Edward Bradbrook

15
EDWARD BRADBROOK BUSINESS DEVELOPMENT MANAGER

Transcript of Edward Bradbrook

Page 1: Edward Bradbrook

EDWARD BRADBROOKBUSINESS DEVELOPMENT MANAGER

Page 2: Edward Bradbrook

CURICULUM VITAENAME: Edward Bradbrook POSITION: Business Development ManagerBORN: Luton England 19 August 1956QUALIFICATIONS: City and Guilds Plumbing Design Technicians Certificate Parts 1 & 2

City and Guilds Estimating Certificate - Advanced AutoCAD CertificatePERMITS: UAE Drivers Licence – UK Drivers Licence OVERVIEWI have worked in the construction industry for more than 30 years and have worked for a number of major and internationally renowned consultancies and contractors during my career including WSP Group, ATKINS, Halcrow and KBR.I have undertaken the design of internal/external drainage, water services, grey water re-cycling, water treatment, medical and non-medical gas systems etc. on major projects working closely with the design team from inception through to project handover. With many contacts in the UAE construction & business community I can be very useful for those who are planning to set up operations or market products/services in the UAE. RECENT PROJECT EXPERIENCE

Aug'15 – presentBusiness Development ManagerSince returning to the UAE last August I have been working with associates in business development.I assisted HRSFUNKE & BYRNELOOBYENERGY prospecting relationships with MEP/Oil & Gas Consultants & Contractors, getting approvals, checking specification compliance & being added to Consultants & Contractors Approved Vendor Lists. I am currently seeking a new challenge in technical sales & marketing.  Jul’14 – Aug'15 - KBR Government Services EMEASenior Public Health EngineerWorking on 3000 man accommodation camp, Afungi, Mozambique for Anadarko Oil & Gas. Designed incineration, water treatment, fuel tank farms & public health services to kitchens, medical clinic, accommodation etc.KBR redeveloped aircraft & pilot facilities at RAF Airfields for Ascent Military Flight Training Scheme. I was responsible for the Public Health services to hangars, staff accommodation, canteens & aircraft washing systems etc.

Page 3: Edward Bradbrook

Jan’14 -.Jul ‘14 - Richmond Sustainable Engineering Solutions UAEBusiness Development ManagerMeeting Consultants, overseeing the design of Solar, Water Services, Sanitation & Drainage Systems. Getting product approval/specified with Consultants, Managing the Sales & Technical Teams.Returned to UK for hip replacement. 

Jul’12 – Dec ’13 ATKINS Dubai – Dubai Creek Harbour DevelopmentSenior Public Health EngineerDubai Creek Harbour Development - a mixed use development comprising 4 hotels, residential & commercial properties. Designed the Public Health services as part of the PH design team & liaised with the project team of architects etc. Jul’11- Jul ‘12 ATKINS Doha – King Abdulaziz International Airport JeddahSenior Public Health EngineerKing Abdulaziz International Airport Jeddah is a 14 billion dollar project that ATKINS designed throughout their global offices. ATKINS Qatar MEP designed 4 Load Centres, 2 Data Centres & a Tree Nursery/Garden Centre. I designed the Public Health Services to International Plumbing Codes as required for the Data Centres & Tree Nursery. 

Jan’10-Jul’11Pipex Limited Abu DhabiSenior Technical EngineerSenior Technical Engineer visiting Consultants & Contractors throughout the UAE advising on the design of non-corrosive pipework & drainage systems/pumping stations etc. for chemical waste. Projects included Masdar, New York University, ADNOC R&D Centre &Guggenheim Museum.  Oct’08-Nov’09 WSP Group Abu Dhabi -Presidential Palace Abu DhabiSenior Public Health EngineerDesigning internal, external gravity and vacuum drainage systems, above ground sanitation, hot, cold and chilled water systems, attending client and design team meetings and meeting with Abu Dhabi Local Authorities.Raddison Hotel, Yas Island, Abu Dhabi

Page 4: Edward Bradbrook

WSP cont’d....Raddison Hotel, Yas Island, Abu Dhabi Involved in the final stages of the project dealing with utilities approvals, answering mechanical contractors RFI’s, modifying foul and surface water drainage including surface water attenuation system and overcoming co-ordination problems on site.Rosewood Hotel, Sowwah Island, Abu DhabiInvolved in initial design team meetings with client and architect planning the cores and bathroom layouts, designing internal drainage systems, above ground sanitation, hot, cold and chilled water systems, modifying specification to US CSI standard. Attending design workshops in US to overcome design and co-ordination issues. 

March’08-Oct’08 Pell Frischmann UAE -Lagoon Hotel Abu Dhabi Senior Public Health EngineerOn Lagoon Hotel Project I was responsible for the design of the foul & surface water internal & external drainage systems, grey water recycling system & plant. On project cancellation I reviewed all existing UAE projects for Pell quality assurance before leaving to join WSP Group ME. SELECTED PROJECTSGreat Ormond Street Children’s Hospital EnglandPublic Health EngineerSurveying existing piped services, designing internal drainage and above ground sanitation systems, specialist water systems (de-ionised, softened & RO) for sterilization and dialysis machines, medical gases to theatres, general, intensive and critical care wards and laboratories.Royal London Hospital EnglandPublic Health EngineerDealing with external drainage diversions and design, designing internal drainage and above ground sanitation, specialist water systems (de-ionised, softened & RO for sterilization and dialysis machines, pneumatic tube delivery system for 23 storey hospital in London.Glaxo Pharmaceutical Campus EnglandPublic Health EngineerWorking for mechanical contractor on site designing and procuring multi-pipe support systems, co-ordinating MEP services, marking out builderswork, penetrations, designing laboratory waste systems from sinks, fume cupboards and attending progress meetings. Monitoring sub-contractor installation of laboratory polypropylene waste system (dilution pots, dual containment pipework etc.).

Page 5: Edward Bradbrook

PIPEX 2009 – MEP MAGAZINE

http://www.constructionweekonline.com/article-10514-pipeline-to-success/

Page 6: Edward Bradbrook

RICHMOND SUSTAINABLE ENGINEERING SOLUTIONSVALSIR RAINPLUS PRESENTATION ADDRESS HOTEL, DUBAI ANDEMIRATES PALACE HOTEL, ABU DHABI

Page 7: Edward Bradbrook

RICHMOND SUSTAINABLE ENGINEERING SOLUTIONSVALSIR RAINPLUS PRESENTATION ADDRESS HOTEL, DUBAI ANDEMIRATES PALACE HOTEL ,ABU DHABI

Page 8: Edward Bradbrook

RICHMOND SUSTAINABLE ENGINEERING SOLUTIONSVALSIR RAINPLUS PRESENTATION ADDRESS HOTEL, DUBAI ANDEMIRATES PALACE HOTEL, ABU DHABI

Page 9: Edward Bradbrook

RICHMOND SUSTAINABLE ENGINEERING SOLUTIONSVALSIR STAND - EXPOCOMFORT 2014 - MILAN

Page 10: Edward Bradbrook

HRSFUNKE – BIG 5 EXHIBITION 2015 - DUBAI

Page 11: Edward Bradbrook

JEDDAH CHAMBER OF COMMERCE 2016

Page 12: Edward Bradbrook

CITY & GUILDS CERTIFICATE

Page 13: Edward Bradbrook

CITY & GUILDS CERTIFICATE

Page 14: Edward Bradbrook

IOP CERTIFICATE AUTOCAD CERTIFICATE

Page 15: Edward Bradbrook

CONTACT DETAILSM: +971 (0)55 349 8347E: eddie @arabflo.comSkype: eddie.bradbrook