Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

14
Edgar L. Black MUCOOL ADVANCED M.T.F. MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS & M.I.C.E. LAYOUTS August 12-13, 2002 August 12-13, 2002 Edgar L. Black Edgar L. Black IIT IIT

Transcript of Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Page 1: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

MUCOOL ADVANCED M.T.F. MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS& M.I.C.E. LAYOUTS

August 12-13, 2002August 12-13, 2002

Edgar L. BlackEdgar L. Black

IITIIT

Page 2: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

CURRENT EFFORTS FOR M.T.F.CURRENT EFFORTS FOR M.T.F. FINALIZE DETAILS OF FORCED COOLANT FLOW ABSORBER TO BE

INSERTED INTO THE LAB G MAGNET.

COORDINATE DESIGN OF THE CONVECTIVE TYPE ABSORBER FOR THE SAME LOCATION (KEK COLLABORATION).

COMPLETE WINDOWS DESIGN WITH SHOP DRAWINGS FOR FABRICATION (TO BE SUBMITTED TO THE MISSISSIPPI COLLABORATION AT THE END OF THIS MEETING).

INITIATE THE INTERFACE RESOLUTION OF UP & DOWN SIDE VACUUM WINDOW DESIGN REQUIREMENTS, (INCLUDING IMMEDIATE AND FUTURE EXPERIMENT PROGRAMS)

START INSTRUMENTATION HARDWARE INTEGRATION DESIGN FOR THE IMMEDIATE TEST PLANS.

Page 3: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

MAGNET, CRYOSTAT & ABSORBER MAGNET, CRYOSTAT & ABSORBER LAYOUTLAYOUT

FINAL CONFIGURATION IS PENDING FOR THE BEAM LINE FINAL DESIGN

Page 4: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

MTF ABSORBER FORCED FLOWMTF ABSORBER FORCED FLOW

Page 5: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

WINDOW/ ABSORBER SEAL DETAILWINDOW/ ABSORBER SEAL DETAIL (SECTION OF THE MANIFOLD)(SECTION OF THE MANIFOLD)

Page 6: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

ABSORBER WINDOW DETAILABSORBER WINDOW DETAIL

MTF

Page 7: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

WINDOW TEST PLATEWINDOW TEST PLATE

Page 8: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

VACUUM VESSEL WINDOWVACUUM VESSEL WINDOW

Page 9: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

CURRENT EFFORTS FOR M.I.C.E.CURRENT EFFORTS FOR M.I.C.E.

NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS).THE RF FEEDS).

INITIATED PLANT LAYOUT COORDINATION FOR THE INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT INSTALLATION AT RALRAL (COMMUNICATION WITH IOURY) (COMMUNICATION WITH IOURY)

NEED MORE INFORMATION ON THE PLANT FACILITIESNEED MORE INFORMATION ON THE PLANT FACILITIES

Page 10: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

SFOFO/M.I.C.E. CONFIGURATIONSFOFO/M.I.C.E. CONFIGURATION201.25 MHz RF CAVITY

MODULES (2)

RF FEED 4/MODULE

LH2 MODULES (3)

Page 11: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

M.I.C.E. SFOFOM.I.C.E. SFOFO

Page 12: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

LOCATION IN QUESTIONLOCATION IN QUESTION

PARTIAL VIEW OF THE R.A.L. FACILITY

Page 13: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

LOCATION ENLARGEDLOCATION ENLARGED

Page 14: Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Edgar L. Black

FUTURE ACTIVITIES WITH TIME DURATIONS (HRS)FUTURE ACTIVITIES WITH TIME DURATIONS (HRS)1-1- FABRICATION OF 21CM WINDOWS AND PRESSURE TEST FABRICATION OF 21CM WINDOWS AND PRESSURE TEST

PLATES. PLATES. 480 480 3 OR 5 WINDOWS FOR EACH MATERIAL?3 OR 5 WINDOWS FOR EACH MATERIAL?

2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE 2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE DESIGN FOR FABRICATION 80DESIGN FOR FABRICATION 80

3 -PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT 3 -PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT WINDOWS AT FERMILAB.WINDOWS AT FERMILAB. 300300

5 - SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE 5 - SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE BURST TESTS AND TEST.BURST TESTS AND TEST. 8080

6 - PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST 6 - PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST AT N.I.U.AT N.I.U. 100 100

7 - FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE 7 - FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE TEST.TEST. 200 200

8 - COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM 8 - COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM MANIFOLD ASSEMBLY.MANIFOLD ASSEMBLY. 60 60

9 - PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE 9 - PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE ABSORBERS FLOW TEST.ABSORBERS FLOW TEST. 160 OR 60 160 OR 60

10 - SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) 10 - SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) AND PERFORM TESTS.AND PERFORM TESTS. 320320