Ecodesign Regulations for Liquid Chillers - · PDF fileeurammon Symposium 2015 for Hermann...
Transcript of Ecodesign Regulations for Liquid Chillers - · PDF fileeurammon Symposium 2015 for Hermann...
eurammon Symposium 2015
for
Hermann Renz, BITZER GmbH
Schaffhausen, 25th/26th June, 2015
Ecodesign Regulations for
Liquid Chillers
Hermann Renz, BITZER GmbH
Schaffhausen, 25th / 26th June, 2015 Page 2
Contents
• Main objectives of Ecodesign Framework Directive
• Projects within the Ecodesign Framework Directive
• ENTR Lot 1 / ENER Lot 21 – Application ranges
• Mandatory requirements for placing on the market
• Load and temperature profiles
• Calculation method
• Efficiency requirements “MEPS“
• Summary
Ecodesign Regulations for Liquid Chillers
Schaffhausen, 25th / 26th June, 2015 Page 3
Ecodesign Framework Directive 2009/125/EC
The four main objectives
• Ensure the free movement of energy-related products within the EU
• Improve the overall environmental performance of these
products and thereby protect the environment,
• Contribute to the security of energy supply and enhance the
competitiveness of the EU economy,
• Preserve the interests of industry, consumers, and other stakeholders
Schaffhausen, 25th / 26th June, 2015 Page 4
Projects (Lots) within the
Ecodesign Framework Directive 2009/125/EC
ENER Lot . ENTR Lot .
1. Boilers 10. Air cond. < 12 kW 20. Local room heating 1. Refrigeration
2. Water heaters 11. Motors, fans, .. - under revision
21. Central heating,
cooling products
2. Transformers
3. PC 12. Com. Refrigerators ….. 3. Multimedia
4. Copiers 13. Domestic Refrig. ….. 4. Industr. furnaces
5. TV, … 14. Dish washers 30. Motors / Drives 5. Machine tools
6. Stand-by losses 15. Fossil fuel burner 31. Compressors 6. A/C and Ventilation
7. Battery charger 16. Laundry Driers 32. Windows 7. Steam boilers
8. Office lights 17. Vacuum cleaners 8. Power cables
9. Street lights 18. Set top boxes 9. Enterprise servers
19. Domestic lighting
HVAC&R Involvement
Current main work
items for HVAC&R
Commissions Energy (ENER) and Enterprise (ENTR)
• MT & LT
Process Chillers
• Condensing Units
• HT Process Chillers
• Comfort A/C Chillers
• Air Heating Heat Pumps
Schaffhausen, 25th / 26th June, 2015 Page 5
Major Projects for HVAC&R
• Current Major Focus
ENTR Lot 1 Professional Storage Cabinets, Blast Cabinets,
Condensing Units and MT/LT Process Chillers
ENER Lot 21 Air Heating Products (incl. “Air” HP), Cooling Products
(incl. A/C Chillers) and High Temp Process Chillers
• Further Lots of Relevance
ENER Lot 1(2) (EU) No 813/2013 ‒ Space heaters and Combi Heaters
ENER Lot 11 (EU) No 327/2011 ‒ Fans Driven by Motors Revision
ENER Lot 12 Commercial Refrigerators and Freezers
ENER Lot 30 Motors & Variable Speed Drives
ENTR Lot 6 A/C and Ventilation Units (merged with ENER Lot 10)
Both Lots are still in a draft stage ‒ Regulation acc. to Lot 1 expected for July!
Schaffhausen, 25th / 26th June, 2015 Page 6
ENTR Lot 1 / ENER Lot 21 – Application Ranges for Chillers
LT
-25°C brine
MT
-8°C brine
HT
+7°C water
air-cooled and water-cooled
A/C
+7°C water
Dieter Mosemann – Mai 2014 6
water cooled
air-cooled and water-cooled
air-cooled and water-cooled
air-cooled and water-cooled
ENTR Lot 1 ENER Lot 21
(1) Process Chillers
(2) Comfort A/C Chillers
Schaffhausen, 25th / 26th June, 2015 Page 7
Minimum Efficiency Performance Standards MEPS
Process Chillers ‒ LT / MT SEPR SEER
LT (brine -25°C) – Cooling capacity < 200 kW // ≥ 200 kW –
MT (brine -8°C) – Cooling capacity < 300 kW // ≥ 300 kW –
tamb (A) 35°C
tamb (B) 25°C
tamb (C) 15°C
tamb (D) 5°C
full load
part load
part load
part load
–
–
–
–
‒ Criteria for MEPS*
SEPR Seasonal Energy Performance Ratio
- calculated from EER at full and part load points
Tier-1 01.07.2016
Tier-2 01.07.2018
Application of the Regulation from ..
ENTR Lot 1 Process Chillers (LT / MT) ‒
Mandatory Requirements for Placing on the Market
Schaffhausen, 25th / 26th June, 2015 Page 8
Minimum Efficiency Performance Standards MEPS
Process Chillers SEPR hs,c (SEER)
HT (water 7°C) – Cooling capacity < 400 kW // ≥ 400 kW //
≥ 1500 kW (water-cooled condenser)
tamb (A) 35°C
tamb (B) 25°C or 30°C
tamb (C) 15°C or 25°C
tamb (D) 5°C or 20°C
full load
part load (25°)
part load (15°)
part load (5°)
full load
part load (30°)
part load (25°)
part load (20°)
‒ Criteria for MEPS*
SEPR Seasonal Energy Performance Ratio
- calculated from EER at full and part load points
hs,c Seasonal Space Cooling Efficiency [%]
Tier-1 01.01.2017 ??
Tier-2 01.01.2020 ??
Application of the Regulation from ..
or*
ENER Lot 21 Process Chillers (HT) ‒
Mandatory Requirements for Placing on the Market
* Not yet confirmed
ISC 05.2015
Schaffhausen, 25th / 26th June, 2015 Page 9
Minimum Efficiency Performance Standards MEPS
hs,c Seasonal Space Cooling Efficiency [%]
- calculated from SEER by CC (PEF) = 2.5
SEER Seasonal Energy Efficiency Ratio
- calculated from EER at full and part load points
Comfort A/C Chillers SEPR hs,c (SEER)
A/C (water 7°C) – Cooling capacity –
–
< 400 kW // ≥ 400 kW //
≥ 1500 kW (water-cooled cond.)
tamb (A) 35°C
tamb (B) 30°C
tamb (C) 25°C
tamb (D) 20°C
–
–
–
–
full load
part load
part load
part load
‒ Criteria for MEPS*
Tier-1 01.01.2017 ??
Tier-2 01.01.2020 ??
Application of the Regulation from ..
ENER Lot 21 Comfort A/C Chillers ‒
Mandatory Requirements for Placing on the Market
ISC 05.2015
Schaffhausen, 25th / 26th June, 2015 Page 10
Load and Temperature Profiles
ENTR Lot 1 ENER Lot 21
A/C Comfort Chillers
HT Process Chillers
MT Process Chillers
Reference
Condition
air-
cooled
tamb
[°C]
water-
cooled
twater
[°C]
load
[%]
A 35 30 100
B 25 23 93
C 15 16 87
D 5 9 80
Reference
Condition
air-
cooled
tamb
[°C]
water-
cooled
twater.
[°C]
load
[%]
A 35 30 100
B 30 26 74
C 25 22 47
D 20 18 21
LT Process Chillers
Schaffhausen, 25th / 26th June, 2015 Page 11
Liquid Chillers ‒ Load Profile vs. Ambient Temperature
Ambient temperature [°C]
Lo
ad
pro
file
[%
]
Schaffhausen, 25th / 26th June, 2015 Page 12
Temperature Profile Strasbourg – ENTR Lot 1 Process Chillers
Ambient temperature [°C]
BIN
ho
urs
pe
r ye
ar
Schaffhausen, 25th / 26th June, 2015 Page 13
Temperature Profile ENER Lot 21* (EN 14825)
for A/C Chillers ‒ vs. Temperature Profile Strasbourg
* based on EN 14825
Efficiency Evaluation
SEPR
Efficiency Evaluation
hs,c (SEER)
BIN
Stu
nden p
ro J
ahr
Umgebungstemperatur [°C] Ambient temperature [°C]
BIN
ho
urs
pe
r ye
ar
Schaffhausen, 25th / 26th June, 2015 Page 14
SEPR and SEER Calculation Method
Tj = BIN temperature
j = BIN number with j {1,2, … n}
PR(Tj) = Refrigeration (cooling) demand for the corresponding BIN temperature Tj
hj = Number of BIN hours occurring at the corresponding BIN temperature Tj
COPPL(Tj) = COP values of the unit for the corresponding BIN temperature Tj
EERbin(Tj) = EER values of the unit for the corresponding BIN temperatur Tj
SEPR
Seasonal Energy Performance Ratio Seasonal Energy Efficiency Ratio
SEPR, SEER = seasonal cooling demand
seasonal electrical energy demand
EERbin
SEER SEER
Schaffhausen, 25th / 26th June, 2015 Page 15
0
50
100
150
200
250
300
350
400
450
0,0
0,2
0,4
0,6
0,8
1,0
1,2
1,4
-20 -15 -10 -5 0 5 10 15 20 25 30 35 40
Dura
tion p
er
bin
in h
ours
Coolin
g d
em
and [
-]
Ambient temperature in °C
bin hours
Demand
A B C D
Capacity characteristic
w/o modulation
Degradation (Cd) of EER
Cd
Degradation Coefficients for EER Correction ‒
Example: Process Chillers w/o Capacity Modulation
Schaffhausen, 25th / 26th June, 2015 Page 16
EER Correction: Chillers w/o Modulation
Degradation Coefficient (Cd), (Cdc) at part load (CR = capacity ratio):
• Cdc can be determined by test (EN 14825) ‒ A/C Chillers
incl. power demand of all auxiliaries during standstill (e.g. oil heater).
If not to be determined by test Cdc = 0,9
• Process Chillers: Due to very high running hours over the year, power demand
for oil heaters is not relevant for Cdc
Part load EER for chillers (compressors) w/o capacity modulation:
Calculation according to EN 14825
Schaffhausen, 25th / 26th June, 2015 Page 17
Excel Sheet for SEPR Calculation –
Example: Process Chillers
Temperature range
for SEPR calculation ‒
from -19°C to 38°C
in 1 K increments
4 Reference Conditions:
35°, 25°, 15°, 5°C ambient
Schaffhausen, 25th / 26th June, 2015 Page 18
Minimum Energy Performance Standards “MEPS“
ENTR Lot 1 / ENER Lot 21 Projects –
Efficiency Requirements for Liquid Chillers
Schaffhausen, 25th / 26th June, 2015 Page 19
• Following slides are showing the current status of minimum efficiency
requirements (MEPS)
• Process Chillers:
MEPS are accepted by Commission Officials and Stakeholders and will
most likely not be changed in the final Regulation
• Comfort A/C Chillers:
Very challenging (some non-plausible) MEPS were not lowered during the
current Inter-service Consultation Process – despite of convincing counter
proposals from Stakeholders at an earlier stage
Further initiatives are taken with the target to reach a consensus –
with the hope that MEPS (at least for Tier-1) will be changed
ENTR Lot 1 / ENER Lot 21 Status
Schaffhausen, 25th / 26th June, 2015 Page 20
Cooling capacity MEPS Tier-1 MEPS Tier-2
LT air-cooled < 200 kW
≥ 200 kW
1,48
1,6
1,7
1,84
MT air-cooled < 300 kW
≥ 300 kW
2,24
2,8
2,58
3,22
HT air-cooled < 400 kW
≥ 400 kW
4,5
5,0
5,0
5,5
Process Chillers – SEPR Analysis
LT water-cooled < 200 kW
≥ 200 kW
1,82
2,1
2,09
2,42
MT water-cooled < 300 kW
≥ 300 kW
2,86
3,8
3,29
4,37
HT water-cooled < 400 kW
≥ 400 kW
≥ 1500 kW (ISC 05.2015)
6,5
7,5
8,0
7,0
8,0
8,5
ENTR Lot 1 / ENER Lot 21 ‒ Liquid Chillers
Proposed Minimum Energy Performance Standards MEPS
Schaffhausen, 25th / 26th June, 2015 Page 21
• Conversion Coefficient CC = 2,5 (PEF)
reflecting the estimated 40% average efficiency
for generating electrical energy within the EU –
acc. to Directive 2012/27/EU, Annex IV
• Summation of Corrections F(i) = 3%
accounts for the “negative contribution due to adjusted contributions
of temperature controls”
A/C Chillers ‒ Conversion of SEER to
Seasonal Space Cooling Energy Efficiency “hs,c
“
1
CC– F(i) [%]hs,c [%] = [%]• SEER
SEER • 40
1,03hs,c [%] =
Subject for misinterpretation –
to be clarified with Commission
SEER • 100 1
2,5 1,03hs,c [%] = • ?
Schaffhausen, 25th / 26th June, 2015 Page 22
Cooling capacity hs,c (SEER) Tier-1 hs,c (SEER) Tier-2
air-cooled < 400 kW
≥ 400 kW
157% (4,0)
173% (4,4)
161% (4,1)
185% (4,7)
water-cooled < 400 kW
≥ 400 kW
≥ 1500 kW
196% (5,1)
256% (6,6)
256% (6,6) ??
200% (5,2)
272% (7,0)
272% (7,0) ??
Comfort A/C Chillers – hs,c / SEER Analysis – Refrigerants GWP > 150
Comfort A/C Chillers – hs,c / SEER Analysis – Refrigerants GWP < 150
Cooling capacity hs,c Tier-1 hs,c Tier-2
air-cooled < 400 kW
≥ 400 kW
141%
156%
145%
167%
water-cooled < 400 kW
≥ 400 kW
≥ 1500 kW
176%
230%
230% ??
180%
245%
245% ??
ISC 05.2015
ENER Lot 21 ‒ Liquid Chillers
Proposed Minimum Seasonal Space Cooling Efficiency
Schaffhausen, 25th / 26th June, 2015 Page 23
Eurovent data base 05.2015: ESEER translated into SEER net
Ecodesign ENER Lot 21 ‒ A/C Chillers < 400 kW
Market Influence within EU
Tier-1
Tier-2
MEPS are not achieved by
Tier-1: 2017 87%
Tier-2: 2019 92%
~ 80%
~ 88%
Schaffhausen, 25th / 26th June, 2015 Page 24
• Process and Comfort A/C Liquid Chillers
• Requirements for tolerances: SEPR, hs,c (SEER),
EER at Reference Conditions
• Comfort A/C Chillers (air-cooled)
• Limits for maximum sound power levels
• General ‒ formal requirements acc. Directive 2009/125/EU
• Conformity assessment acc. Article 8 (2)
CE Marking including Declaration of Conformity
• Technical Documentation acc. Annex IV and V
• Information on disassembly , recycling and disposal
Further Requirements
Schaffhausen, 25th / 26th June, 2015 Page 25
Example:
Process Chillers
• Data sheet for
performance
declaration
Schaffhausen, 25th / 26th June, 2015 Page 26
• Ecodesign Regulations Liquid Chillers are setting very high Energy
Efficiency requirements in future
• Regulations still in draft stage ‒ ENTR Lot 1 expected for July 2015
• Minimum Energy Performance Standards (MEPS) will become
mandatory for being allowed to place products on the EU Market
• Tier-1 for CU and LT / MT Process Chillers as of July 1, 2016
• Liquid Chillers for Comfort A/C will in future be assessed on basis of
“Seasonal Space Cooling Energy Efficiency“
• Eurovent data base shows that the majority of currently produced
products must be dropped from the market
• Proposed MEPS from the EU Commission are “overstated” – request
from Stakeholders to set lower levels
Summary
Contact:
Hermann Renz
Eschenbruennlestr. 15, D-71065 Sindelfingen
Germany
+49 7031 932 240
+49 7031 932 5240
Thank You for Your Attention!