvs

E.l.D.- Parry (lndia) timitedHullath Village, Haliyal - 581329 Uttara Kannada District, Karnataka, lndia.Tel : +91 8284220676,221566 I 7 Fax : +91" 82842?0456Cl N : 124211TN1975P1C006989Website : www.eidparry.com

Date 10.01.2020No./HYL/ENV/MOEF CLt 01 t2O1 g_20

To,

The Additionar principar chief conservator of Forest (c)Ministry Of Environment Forest &Climate ChangeKendriya Sadan, 4th Floor,E & F Wing, il Block, Koremangala,Bangalore- 560034.

Dear Sir,

Sub': Submission of Six Monthly compliance report to the MoEF Clearance issued for SoKLpDDistillery plant and 24 MW Co_generation plant.Ref.: 1. EC No. F. No J-11o11r4Tt2oo7-ra,il(r)dated october l}th 2007.

2.Your office tetter No Ept12.1/640/KAR/g13g Dated gth March 2016.

with reference to the above please find here with the six Monthly compliance report to the M.EFclearance issued for sOKLpD Distiilery prant and 24 Mw co-generation prant .

This is submitted for your kind information and record prease.

Thanking you,

Sr. Associated Vice president

Encl : Compliance report with all enclosures

c'c' The Adviser,MoEF &cc Kendriya sadan, 4th Floor, E & F wing, il Block, Koremangala,Bangalore-S60034.

Regd. Oftice: Dare House,234, N.S.C. Bose Road, Parrys Corner, Chennai - 600001, lndia

fel +91 44-25306789 Fax: +9744-25347609 / 25340858 Website: www.eidparry.com*

murugoPPo

For E.l.D.Parry (i) Ltd, Hatiyat

J.Venkata Rao

Page 2: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

E.I.p.PARRY (I) tTD, HALIYALCOMPLIANCE REPORT TO THE M.O.E.F. CLEARANCE ISSUED FOR SUGAR 6OOOTCD, COGEN 34 MWDISTILLERY 9OKLPD AND POWER FROM INCINERATION BOITER 3 MW.

EC '-lA ll (l) Dote 04.02.Sl.No. Specific Conditions Compliance Statusi) Compliance to all the specific and general conditions

mentioned in the existing environmental clearance letterno.J-1101U4712A07-lA.ll (l) dated 18.10.2007 shall be

ensured

We are complying all the specific andgeneral conditions mentioned in theexisting Environmental Clearance letterNO J-1101114712007-lA ll(l) dated18.09.2007.

ii) Environment clearance accorded is for molasses baseddistillery unit (90 KLPD) only and no grain based distilleryunit shall be operated without prior permission from theMinistrv.

Agreed.

iii) ESP along with stack of adequate height will be providedto bagasse fired boiler (45 TPH) Bag filter along withstack of adequate height will be provided to spent washfired boiler (10 TPH) to control particulate emissionswithin 50 mg/Nm3. At no time, the emission levels shallgo beyond he prescribed standards. ln the event of failureof any pollution control system adopted by the unit, therespective unit shall not be restarted until the controlmeasures are rectified to achieve the desired efficiency.

We have installed two field ElectrostaticPrecipitator and Stack height as perCPCB guidelines to control theemissions from the 45 TPH Bagassefired Boiler of Cogeneration plant .

The Bag filter is installed for the 10 TPHBoiler fired on spent wash and coal andmaintain the particulate emissionswithin the prescribed limits of KSPCBWe have also installed online monitoringsystem for distillery boiler for analyzingparticulate matter, Sox and NOx..Weare regularly submitting monthly reportto regional office Kanrar of onlineemission monitoring.

(iv) In plant, control measures for checking fugitive emissionfrom allthe vulnerable sources shall be provided. Fugitiveemissions shall be controlled by providing closed storage,closed handling & conveyance of chemicals / materials,multi cyclone separator and water sprinkling system.Dust suppression system including water sprinklingsystem shall be provided at loading and unloading areasto control dust emissions. Fugitive emissions in the workzone environment, product, raw materials storage areaetc., shall be regularly monitored and records shall bemaintained. The emissions shall conform to the limitsprescribed by Karnataka State Pollution Control Board(KSPCB).

We have taken care of control measuresfor checking fugitive emission from all

the vulnerable sources. Fugitiveemissions are being followed andcontrolled by providing closed storage,closed handling & conveyance ofchemicals / materials, and watersprinkling system. Dust suppressionsystem including water sprinklingsystem is provided at loading andunloading areas to control dustemissions. Fugitive emissions in thework zone environment, product, rawmaterials storage area etc. are regularlymonitored and records are maintained.The emissions are conforming andwithin the limits prescribed by KarnatakaState Pollution Control Board (KSPCB).

v) The gaseous emissions from DG set shall be dispersedthrough adequate stack height as per CPCB guidelines.Acoustic enclosure shall be provided to the DG sets tomitigate the noise pollution.

We have provided the stack of adequateheight and Acoustic enclosure to all DGsets as per CPCB guidelines to mitigatethe noise pollution. The analysis reportsare enclosed as Annexure-l

vi) The company shall upload the status of compliance of thestipulated environmental clearance conditions, includingresults of monitored data on its website and shall updatethe same periodically. lt shall simultaneously be sent to

Agreed and complied. We have installedOnline monitoring system for ETPtreated effluent and Stack of 10 TPHBoiler and results are connected to

1.

Page 3: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

COMPLIANCE MOEF CLEARANCE

the Regional office of MOEF, the respective Zonal Officeof CPCB and the KSPCB. The levels of PM10, PM2.5,SO2, NOx, CO and HC (Methane) in ambient air shall be

monitored and displayed at a convenient location near themain qate of the companv and at important public places.

CPCB, KSPCB server. We havedisplayed the board near main gateshowing the levels of PM'10, PM2.5,SO2, NOx, CO and HC (Methane) inambient air.

(vii) Pucca approach road to project site shall be constructedprior to commencing constructions activity of the main

distillerv to avoid fuqitive emissions.

Completed

(viii) Total fresh water requirement from Kali river for distilleryand sugar along with cogeneration shall not exceed 3161

m3 / day. Prior permission for the drawl of 3161 M3/daywater shall be obtained from the Competent Authority.Water consumption shall be reduced by adopting 3 R's(Reduce, Reuse and Recycle) concept in the process.

We are regularly monitoring the waterquality and recycle ,reduce the wateraccording to the requirement. Our rawwater consumption is well within thenorms of 3161 m3/day.Complied.

(ix) Spent wash generation from molasses shall not exceed 8Kl/Kl of alcohol produced (ie., 720 M3/day). The spentwash from molasses based distillery will be concentratedin MEE and concentrated spent wash will be incineratedin incineration boiler to achieve zerc discharge.Condensate water and treated spent lease will be reusedas dilution water for fermentation, cooling tower and boilermake up.

The spent wash generation is I KL/KLof Alcohol produced. The spent washgenerated is evaporated in MultipleEffect Evaporators and the concentratedspent wash is used as fuel for '10 TPHboilers. The condensate from theevaporator is treated in the ETP andused for processComolied.

(x) Wastewater generation from the sugar unit shall not

exceed 100 liters per tonne of cane crushed ie.,600M3/day. Effluent from sugar unit shall be treated in theeffluent treatment plant (ETP). Water quality of treatedeffluent shall be monitored regularly. ln any case, nowaste water / treated effluent shall be discharged intoriver / natural stream. Domestic effluent shall be treated intreatment plant

Wastewater generation from the sugarunit is wellwithin the norms of 100 litersper tonne of cane crushed ie.,600M3/day. Effluent from sugar unit is

treated in the effluent treatment plant(ETP) and used for on land irrigationand green belt develoPment. Waterquality of treated effluent is monitoredregularly. No waste water / treatedeffluent is discharged into river / naturalstream. Domestic effluent is treated in

treatment plant.Comolied.

(xi) Spent wash shall be stored in impervious lagoon withHDPE lining as per CPCB guidelines and shall be kept inproper condition to prevent ground water pollution.Storage capacity of spent wash lagoon shall be for 5days.

The spent wash is stored in imperviouslagoon of RCC with HDPE lining andare kept in proper condition to preventground water pollution. As Per theCPCB recommendations, storage is notexceedinq 05 days capacity

(xii) Adequate numbers of ground water quality monitoringstations by providing piezometers around the project areashall be set up. Sampling and trend analysis monitoringmust be made on monthly a basis and report submitted toSPCB and this Ministry. The ground water qualitymonitoring for PH, BOD, COD, chloride, Sulphate andTotal Dissolved Solids shall be monitored. Sampling andtrend analysis monitoring must be made on monthly basisand report submitted to the Ministry's Regional office atBanqalore and KSPCB.

We are analyzing the samPle onmonthly basis with KSPCB and also withKSPCB approved third party. Groundwater quality is well within the stipulatedstandards.Gomplied.

(xiii) Process effluent / any waste water shall not be allowed to

mix the storm water. Storm water drain shall be passedthrouoh ouard oond.

No process water is allowed to mix thestorm water drain. Separate drains areorovided for storm water.

2

Page 4: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

COMPLIANCE MOEF CLEARANCE

Complied.(xiv) As proposed, no effluent from sugar, distillery, and co-

generation power plant shall be discharged outside thepremises and Zero effluent discharge concept shall befollowed.

We are utilizing our treated water in ourown cane farm and no water isdischarged outside the premises. Weare following zero effluent dischargeconcept.

(xv) Bagasse storage shall be done in such a way that it doesnot get air borne or fly around due to wind. Fly ash shallbe stored separately as per CPCB guidelines so that itshall not adversely affect the air quality, becoming airborne by wind or water regime during rainy season byflowing along with the storm water. Direct exposure ofworkers to fly ash and dust shall be avoided.

We are having bagasse storage yardand provided with barricade with MSstructure and Galvalume sheets to avoidthe flying of bagasse particles due towind. We are providing PPE for theworkers working in bagasse yard.Complied.

(xvi) Boiler ash shall be stored separately as per CPCBguidelines so that it shall not adversely affect the airquality, becoming air borne by wind or water regimeduring rainy season by flowing along with the storm water.Direct exposure of workers to fly ash & dust shall beavoided. Bagasse ash and coal ash shall be storedseparatelv.

We are storing the boiler ash as perCPCB guidelines without affecting theair quality during wind or water regimeduring rainy season.Complied.

(xvii) Firefighting system shall be as per the norms and coverall areas where alcohol is produced, handled and stored.Provision of foam system for firefighting shall be made tocontrol fire from the alcohol storage tank.

We have provided pucca firefightingsystem in distillery with provision offoam system to control fire from alcoholstorage tank, under emergency.Comolied.

(xviii) Risk assessment should be carried to assess the fire andexplosion risk due to storage of alcohol and reportsubmitted to the Ministry and its Regional office atBanqalore within six months.

We are regularly submitting to theministry and regional office atBangalore at every six monthsComplied..

(xix) Occupational health surveillance programme should beundertaken as regular exercise for all the employees. Thefirst aid facilities in the occupational health centre shouldbe strengthened and the regular medical test records ofeach employee should be maintained separately.

We have under taken the Occupational

Health Surveillance programme as a

regular exercise for all the employees.The first aid facilities in theoccuputional health centre is

maintained seperately.Regular medical test records of eachemployee are maintained separately.Gomplied.

(xx) Dedicated parking facility for loading and unloading ofmaterial shall be provide in the factory premises. Unitshall develop and implement good traffic managementsystem for their incoming and outgoing vehicles to avoidcongestion on the public road.

We are having separate parking facilityfor raw material lorries and systems arewell developed to avoid congestion onthe public road.Complied.

(xxi) Green belt shall be developed in 85 acres of land out oftotal land of 226 acres within plant premises with at least10 meter wide green belt on all sides along the peripheryof the project area, in downward direction, and along roadsides etc., Selection of plant species shall be as per theCPCB guidelines in consultation with the DFO. Unit shallprepare year-wise greenbelt development plan to achievetarget of 85 acres greenbelt and submit to the Regionaloffice. Each year achievement also be submitted to the

Agreed and complied. Green belt ofadequate width and density in 95 acres

of the plant area has been developed.We have done the plantations of about27859 saplings in our premises. This

year we have already planted 1325

saplings in and around the factorypremises. Photographs are enclosed as

3

Page 5: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

COMPLIANCE MOEF CLEARANCE

RegionalOffice. Annexure -ll

(xxii) All the commitments made during the Public Hearing /Public Consultation meeting held on 23'd May, 2014should be satisfactorily implemented and adequatebudqet provision should be made accordingly.

Gomplied..

(xxiii) At least 5% of the total cost of the project should beearmarked towards the Enterprise Social Commitment(ESC) based on local needs and action plan with financialand physical breakup/details should be prepared and

submitted to the Ministry's Regional office at Bangalore.lmplementation of such program should be ensuredaccordinqlv in a time bound manner.

Budget provisions are made regularlyfor ESC and implemented accordingly

Complied..

(xxiv) Provision shall be made for the housing for theconstruction labour within the site with all necessaryinfrastructure and facilities such as fuel for cooking,mobile toilets, mobile sewage treatment plant, safedrinking water, medical health care, crdche etc., Thehousing may be in the form of temporary structure to beremoved after the completion of the project. All theconstruction wastes shall be managed so that there is no

impact on the surroundinq environment.

Agreed.

B. GENERAL CONDITIONS:

(t) The Project authorities must strictly adhere to thestipulations made by the Karnataka State Pollution ControlBoard (KSPCB), State Government and any otherstatutorv authoritv.

Agreed and complied.

(ii) No further expansion or modifications in the plant shall becarried out without prior approval of the Ministry ofEnvironment and Forests. ln case of deviations oralterations in the project proposal from those submitted tothis Ministry for clearance, a fresh reference shall be madeto the Ministry to assess the adequacy of conditionsimpobed and to add additional environmental protectionmeasures required, if any.

No further expansion will take withoutprior approval from Ministry ofEnvironment and Forests..

(iii) The location of ambient air quality monitoring stations shallbe decided in consultation with the State Pollution ControlBoard (SPCB) and it shall be ensured that at least onestation is installed in the upwind and downwind directionas well as where maximum ground level concentrationsare anticipated.

Ambient air quality monitoring stations

have been identified at three places in

consultation with KSPCB . ETP,Maingate

entrance and at distillery)in the

downwind direction as well as where

maximum ground level concentration ofSPM, SO2, Nox are anticipated. Regular

monthly monitoring was carried out and

the monitored results are submitted to

KSPCB. The reports are attached as

Annexure-lll.

(iv) The National ambient Air quality Emission Standardsissued by the Ministry vide G.S.R.No.826(E) dated 16th

November,2009 shall be followed.

Complied.

(v) The overall noise levels in and around the plant area shallbe kept well within the standards by providing noise

The overall noise levels in and aroundthe plant area are kept well within the'

4

Page 6: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

COMPLIANCE MOEF CLEARANCE

control measures including acoustic hoods, silencers,enclosures etc., on all sources of noise generation. Theambient noise levels shall conform to the standardsprescribed under Environment (Protection) Act, 1986Rules, 1989 viz.,75dBA (day time) and 70 d BA( nighttime)

standards by providing noise controlmeasures including acoustic hoods,silencers, enclosures etc. on allsources of noise generation The ambientnoise levels are confirm to the standardsprescribed under EPA Rules, 1989 viz.75 dB A ( day time)and70 dB A (nighttime).The Noise monitoring reports areattached

(vi) The company shall harvest rainwater from the roof tops ofthe building and storm water drains to recharge the groundwater and use the same water for the process activities ofthe project to conserve fresh water.

. We are having adequate numbers ofRain water drains, storm water pits, torecharge the ground waterComplied..

(vii) Training shall be imparted to all employees on safety andhealth aspects of chemicals handling. Pre-employmentand routine periodical medical examinations for allemployees shall be undertaken on regular basis. Trainingto all employees on handling of chemicals shall beimparted.

We have given Training to allemployees on Safety and Healthaspects of chemicals handling. Pre-employment and routine periodicalmedical examinations for all employeesare undertaken on regular basis.Training to all employees on handling ofchemicals is imparted.Complied.

(viii) The company shall also comply with all the environmentalprotection measures and safeguards proposed in thedocuments submitted to the Ministry. All therecommendations made in the EIfuEMP in respect ofenvironmental management, risk mitigation measures andpublic hearing relating to the project shall be implemented.

Training to all employees on Safety andHealth aspects of chemicals handlinghas been provided. A well-equippedprimary health center is beingmaintained. Pre-employment and routineperiodical medical examinations for allemployees are undertaken on regularbasis and records are maintained.Training to all employees on handling ofchemicals is impartedComplied..

(ix) The company shall undertake all relevant measures forimproving the socio-economic conditions of thesurrounding area. CSR activities shall be undertaken byinvolving local villages and administration.

Adequate measures are taken to comply

the direction. CSR activities are taken up

to improve the socio - economic

conditions in surrounding area, like

Balwadi schools, education to thepoorer. Medical facilities in rural areas,

Roads to villages, drinking waterarrangement to nearby villages, desiltingponds every year etc.,

Complied.(x) The company shall undertake eco-developmental

measures including community welfare measures in theproject area for the overall improvement of theenvironment.

Several CSR activities to uplift the socio-economic conditions of surrounding areainvolving local villages andadministration are being taken up ln andaround Haliyal pond desilting work takenuo to recharqe qround water for the

5

Page 7: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

improvement of environment..Complied.

(xi) A separate Environmental Management cell equipped withfull-fledged laboratory facilities shall be set up to carry outthe environmental management and monitoring functions.

A seParateEnvironmental Management cell is set

up comprising of

Mr. J. Venkatarao, Sr. AVP works

Mr. Kanagasabai,, AGM Process

Mr. K. Venu Gopal, Sr.Manager Process

Mr. Alam Shah, Sr. Man Distillery,

Mr. Thirumal, Manager QA

Established well equipped Laboratory.Online flow meter for discharge andOnline stack monitoring are provided

and they are connected to CPCB server.Complied.

(xii) The company shall earmark sufficient funds towardscapital cost and recurring cost per annum t implement theconditions stipulated by the Ministry of Environmentmanagement / pollution control measures shall not bediverted for any other purpose.

Sufficient funds are provided in capitalcost for environment protection forenvironment managemenUpollutioncontrol measure.every year..Comolied.

(xiii) A copy of the clearance letter shall be sent by the projectproponent to concerned Panchayat, Zllla praised IMunicipal Corporation, Urban Local Body and the LocalNGO, if any, from whom suggestions / representations, ifanv, were received while processing the proposal.

Complied..

(xiv) The project proponent shall also submit six monthlyreports on the status of compliance of the stipulatedEnvironmental Clearance conditions including results ofmonitored data ( both in hard copies as well as by e-mail)to the respective Regional Office of MoEF, the respectivezonal office of CPCB and KSPCB. A copy ofEnvironmental Clearance and six monthly compliancestatus report shall be posted on the website of thecompanv.

Environmental clearance and sixmonthly compliance report are posted inthe website of the company.

Complied.

(xv) The environmental statement for each financial yearending 31"t march in Form-V as is mandated shall besubmitted to the concerned State Pollution Control boardas prescribed under the Environment (Protection) Rules,1986, as amended subsequently, shall also be put on thewebsite of the company along with status of compliance ofenvironmental clearance conditions and shall also be sentto the respective Reqional offices of MoEF by e-mail.

Submitted regularily to the regionalotfice

Kanrvar within the stipulated time.

Complied.

(xvi) The project proponent shall inform the public that theproject has been accorded environmental clearance by theMinistry and copies of the clearance letter are availablewith the SPCB / committee and may also e seen atWebsite of the Ministry at http://moef.ni.c.in. this shall beadvertised within seven days from the date of issue of the

A notice of unit exPansion from4800TCD to 6000TCD, Cogenerationpower plant from 24MW to 34MW and

Distillery plant from 45KLPD to 9OKLPD

is advertised in local newspaper and it

COMPLIANCE MOEF CLEARANCE

6

Page 8: E.l.D.- Parry ffinnvs€¦ · iii) ESP along with stack of adequate height will be provided to bagasse fired boiler (45 TPH) Bag filter along with stack of adequate height will be

COMPLIANCE MOEF CLEARANCE

clearance letter, at least in two local newspapers that arewidely circulated in the region of which one shall be in thevernacular language of the locality concerned and a copyof the same shall be forwarded to the concerned Regionaloffice of the Ministry.

was informed and have alreadY

submitted a copy of their advertisement

to the regional officeComplied..

(xvii) tne project authorities shall inform the Regional office as

well as the Ministry, the date of financial closure and final

approval of the project by the concerned authorities and

the date of start of the proiect. -

Agreed.

8 @voke or suspend the clearance, ifimplementation of any of the above conditions is not

satisfactory.

Agreed

9 the tvtinistry reserves the right to stipulate additionalconditions, if found necessary. The company in a time

bound manner will implement these conditions.Agreed.

10 the aOove conditions will be enforced, inter-alia under theprovisions of the Water (prevention & Control of Pollution)Act, 1974, Air (Prevention & Control of Water PollutionAct, 1981 , the Environmental (Protection) Act, 1986

Hazardous waste (Management, handling and Trans-boundary Movement) (Protection) Rules, 2008 and the

Public liability lnsurance Act, 1991 along with their

amendments and rules.

Agreed.

11 Therenr/rronmental clearance is issued for Expansion oflntegrated Sugar Complex ( Sugar, Distillery and

Cogeneration Power Plant) at village Hullatti & Alloli,Taluk, Haliyal, District Uttar Kannada, Karnataka to M /s.

EID parry (lndia) Ltd.,

Agreed.

For E.l.D.Parry (i) Ltd, Haliyal. ..

. oqf!\.1r t,q.! l rl"d-

J.Venkata Rao

Sr.Associate Vice