Dup Led Wall
2
August 15, 2015 Dear Mr. Casalan This is to formally submit our quotation regarding the technical requirements subject to the following terms and conditions: Event Date: August 18 to Sept 13, 2015 Set up: August 18, 2015 Pull out: September 13, 2015 Venue: WILFREDO GUERRERO THEATER PALMA HALL UNIVERSITY OF THE PHILIPPINES -DILIMAN Client: MR. MANNY CASALAN DULAANG UP PRODUCTION MANAGER P A R T I C U L A R S: RENTAL OF LED VIDEO WALL 1 SET 7’ x 9’ LED VIDEO WALL (P6) 1 UNIT PROCESSOR 1 LOT CABLES & CONNECTORS 1 LOT POWER CORDS TOTAL: Php 50,000.00 (TOTAL VAT INC. TERMS & CONDITION: GOVERNMENT TERMS Thank you, Arnold Sanchez
-
Upload
mark-mirando -
Category
Documents
-
view
212 -
download
0
description
LED
Transcript of Dup Led Wall
August 15, 2015
Dear Mr. Casalan
This is to formally submit our quotation regarding the technical requirements subject to the following terms and conditions:
Event Date: August 18 to Sept 13, 2015Set up: August 18, 2015Pull out: September 13, 2015Venue: WILFREDO GUERRERO THEATER
PALMA HALLUNIVERSITY OF THE PHILIPPINES -DILIMAN
Client: MR. MANNY CASALANDULAANG UP PRODUCTION MANAGER
P A R T I C U L A R S: RENTAL OF LED VIDEO WALL
1 SET 7’ x 9’ LED VIDEO WALL (P6)1 UNIT PROCESSOR 1 LOT CABLES & CONNECTORS1 LOT POWER CORDS
TOTAL: Php 50,000.00 (TOTAL VAT INC.
TERMS & CONDITION: GOVERNMENT TERMS
Thank you,
Arnold SanchezSALES & OPERATIONS
Conformed: MANNY CASALANDUP PRODUCTION MANAGER