EASTERN PLAINS TRANSMISSION
PROJECT
Tri-State Generation & Transmission
and Western Area Power
Administration
EASTERN PLAINS TRANSMISSION PROJECT
Resource Additions► 2 x 600 MW supercritical coal units at
Holcomb substation 2011, 2012 – near Garden City, Kansas
► Possible 600 MW addition at Lamar Energy Center in 2020.
► Task was how to integrate into existing Western Interconnection transmission system
EASTERN PLAINS TRANSMISSION PROJECT
Transmission Additions► Began with 345-kV alternatives and corridors
► Expanded to look into 500-kV alternative along same corridors
► Following slides show this progression
Initial Design
BURLINGTON3 X 345/230
HOLCOMB
1200 MW
WRAY
PAWNEESTORY
COMANCHE
BOONE
SMOKY HILL
CORNER POINT
LAMAR ENERGY CENTER
Sensitivities with and without
LAMAR2 X 345/230
BIG SANDY2 X 345/230
DANIELS PARK3 X 345/230
WATERTON2 X 345/230
New 345
New 230
Planned 345
Existing 230
S A-1S A-1
345 kV Minimum for 1200 MW
BURLINGTON
2 X 345/230
HOLCOMB
1200 MW
WRAY
PAWNEESTORY
COMANCHE
SMOKY HILL
CORNER POINT
LAMAR ENERGY CENTER
BIG SANDY2 X 345/230
BOONE2 X 345/230
LAMAR2 X 345/230
Sensitivities with 0 autos
DANIELS PARK3 X 345/230
WATERTON2 X 345/230
MIDWAY1 X 345/230
New 345
New 230
Planned 345
Existing 230
150 miles
3 mile separation
80 miles
100miles
45 miles
80 miles B.Sandy – Midway
80 miles
70 miles
65 miles
125 Mile Rd. Sub
3/09/06
345 kV Minimum for 1800 MW
BURLINGTON
2 X 345/230
HOLCOMB
1200 MW
WRAY
PAWNEESTORY
COMANCHE
SMOKY HILL
CORNER POINT
LAMAR ENERGY CENTER
600 MW
Preliminary Stability Sensitivities evaluated two lines. Not preferred
BIG SANDY2 X 345/230
BOONE2 X 345/230
LAMAR2 X 345/230
Sensitivities with 0 autos
DANIELS PARK3 X 345/230
WATERTON2 X 345/230
MIDWAY1 X 345/230
New 345
New 230
Planned 345
Existing 230
150 miles
135 miles
Preferred instead of 2 Holcomb-Burlington
3 mile separation
80miles
100miles
45 miles
125 Mile Rd. Sub
80 miles
70 miles
65 miles
80 miles
3/09/06
500 kV Minimum for 1200 MW
BURLINGTON
2 X 500/230
HOLCOMB
1200 MW
WRAY
PAWNEESTORY
COMANCHE
SMOKY HILL
CORNER POINT
2 X 500/230
BIG SANDY2 X 500/230
BOONE2 X 500/230
LAMAR210 +90
DANIELS PARK3 X 345/230
WATERTON2 X 345/230
Double-ckt 230
New 345
New 230
Planned 345
Existing 230
New 500
150 miles
70 miles
80 miles
80miles
100miles
45 miles
80 miles MIDWAY2 X 500/230
3/09/06
65 miles
125 Mile Rd. Sub
500 kV Minimum for 1800 MW
BURLINGTON
2 X 500/230
HOLCOMB
1200 MW
WRAY
PAWNEESTORY
COMANCHE
SMOKY HILL
CORNER POINT
LAMAR ENERGY CENTER
2 X 500/230
600 MW
BIG SANDY2 X 500/230
BOONE2 X 500/230
LAMAR210 +90
DANIELS PARK3 X 345/230
WATERTON2 X 345/230
Double-ckt 230
New 345
New 230
Planned 345
Existing 230
New 500
150 miles
70 miles
80 miles
80miles
100miles
45 miles
80 miles MIDWAY2 X 500/230
3/09/06
65 miles
125 Mile Rd. Sub
EASTERN PLAINS TRANSMISSION PROJECT
1200 MW Cost Comparison Minimum 345 kV Cost – $598.1 Million Minimum 500 kV Cost – $715.8 Million Difference of $117.7 Million
► 20 MW Less Losses on 500 kV System► Average Cost of Energy $32.7/MWh► 70% Plant Factor► 26.4 Years to Payback
EASTERN PLAINS TRANSMISSION PROJECT
1800 MW Cost Comparison Minimum 345 kV Cost – $676.7 Million Minimum 500 kV Cost – $786.4 Million Difference of $109.7 Million
► 30 MW Less Losses on 500 kV System► Average Cost of Energy $32.7/MWh► 70% Plant Factor► 16.5 Years to Payback
EASTERN PLAINS TRANSMISSION PROJECT
Questions?