Eden Gardens - City of Ryde

27
Eden Gardens NCC 2019 Section J Report Prepared for Development Application Project No: SYD0684 Date: 25 February 2021 Revision: 04

Transcript of Eden Gardens - City of Ryde

Page 1: Eden Gardens - City of Ryde

Eden Gardens

NCC 2019 Section J Report Prepared for Development Application

Project No: SYD0684

Date: 25 February 2021

Revision: 04

Page 2: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 1

Project: Eden Gardens

Location: 307 Lane Cove Road,

Macquarie Park, NSW

2113

Prepared by: ADP Consulting Pty Ltd

Level 3, 8 Spring Street

Sydney NSW 2000

Project No: SYD0684

Revision: 04

Date: 25 February 2021

Rev Date Comment Author Technical Review Authorization

01 12/11/2020 Draft Issue KS ZN RR

02 17/02/2021 DA issue KS ZN RR

03 24/02/2021 DA Issue – updated to

comments

KS ZN RR

04 25/02/2021 DA Issue – minor updates KS ZN RR

Project Team

Client / Principal Thunderbirds Are Go Pty Ltd atf the Gardeners Trust

Project manager Pier Property Corporation

Architect DKO Architects

Page 3: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 2

Contents Executive Summary ........................................................................................................................................... 3

1. Introduction ............................................................................................................................................ 6

1.1 Project Background ...................................................................................................................................................................... 6

1.2 Site Context ..................................................................................................................................................................................... 6

1.3 Assessment Assumptions and References .......................................................................................................................... 7

1.4 Scope of Assessment ................................................................................................................................................................... 7

2. Section J DTS Compliance ...................................................................................................................... 8

2.1 Overview ........................................................................................................................................................................................... 8

2.2 Terminology .................................................................................................................................................................................... 8

3. Part J1 Building Fabric ........................................................................................................................ 10

3.1 Responsible Designer ................................................................................................................................................................ 10

3.2 Summary of Requirements ...................................................................................................................................................... 10

3.3 J1.1 Application of Part ............................................................................................................................................................. 10

3.4 J1.2 Thermal Construction Installations .............................................................................................................................. 11

3.5 J1.3 Roof & Ceiling Constructions ........................................................................................................................................ 11

3.6 J1.4 Roof lights ............................................................................................................................................................................. 11

3.7 J1.5 Wall-Glazing Construction System .............................................................................................................................. 11

3.8 J1.6 Floors ....................................................................................................................................................................................... 14

4. Part J3 Building Sealing ...................................................................................................................... 15

4.1 Building Fabric Sealing .............................................................................................................................................................. 15

5. Conclusions & Recommendations ...................................................................................................... 16

Page 4: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 3

Executive Summary ADP Consulting has been engaged by Thunderbirds Are Go Pty Ltd to undertake the following Section J

assessment for the proposed buildings to be located 307 Lane Cove Road, Macquarie Park, NSW 2113.

This report has been prepared to support the DA submission as a legislative requirement in accordance with

NCC Section J 2019 provisions and has been provided to advise on the minimum Part J1 & J3 (Building Fabric)

requirements for the proposed new and existing buildings within the Eden Gardens proposed site boundary.

This includes the development of a new commercial office tower, restaurant, and garden centre with additional

extensions proposed to the two existing buildings on site, creating new spaces for a neighbourhood shops and

function centre.

Assessment Outcomes

Building Fabric Systems

Based on a review of the proposed Architectural drawings and the calculations carried out as part of this

assessment the following minimum Part J1 performance requirements have been identified.

The following minimum Part J1.5 performance requirements for external walls, roofs and ceilings have been

identified for the Restaurant, Neighbourhood Shops, and Function Centre (Building B, C, and D respectively).

Total system insulation is to be provided as follows:

Envelope Construction Total System R-Value (m²K/W)

Building Type Building B

Restaurant

Building C

Neighbourhood Shops

Building D

Function Centre

J1.5 (i) Total System external wall

construction (wall area <80%) ≥ 1.0 ≥ 1.0 ≥ 1.0

J1.5 (ii) Total System external wall

construction (wall area >80%) NA NA ≥ 1.4

J1.5 (iii) Internal Wall insulation – wall

separating conditioned and unconditioned

spaces

≥ 1.4 ≥ 1.4 ≥ 1.4

Envelope Construction Total System R-Value (m²K/W)

J1.6 All Floor constructions

concrete slab on ground and floors above an unconditioned zone

≥ 2.00 (downwards heat flow)

Page 5: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 4

Glazing Systems

The following minimum Part J1.5 performance requirements for external glazing has been identified for the

following orientations of the Restaurant, Neighbourhood Shops, and Function Centre (Building B, C, and D

respectively).

Building B – Restaurant

Glazing – Frame Construction

(Uniform solution)

Façade orientation Total System U-Value

(W/m²K)

Total System

SHGC

Ground floor North ≤ 2.4 ≤ 0.34

Ground floor East ≤ 2.4 ≤ 0.34

Ground floor South ≤ 2.4 ≤ 0.34

Ground floor West ≤ 2.4 ≤ 0.34

Building C - Neighbourhood Shops

Glazing – Frame Construction

(Uniform solution)

Façade orientation Total System U-Value

(W/m²K)

Total System

SHGC

Ground floor North ≤ 2.20 ≤ 0.18

Ground floor East ≤ 2.20 ≤ 0.18

Ground floor South ≤ 2.20 ≤ 0.18

Ground floor West ≤ 2.20 ≤ 0.18

Building D - Function Centre

Glazing – Frame Construction

(Non-uniform solution)

Façade orientation Total System U-Value

(W/m²K)

Total System

SHGC

Lower Ground floor North N/A N/A

Lower Ground floor East ≤ 2.14 ≤ 0.19

Lower Ground floor South ≤ 5.80 ≤ 0.81

Lower Ground floor West ≤ 3.25 ≤ 0.36

Ground floor North ≤ 2.95 ≤ 0.37

Ground floor East ≤ 2.18 ≤ 0.16

Ground floor South ≤ 5.80 ≤ 0.81

Ground floor West N/A N/A

Note: the above window frame construction values are AFRC total system values and include both the glazing and frame

Page 6: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 5

Please note the following:

> It is anticipated that will be no air conditioning provided for Building E: Garden Centre and as such this

building is not required to meet the minimum Section J provisions for energy efficiency. This Building is

not included within the scope of this assessment.

> Building A: Commercial Office Tower will demonstrate compliance with Section J though the alternative

JV3 Verification Methodology. A separate energy modelling assessment and report has been provided.

Please refer to the ADP SYD0684_Eden Gardens JV3 Modelling Report_Rev04 Report for compliance.

> It assumed that all other NCC Section J requirements (J5 to J8) will be designed to meet the minimum

Deem-to-Satisfy (DTS) requirements. Compliance is subject to confirmation from the D&C contractor that

all as-installed details pertaining to the thermal performance are within the performance requirements as

detailed in this report. It is the responsibility of the D&C contractor, architect and building surveyor to

ensure all final construction selections are compliant

> Any changes to the architecture plans may result in a change to the wall-glazing performance

specifications detailed in this report

Page 7: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 6

1. Introduction

1.1 Project Background ADP Consulting has been engaged by Thunderbirds Are Go Pty Ltd to undertake the following Section J

compliance assessment detailing the minimum building fabric requirements for the proposed buildings to be

located at 307 Lane Cove Road, Macquarie Park, NSW 2113

The purpose of this report is to demonstrate that all building fabric construction proposed for new buildings

on site (including any alterations and additions to the existing buildings) meet the minimum Section

compliance requirements outlined in the NCC 2019 for Parts J1 (Building Fabric) & J3 (Building Sealing)

provisions.

1.2 Site Context The Eden Garden development will comprise of 5 proposed building consisting of a new commercial office

tower, restaurant, and garden centre with additional extensions proposed to the two existing buildings,

creating new spaces for a neighbourhood Shops and function centre.

The site is located close to Macquarie Park within the City of Ryde Council boundaries and is located between

the Lane Cove Road to the northwest and the Lane Cove National Park stretching out to the southeast.

Figure 1 Proposed Development Site Plan

Page 8: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 7

1.3 Assessment Assumptions and References

This Section J report has been prepared based on a review of the following reference documents and

standards:

> Section J provisions of the NCC 2019 Building (BCA) Code of Australia

> 3D IFC Model issued on 05/02/2021

> DA Drawings provided by DKO Architects issued 13/02/2021

> Amended Drawings for Function Centre provided by DKO Architects issued 16/02/2021

1.4 Scope of Assessment

The following new and existing buildings are to be located within the Eden Garden site boundary have been

included in the scope of this Section J compliance assessment:

Table 1 BUILDINGS UNDER ASSESSMENT

Building Type Development Type Building Space

Classification

Assessment

Methodology

Building A:

Commercial Office Tower

New Building Class 5 (Office) JV3 Alternative

Verification

Building B:

Restaurant

New Building Class 6 (Retail) DTS Calculator

Building C:

Neighbourhood Shops

Existing Building

Additions & Alterations

Class 6 (Retail) DTS Calculator

Building D:

Function Centre

Existing Building

Additions & Alterations

Class 9b (Assembly

building

DTS Calculator

Building E:

Eden Gardens/Carpark & BOH

services, Horticulture, Retail, and

Garden centre

New Building Class 6 (Retail), Class 7b

(loading dock and

storage), Class 7a

(Carpark), Class 9b

(assembly area)

No Section J

Requirement

Please Note:

> It is anticipated that will be no air conditioning provided for Building E: Eden Gardens/Garden Centre

and as such this building is not required to meet the minimum Section J provisions for energy efficiency.

This Building is not included within the scope of this assessment.

> Building A: Commercial Office Tower will demonstrate compliance with Section J though the alternative

JV3 Verification Methodology. A separate energy modelling assessment and report has been provided.

Please refer to the ADP SYD0684_Eden Gardens JV3 Modelling Report_Rev04 for compliance.

Page 9: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 8

Figure 1 SITE PLAN MARK-UP

2. Section J DTS Compliance 2.1 Overview

Section J of the NCC was introduced to set minimum energy efficiency measures for the various classifications

of building types while still maintaining acceptable internal environmental conditions for occupants. The

measures were designed to reduce the use of artificial heating and cooling, improve the energy performance

of lighting, conditioning, and ventilation, and reduce energy loss through air leakage. These reductions are

achieved by setting specific prescriptive design criteria for the building fabric (section J1 & J3) and the building

services (section J5 to J8). Compliance is achieved when these minimum prescriptive requirements are met.

Where the minimum performance requirements cannot be met through the projects design intent an

alternative JV3 Verification methodology can used, demonstrating that the estimated energy consumption of

the proposed design is less than that of a DTS solution.

2.2 Terminology

2.2.1 Thermal Performance of a Wall-Glazing Construction

When determining an appropriate wall-glazing construction for a building project, the building’s thermal

envelope will be required to comply with certain performance values for energy efficiency and occupant

thermal comfort. The two heat transfer mechanisms that determine the performance of a wall-glazing

construction include conduction and solar heat gain. In order to comply with the Section J provisions, the wall-

glazing system must achieve a specified U-value and Solar Heat Gain coefficient (SHGC). It is important to note,

that these values are to be read as “total system values” and are inclusive of both the frame and glazing1.

1 Thermal Performance values are available for all aluminium window and door products as part of their WERS rating

(http://www.wers.net/wers-home).

Page 10: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 9

2.2.2 U-Value

U-value is the measure of a wall-glazing constructions ability to conduct heat. The lower the U-value, the

greater the insulation properties of the construction. In all cases regardless of climate zone, a façade

construction with high performance insulation properties will assist with improving a building’s occupant

thermal comfort and energy efficiency. It is also to be noted that the conductive U-value is equal to the inverse

of insulative R-value (U = 1/R).

2.2.3 R-Value

R-value is the measure of a wall-glazing constructions resistance to heat flow. The higher the R-value, the

higher the level of insulation and thermal performance. It is also to be noted that the insulative R-value is equal

to the inverse of the conductive U-value (R = 1/U).

2.2.4 Solar Heat Gain Coefficient (SHGC)

> Solar Heat Gain Coefficient (SHGC) is the fraction of incident solar radiation admitted through a window.

In a warm climate, windows which have a low SHGC allow less solar radiation to pass through. This reduces the

buildings heat load and need for active cooling2.

2 Further information on glazing performance can be found at (https://www.yourhome.gov.au/passive-design/glazing

Page 11: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 10

3. Part J1 Building Fabric

3.1 Responsible Designer

For the purposes of Part J1 – Building Fabric Compliance, the responsible designers are identified as the project

Architect and Façade Engineer (where applicable). The minimum insulation and glazing recommendations

outlined in this report must be addressed for construction.

It assumed that all other NCC Section J requirements (J5 to J8) will be designed to meet the minimum Deem-

to-Satisfy (DTS) requirements and will be the responsibility of the D&C contractor, services sub-contractors

and building surveyor to ensure the final construction incorporates a compliant solution.

3.2 Summary of Requirements

Part J1 establishes minimum construction and performance provisions required for the projects specific climate

zone and building classification. This will apply to the following Part J1 criteria:

> J1.2 Thermal construction installations

> J1.3 Roof and ceiling construction

> J1.4 Roof lights

> J1.5 Combined wall & glazing system

> J1.6 Floor constructions

Insulation and glazing performance requirements have been provided to meet the minimum compliance

measures for the above areas.

3.3 J1.1 Application of Part

Section J 2019, Part J1 is applicable to the scope of the design and construction works identified for the project.

For the purposes of this project the proposed works consist of the design and development of the following

proposed buildings:

> Building B Restaurant (New Building)

> Building C Neighbourhood Shops (Alterations & Additions)

> Building D Function Centre (Alterations & Additions)

Please note:

> Building E: Garden Centre has no minimum Section J requirements and as such does not form part of

the scope of assessment.

> Building A: Commercial Office Tower has been assessed using the JV3 Alternative Verification Modelling

Methodology. Please refer to the ADP SYD0684_Eden Gardens JV3 Modelling_Rev04 Report

> The following section of this report is intended to provide an analysis of the building elements forming

the envelope of the development as required under Part J1 and intends to demonstrate compliance

using the NCC 2019 Wall-Glazing calculator shown in (Figure 2).

Page 12: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 11

3.4 J1.2 Thermal Construction Installations

All insulation for all buildings installed for the project must comply with section J1.2 of the BCA. All Installed

insulation must adhere to the following requirements:

> Form a continuous barrier with ceilings, walls bulkheads, floors or similar that inherently contribute to the

building’s thermal envelope

> Abut or overlaps all adjoining insulation other than insulation located at supporting members such as

studs, noggings, furring channels or similar

> It is important that the insulation provided must not hinder the safe or effective operation of any service

or fittings

> All insulation must comply with AS4859.1.

> Specific installation requirements further referring to bulk or reflective insulation are outlined in Part J1.2

of the NCC 2019 Section J provisions.

3.5 J1.3 Roof & Ceiling Constructions

Roofs or ceiling constructions for all buildings must achieve a minimum total R-value greater than or equal to

R3.7 for a downward direction of heat flow. The solar absorptance of the upper surface of the roof must not

be more than 0.45.

3.6 J1.4 Roof lights

No roof lights serving a conditioned space have been identified on the architectural drawings provided.

3.7 J1.5 Wall-Glazing Construction System

Part J1.5 establishes the minimum external wall and window construction performance required for the

proposed building. This is assessed against the projects location and climate as per the Australian Building

Codes Board (ABCB) Climate Zone Map (Figure 3).

> The development is situated in climate zone 5 – warm temperate.

> Compliance for each wall orientation is identified as the Total System U-Value of the wall-glazing

construction and is determined through the use of the NCC Section J 2019 Wall-Glazing Calculator (Figure 2).

Figure 2 NCC 2019 Wall-Glazing Calculator Figure 3 ABCB Climate Zone

Page 13: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 12

3.7.1 Part J1.5- Wall Systems

> Wall Insulation performance has been assessed as per the Section J wall-glazing calculator. The following

minimum Part J1.5 performance requirements for external walls have been identified for the Restaurant,

Neighbourhood Shops, and Function Centre (Building B, C, and D respectively).

Please refer to Appendix B for the external Façade insulation mark up,

Total system insulation is to be provided as follows:

Envelope Construction Total System R-Value (m²K/W)

Building Type Building B

Restaurant

Building C

Neighbourhood Shops

Building D

Function Centre

J1.5 (i) Total System external wall

construction (wall area <80%) ≥ 1.0 ≥ 1.0 ≥ 1.0

J1.5 (ii) Total System external wall

construction (wall area >80%) NA NA ≥ 1.4

J1.5 (iii) Internal Wall insulation – wall

separating conditioned and unconditioned

spaces

≥ 1.4 ≥ 1.4 ≥ 1.4

Note: The insulation value above are performance values for the total wall system, inclusive of any concrete slabs, air cavities,

wall studs or cladding proposed.

3.7.2 Part J1.5- Glazing Systems

> Glazing performance has been assessed as per the Section J wall-glazing calculator. The following

minimum Part J1.5 performance requirements for external glazing has been identified for the following

orientations of the Restaurant, Neighbourhood Shops, and Function Centre (Building B, C, and D respectively).

Please refer to Appendix A for the completed NCC 2019 Section J Wall-Glazing Calculators

Building B – Restaurant

Glazing – Frame Construction

(Uniform solution)

Façade orientation Total System U-Value

(W/m²K)

Total System

SHGC

Ground floor North ≤ 2.4 ≤ 0.34

Ground floor East ≤ 2.4 ≤ 0.34

Ground floor South ≤ 2.4 ≤ 0.34

Ground floor West ≤ 2.4 ≤ 0.34

Page 14: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 13

Building C - Neighbourhood Shops

Glazing – Frame Construction

(Uniform solution)

Façade orientation Total System U-Value

(W/m²K)

Total System

SHGC

Ground floor North ≤ 2.20 ≤ 0.18

Ground floor East ≤ 2.20 ≤ 0.18

Ground floor South ≤ 2.20 ≤ 0.18

Ground floor West ≤ 2.20 ≤ 0.18

Building D - Function Centre

Glazing – Frame Construction

(Non-uniform solution)

Façade orientation Total System U-Value

(W/m²K)

Total System

SHGC

Lower Ground floor North N/A N/A

Lower Ground floor East ≤ 2.14 ≤ 0.19

Lower Ground floor South ≤ 5.80 ≤ 0.81

Lower Ground floor West ≤ 3.25 ≤ 0.36

Ground floor North ≤ 2.95 ≤ 0.37

Ground floor East ≤ 2.18 ≤ 0.16

Ground floor South ≤ 5.80 ≤ 0.81

Ground floor West N/A N/A

Note: the above window frame construction values provided for Buildings C, D, & E are AFRC total system values and include

both the glazing and frame

Solar Admittance

The maximum solar admittance for the above solution for each building has been calculated as a percentage

of the incident solar irradiance allowed for the wall-glazing construction of each orientation. Part J1.5b

stipulates that the solar admittance for each façade aspect must not exceed a maximum value of 0.13 for a

Class 5 and Class 6 building and 0.10 for Class 9b buildings.

Page 15: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 14

3.8 J1.6 Floors

Part J1.6 establishes the minimum floor construction performances required for a concrete slab on ground

and floor spaces above an unconditioned zone.

> The following minimum Part J1.6 performance requirements for floor constructions have been identified

for the Restaurant, Neighbourhood Shops, and Function Centre (Building B, C, and D respectively).

Please refer to Appendix B for the floor construction insulation mark up.

Total system insulation is to be provided as follows:

Envelope Construction Total System R-Value (m²K/W)

J1.6 All Floor constructions

concrete slab on ground and floors above an unconditioned zone

≥ 2.00 (downwards heat flow)

Please note where insulation is to be provide to concrete slab on ground, the following requirements are to

be met. Insulation provided must be:

> Water resistant

> Form a continuous barrier from the adjacent finished ground level to a depth of no less then 300mm or

be installed for the full length of the concrete slab on ground’s vertical edge.

Page 16: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 15

4. Part J3 Building Sealing

4.1 Building Fabric Sealing

> The minimum building sealing requirements for all proposed works for each building must adhere to

the following requirements:

> Seals must be fitted to each edge of a door, operable window, or the like

> An entrance to a building, if leading to a conditioned space must have an airlock, self-closing door,

revolving door, or the like.

> Ceilings, walls, floors, and any opening such as a window frame, door frame, roof light frame or the like

must be:

– constructed to minimise air leakage in accordance with when forming part of the building envelope

– enclosed by internal lining systems that are close fitting at ceiling, wall, and floor junctions; or:

– sealed at junctions and penetrations with close fitting architrave, skirting or cornice; or expanding

foam, rubber compressible strip, caulking or the like.

Page 17: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 25 February 2021 Rev: 04 16

5. Conclusions &

Recommendations This assessment has been carried out to demonstrate that where relevant to Section J the proposed buildings

comply with the energy efficiency requirements specified within Section J of the NCC 2019.

It is evident from the above assessment that the proposed façade can meet the minimum provisions for Parts

J1 & J3 for all levels.

Should the project wish to consider a different glazing system, a JV3 energy modelling solution can be

undertaken to maintain compliance.

Page 18: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 17 February 2021 Rev: 02 17

Appendix A

DTS Façade-Glazing Calculators

Page 19: Eden Gardens - City of Ryde

[KUTOOLSFOREXCEL]

Compliant Solution = Date Non-Compliant Solution = 28/10/2020

Name Method 2Khyati Saxena North East South West All

Company Wall-glazing U-Value (W/m².K) 2.27 1.73 2.27 1.73 1.99

ADP Consulting 2.00 2.00 2.00 2.00 2Solar Admittance 0.11 0.09 0.25 0.09

Position 0.13 0.13 0.13 0.13Sustainabilty Engineer AC Energy Value 69

69.80844Building Name / AddressRestaurant - lane coveMacquarie park

Method 1Building State

NSW

Climate Zone

Building Classification

Storeys Above Ground Method 21

North East South West

Glazing Area (m²) 37 48 114.84 48

Glazing to Façade Ratio 91% 52% 91% 52%

Methodology

Average Glazing U-Value (W/m².K) 2.40 2.40 2.40 2.40

Average Glazing SHGC 0.34 0.34 0.34 0.34

Wall Area (m²) 3.7 43.6 11.5 43.6

Methodology

Average Wall R-value (m²K/W) 1.00 1.00 1.00 1.00

Solar Absorptance 0.6 0.6 0.6 0.6

IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THIS CALCULATOR

Calculator

East + East - SH + South + South - SH + West + West - SH +

Horizontal

0 +

AFRC (True module size)

Horizontal

0 +

0 +

Climate Zone 5 - Warm

temperate

Project Summary

Method 1

Class 6 - restaurants, cafes,

bars

The summary below provides an overview of where compliance has been achieved for Specification J1.5a -

Calculation of U-Value and solar admittance - Method 1 (Single Aspect) and Method 2 (Multiple Apects).

Wall + Wall +

0 +

Horizontal Horizontal

Wall Thickness

NCC Specification J1.5b

Wall Construction

Glazing References

Shading Systems

0 + 0 + 0 + 0

Wall <80% + Wall <80% + Wall <80% +

Wall + Wall +

Project Details

0 + 0 + 0 + 0 +

0 + 0 + 0 +

North - SH +

Wall Types

Glass Types

Glazing System Types

Frame Types 0 +

Wall <80% +

2.27 1.73 2.27 1.730.8

1.3

1.8

2.3

2.8

North East South West

W/m

²K

Wall-glazing U-Value

Proposed Design DTS Reference

0.11 0.09 0.25 0.090.04

0.09

0.14

0.19

0.24

0.29

North East South West

SA

Solar Admittance

Proposed Reference DTS Reference

2.00 1.990.8

1.3

1.8

2.3

W/m

²K

Wall-glazing U-Value - ALL

DTS Reference Proposed Design

70 6960

65

70

75

AC

En

erg

y

AC Energy Value

DTS Reference Proposed Design

FaçadeReport

By accessing or using this calculator, you agree to the following: While care has been taken in the preparation of this calcu lator, it may not be complete or up-to-date. You can ensure that you are using a complete and up-to-date version by checking the Australian Building Codes Board website (www.abcb.gov.au). The Australian Building Codes Board, the Commonwealth of Australia and States and Territories of Australia do not accept any liability, including liability for negligence, for any loss (howsoever caused) , damage, injury, expense or cost incurred by any person as a result of accessing, using or relying upon this calculator, to the maximum extent permitted by law. No representation or warranty is made or given as to the currency, accuracy, reliability, merc hantability, fitness for any purpose or completeness of this calculator or any information which may appear on any linked websites, or in other linked information sources, and all such representations and warranties are excluded to the extent permitted by law. This calculator i s not legal or professional advice. Persons rely upon this calculator entirely at their own risk and must take responsibility for assessing the relevance and accuracy of the information in relation to their particular circumstances.

© Commonwealth of Australia and the States and Territories of Australia 2019, published by the Australian Building Codes Board.The material in this calculator is licensed under a Creative Commons Attribution-No Derivatives—4.0 International licence, with the exception of third party materials and any trade marks. It is provided for general information only and without warranties of any kind. You may not make derivatives of this calculator, but may only use a verbatim copy. More information on this CC BY ND licence is set out at the Creative Commons Website. For information regarding this calculator, see www.abcb.gov.au.

DTS ConstructionValues

Eden Gardens Lane Cove - Building B - Restaurant Uniform Solution

ksaxena
Rectangle
ksaxena
Callout
Compliance Pathway
Page 20: Eden Gardens - City of Ryde

[KUTOOLSFOREXCEL]

Compliant Solution = Date Non-Compliant Solution = 15/02/2021

Name Method 2Khyati Saxena North East South West All

Company Wall-glazing U-Value (W/m².K) 2.12 1.75 1.44 1.94 1.87

ADP Consulting 2.00 2.00 2.00 2.00 2Solar Admittance 0.11 0.13 0.06 0.15

Position 0.13 0.13 0.13 0.13Sustainabilty Engineer AC Energy Value125

126.021194Building Name / AddressGarden centre/Neighbourhood shops - lane coveMacquarie park

Method 1Building State

NSW

Climate Zone

Building Classification

Storeys Above Ground Method 21

North East South West

Glazing Area (m²) 85 167.94 11.15 154.7

Glazing to Façade Ratio 94% 70% 49% 83%

Methodology

Average Glazing U-Value (W/m².K) 2.20 2.20 2.20 2.20

Average Glazing SHGC 0.18 0.18 0.18 0.18

Wall Area (m²) 5.1 72.2 11.65 32.8

Methodology

Average Wall R-value (m²K/W) 1.40 1.40 1.40 1.40

Solar Absorptance 0.6 0.6 0.6 0.6

IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THIS CALCULATOR

Calculator

East + South + South - SH + West +

Horizontal

0 +

AFRC (True module size)

Horizontal

0 +

0 +

Climate Zone 5 - Warm

temperate

Project Summary

Method 1

Class 6 - department stores,

shopping centres

The summary below provides an overview of where compliance has been achieved for Specification J1.5a -

Calculation of U-Value and solar admittance - Method 1 (Single Aspect) and Method 2 (Multiple Apects).

Wall + Wall +

0 +

Horizontal Horizontal

Wall Thickness

NCC Specification J1.5b

Wall Construction

Glazing References

Shading Systems

0 + 0 + 0 + 0

Wall >80% + Wall >80% + Wall >80% +

Wall + Wall +

Project Details

0 + 0 + 0 + 0 +

0 + 0 + 0 +

North +

Wall Types

Glass Types

Glazing System Types

Frame Types 0 +

Wall >80% +

2.12 1.75 1.44 1.940.8

1.3

1.8

2.3

North East South West

W/m

²K

Wall-glazing U-Value

Proposed Design DTS Reference

0.11 0.13 0.06 0.150.04

0.06

0.08

0.10

0.12

0.14

0.16

North East South West

SA

Solar Admittance

Proposed Reference DTS Reference

2.00 1.870.8

1.3

1.8

2.3

W/m

²K

Wall-glazing U-Value - ALL

DTS Reference Proposed Design

126 12560

80

100

120

140

AC

En

erg

y

AC Energy Value

DTS Reference Proposed Design

FaçadeReport

By accessing or using this calculator, you agree to the following: While care has been taken in the preparation of this calcu lator, it may not be complete or up-to-date. You can ensure that you are using a complete and up-to-date version by checking the Australian Building Codes Board website (www.abcb.gov.au). The Australian Building Codes Board, the Commonwealth of Australia and States and Territories of Australia do not accept any liability, including liability for negligence, for any loss (howsoever caused) , damage, injury, expense or cost incurred by any person as a result of accessing, using or relying upon this calculator, to the maximum extent permitted by law. No representation or warranty is made or given as to the currency, accuracy, reliability, merc hantability, fitness for any purpose or completeness of this calculator or any information which may appear on any linked websites, or in other linked information sources, and all such representations and warranties are excluded to the extent permitted by law. This calculator i s not legal or professional advice. Persons rely upon this calculator entirely at their own risk and must take responsibility for assessing the relevance and accuracy of the information in relation to their particular circumstances.

© Commonwealth of Australia and the States and Territories of Australia 2019, published by the Australian Building Codes Board.The material in this calculator is licensed under a Creative Commons Attribution-No Derivatives—4.0 International licence, with the exception of third party materials and any trade marks. It is provided for general information only and without warranties of any kind. You may not make derivatives of this calculator, but may only use a verbatim copy. More information on this CC BY ND licence is set out at the Creative Commons Website. For information regarding this calculator, see www.abcb.gov.au.

DTS ConstructionValues

Eden Gardens Lane Cove - Building C -Neighbourhood Shops Uniform Solution

ksaxena
Rectangle
ksaxena
Callout
Compliance Pathway
Page 21: Eden Gardens - City of Ryde

[KUTOOLSFOREXCEL]

Compliant Solution = Date Non-Compliant Solution = 12/11/2020

Name Method 2Bianca Bulsara North East South West All

Company Wall-glazing U-Value (W/m².K) 1.96 1.25 1.96 1.83

ADP Consulting 2.00 2.00 2.00 2Solar Admittance 0.13 0.09 0.13

Position 0.13 0.13 0.13Sustainabilty Engineer AC Energy Value 37

36.8363294Building Name / AddressFunction Centre - lane coveMacquarie park

Method 1Building State

NSW

Climate Zone

Building Classification

Storeys Above Ground Method 20

North East South West

Glazing Area (m²) 89 4.004 53.3064

Glazing to Façade Ratio 85% 11% 90%

Methodology

Average Glazing U-Value (W/m².K) 2.13 5.80 2.07

Average Glazing SHGC 0.16 0.81 0.16

Wall Area (m²) 15.7065 33.956 5.7

Methodology

Average Wall R-value (m²K/W) 1.00 1.40 1.00

Solar Absorptance

IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THIS CALCULATOR

Project Details

0 + 0 + 0 +

0 + 0 +

North +

Wall Types

Glass Types

Glazing System Types

Frame Types 0 +

Wall >80% +

Wall Thickness

NCC Specification J1.5b

Wall Construction

Glazing References

Shading Systems

0 + 0 + 0 + 0

Wall <80% + Wall <80% + Wall >80% +

Wall + Wall + Wall + Wall +

0 +

Horizontal Horizontal

Climate Zone 5 - Warm

temperate

Project Summary

Method 1

Class 9b - public halls, function

rooms or the like

The summary below provides an overview of where compliance has been achieved for Specification J1.5a -

Calculation of U-Value and solar admittance - Method 1 (Single Aspect) and Method 2 (Multiple Apects).

Calculator

East + EastDoor + South + West + WestDoor +

Horizontal

AFRC (True module size)

Horizontal

0 +

1.96 1.25 1.960.8

1.3

1.8

2.3

North East South West

W/m

²K

Wall-glazing U-Value

Proposed Design DTS Reference

0.13 0.09 0.130.04

0.06

0.08

0.10

0.12

0.14

North East South West

SA

Solar Admittance

Proposed Reference DTS Reference

2.00 1.830.8

1.3

1.8

2.3

W/m

²K

Wall-glazing U-Value - ALL

DTS Reference Proposed Design

60

80

100

120

AC

En

erg

y

AC Energy Value

DTS Reference Proposed Design

FaçadeReport

By accessing or using this calculator, you agree to the following: While care has been taken in the preparation of this calcu lator, it may not be complete or up-to-date. You can ensure that you are using a complete and up-to-date version by checking the Australian Building Codes Board website (www.abcb.gov.au). The Australian Building Codes Board, the Commonwealth of Australia and States and Territories of Australia do not accept any liability, including liability for negligence, for any loss (howsoever caused) , damage, injury, expense or cost incurred by any person as a result of accessing, using or relying upon this calculator, to the maximum extent permitted by law. No representation or warranty is made or given as to the currency, accuracy, reliability, merc hantability, fitness for any purpose or completeness of this calculator or any information which may appear on any linked websites, or in other linked information sources, and all such representations and warranties are excluded to the extent permitted by law. This calculator i s not legal or professional advice. Persons rely upon this calculator entirely at their own risk and must take responsibility for assessing the relevance and accuracy of the information in relation to their particular circumstances.

© Commonwealth of Australia and the States and Territories of Australia 2019, published by the Australian Building Codes Board.The material in this calculator is licensed under a Creative Commons Attribution-No Derivatives—4.0 International licence, with the exception of third party materials and any trade marks. It is provided for general information only and without warranties of any kind. You may not make derivatives of this calculator, but may only use a verbatim copy. More information on this CC BY ND licence is set out at the Creative Commons Website. For information regarding this calculator, see www.abcb.gov.au.

DTS ConstructionValues

Eden Gardens Lane Cove - Building D - Function Centre Lower Ground Floor - Non-Uniform Solution

Page 22: Eden Gardens - City of Ryde

[KUTOOLSFOREXCEL]

Compliant Solution = Date Non-Compliant Solution = 12/11/2020

Name Method 2Bianca Bulsara North East South West All

Company Wall-glazing U-Value (W/m².K) 1.99 2.00 0.99 1.63 1.72

ADP Consulting 2.00 2.00 2.00 2.00 2Solar Admittance 0.13 0.13 0.04 0.10

Position 0.13 0.13 0.13 0.13Sustainabilty Engineer AC Energy Value 76

81.8677262Building Name / AddressFunction Centre - lane cove0

Method 1Building State

NSW

Climate Zone

Building Classification

Storeys Above Ground Method 20

North East South West

Glazing Area (m²) 16.092 143 3.978 62.5868

Glazing to Façade Ratio 22% 88% 5% 60%

Methodology

Average Glazing U-Value (W/m².K) 5.50 2.13 5.80 2.06

Average Glazing SHGC 0.59 0.16 0.81 0.16

Wall Area (m²) 57.071 19.33 69.185 42.4032

Methodology

Average Wall R-value (m²K/W) 1.00 1.00 1.40 1.00

Solar Absorptance

IMPORTANT NOTICE AND DISCLAIMER IN RESPECT OF THIS CALCULATOR

Calculator

East1 + East2 + East3 + South + West1 + West2 + West3 +

Horizontal

0 +

AFRC (True module size)

Horizontal

0 +

0 +

Climate Zone 5 - Warm

temperate

Project Summary

Method 1

Class 9b - public halls, function

rooms or the like

The summary below provides an overview of where compliance has been achieved for Specification J1.5a -

Calculation of U-Value and solar admittance - Method 1 (Single Aspect) and Method 2 (Multiple Apects).

Wall + Wall +

0 +

Horizontal Horizontal

Wall Thickness

NCC Specification J1.5b

Wall Construction

Glazing References

Shading Systems

0 + 0 + 0 + 0

Wall <80% + Wall <80% + Wall >80% +

Wall + Wall +

Project Details

0 + 0 + 0 + 0 +

0 + 0 + 0 +

North +

Wall Types

Glass Types

Glazing System Types

Frame Types 0 +

Wall >80% +

1.99 2.00 0.99 1.630.8

1.3

1.8

2.3

North East South West

W/m

²K

Wall-glazing U-Value

Proposed Design DTS Reference

0.13 0.13 0.04 0.100.04

0.06

0.08

0.10

0.12

0.14

North East South West

SA

Solar Admittance

Proposed Reference DTS Reference

2.00 1.720.8

1.3

1.8

2.3

W/m

²K

Wall-glazing U-Value - ALL

DTS Reference Proposed Design

82 7660

65

70

75

80

85

AC

En

erg

y

AC Energy Value

DTS Reference Proposed Design

FaçadeReport

By accessing or using this calculator, you agree to the following: While care has been taken in the preparation of this calcu lator, it may not be complete or up-to-date. You can ensure that you are using a complete and up-to-date version by checking the Australian Building Codes Board website (www.abcb.gov.au). The Australian Building Codes Board, the Commonwealth of Australia and States and Territories of Australia do not accept any liability, including liability for negligence, for any loss (howsoever caused) , damage, injury, expense or cost incurred by any person as a result of accessing, using or relying upon this calculator, to the maximum extent permitted by law. No representation or warranty is made or given as to the currency, accuracy, reliability, merc hantability, fitness for any purpose or completeness of this calculator or any information which may appear on any linked websites, or in other linked information sources, and all such representations and warranties are excluded to the extent permitted by law. This calculator i s not legal or professional advice. Persons rely upon this calculator entirely at their own risk and must take responsibility for assessing the relevance and accuracy of the information in relation to their particular circumstances.

© Commonwealth of Australia and the States and Territories of Australia 2019, published by the Australian Building Codes Board.The material in this calculator is licensed under a Creative Commons Attribution-No Derivatives—4.0 International licence, with the exception of third party materials and any trade marks. It is provided for general information only and without warranties of any kind. You may not make derivatives of this calculator, but may only use a verbatim copy. More information on this CC BY ND licence is set out at the Creative Commons Website. For information regarding this calculator, see www.abcb.gov.au.

DTS ConstructionValues

Eden Gardens Lane Cove - Building D - Function Centre Ground Floor - Non-Uniform Solution

ksaxena
Rectangle
ksaxena
Callout
Compliance Pathway
Page 23: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 17 February 2021 Rev: 02 18

Appendix B

Insulation Mark-up

Page 24: Eden Gardens - City of Ryde

© DKO Architecture (VIC) Pty LtdExcept as allowed under copyright act, no part of thisdrawing may be reproduced or otherwise dealt withwithout written permission of DKO Architecture.

CkdBy DescriptionDateRev.

Scale

RevisionDA104Drawing Number

12010307 Lane Cove Road,Macquarie Park, NSW2113

Lower GroundProject Name Lane Cove Project Number

Drawing NameProject Address

Date

Client Eden Gardens

DKO Architecture (Vic.) Pty Ltd90-94 Rokeby StreetCollingwood, VIC 3066T +61 3 8601 [email protected]: 61413783636

Prin

ted:

13/

02/2

021

9:3

7 PM

dKO

Tit

le B

lock

s_v2

1.pm

k M

:\_

_C

AD

TE

MPL

ATE

FIL

ES\

DK

O A

rchi

CA

D 2

1 Ti

tle

Pane

l\dK

O T

itle

Blo

cks_

v21.

pmk

1:400, 1:1@A113/02/2021

14/10/2020 PRE DA DRAFTRR & LS JL04/11/2020 PRE DA DRAFTRR, LS, JM JL13/02/2021 DA APPLICATIONRR, LS

864.15 m2

52.47 m2

57.67

24.28 m2

52.83 m2

219.03 m2

Air

Dis

char

ge

(Pro

pos

ed)

3.0

0 m

2

Main Switch Room

(Existing)21.72 m2

41.65 m2

+57,690

+57,690

5,468.88 m2 EXISTING

CarparkFan Room(Existing)16.12 m2

1,879.71 m2 NEW

23.60 m2

57.02 m2

MAINCOMMS ROOM

16.00 m2

173 Car Parking Spaces (existing)

LOA

DIN

G

Carpark SupplyAir Intake viaAbove Ground

Facade Openings

263.03 m2

FUNCTIONROOM 4

M M

UPUP

PLANT30.00 m2

3,20

0

+57,690

+57,690

+57,690

+57,690

+57,690

97.09 m2

42.52 m2

204.59 m2

140.72 m2

57.67

57.67

57.67

M H M M/H M M MHMM/HMM

215.75 m2

STAFF KITCHEN &LOUNGE

CELLAR

+57,690

SEWER PUMP

STATION16.00 m2

GREASE ARRESTOR

30.00 m2

COLDWATERPUMPS

20.00 m2

Gre

ase

Arr

esto

r3.

60

m2

SewerPump

2.54 m2

UNDER SLABSEWER HOLDING TANK

24.00 m2

NON-POTABLEWATER

PRESSURE15.00 m2

MAINSWITCHROOM

56.00 m2

Elec

23.60 m2

53 Car Parking Spaces(new)

LOBBY

14 H

OR

IZO

NTA

L =

28

10 STACKER x 10 =110

SKYLIGHT ABOVE

SECURITY/BLDG MANAGER'S

OFFICEWATER

FOUNTAIN&

SKYLIGHT

80 LOCKERS

9 MALE SHOWERS

EOTF

80 LOCKERS

9 FEMALE SHOWERS

ENTRY

M &

FA

MB

ULA

NT

WC

s

RE

PAIR

STA

TIO

N

EXIST.SERVICES

PRE-FUNCTION

SERVICES

STORE

PREPKITCHEN

LIFT

STAIR

LOBBY

IRO

NIR

ON

MAILROOM

KIT

CH

EN

& L

OC

KE

RS

WASTE

WASTELIFT

LIFT

STAIR

OUTDOORFUNCTIONS

FALL 1:5FALL1:8

FALL1:8

RA

MP

BO

TTO

M

Ele

c D

B B

oard

SHAREDAREA

OUTDOORCOURTYARD

CORE

18 x

240

LC

OM

MIN

GLE

DR

EC

YCLI

NG

BIN

S

18 x

240

L G

EN

ER

AL

WA

STE

BIN

S

UP

PLANT

5 No.MOTORCYCLES

4 CAR SHARESPACES

F F

6,66

510

,075

6,55

0

50,305

32,450

176.

49m

3

23°4

7'50

"

21.97m 39°59'50"

65.245m 106°16'40"

35.69m 110°16'20"

242.325m 196°16'40"

17.435m 5°00'10"

105.63m 34°52'50"

WA

LK W

AY

UN

ISE

XD

DA

RAMP

FZ BAL

40 BAL

29 BAL

19 BAL

12.5 BAL

0 4 8 12 16 20m

1. BUILDING D - FUNCTION CENTRELOWER GROUND FLOOR - Floor and Wall Insulation Mark-Up

Internal Wall InsulationTotal R1.4

External Wall/SpandrelInsulation Total >R1.0

Roof Insulation Total>R3.7 &Solar Absorptance<0.45

Floor Insulation TotalR2.0

Insulation Legend for New Additions

External Wall InsulationTotal >R1.4

1.

Page 25: Eden Gardens - City of Ryde

© DKO Architecture (VIC) Pty LtdExcept as allowed under copyright act, no part of thisdrawing may be reproduced or otherwise dealt withwithout written permission of DKO Architecture.

CkdBy DescriptionDateRev.

Scale

RevisionDA105Drawing Number

12010307 Lane Cove Road,Macquarie Park, NSW2113

Ground LevelProject Name Lane Cove Project Number

Drawing NameProject Address

Date

Client Eden Gardens

DKO Architecture (Vic.) Pty Ltd90-94 Rokeby StreetCollingwood, VIC 3066T +61 3 8601 [email protected]: 61413783636

Prin

ted:

16/

02/2

021

4:4

9 PM

dKO

Tit

le B

lock

s_v2

1.pm

k M

:\_

_C

AD

TE

MPL

ATE

FIL

ES\

DK

O A

rchi

CA

D 2

1 Ti

tle

Pane

l\dK

O T

itle

Blo

cks_

v21.

pmk

1:400, 1:1@A116/02/2021

14/10/2020 PRE DA DRAFTRR & LS JL04/11/2020 PRE DA DRAFTRR, LS, JM JL13/02/2021 DA APPLICATIONRR, LS

137.70 m2

32.82 m2

141.08 m2

120.20 m2

644.30 m2

155.22 m2

30.50 m2

1,508.40 m2

118.28 m2 115.96 m2

125.93 m2

181.42 m2

147.26 m2

182.39 m2

103.13 m2

70.6

7 m

2

DDA

M M

UPUP

DNDN

35,685

25,6

25

25,2

20

30,8005,80

0

19,395 1,600 300

15,250 6,500 9,050

14,030 15,400 7,555

19,9

00

12,0

65

+60,840

+60,840

+60,840

+60,840

+60,840

643.35 m2

61.9

7 m

2

62.0

7 m

2

46.35 m2

484.82 m2

61.69 m2 61.70 m2

40.09 m2

1:41:51:8

FALL 1:5FALL

1:8

FOYER

HO

RIZ

ON

TAL

BIK

ES

UN

DE

R S

TAIR

S

BAR

TERRACE

WALLCLIMBINGTICKETS

FALL1:8

RA

MP

BO

TTO

M

Elec DB Board

FOLD

-UP

DO

OR

FOLD-UPDOOR

FOLD-UPDOOR

FOLD

-UP

DO

OR

FOLD

-UP

DO

OR

FOLD

-UP

DO

OR

HO

RIZ

ON

TAL

BIK

ES

HO

RIZ

ON

TAL

BIK

ES

HORIZONTALBIKES

HEA

VY R

IGID

VEH

ICLE

UPRIGHT KERBGUTTER

BARRIERS

UPRIGHT KERB

UPRIGHT KERB

LIP

1:81:5

RA

MP

TOP

NE

W C

AN

OPY

OV

ER

M H M M/H M MM MHMM/HMM M

808.15 m2

RESTAURANT

ENTRY

OU

TDO

OR

DIN

NE

R D

ININ

G

CONCIERGE

+60,840

M-WC

PREPKITCHEN

FUNCTIONROOM 1

PRE-FUNCTION

FUNCTIONROOM 2

FUNCTION/BRIDALROOM 3

F-WC

DDA

M-WC F-WCLIFT

STAIR

LIFT

GARDENCENTRE

WASTE

FIRESERVICES

LOADING BAY

EG STORAGE

WATERFEATURE

12 x 1100L GENERALWASTE BINS

13 x 1100L CO-MINGLEDRECYCLING BINS

6 x 240L GARDENORGANICS

RECYCLING BINS

BIN LIFT /COMPACTOR

ZONE

UP

DN

UP

PUMP PUMPFCR

ROCKCLIMBINGPLATFORM

ABOVE

PATH FOREMERGENGY

VEHICLE

7,000

20,7

0045

,210

65,9

10

3,54

017

,950

28,000

21,335 14,350 7,550 78,285 7,860 11,405

36,985 7,840

12,8

90

37,2

85

183.12 m2

EXISTINGRAINWATER RE-USE TANK

EXISTING CARPARKEXHAUST

3.50 m2

EXISTING BOOSTERCUPBOARD

3.00 m2

311.04 m2

VOID

48 Car Parking Spaces

COMM.LOBBY

VOID OVER

VOID OVERCONCIERGE

SKYLIGHTABOVE EOT

ENTRY/EXIT

EXIT

F&B

SALES

AC

LIFTNEW

STAIREXIST.STAIR

VOIDTRAVELATOR

CA

NO

PYO

VE

R

OUTDOORLUNCH DINING

DDA

BAMBOOGARDEN

NEW 2 x KIOSKSUBSTATION

176.

49m

3

23°4

7'50

"

21.97m 39°59'50"

65.245m 106°16'40"

35.69m 110°16'20"

242.325m 196°16'40"

17.435m 5°00'10"

105.63m 34°52'50"

RED LINE OF EXIST.

RED LINE OF EXIST.

RED LINEOF EXIST.

RED LINEOF EXIST.

FIRE TANKS(2m W x 19m L x 2.5m H)TO BE CO-ORDINATED

EXISTING SUB-STATION TO BE

RELOCATED

EXISTING FPRTO BE

RELOCATED

RELOCATEDSUB STATION

EXISTINGCARPARKEXHAUST

SCR

EE

N

VOID OVERWAITING AREA

PEDESTRIANACCESS

VEHICLE ACCESS(TO BE REVIEWED &

CO-ORDINATED)

LANE COVE ROAD

CORE

6 Car ParkingSpaces

FIEL

D

PROPOSED.

SCR

EE

N

M-WC

F-WC

PROPOSED.

FZ BAL

40 BAL

29 BAL

19 BAL

12.5 BAL

SECURITY GATELOCATION.

GATE TO BE DESIGNED.

SECURITY GATELOCATION.

GATE TO BE DESIGNED.

SECURITY GATELOCATION.

GATE TO BE DESIGNED.

GARDENCENTRE

TENANCY

GARDENCENTRE

TENANCY

NEIGHBOURHOODSHOP

GARDEN CENTRETENANCY

NEW CONCRETEWALL TO ENCASEEXIST. COLUMNS .

GARDEN CENTRE/NEIGHBOURHOOD SHOPS

NEIGHBOURHOODSHOP

NEIGHBOURHOODSHOP

F F

0 4 8 12 16 20m

Internal Wall InsulationTotal R1.4

External Wall/SpandrelInsulation Total >R1.0

Roof Insulation Total>R3.7 &Solar Absorptance<0.45

Floor Insulation TotalR2.0

Insulation Legend for New Additions

External Wall InsulationTotal >R1.4

1. BUILDING D - FUNCTION CENTREGROUND FLOOR - Floor and Wall Insulation Mark-Up

2. BUILDING C - NEIGHBOURHOOD SHOPS GROUND FLOOR - Floor and Wall Insulation Mark-Up

3. BUILDING B - RESTAURANT GROUND FLOOR - Floor and Wall Insulation Mark-Up

1.

3.

2.

Page 26: Eden Gardens - City of Ryde

© DKO Architecture (VIC) Pty LtdExcept as allowed under copyright act, no part of thisdrawing may be reproduced or otherwise dealt withwithout written permission of DKO Architecture.

CkdBy DescriptionDateRev.

Scale

RevisionDA105Drawing Number

12010307 Lane Cove Road,Macquarie Park, NSW2113

Ground LevelProject Name Lane Cove Project Number

Drawing NameProject Address

Date

Client Eden Gardens

DKO Architecture (Vic.) Pty Ltd90-94 Rokeby StreetCollingwood, VIC 3066T +61 3 8601 [email protected]: 61413783636

Prin

ted:

16/

02/2

021

4:4

9 PM

dKO

Tit

le B

lock

s_v2

1.pm

k M

:\_

_C

AD

TE

MPL

ATE

FIL

ES\

DK

O A

rchi

CA

D 2

1 Ti

tle

Pane

l\dK

O T

itle

Blo

cks_

v21.

pmk

1:400, 1:1@A116/02/2021

14/10/2020 PRE DA DRAFTRR & LS JL04/11/2020 PRE DA DRAFTRR, LS, JM JL13/02/2021 DA APPLICATIONRR, LS

137.70 m2

32.82 m2

141.08 m2

120.20 m2

644.30 m2

155.22 m2

30.50 m2

1,508.40 m2

118.28 m2 115.96 m2

125.93 m2

181.42 m2

147.26 m2

182.39 m2

103.13 m2

70.6

7 m

2

DDA

M M

UPUP

DNDN

35,685

25,6

25

25,2

20

30,8005,80

0

19,395 1,600 300

15,250 6,500 9,050

14,030 15,400 7,555

19,9

00

12,0

65

+60,840

+60,840

+60,840

+60,840

+60,840

643.35 m2

61.9

7 m

2

62.0

7 m

2

46.35 m2

484.82 m2

61.69 m2 61.70 m2

40.09 m2

1:41:51:8

FALL 1:5FALL

1:8

FOYER

HO

RIZ

ON

TAL

BIK

ES

UN

DE

R S

TAIR

S

BAR

TERRACE

WALLCLIMBINGTICKETS

FALL1:8

RA

MP

BO

TTO

M

Elec DB Board

FOLD

-UP

DO

OR

FOLD-UPDOOR

FOLD-UPDOOR

FOLD

-UP

DO

OR

FOLD

-UP

DO

OR

FOLD

-UP

DO

OR

HO

RIZ

ON

TAL

BIK

ES

HO

RIZ

ON

TAL

BIK

ES

HORIZONTALBIKES

HEA

VY R

IGID

VEH

ICLE

UPRIGHT KERBGUTTER

BARRIERS

UPRIGHT KERB

UPRIGHT KERB

LIP

1:81:5

RA

MP

TOP

NE

W C

AN

OPY

OV

ER

M H M M/H M MM MHMM/HMM M

808.15 m2

RESTAURANT

ENTRY

OU

TDO

OR

DIN

NE

R D

ININ

G

CONCIERGE

+60,840

M-WC

PREPKITCHEN

FUNCTIONROOM 1

PRE-FUNCTION

FUNCTIONROOM 2

FUNCTION/BRIDALROOM 3

F-WC

DDA

M-WC F-WCLIFT

STAIR

LIFT

GARDENCENTRE

WASTE

FIRESERVICES

LOADING BAY

EG STORAGE

WATERFEATURE

12 x 1100L GENERALWASTE BINS

13 x 1100L CO-MINGLEDRECYCLING BINS

6 x 240L GARDENORGANICS

RECYCLING BINS

BIN LIFT /COMPACTOR

ZONE

UP

DN

UP

PUMP PUMPFCR

ROCKCLIMBINGPLATFORM

ABOVE

PATH FOREMERGENGY

VEHICLE

7,000

20,7

0045

,210

65,9

10

3,54

017

,950

28,000

21,335 14,350 7,550 78,285 7,860 11,405

36,985 7,840

12,8

90

37,2

85

183.12 m2

EXISTINGRAINWATER RE-USE TANK

EXISTING CARPARKEXHAUST

3.50 m2

EXISTING BOOSTERCUPBOARD

3.00 m2

311.04 m2

VOID

48 Car Parking Spaces

COMM.LOBBY

VOID OVER

VOID OVERCONCIERGE

SKYLIGHTABOVE EOT

ENTRY/EXIT

EXIT

F&B

SALES

AC

LIFTNEW

STAIREXIST.STAIR

VOIDTRAVELATOR

CA

NO

PYO

VE

R

OUTDOORLUNCH DINING

DDA

BAMBOOGARDEN

NEW 2 x KIOSKSUBSTATION

176.

49m

3

23°4

7'50

"

21.97m 39°59'50"

65.245m 106°16'40"

35.69m 110°16'20"

242.325m 196°16'40"

17.435m 5°00'10"

105.63m 34°52'50"

RED LINE OF EXIST.

RED LINE OF EXIST.

RED LINEOF EXIST.

RED LINEOF EXIST.

FIRE TANKS(2m W x 19m L x 2.5m H)TO BE CO-ORDINATED

EXISTING SUB-STATION TO BE

RELOCATED

EXISTING FPRTO BE

RELOCATED

RELOCATEDSUB STATION

EXISTINGCARPARKEXHAUST

SCR

EE

N

VOID OVERWAITING AREA

PEDESTRIANACCESS

VEHICLE ACCESS(TO BE REVIEWED &

CO-ORDINATED)

LANE COVE ROAD

CORE

6 Car ParkingSpaces

FIEL

D

PROPOSED.

SCR

EE

N

M-WC

F-WC

PROPOSED.

FZ BAL

40 BAL

29 BAL

19 BAL

12.5 BAL

SECURITY GATELOCATION.

GATE TO BE DESIGNED.

SECURITY GATELOCATION.

GATE TO BE DESIGNED.

SECURITY GATELOCATION.

GATE TO BE DESIGNED.

GARDENCENTRE

TENANCY

GARDENCENTRE

TENANCY

NEIGHBOURHOODSHOP

GARDEN CENTRETENANCY

NEW CONCRETEWALL TO ENCASEEXIST. COLUMNS .

GARDEN CENTRE/NEIGHBOURHOOD SHOPS

NEIGHBOURHOODSHOP

NEIGHBOURHOODSHOP

F F

0 4 8 12 16 20m

2. BUILDING C - NEIGHBOURHOOD SHOPS GROUND FLOOR - Roof Insulation Mark-Up

1. BUILDING D - FUNCTION CENTREGROUND FLOOR - Roof Insulation Mark-Up

Internal Wall InsulationTotal R1.4

External Wall/SpandrelInsulation Total >R1.0

Roof Insulation Total>R3.7 &Solar Absorptance<0.45

Floor Insulation TotalR2.0

Insulation Legend for New Additions

External Wall InsulationTotal >R1.4

3. BUILDING B - RESTAURANT GROUND FLOOR - Roof Insulation Mark-Up

1.

3.

2.

Page 27: Eden Gardens - City of Ryde

Project: SYD0684 Eden Gardens

Report: NCC 2019 Section J

Date: 17 February 2021 Rev: 02 19

Melbourne

Level 11, 60 Albert Road

South Melbourne VIC 3205

T. 03 9521 1195

Sydney

Level 3, 8 Spring Street

Sydney NSW 2000

T. 02 8203 5447

Brisbane

Ground Floor, 102 Adelaide Street

Brisbane QLD 4000

T. 07 3088 4022

adpconsulting.com.au

Creating great environments with great people