APPENDIX E:
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. 10 YEAR TRANSMISSION PROJECTS
Proceeding 18M-XXXXE 1 of 33
Colo
rado
PUC
E-Fil
ings
Syst
em
Tri-State's 2018 Ten Year Transmission Plan Projects Table of Contents
Burlington ‐ Burlington (KCEA) Rebuild ................................................................. E-3 Burlington-Lamar 345 230kV ................................................................................... E-6 Falcon-Midway 115 kV ............................................................................................ E-9 Falcon-Paddock-Calhan 69-115kV Line Rebuild ................................................... E-12 Lamar Front Range ................................................................................................. E-16 Lost Canyon ............................................................................................................ E-19 San Luis Valley-Poncha 230 kV Line #2 ................................................................ E-22 Southwest Weld Expansion .................................................................................... E-25 Sunshine-Telluride Line Uprate .............................................................................. E-28 Western Colorado Transmission Upgrade .............................................................. E-31
Proceeding 18M-XXXXE 2 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: Rebuild the existing Burlington ‐ Burlington (KCEA) 115kV line
Voltage Class: 115 kV
Facility Rating: 242 MVA
Point of Origin/Location: Burlington
Point of Termination: Burlington (KCEA)
Intermediate Points:
Length of Line (in Miles): 2.0
Type of Project: Transmission Line
Development Status: Planned
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Increase conductor thermal rating.
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $2,294,000
Schedule:
Construction Date:
Planned In‐Service Date: 2020
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Burlington ‐ Burlington (KCEA) Rebuild
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 3 of 33
#*
#*
#*#*Burlington
Burlington Generation
Burlington (KC)
Burlington (PSC)
Burlington - Landsman Creek
Bonn
y Cre
ek - B
urlin
gton
Burli
ngto
n - B
urlin
gton
(Kc)
Burlington (Kc) - Burlington (Psc)Burlington - W
aanibe Tap
Burlington-Burlington KCEA 115kV Transmission Line Rebuild
Document Path: \\hqstore\geostore\Products\CapitalProjects\GeoMaps\Maps\MXD\PP74_Burlington-BurlingtonKCEA115kVTransmissionLineRebuild.mxd
This map includes confidential information of Tri-State and third parties. The GIS data and maps may not be disclosed to any third party.The user agrees to keep this information confidential and notdisclose it to third parties. If you have any questions regardingthis, please contact the Tri-State legal department.GIS data and maps available to Tri-State Generation andTransmission Association employees are provided as generalinformation to aid Tri-State transmission maintenance. No user of Tri-State’s GIS data and maps may sell any portion of theinformation provided therein. Tri-State makes no warranteeregarding accuracy or completeness of the data and maps. Usersshall rely only upon proper field verification of Tri-State GIS data.Last Updated: 10/28/2015 Author: johhan0 0.6 1.20.3
Miles
Burlington - Burlington KCEA 115kV Transmission Line Rebuild
#* Station - Tri-State
#* Station - Other UtilityTransmission Line - Tri-StateProject AreaProject Feature
¹
Proceeding 18M-XXXXE 4 of 33
Burlington - Burlington (KCEA) Rebuild
Under peak loading conditions, the K.C. Electric Association (KCEA) 69kV system fed from Smoky Hill substation cannot be switched to the west to pick up additional load for the loss of the Limon source after the Smoky Hill transformer is replaced with a larger unit. To mitigate this limitation, Tri-State will rebuild the Burlington-Burlington (KCEA) line with 795kcmil ACSR “Drake” conductor. The increased capacity will additionally help K.C. Electric Association’s serve new load in the area.
Proceeding 18M-XXXXE 5 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: Construct a 230 kV transmission line from Burlington Substation to
Lamar Substation
Voltage Class: 230 kV
Facility Rating: 642 MVA
Point of Origin/Location: Burlington
Point of Termination: Lamar
Intermediate Points:
Length of Line (in Miles): 106 Miles
Type of Project: Transmission Line
Development Status: Under Construction
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Improve load‐serving capability, remove generation operating
restrictions & support renewable resource development in eastern
Colorado.
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $54,000,000
Schedule:
Construction Date:
Planned In‐Service Date: 2021
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Burlington‐Lamar 230 kV Transmission Project
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 6 of 33
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
BonnyCreek
Lamar (CO)
Waanibe Tap
Willow Creek
Eads
Holly
Lamso
Flagler
Waanibe
Granada
Arapahoe
Prowers
Holly Tap
Fort Lyon
Las Animas
Smoky HillSand Creek
Kit Carson
Flagler Tap
Cheyenne Wells
Kit Carson Tap
Boone - Lamar
Arapahoe-Waanibe
Finney - Lamar
Eads
- Tap
South Fork
BurlingtonLandsman Creek
Hell Creek Tap
Burlington Generation
HaleLiberty
Stratton
SagebrushHell Creek
Burlington (KC)Burlington (PSC)
Kit Carson Wind Power
Big Sandy - Landsman Creek
Boone - LamarFinney - Lamar
Eads
- Tap
Kit C
arso
n Tap
- Kit
Carso
n
Do cumen t Path: \\hqsto re\geo sto re\Pro ducts\SystemPlan n ing\2016_ PUC\Map s\MXD\Overview _ Burlingto n Lamar345_ 230kV.mxd
Last Up dated: 11/30/2015 Autho r: ricgar
0 9 184.5Miles
Tri-State GenerationTri-State Generationand Transmissionand Transmission
Burlington-Lamar 230kV
#* Station - Tri-State
#* Station - Other UtilityTransmission Line - Tri-StateTransmission Line - Other UtilityProject Area
¹
Tri-State Gen eratio n an d Tran smissio n Asso ciatio n p ro vides GISdata to aid the develo p men t o f Tri-State p ro jects. No user o f Tri-State’s GIS data and map s may sell an y p o rtio n o f the info rmatio np ro vided therein . Tri-State makes n o warran tee regardin gaccuracy o r co mp leten ess o f the data and map s. Users shall relyo n ly up o n p ro p er field verificatio n o f Tri-State GIS data.
Proceeding 18M-XXXXE 7 of 33
Burlington-Lamar 230kV Transmission Project Past studies in the Boone-Lamar area of Colorado have shown voltage collapse for the Boone- Lamar 230kV line outage with cross-trips of all generation injected at Lamar 230kV. In order to mitigate these violations and provide for future growth and potential new generation, Tri-State determined the best solution was to construct a new transmission line from the existing Burlington substation to the existing Lamar substation.
Proceeding 18M-XXXXE 8 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: Planned uprate of existing 115 kV line between Falcon and Midway.
Voltage Class: 115 kV
Facility Rating: 146 MVA
Point of Origin/Location: Falcon
Point of Termination: Midway
Intermediate Points: Geesen, Lorson Ranch, Rancho
Length of Line (in Miles): 27.0
Type of Project: Transmission Line
Development Status: Planned
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Increase conductor thermal rating.
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $5,616,000
Schedule:
Construction Date:
Planned In‐Service Date: 2021
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Falcon‐Midway 115 kV Line Uprate Project
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 9 of 33
#*
#*
#*
#*
#*
#*
Midway
Falcon
Geesen
LorsonRanch
Fountain Valley Gen
Schriever Air Force Base
Lincoln - Midway
Boone - Midway
Gees
en - R
anch
oFa
lcon -
Gee
sen
Geesen - Schriever
Falcon - Fuller
Docume nt Path: \\hqs tore \ge os tore \Products \Sys te mPlanning\2016_PUC\Maps\MXD\Ove rvie w_FalconMidwayLine Uprate .mxd
Las t Update d: 11/30/2015 Author: ricgar
0 2.5 51.25Mile s
Tri-State GenerationTri-State Generationand Transmissionand TransmissionFalcon – Midway Falcon – Midway 115 kV Line Uprate 115 kV Line Uprate
#* Station - Other UtilityTransmission Line - Tri-StateProject AreaProject Transmission Line - TSGT
¹
Tri-State Ge ne ration and Transmis s ion As s ociation provide s GISdata to aid the de ve lopme nt of Tri-State proje cts . No us e r of Tri-State ’s GIS data and maps may s e ll any portion of the informationprovide d the re in. Tri-State make s no warrante e re gardingaccuracy or comple te ne s s of the data and maps . Us e rs s hall re lyonly upon prope r fie ld ve rification of Tri-State GIS data.
Proceeding 18M-XXXXE 10 of 33
Falcon-Midway 115kV Line Uprate The current Falcon-Midway 115kV transmission line has a thermal rating of 95MVA, which leads to forecasted overloads by the summer of 2018 from an outage on Tri-State’s 115kV Falcon-Fuller line. In order to mitigate this problem, Tri-State is raising, moving, or rebuilding structures along the line to increase the overall line rating to 140MVA. The increased capacity will help serve Mountain View Electric Association’s (MVEA) customer load in the area. The project is being built and financed solely by Tri-State.
Proceeding 18M-XXXXE 11 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: Planned rebuild of existing 69kV line between Falcon and Calhan.
Voltage Class: 115 kV
Facility Rating: 242 MVA
Point of Origin/Location: Falcon
Point of Termination: Calhan
Intermediate Points: Paddock
Length of Line (in Miles): 25.0
Type of Project: Transmission Line and Substation
Development Status: Planned
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Increase conductor thermal rating and create 115kV loop.
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $33,400,000
Schedule:
Construction Date:
Planned In‐Service Date: 2022Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information: Chris Pink
Email [email protected]
Phone 303‐254‐3339
Website Information http://www.tristategt.org/transmissionPlanning/puc3627_Transmissi
Falcon‐Paddock‐Calhan 115kV
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 12 of 33
#0
#0
#0
#0
#0
#0
#0
FALCONFALCON- FULLER- FULLER
BLAC
K SQ
UIRR
EL - F
ULLE
RBL
ACK
SQUI
RREL
- FUL
LER
GEESEN - SCHRIEVERGEESEN - SCHRIEVER
FALC
ON - G
EESE
NFA
LCON
- GEE
SEN
GEESENGEESEN115kV115kV
PADDOCKPADDOCK115kV115kV
FALCONFALCON115kV115kV
SCHRIEVERSCHRIEVERAIR FORCEAIR FORCEBASE 115kVBASE 115kV
CLAREMONT230kV
FULLER230kV
MXD
Loca
tion:
P:\Pr
oduc
ts\Ca
pitalP
rojec
ts\Ge
oMap
s\Map
s\MXD
\PP25
_Falc
on_P
addo
ckLin
eReb
uild.m
xd
Tri-State Generationand TransmissionFalcon - Paddock 69 - 115kV Line Rebuild
0 1 20.5Miles
GIS data and maps available to Tri-State Generation and Transmission Association employees are provided as general information to aid Tri-State transmission maintenance. No user of Tri-State’s GIS data and maps may sell any portion of the information provided therein. Tri-State makes no warrantee regarding accuracy or completeness of the data and maps. Users shall rely only upon proper field verification of Tri-State GIS data.
This map includes confidential information of Tri-State and third parties. The GIS data and maps may not be disclosed to any third party. The user agrees to keep this information confidential and not disclose it to third parties. If you have any q uestions regarding this, please contact theTri-State legal department.
Date Created: 10/28/2014 Author: catcar
#0 Trans - Station - TSGT#0 Trans - Station - Other Utility
Transmission Line - TSGTTransmission Line - Other UtilityProject Area
Project Feature
¹
Proceeding 18M-XXXXE 13 of 33
Calhan - Paddock 115kV Line
CALHAN CALHAN
PEYTONPEYTON
PADDOCKPADDOCK
ELLICOTTELLICOTT
MERIDIAN RANCHMERIDIAN RANCH CALHAN - PEYTONCALHAN - PEYTON
Document Path: \\hqstore\geostore\Products\CapitalProjects\GeoMaps\Maps\MXD\PP22_Calhan_Paddock115kVLine.mxd
This map includes confidential information of Tri-State and third parties. The GIS data and maps may not be disclosed to any third party.The user agrees to keep this information confidential and notdisclose it to third parties. If you have any questions regardingthis, please contact the Tri-State legal department.GIS data and maps available to Tri-State Generation andTransmission Association employees are provided as generalinformation to aid Tri-State transmission maintenance. No user of Tri-State’s GIS data and maps may sell any portion of theinformation provided therein. Tri-State makes no warranteeregarding accuracy or completeness of the data and maps. Usersshall rely only upon proper field verification of Tri-State GIS data.Last Updated: 10/28/2014 Author: yanfaga0 1 20.5
Miles
Calhan-Paddock 115kV Line
Substation- Tri-StateTransmission Line- Tri-StateSubstation- Other UtilityTransmission Line- Other UtilityProject Area
Project Feature
Proceeding 18M-XXXXE 14 of 33
Falcon‐Paddock‐Calhan 115kV Line
The current Falcon – Paddock – Calhan 69 kV transmission line will be rebuilt to create a 115
kV loop in MVEA’s central system. The 115 kV line will improve system reliability by looping
the existing radial 115kV and 69kV substations in MVEA’s system and provide increased
voltage support. The 115 kV line will also help serve Mountain View Electric Association’s
(“MVEA”) customer load growth in the area. The project is being built and financed solely
by Tri‐State.
Proceeding 18M-XXXXE 15 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants: Public Service Company of Colorado/Xcel Energy
Project Description: Two high voltage transmission paths from Lamar Substation to Pueblo
area and a second path from Lamar to substations near Brush and/or
Deer Trail.
Voltage Class: 345 kV
Facility Rating: 2000 MW
Point of Origin/Location: Lamar, CO
Point of Termination: TBD: Comanche, Story, Pawnee, Avondale, Lamar, Lamar Energy
Center, Burlington, Big Sandy, Missile Site
Intermediate Points: Burlington, Big Sandy, Boone
Length of Line (in Miles): 300‐350
Type of Project: Transmission Line
Development Status: Conceptual
Routing: Burlington, Big Sandy, Boone
Subregional Planning Group: CCPG
Purpose of Project: Tri‐State reliability, system load‐serving connectivity as regional
power provider & future resources. Xcel Senate Bill 07‐100 &
reliability.
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $900,000,000
Schedule:
Construction Date:
Planned In‐Service Date: TBD
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Lamar Front Range Project
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 16 of 33
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
!( !(
!(!(
!(
!(
Arapahoe-Waanibe
Vilas 230 kV
Comanche 345/230kV
Missile Site 245/230kV
Big Sandy 345kV and 230/115kV
Burlington345/230kVand 230/115kV
Lamar EnergyCenter345kVSwitchboard/Lamar345/230kV
Horsetooth Tap
Wray
Carey
Limon
VilasLudlow
Lincoln
Reunion
La Junta
Limon Ct
WrayTap
Lyons Tap
Big Sandy
J.m Shafer
Walsenburg
South Fork
Vernon Tap
Burlington
Lamar (CO)
Limon (Kc)
North Yuma
Stem Beach
Henry Lake
Waanibe Tap
Erie SwitchLastChance
Kersey West
Van BremmerYork Canyon
Deering Lake
Crete Switch
Story 230 kV
Burro Canyon
Willow Creek
Story 345 KvLost Creek Tap
LandsmanCreek
Del Camino Tap
Black Squirrel
Hell Creek Tap
Olive Creek Tap
Pueblo West Tap
BlackForest Tap
Limon GenerationBurlingtonGeneration
Horsetooth Tap
Del CaminoSwitch
Knutson GenerationBrighton Knutson 230kV
Boone - Lamar
Vilas - Vilas Tap
Keota -Story
Boone - Midway
Boone - Lamar
Doc ument Path: \\hq store\geostore\Produc ts\SystemPlanning\2016_PUC\Map s\MXD\Overview_LamarFrontRangeProjec t.mxd
Last Updated: 11/30/2015 Author: ric gar
0 20 4010Miles
Tri-State GenerationTri-State Generationand Transmissionand TransmissionLamar-Front RangeLamar-Front RangeProjectProject
#* Station - Tri-StateTransmission Line - Tri-StateTransmission Line - Other UtilityProject AreaProject Feature
!( Project Feature ¹
Tri-State Generation and Transmission Assoc iation p rovides GISdata to aid the develop ment of Tri-State p rojec ts. No user of Tri-State’s GIS data and map s may sell any p ortion of the informationp rovided therein. Tri-State makes no warrantee regardingac c urac y or completeness of the data and map s. Users shall relyonly up on p roper field verific ation of Tri-State GIS data.
Proceeding 18M-XXXXE 17 of 33
Lamar Front Range Project
The Lamar-Front Range Project is a plan developed jointly through the CCPG to significantly improve load-serving capability, reliability, and potential resource accommodation in eastern and southeastern Colorado. The project could provide connectivity to the bulk transmission systems of Tri-State and PSCo, and provide strong “looped service” to areas with long radial transmission configurations. In concept, the project could create a transmission system capable of at least 2000 MW of new generation in eastern and southeastern Colorado.
This conceptual project identifies the transmission element additions that are needed to meet both companies’ needs, including delivery of future generation to loads in the Denver and Front Range areas. The present conceptual project involves double circuit 345 kV transmission lines connecting Lamar to the Pueblo area and Lamar to the Burlington and Big Sandy substations. Transmission connections in the Pueblo area and connections from Big Sandy to Missile Site, Story, and Pawnee are also currently being evaluated.
Proceeding 18M-XXXXE 18 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: New 115 kV transmission line between Lost Canyon and Main Switch
Substations.
Voltage Class: 115 kV
Facility Rating: 238 MVA
Point of Origin/Location: Lost Canyon
Point of Termination: Main Switch
Intermediate Points:
Length of Line (in Miles): 16.0
Type of Project: Transmission Line
Development Status: Planned
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Increase load serving capability of CO2 loop
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $17,800,000
Schedule:
Construction Date:
Planned In‐Service Date: 2022
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information: Chris Pink
[email protected] Email
Phone
Lost Canyon ‐ Main Switch 115 kV Line
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 19 of 33
!( !(#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*#*
#*
#*
#*
#*
Lost Canyon - Main Switch 115kV
Lost Canyon - Main Switch 115kV
Empire
Anasazi
Lost Canyon
GreatCut Tap
Main
Nuchu
Cortez
AaiolaMoqui C
Dolores
Fairview
Blue Door
GreatCut
Cahone Pump
East Cortez
Ruin Canyon
SandCanyon Cortez Hydro
Towaoc Canal
Basket Maker
Pleasant View
Fairview Pump
Goodman PointCortez Pipeline
Towaoc Canal Tap
Yellow Jacket West
Pleasant View Wapa
Great Cut PumpingPlant (Usbr)
Cahone - Empire
Lost Canyon - Shiprock
Lost
Cany
on - C
ureca
nti
Aaiol
a - P
leasa
nt Vi
ew
Tap -
Cah
one
Cortez Pipeline - Main
Docume nt Path: \\hqs tore \ge os tore \Products \Sys te mPlanning\2016_PUC\Maps\MXD\Ove rvie w_Los tCanyonMainSwitch115kV.mxd
Las t Update d: 11/19/2015 Author: yke vrop
0 2.5 51.25Mile s
Tri-State GenerationTri-State Generationand Transmissionand TransmissionLost Canyon - Main Lost Canyon - Main Switch 115kVSwitch 115kV
#* Station - Tri-State
#* Station - Other UtilityTransmission Line - Tri-StateTransmission Line - Other UtilityProject Area
!( Project Feature ¹
Tri-State Ge ne ration and Transmis s ion As s ociation provide s GISdata to aid the de ve lopme nt of Tri-State proje cts . No us e r of Tri-State ’s GIS data and maps may s e ll any portion of the informationprovide d the re in. Tri-State make s no warrante e re gardingaccuracy or comple te ne s s of the data and maps . Us e rs s hall re lyonly upon prope r fie ld ve rification of Tri-State GIS data.
Proceeding 18M-XXXXE 20 of 33
Lost Canyon – Main Swich 115 kV Line There is heavy load growth in the CO2 Loop consisting of the Yellow Jacket Switch-Main Switch-Sand Canyon-Hovenweep-Yellow Jacket 115 kV system. Constructing the new Lost Canyon-Main Switch 115 kV line will provide support to meet the future load growth for CO2 Loop.
Proceeding 18M-XXXXE 21 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants: Xcel Energy
Project Description: Construct a second 230 kV transmission line from San Luis Valley to
Poncha.
Voltage Class: 230 kV
Facility Rating: 631 MVA
Point of Origin/Location: San Luis Valley
Point of Termination: Poncha
Intermediate Points:
Length of Line (in Miles): 62 Miles
Type of Project: Transmission Line
Development Status: Planned
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Provide reliable and adequate load support to San Luis Valley
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $58,000,000
Schedule:
Construction Date:
Planned In‐Service Date: 2022
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
San Luis Valley‐Poncha 230 kV Line #2
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 22 of 33
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*#*
#*
#*
Ramon
Casa
Alkali
Waverly
Stanley Tap
Smeltertown
Plaza (Tsgt)San Luis Valley
Poncha - San Luis Valley
Stan
ley Ta
p - W
aver
ly
Plaza - Zinzer
Zinzer
Ansel
Center
Howard
Carmel
Poncha
Moffat
Blanca
Alamosa
Skinner
Kettle
Moffat
Stanley
Querida
Ox Cart
Highland
Saguache
Del Norte
La Garita
Canon West
South Fork
Ft Garland
Mirage Jct
Ray Lewis
Rio Grande
Hooper Tap
Canon CityCotter Mill
North Canon
Villa GroveKerber Creek
Mears Junction
Plaza (Slvrec)
Tallahassee Tap
Poncha JunctionSalida (Wapa/psco) Twelve Mile Canon West - Poncha
Fort Garland - Tap
Mosca Jct. - Moffat
Creede - Highland
Moffat - SaguacheOx Cart - Villa Grove
Doc ument Path: \\hq store\geostore\Produc ts\SystemPlanning\2016_PUC\Map s\MXD\Overview_SanLuisValley230kVLineDevelopment.mxd
Last Updated: 11/20/2015 Author: ykevrop
0 8 164Miles
Tri-State GenerationTri-State Generationand Transmissionand TransmissionSan Luis Valley 230kVSan Luis Valley 230kVLine DevelopmentLine Development
#* Station - Tri-State
#* Station - Other UtilityTransmission Line - Tri-StateTransmission Line - Other UtilityProject Area
¹
Tri-State Generation and Transmission Assoc iation p rovides GISdata to aid the development of Tri-State p rojec ts. No user of Tri-State’s GIS data and map s may sell any portion of the informationp rovided therein. Tri-State makes no warrantee regardingac c urac y or completeness of the data and map s. Users shall relyonly up on p roper field verific ation of Tri-State GIS data.
Proceeding 18M-XXXXE 23 of 33
San Luis Valley – Poncha 230 kV #2
New high-voltage transmission must be built in the San Luis Valley (SLV) region of south-central Colorado to restore electric system reliability and customer load-serving capability, and to accommodate development of potential generation resources. . Tri-State Generation and Transmission (Tri-State) and Public Service Company of Colorado (Public Service) facilitated a study effort through the Colorado Coordinated Planning Group (CCPG) to perform an evaluation of the transmission system immediately in and around the SLV and develop system alternatives that would improve the transmission system between the SLV and Poncha Springs (Poncha), Colorado. Both Tri-State and Public Service have electric customer loads in the SLV region that are served radially from transmission that originates at or near Poncha. The study concluded that, at a minimum, an additional 230 kV line is needed to increase system reliability. Studies show that this could be accomplished by either adding a new 230 kV line or rebuilding an existing lower voltage line to and operating it at 230 kV.
Proceeding 18M-XXXXE 24 of 33
Project Sponsor:
Additional Project Participants:
Project Description:
Tri‐State Generation and Transmission Association
Xcel Energy
Construct approximately 30 aggregated miles of 115 kV and 230 kV
transmission lines with six potential load‐serving substations and/or
line taps.
Voltage Class: 230 kV
Facility Rating: 300 MW
Point of Origin/Location: JM Shafer
Point of Termination: South Kersey, Henry Lake
Intermediate Points: Davis, Colfer (Hudson), Rattlesnake Ridge, Neres Canal, Greenhouse
Length of Line (in Miles):
Type of Project:
Development Status:
30 miles
Transmission Line and Substation Under Construction
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Load‐serving
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $70,000,000
Schedule:
Construction Date:
Planned In‐Service Date: 2022
Regulatory Info: CPCN filed 8/2014
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Southwest Weld Expansion Project
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 25 of 33
!(!(
!(
!(!(
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
Milton
Colfer
Greenhouse
Neres Canal
Rattlesnake Ridge
J.m Shafer
Henry Lake
Erie Switch
Kersey West
Del Camino Switch
Henry Lake - StoryErie - Sipres Henry Lake - Sipres
RMEC
Evans
Davis
Ennis
Hudson
DaconoFulton
Sipres
Kersey
Vasquez
Bromley
Spindle
Rosedale
Lochbuie
Highland
Gilcrest
Lasalle Johnstown
Unc Cogen
Box Elder
FrederickDavis Tap
Godfrey Sw
Keenesburg
Unc SwitchBoomerang
Kersey Tap
Fort Lupton
Rinn Valley
South Kersey
Platte Valley
Arrowhead Lake
Brighton 34.5kv
Del Camino (Up)
Hanger 160 Solar
Fort Saint Vrain
United Power Solar
Erie - Hoyt
Fort Lupton - Pawnee
Weld
- For
t St. V
rain
Ennis - Hudson
Parkway - Fulton
Windsor - Fort St Vrain
Vasq
uez -
Fort
Lupt
on
Rosedale - Weld
Box Elder 44kv - Tap
Gree
n Vall
ey - K
eene
sbur
g
Hudson - Ft Lupton
Gilcrest 44kv - Lasalle 44kv
Keenesburg - RMEC
Docume nt Path: \\hqs tore \ge os tore \Products \Sys te mPlanning\2016_PUC\Maps\MXD\Ove rvie w_Southw e s tWe ldExpansionProje ct.mxd
Las t Update d: 11/20/2015 Author: yke vrop
0 2.5 51.25Mile s
Tri-State GenerationTri-State Generationand Transmissionand TransmissionSouthwest Weld Southwest Weld Expansion ProjectExpansion Project
#* Station - Tri-State
#* Station - Other UtilityTransmission Line - Tri-StateTransmission Line - Other UtilityProject AreaProject Feature
!( Project Feature ¹
Tri-State Ge ne ration and Transmis s ion As s ociation provide s GISdata to aid the de ve lopme nt of Tri-State proje cts . No us e r of Tri-State ’s GIS data and maps may s e ll any portion of the informationprovide d the re in. Tri-State make s no warrante e re gardingaccuracy or comple te ne s s of the data and maps . Us e rs s hall re lyonly upon prope r fie ld ve rification of Tri-State GIS data.
Proceeding 18M-XXXXE 26 of 33
Southwest Weld Expansion Project
Due to large scale oil and gas development in Southwest Weld County and native load growth, Tri-State is planning on constructing approximately 30 aggregate miles of 115kV and 230 kV transmission lines to meet the forecasted demand of approximately 300MW within the next five years. Six potential 115kV load-serving substations and/or line taps will be constructed by Tri- State, while new 69kV transmission lines and substations will be constructed by United Power for the project.
Proceeding 18M-XXXXE 27 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: Convert Sunshine‐Telluride to 115kV & Sunshine Reactor Addition
Voltage Class: 115 kV
Facility Rating: 95 MVA
Point of Origin/Location: Sunshine
Point of Termination: Telluride
Intermediate Points:
Length of Line (in Miles): 4.8
Type of Project: Transmission Line and Substation
Development Status: Under Construction
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Create room at Sunshine for mobile transformer and reactor
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $3,063,000
Schedule:
Construction Date:
Planned In‐Service Date: 2019
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Sunshine‐Telluride Line Uprate & Reactor Addition
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 28 of 33
#*
#*
#*Sunshine
Telluride
Suns
hine -
Tellu
rideSunshine - Wilson Mesa
Docum ent Path: \\hqsto re\geo sto re\Pro ducts\Ca p italPro jects\GeoMa p s\Ma p s\MXD\PP89_Sunshine_Telluride69_115kVUp rate.m xd
La st Updated: 11/1/2016 Autho r: kevro p
0 0.5 10.25Miles
Sunshine-Telluride Line Uprate
#* Statio n - Tri-State
#* Statio n - Other UtilityTra n sm issio n Line - Tri-StatePro ject AreaPro ject Feature
¹
This m a p includes co nfidential info rm atio n o f Tri-State a nd third p a rties.The GIS data a nd m a p s m a y n o t be disclo sed to a n y third p a rty. The useragrees to keep this info rm atio n co nfidential a nd n o t disclo se it to thirdp a rties. If yo u ha ve a n y questio n s rega rding this, plea se co ntact the Tri-State legal dep a rtm ent.GIS data a nd m a p s a vailable to Tri-State Generatio n a nd Tra n sm issio nAsso ciatio n em p lo yees a re p ro vided a s general info rm atio n to aid Tri-Statetra n sm issio n m ainten a nce. No user of Tri-State’s GIS data a nd m a p s m a ysell a n y p o rtio n o f the info rm atio n p ro vided therein. Tri-State m akes n ow a rra ntee rega rding accuracy o r co m p leteness o f the data a nd m a p s. Usersshall rely o nly up o n p ro p er field verificatio n o f Tri-State GIS data.
Proceeding 18M-XXXXE 29 of 33
Sunshine-Telluride Line Uprate
Tri-State has identified the need for additional space at Sunshine substation to allow connection of a 115-69 kV mobile transformer in emergency conditions, as well as connection of a new 16 MVAR reactor to supplement and backup the existing Norwood reactor used to mitigate high voltages in the area. To create additional space, the existing Sunshine-Telluride 69 kV line will be re-energized at 115 kV and the Sunshine 115-69 kV transformer will be removed. Energizing the Sunshine – Telluride line at 115 kV will additionally improve load serving capability at Telluride.
Proceeding 18M-XXXXE 30 of 33
Project Sponsor: Tri‐State Generation and Transmission Association
Additional Project Participants:
Project Description: Upgrade existing transmission line and facilities from Montrose
Substation to Cahone Substation from 115 kV to 230 kV construction.
A new Maverick 115kV substation will be constructed near Nucla
substation. The existing Nucla ‐ Norwood 115kV line will sectionalize
at Maverick substation.
Voltage Class: 230 kV
Facility Rating: 645 MVA
Point of Origin/Location: Montrose
Point of Termination: Cahone
Intermediate Points: Nucla, Maverick
Length of Line (in Miles): 80 Miles
Type of Project: Transmission Line and Substation
Development Status: Under Construction
Routing:
Subregional Planning Group: CCPG
Purpose of Project: Reliability ‐ eliminate need for existing Nucla Remedial Action Scheme
and replace failing structures.
Project Driver (Primary): Reliability
Project Driver (Secondary):
Estimated Cost (in 2014 Dollars): $120,000,000
Schedule:
Construction Date: 2014
Planned In‐Service Date: 2019
Regulatory Info:
Regulatory Date:
Permitting Info:
Permitting Date:
Contact Information:
Phone
Chris Pink
303‐254‐3339
Western Colorado Transmission Upgrade Project
Tri‐State Generation and Transmission Association
2018‐2028 Transmission Plan
Proceeding 18M-XXXXE 31 of 33
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*#*
#*
#*#*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
Nucla
Cahone
Empire
Anasazi
Norwood
Telluride
Cow Creek
MolasTap
HotchkissDoughspoon
Wilson Mesa
Happy CanyonMontrose 115Montrose
345
StarrNelson
Peach Valley
GreatCut Tap
Garnet Mesa Tap
Spring CreekTap
Nucla Generation
Burro Bridge
SilvertonTap
Document Path: \\hq s tore\geos tore\Prod ucts \Sys temPlanning\2016_PUC\Maps\MXD\Overview_Wes ternColorad oTransmis s ionLine.mxd
Las t Upd ated : 12/16/2015 Author: ykevrop
0 7.5 153.75Miles
Tri-State GenerationTri-State Generationand Transmissionand TransmissionWestern ColoradoWestern ColoradoTransmission UpgradeTransmission UpgradeProjectProject
#* Station - Tri-State
#* Station - Other UtilityTransmission Line - Tri-StateTransmission Line - Other UtilityProject Area
¹
Tri-State Generation and Transmis s ion As s ociation provid es GISd ata to aid the d evelopment of Tri-State projects . No user of Tri-State’s GIS d ata and maps may sell any portion of the informationprovid ed therein. Tri-State makes no warrantee regard ingaccuracy or completenes s of the d ata and maps . Us ers s hall relyonly upon proper field verification of Tri-State GIS d ata.
Proceeding 18M-XXXXE 32 of 33
Western Colorado Transmission Upgrade Project (Montrose-Nucla-Cahone 230 kV Line) The 40 mile long Montrose – Nucla and Nucla – Cahone 115kV transmission lines are old, overloaded, undersized, and must be rebuilt. To ensure continued reliability of the southwest Colorado transmission system, Tri-State is replacing them with new, higher capacity lines rated for 230kV operation. This project will increase the load serving capability of the southwest Colorado transmission system and also eliminate the need for the existing Nucla Remedial Action Scheme (RAS), which trips the Montrose-Nucla line when it starts to overload after contingencies/outages in the area.
Proceeding 18M-XXXXE 33 of 33