PROJECT : 2x150MW SLPGC CFB POWER PLANT PHASE 1JOB SAFETY ANALYSIS
Activity : Earth works
JSA Responsible Supervisor / Foreman JSA ParticipantsJSA: 1. 4. 1. Rolando C. Vidallon - SO 4
.Ronald Corpuz – Supt. 7. Bayani Abines -
EIC
Rev: 0 2. 5. 2. Freddie Ragaas - CQC 5.
Almer Bahingawan - FE 8.
Date: June 04, 2013 3. 6. 3. Ronald Navotas - CQC 6.
Jade Dumanon - FE 9.
Prepared:
Rolando C. Vidallon 06-04--13
Reviewed:
Crisostomo D. Ibarra
06-04-13
Approved:
Roberto A. Bacena 06-04-13
Safety Officer Signature Date Project In-charge Signature Date Project Director Signature/Date
Project Name: 2x150MW SLPGC CFB POWER PLANT Contract No.:
Review Comments Revision Details
Accomplish attachment 1:
Rev
0
Date By
SO
Initial
RCV
Act No Job Steps Hazards Identified System and Checks Needed Action By
1. >GENERAL JOB REQUIREMENTS
>Unsafe work practices, >Short-cut methods,>Unsafe act and Unsafe condition.
>A tool box talk shall be conducted with field supervisor, subcontractor and workers involved to various activities based on targeted daily accomplishment.
Site SupervisorSafety Officer.Field Engineer
2. >MOBILIZATION FOR WORK
>Slip, Trip, Fall.( soil collapse /cave in /erosion )>Noise pollution,>Dust production. >Engaging unskilled and unexperienced workers may contribute to hazard or injury.>Misguided personnel>Misuse of PPE may lead to future LTA.>Health hazard
>Are proper Personal Protective Equipment Issued and actually used on site? e.g. :>Ear plug, Ear muff, Dust mask, Safety goggles, safety gloves, Full body harness. Safety boots etc.> Is there proper Illumination at work place?> Does the company engage skilled and well experienced workers only?> Are the employee fit to work? ( verify medical records)> Daily Monitoring on all scope of work, e.g. Hot works, rebar, concrete pouring (etc.).
Safety OfficerContractorAdminSupervisorStock clerkWorkersField EngineerProject Nurse
Page 1 of 4
PROJECT : 2x150MW SLPGC CFB POWER PLANT PHASE 1JOB SAFETY ANALYSIS
Activity : Earth works
> Conduct Safety orientation to all personnel>Provide safety signage
Act No Job Steps Hazards Identified System and Checks Needed Action By
3. >EQUIPMENT MOBILIZATION
>Bad equipment>Unauthorized operator>Fire hazard>Uncontrolled vehicle movement>Moving / Speedy vehicles.> Dump trucks>Traffic, / congestion
>Do Heavy equipment has the 3rd party certification? Are they properly inspected and labelled.>Are Operators well trained and has 2 yrs. license and undergone defensive driving?>Does the Equipment have fire extinguisher?>Are the Equipment in good working condition and with maintenance record?>Does the required speed limit of10 kph per vehicle maintained on site?
Safety OfficerEquipment In-chargeGuard on Duty
4. >CLEARING AND GRUBBING
>Noise pollution due to equipment operation.>Dust production>Bad Equipment>Oil spill>Bad weather condition
>Are equipment in proper maintenance?>Regular check needed>Maintain dewatering at site>Check the specific area to be cleared.>Proper PPE required e.g. Dust mask, Goggles, etc.
OperatorEquipment in-chargeSafety Officer
Page 2 of 4
PROJECT : 2x150MW SLPGC CFB POWER PLANT PHASE 1JOB SAFETY ANALYSIS
Activity : Earth works
Act No Job Steps Hazards Identified System and Checks Needed Action By
5. >EXCAVATION > Excavation collapse, soil erosion >Persons and Equipment / Vehicles fall on excavated area,>Workers being struck by excavating equipment.>Bad Weather condition.
>Check Proper excavation procedure / e.g. Sloping technique>Consistently monitor vibration near excavated areas.>Secure excavated area with caution tape and Signage as well.>Proper PPE.>Competent Equipment Operator.>Workers must position themselves in the areas where the operator has a clear view of them, get focused on their job always. >Constant communication must establish> Conduct Toolbox talk and obtain work permit.>Always consider daily weather condition prior to activity. >No equipment shall stay at excavated areas whenever there is an extreme bad weather condition e.g. typhoon, (etc.)>Rain coat, safety boots, flash lights are to be provided for adequate protection.
Equipment Operator,Safety Officer,Equipment In-charge,Site SupervisorContractorField Engineer
Page 3 of 4
PROJECT : 2x150MW SLPGC CFB POWER PLANT PHASE 1JOB SAFETY ANALYSIS
Activity : Earth works
Act No Job Steps Hazards Identified System and Checks Needed Action By
6. BACKFILLING >Damage to other adjacent or nearby obstruction or properties.>Collapse of excavation>Driving through uneven embankment causing equipment to bog down.>Open excavated areas without any warning or signage may cause accident.>Unsafe practice of running dump >Dust production (health hazard)
> A survey shall be carried out to assess risks to any adjacent structures and or Utilities that may exist. >Operators shall be brief on any identified potential hazard.>Unauthorized personnel shall be excluded from areas where the back filling of excavation is taking place. >Spotter shall assist / monitor the backfilling operations in order to prevent any possible equipment damage.>Both Equipment and Operator shall have certification.>Right Equipment for the job. e.g.Backhoe, Grader, Road roller, Dump truck, Water truck etc. >Proper signage to be deployed on site
OperatorSpotter / BanksmenSafety OfficerContractorSite SupervisorsField Engineer
CHANGING CONDITIONS & EMERGENCY PROCEDURES: Stop work, switch off equipments, Supervisor directs personnel to nearest and safest Muster Point. Supervisor accounts for all workers.
Page 4 of 4