Information Technology Initiatives (IT)

HARYANA POWER DEPARTMENT

8th February, 2014

HPGCL

Page 2: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

2

Agenda• Vision & Mission of Power Department • Areas of IT Intervention in DISCOMS• Details of existing IT initiatives of DISCOMs• R-APDRP implementation• Smart Grid Pilot Project in Panipat• State Govt. Village Information Project at Barwala• IT Initiatives of HVPNL• IT Initiatives of HPGCL

Page 3: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

3

Vision & Mission of Power Department

• VisionEnsuring availability of adequate, quality and reliable power and sustainability of power sector in

the State thereby contributing to accelerated development of the State.• Mission

– Creation of sufficient generation capacity through own generation assets and through contractual generation capacities.

– Strengthening transmission capacity and transmission system by adding 12300 MVA capacity with addition of 69 no. new substations and augmentation of 144 no. existing substations during 12th Five Year Plan in view of load growth to evacuate and transmit power in a reliable manner by ensuring grid discipline.

– To strengthen distribution system by adding 4435 MVA capacity with addition of 225 no. new 33 kV substations and augmentation of 197 no. existing 33 kV substations during 12th Five Year Plan to meet the growing demands of consumers for reliable and adequate power and to improve consumer service.

– To achieve best in class Techno economic performance in the power generation, transmission and distribution sector.

– To generate return on Investment in the long run & to meet revenue expenditure needs in the short term.

– Maintain Security of the grid in a reliable manner through adherence to grid discipline.– To strive to achieve energy conservation and increase energy efficiency. – To meet the regulatory and financial obligations of the financial restructuring plan (FRP).– To eliminate the gap between the Average Cost of Supply (ACS) and the Average Revenue

Realized (ARR)

Page 4: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

4

IT intervention in DiscomsSr. No. Area of initiatives Outcome parameters of IT intervention

1 Customer Services Monitoring of each and every consumer complaints and to track its registration and resolution

2 Metering Tamper proof feature meters leading to accurate recording of energy consumed by meters & reduced AT&C losses

3 Meter Reading Elimination of human interface leading to accurate meter reading and reduced AT&C losses

4 Billing Uniform and accurate application of tariffs and Availability of MIS and backend database for online application, tariff determination

5 Collection Reduction in collection frauds, revenue protection and increased avenues of bill collection to the consumers

6 Energy Audit Identification of high loss areas for taking corrective action for reducing the losses

7 Vigilance & Enforcement

Help in detection of theft of electricity and in turn reduces the AT&C losses

8 Business processes of HR, Finance & Accounting

In crease the operational efficiency and employee productivity

Page 5: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

5

Consumer & Online Services initiatives

• Centralized Call Center with Toll Free number 1800-180-1615. During December-2013 around 13119 nos. complaints were received and redressed.

• Online Web-based Consumer Grievances Redressal System [CGRS] at www.uhbvn.com & www.dhbvn.com. Around 478 complaints were received from consumers are entered in the system in January, 2014

• SMS based complaint registration system with short code 51969 w.e.f. 01.01.2014. 305 complaints were registered in January, 2014.

• E-Mail Complaint registration through E-Mail through [email protected] & [email protected] w.e.f. 01.01.2014 and 154 complaints have been received on E-mail.

• On-Line Loading of FIR:- On detection of theft case , it is mandatory to lodge On-Line FIR within 24hours . 2089 FIRs were registered in December, 2013

• Online Application facility for new Industrial Connections and for other categories greater than 20 KW w.e.f. 01.01.2014. As on date 29 Nos. online applications have been received on the portal

• Online Bill Payment facility :- Online Bill Payment Facility is available for all the consumers for bill payment through Net banking , Credit Cards & debit cards. Monthly collection of around Rs 10 Crores is collected every month from 12000 users.

• Computerized Cash Collection:- The cash collection at Nigam Counters has been computerized to prevent fraud , online reconciliation .

Page 6: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

6

Metering & Meter Reading initiatives-

Installation of Electronic Meters :- Around 37 lacs Nos. Electronic meters have been installed after replacing old Electromechanical meters.

Optical Port meters:- Around 7.35 lacs consumers are provided with meters optical port.

Trivector meters:- High value Consumers approax 25000 Nos. are provided with advance meters which are capable of storing 180 days metering data, tamper data, Load survey data on half hour interval basis and Time of day consumption data.

Automatic Meter reading [AMR] of HT Consumers :- AMR based on GPRS technology has been implemented on 4000 HT Industrial consumers in UHBVN.

Automatic Meter Reading of feeder meter :-For automatic meter reading of feeder meter, the work has been executed by M/s NELCO and around data if approax 2000 nos. feeders is being received through GPRS Routers.

Automatic meter reading of DTs:- For automatic meter reading of DTs, the work has been executed by M.s Omneagate for around 20,000 DTs in Yamunanagar & Jind District.

CMRI Meter reading of HT/LT Consumers- All the high value consumers [25,000] are being reading through CMRI for down loading the meter data. The Optical port of around 7.35 lacs LT consumers is being brought outside for electronic meter reading through CMRI

Spot Billing. - In 42 Nos. Urban sub-divisions, the meter reading of LT consumers is being taken through Spot Billing.

AMR on High Value Consumers :- The implementation of AMR on Mobile Towers [3000 Nos.] and all the connections with connected load greater than 10 KW [85000] is under process.

Page 7: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

7

Computerised Billing, Web-Based MIS and Updation of Billing Database Initiatives-

Computerized Billing of all Categories :- The Billing of all the 53 Lacs consumers of UHBVN & DHBVN has been computerized through various billing agencies.

Web-based MIS Project:- For bringing the complete Billing data of all the Billing agencies on one common Platform, a web-based MIS Project has been implemented through M/s Hartron.

Sub-Division Automation System (SAS):- 13 Nos. Sub-divisions of DHBVN are covered under project, where in all the sub-division functions are fully automated.

Updation of Consumer Data Base through HESL:- M/s HESL has been entrusted to update the consumer data base to have the following Complete address of the consumers Mobile Number & telephone Number of Consumer Meter Make Number of ACs installed Nature of business – Petrol/Pump/Hospital/Mobile Tower etc. Meter Inside /Outside

Progress :- The survey of almost 95% consumer has been completed and the consumer database is being updated by the Billing vendors.

Page 8: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

8

ERP Initiatives- The work of implementation of ERP (SAP) in DHBVN was allotted to M/s TCIL with

the total cost of the project is Rs. 6.67 Cr.

In this project, the following modules of ERP (SAP) are to be implemented in DHBVN. Material Management (MM)- Implemented Quality Management (QM)- implemented Project Systems (PS)- Implemented Finance (FI) Controlling (CO)- Implemented Plant Maintenance (PM)- Under Roll Out

The tender for ERP Implementation in UHBVN will be floated shortly

Page 9: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

9

Restructured Accelerated Power Development & Reform Programme [R-APDRP]

• Central Sector Scheme – Government of India , Ministry of Power [MOP] Scheme

• Coverage -Covers 36 Towns with population greater than 30,000 as per 2001 census.

• Cost of the Project :- Rs 165 Crores.• System Integrator :- M/s HCL Technologies , Noida• Award of Contract :- November, 2013• Completion Period :- 18 months • Scope of work :- Computerization of billing, collection, GIS Mapping,

Energy audit , Automatic meter reading , customer care services for 16 lacs consumers under 92 sub-divisions.– Establishment of Data Center at Hissar – Completed – Establishment of Disaster Recovery Center [DRC] at Panchkula- By

February, 2014– Establishment of Customer Care Center Gurgaon.-February-2014– Go-Live of 36 towns from Feb.2014 to May-2014

Page 10: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

10

Integrated Business Process Approach – Mission R-APDRP

10

MDAS

GIS

CC & B

Web Portal

E A&A & Network Analysis Tools

Website

Local Office

Utility Head Office

Spot Billing

Internal Report Generation and Analysis of AT & C Losses

Sub Station

Distribution Transformer

HT

Complaints, New Connection /

Disconnection

Pay Bill Online

Customer Care

Data Center

Page 11: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

11

Smart Grid Pilot Project at Panipat

•Location:•Panipat City SubdivisionProject Summary:•Project covers 31,623 consumers in Panipat•Input energy of about 144.14 MU •Functionality covered:

– Advanced Metering Infrastructure (AMI)– Peak Load Management (PLM)– Outage Management System (OMS)– Renewable integration through net metering

•Estimated cost of the project Rs. 46.76 crore•Annual benefit of Rs. 9.3 crore •Payback period- 60 months•RFP for the project is under finalization.

Page 12: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

12

Pilot Project at Barwala Under “Integrated Village Information and Service (IVISS) under e-Seva

2 Nos. Villages Barwala and Bataur having 3500 Consumers are covered. Tangible Benefits observed Village Barwala

Reduction in Average Billing Cases of Barwala from 564 nos. cases to 332 Cases i.e. reduction by 41.37%.

Increase in Collection efficiency and ROR as Under

Other In-Tangible Benefits– Meter Reading application on an Android based tablet having audit trail of actual

meter reading position coordinates and photograph .– All payments are recorded immediately and online into an integrated system.

The receipt is generated only upon confirmation from the Billing system.– Bill format has been simplified to eliminate rarely needed information.– Inconsistent Reports are proposed to be made available electronically.– Duplicate Bill generation, references to old bills and payments are available

at e-Seva centers. This can also be made available at SDO offices.

Sr. No. Month Agency Collection Efficiency (%)

ROR [ Realization/Units Billed][Rs /Unit]

1 July-2013 HESL 59.37% 3.63

2 Sept.-2013 VLE 101.26% 6.31

3 Nov -2013 VLE 104.14% 6.68

Page 13: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

13

IT Initiatives in HPGCL

Implementation of Enterprise Resource Planning (ERP):. Under ERP all Technical, Financial & Commercial activities of HPGCL will be integrated. The implementation of ERP will bring Standardization of processes, Transparency in organisation, real-time availability of data and better & quick decision making apart from reduction in losses in power plant ultimately reduction in cost of generation. ERP enables interaction with specialist for O & M of equipments.

Generation Control Centre (GCC): A centralized Generation Control Centre is being set up at corporate office Panchkula which will be used to display real time monitoring of power plant operational data through mimic diagrams and make available requisite reports for monitoring of key operating parameters & performance efficiency calculations for generating Units of HPGCL. The setting up of GCC will also help us in finding the route cause analysis of trippings.

CCTV Surveillance System has been installed across all HPGCL Power Plant control rooms in order to watch the real time activities for monitoring purpose.

Page 14: eHaryana 2014 - Roadmap for CSCs & Basic Citizen Services... - Shri Devender Singh, Principal Secretary, Government...

14

IT Initiatives in HVPNL

• ERP Implementation:-– System Integrator :- M/s Satyam Computers Limited (Now M/s Tech Mahindra)– Approval Cost :- Rs 26 Crores – Implementation stage :- Pilot roll out within next one month.– Scope of Work

• ERP Module (s) includes HR, Payroll, Finance & Accounts, Material management and Data Warehouse.

• ERP/ COTS Software including Document Management System, Legal Services and Fleet Management

• Substations (Op & mtc) module & Field Offices (Division, Circle, Zone) Computerization.

• Portal and e-mail Messaging.• Interface/Integration with existing packages.• State Wide Area Network (SWAN) connectivity being used to connect all the offices

including Corporate Office, field Zonal Offices, Circle Offices, Division offices and all Substations.

• Optical Fibre Network :- Existing Wide Band Network of 93 KM under Unified Load Dispatch Center Scheme,

• Scada Monitoring :- 54 Sub-stations are being monitored through SCADA implementation.