Transcript of Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
Edgar L. Black
MUCOOL ADVANCED M.T.F. MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS& M.I.C.E. LAYOUTS
August 12-13, 2002August 12-13, 2002
Edgar L. BlackEdgar L. Black
IITIIT
Edgar L. Black
CURRENT EFFORTS FOR M.T.F.CURRENT EFFORTS FOR M.T.F. FINALIZE DETAILS OF FORCED COOLANT FLOW ABSORBER TO BE
INSERTED INTO THE LAB G MAGNET.
COORDINATE DESIGN OF THE CONVECTIVE TYPE ABSORBER FOR THE SAME LOCATION (KEK COLLABORATION).
COMPLETE WINDOWS DESIGN WITH SHOP DRAWINGS FOR FABRICATION (TO BE SUBMITTED TO THE MISSISSIPPI COLLABORATION AT THE END OF THIS MEETING).
INITIATE THE INTERFACE RESOLUTION OF UP & DOWN SIDE VACUUM WINDOW DESIGN REQUIREMENTS, (INCLUDING IMMEDIATE AND FUTURE EXPERIMENT PROGRAMS)
START INSTRUMENTATION HARDWARE INTEGRATION DESIGN FOR THE IMMEDIATE TEST PLANS.
Edgar L. Black
MAGNET, CRYOSTAT & ABSORBER MAGNET, CRYOSTAT & ABSORBER LAYOUTLAYOUT
FINAL CONFIGURATION IS PENDING FOR THE BEAM LINE FINAL DESIGN
Edgar L. Black
MTF ABSORBER FORCED FLOWMTF ABSORBER FORCED FLOW
Edgar L. Black
WINDOW/ ABSORBER SEAL DETAILWINDOW/ ABSORBER SEAL DETAIL (SECTION OF THE MANIFOLD)(SECTION OF THE MANIFOLD)
Edgar L. Black
ABSORBER WINDOW DETAILABSORBER WINDOW DETAIL
MTF
Edgar L. Black
WINDOW TEST PLATEWINDOW TEST PLATE
Edgar L. Black
VACUUM VESSEL WINDOWVACUUM VESSEL WINDOW
Edgar L. Black
CURRENT EFFORTS FOR M.I.C.E.CURRENT EFFORTS FOR M.I.C.E.
NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS).THE RF FEEDS).
INITIATED PLANT LAYOUT COORDINATION FOR THE INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT INSTALLATION AT RALRAL (COMMUNICATION WITH IOURY) (COMMUNICATION WITH IOURY)
NEED MORE INFORMATION ON THE PLANT FACILITIESNEED MORE INFORMATION ON THE PLANT FACILITIES
Edgar L. Black
SFOFO/M.I.C.E. CONFIGURATIONSFOFO/M.I.C.E. CONFIGURATION201.25 MHz RF CAVITY
MODULES (2)
RF FEED 4/MODULE
LH2 MODULES (3)
Edgar L. Black
M.I.C.E. SFOFOM.I.C.E. SFOFO
Edgar L. Black
LOCATION IN QUESTIONLOCATION IN QUESTION
PARTIAL VIEW OF THE R.A.L. FACILITY
Edgar L. Black
LOCATION ENLARGEDLOCATION ENLARGED
Edgar L. Black
FUTURE ACTIVITIES WITH TIME DURATIONS (HRS)FUTURE ACTIVITIES WITH TIME DURATIONS (HRS)1-1- FABRICATION OF 21CM WINDOWS AND PRESSURE TEST FABRICATION OF 21CM WINDOWS AND PRESSURE TEST
PLATES. PLATES. 480 480 3 OR 5 WINDOWS FOR EACH MATERIAL?3 OR 5 WINDOWS FOR EACH MATERIAL?
2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE 2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE DESIGN FOR FABRICATION 80DESIGN FOR FABRICATION 80
3 -PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT 3 -PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT WINDOWS AT FERMILAB.WINDOWS AT FERMILAB. 300300
5 - SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE 5 - SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE BURST TESTS AND TEST.BURST TESTS AND TEST. 8080
6 - PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST 6 - PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST AT N.I.U.AT N.I.U. 100 100
7 - FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE 7 - FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE TEST.TEST. 200 200
8 - COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM 8 - COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM MANIFOLD ASSEMBLY.MANIFOLD ASSEMBLY. 60 60
9 - PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE 9 - PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE ABSORBERS FLOW TEST.ABSORBERS FLOW TEST. 160 OR 60 160 OR 60
10 - SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) 10 - SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) AND PERFORM TESTS.AND PERFORM TESTS. 320320