    Hydraulic Oil Tank EC210B-17-01Air Breather EC210B-17-02Fuel Tank EC210B-17-03Swing Ring Gear EC210B-17-04Bucket Clearance Adjustment EC210B-17-05Under Carriage and Track Link EC210B-17-06Measuring Method of Track Link Pitch EC210B-17-07Upper Roller EC210B-17-08Lower Roller EC210B-17-09

    Sprocket EC210B-17-10Idler EC210B-17-11Recoil Spring EC210B-17-12

    17 MISCELLANEOUS

    http://ec210b-main.pdf/http://ec210b-main.pdf/http://ec210b-main.pdf/

  • 8/15/2019 ec210b-17.pdf

    2/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-01

    Hydraulic Oil Tank

    SIDEDOOR

    FUELTANK

  • 8/15/2019 ec210b-17.pdf

    3/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-02

    Air Breather

    Hydraulic oil tank

  • 8/15/2019 ec210b-17.pdf

    4/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-03

    Fuel Tank

    HYD.TANK

    TOOLBOX

  • 8/15/2019 ec210b-17.pdf

    5/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-04

    Swing Ring Gear

    "S" mark(inner race) Plug(outer race)

    SECTION A-A

    A

    A

  • 8/15/2019 ec210b-17.pdf

    6/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-05

    Bucket Clearance Adjustment

    A

    Section A-A

    Detail B

    Max. 2.0mm Gap

    Shim

    B

    A

  • 8/15/2019 ec210b-17.pdf

    7/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-06

    Under Carriage and Track Link

    4

    3

    10 S02776C

    8

    6 7

    2

    5

    9

    1 unit : mm (in)

    No. Check item Standard size Repair limit Remedy

    1 Link pitch 190.3 (7.5) 194.3 (7.65) Turn or replace pin andbushing2 Outer diameter of bushing 59 (2.32) 53 (2.09)

    3 Height of grouser (shoe) 26 (1.02) 16 (0.63) Lug welding or replace

    4 Height of link 105 (4.13) 97 (3.82) Replace or replace

    5 Clea rance of li nk andbushing

    Standardsize

    Tolerance Clearance Replace with largerbushingShaft Hole Standard

    sizeRepair limit

    59 (2.32) +0.040

    –0.16 –0.23

    –0.16~ –0.27

    0.1

    6 Clearance of link and pin 38(1.50)

    +0.070

    –0.22 –0.30

    –0.22~ –0.37

    0 .1 Replace with large r pin

    7 Clea rance of li nk andmaster pin

    38(1.50)

    –0.26 –0.3

    –0.22 –0.30

    –0.08~ +0.04

    – –

    8 Clearance of pin andbushing

    38(1.50)

    +0.070

    +0.80+0.30

    0.23~0.80

    5 Turn or replace pin andbushing

    9 Clearance between links 1.4 (One side) 10 (Both sides)

    10 Tightening torque of shoescrew

    80 ~ 90 kgf·m (578 ~ 650 lbf·ft) Tighten

  • 8/15/2019 ec210b-17.pdf

    8/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-07

    Measuring method of Track Link Pitch(Service Bulletin KORK112)

    S01902C

    TRACK PIN

    TRACK PIN

    TRACK PIN

    Pitch of four link

    Calculation of track link wear

    • Track link wear = (Pitch of four track links / 4) - Initial track link pitch.

    • % of wear = [Track link wear / (Repair limit - Initial track link pitch)] x 100.

    • Remaining life (%) = 100 - Rate of wear (%)

    < Initial track link pitch & Repair limit> (Unit : mm)

    Track l ink p itch SE130LC-3 SE130LCM-3 SE210-3 SE240-3 SE280-3 SE350-3 SE450-3

    Initial 171.75 190.3 203.5 216.2

    Repair limit 175.75 194.3 207.5 220.2

    Track link pitch EC140LC EC140LCM EC150 EC210 EC240 EC290 EC360 EC460

    Initial 171.75 190.3 203.5 216.2

    Repair limit 175.75 194.3 207.5 220.2

    Track link pitch EC140BLC EC140BLCM EC150B EC210B EC240B

    Initial 171.75 190.3

    Repair limit 175.75 194.3

    Track link pitch EC290B EC330B EC360B EC460B

    Initial 203.5 216.2

    Repair limit 207.5 220.2

  • 8/15/2019 ec210b-17.pdf

    9/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-08

    Upper Roller

    - After disassembly and assembly, fill SAE10W-30 engine oil 65cc.

    S02779A

    1 2

    4 5

    3

    unit : mm (in)

    No. Check item Standard size Repair limit Remedy

    1 Outer diameter offlange

    170 (6.7) – Reinforcementwelding or replace

    2 Outer diameter oftread

    140 (5.5) 130 (5.1)

    3 Width of flange 83 (3.3) 71 (2.8)

    4 Clearance betweenshaft and bushing

    Standardsize

    Tolerance Clearance Replace bushing

    Shaft Hole Standardsize

    Repair limit

    55(5.17) +0.030 –0.090 +0.35+0.30 0.33~0.44 1.5

    5 Clearance betweenroller and bushing

    63(2.48)

    +0.150+0.120

    +0.0300

    0.09~0.18

    0 Replace bushing

    6 Mounting screwtorque

    52 ± 5 kgf·m (375 ± 36 lbf·ft)

  • 8/15/2019 ec210b-17.pdf

    10/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-09

    Lower Roller

    - After disassembly and assembly, fill SAE10W-30 engine oil 250cc.

    2 4 5

    3

    1

    S02778A

    unit : mm (in)

    No. Check item Standard size Repair limit Remedy

    1 Outer diameter of flange 195 (7.7) Reinforcementwelding orreplace

    2 Outer diameter of tread 160 (6.3) 148 (5.8)

    3 Width of flange 20.5 (0.8) 13.5 (0.5)

    4 Clearance betweenshaft and bushing

    Standardsize

    Tolerance Clearance Replace bushing

    Shaft Hole Standardsize

    Repair limit

    70(2.76)

    0 –0.03

    +0.30+0.25

    +0.25~0.33

    1.5

    5 Clearance betweenroller and bushing

    78(3.07)

    +0.132+0.102

    +0.0460

    0.056~0.132

    0 Replace bushing

    6 Mounting screw torque 27 3 kgf·m (195 22 lbf·ft)

  • 8/15/2019 ec210b-17.pdf

    11/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-10

    Sprocket B

    A Symbol Item Wear limit Remedy

    A Wear limit of sprocket tooth profile 6 (0.24) Replace

    B Width of sprocket tooth

    Standard value 68 ± 1.5 (2.68 ± 0.06)

    Allowable value 62 (2.44)

    C Number of tooth 21 EA. –

    14516700EC210BEC240B

    Measuring datums

    < Measuring Tool for tooth wear >

  • 8/15/2019 ec210b-17.pdf

    12/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-11

    IdlerD

    C E

    B

    F G

    A Item Specification Allowable value Remedy

    A 540 - Replace

    B 500 488 Replace

    C 83 75 Replace

    D 170 - Replace

    E 43.5 50 Replace

    F 0.33 ~ 0.44 1.5 Replace

    G 0.09 ~ 0.15 - Replace

    - After disassembly and assembly, fill SAE10W-30 engine oil 365cc.

  • 8/15/2019 ec210b-17.pdf

    13/13

    Volvo Construction EquipmentKorea Ltd.

    EC210B-17-12

    Recoil Spring

    A90o

    40cm

    unit:mm(in)Condition Distance (A)

    Normal soil 320 ~ 340 (12.6 ~ 13.4)

    Rocky ground 300 ~ 320 (11.8 ~ 12.6)

    Soft ground (swamp, clay, sandysoil)

    340 ~ 360 (13.4 ~ 14.2)