August 15, 2015 Dear Mr. Casalan This is to formally submit our quotation regarding the technical requirements subject to the following terms and conditions: Event Date: August 18 to Sept 13, 2015 Set up: August 18, 2015 Pull out: September 13, 2015 Venue: WILFREDO GUERRERO THEATER PALMA HALL UNIVERSITY OF THE PHILIPPINES -DILIMAN Client: MR. MANNY CASALAN DULAANG UP PRODUCTION MANAGER P A R T I C U L A R S: RENTAL OF LED VIDEO WALL 1 SET 7’ x 9’ LED VIDEO WALL (P6) 1 UNIT PROCESSOR 1 LOT CABLES & CONNECTORS 1 LOT POWER CORDS TOTAL: Php 50,000.00 (TOTAL VAT INC. TERMS & CONDITION: GOVERNMENT TERMS Thank you, Arnold Sanchez

description

LED

Transcript of Dup Led Wall

Page 1: Dup Led Wall

August 15, 2015

Dear Mr. Casalan

This is to formally submit our quotation regarding the technical requirements subject to the following terms and conditions:  

Event Date: August 18 to Sept 13, 2015Set up: August 18, 2015Pull out: September 13, 2015Venue: WILFREDO GUERRERO THEATER

PALMA HALLUNIVERSITY OF THE PHILIPPINES -DILIMAN

Client: MR. MANNY CASALANDULAANG UP PRODUCTION MANAGER

P A R T I C U L A R S: RENTAL OF LED VIDEO WALL

1 SET 7’ x 9’ LED VIDEO WALL (P6)1 UNIT PROCESSOR 1 LOT CABLES & CONNECTORS1 LOT POWER CORDS

TOTAL: Php 50,000.00 (TOTAL VAT INC.

TERMS & CONDITION: GOVERNMENT TERMS

Thank you,

Arnold SanchezSALES & OPERATIONS

Conformed: MANNY CASALANDUP PRODUCTION MANAGER