DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY...
Transcript of DSA Inspectors Arcadia USD Arcadia HS · 2014. 5. 5. · DSA 155 PROJECT INSPECTOR SEMI-MONTHLY...
DSA Inspectors
Arcadia USD
Arcadia HSCampus Enrichment
Inspection ReportApr 2014
ArchitectLPA Architects
DSA Application No. A03-111889
33 Narcissa Drive, Rancho Palos Verdes, CA 90275 | (626) 786-4331 | [email protected]
Issued 03/21/13 Page 1 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA
This form shall be completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Section 4-337and submitted to the DSA.
PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD: (Continues on Page 2)
STATUS OF CONSTRUCTION WORK:
Bldg B Electrical and plumbing rough in has begun
Bldg P (East Portion - Cafeteria) Demo and abatement is ongoing
Bldg O oranamental fencing is being installed
Bldg U framing, electrical, HVAC and Plumbing is ongoing
Site-work site utilities are ongoing, Main walkway canopy north half is complete
OUTSTANDING DEVIATION NOTICES: (List “Notice Numbers” used on forms DSA 154.)
Notice issued for storefront window system being installed without approval from DSA on the deferred approval
RESOLVED DEVIATION NOTICES: (List the “Notice Numbers” used on forms DSA 154.)
None.
School District/Owner: Arcadia Unified School District DSA File #: 19 - H32
Project Name/School: Arcadia High School – Campus Enrichment DSA App. #: 03 - 111889
From: Building #(s)
(As identified on the plans): C, D, E, F, G, H, K, O, P, W, and Rally Court (site)
Kenneth Burr
DSA Project Inspector Certification #: Cert 5654, Class 1
Report #: 43 Page 1 of 2 Date of Report: 5/5/2014 DSA 152 Card #(s):
N/A
(List above all building numbers and inspection card numbers for which this report applies.)
REPORTING PERIOD DATES
From: 4/1/14 To: 4/15/14
Construction project is estimated to be 78 % complete at this time.
DSA 155
PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13
Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA
Report #: 43 Page 2 of 2 Date of Report: 5/5/2014 DSA App. #: 03 - 111889
PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD (Continued from Page 1)
QUESTIONS OR UNUSUAL CONDITIONS: (List any questions or unusual conditions encountered.)
None
PROBLEMS OR NON-COMPLYING CONDITIONS:
(List any problems or non-complying conditions and how they were resolved.)
[1] All Addenda are approved
[2] Storefront Deferred Approval Submittal not DSA-Approved. A/E review comments returned to GC and sub-contractor 4.18.13.
INSTRUCTIONS RECEIVED FROM THE ARCHITECT OR REGISTERED ENGINEER: (List any.)
None.
OFFICIAL SITE VISITORS: (List any and whom they represent. May include, architects, registered engineers, school district representatives, DSA field representative, etc.) .
Weekly Owner/Architect/Contractor meetings. Owner’s Rep and Architect in attendance.
Submit completed form electronically to the DSA Regional Office with construction oversight authority for the project:
DSA OAKLAND
DSA SACRAMENTO
DSA LOS ANGELES
DSA SAN DIEGO
Issued 03/21/13 Page 1 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA
This form shall be completed by the Project Inspector, in accordance with California Code of Regulations, Title 24, Part 1, Section 4-337and submitted to the DSA.
PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD: (Continues on Page 2)
STATUS OF CONSTRUCTION WORK:
Bldg B Electrical and plumbing rough in has begun
Bldg P (East Portion - Cafeteria) Demo and abatement is ongoing
Bldg O oranamental fencing is being installed
Bldg U framing, electrical, HVAC and Plumbing is ongoing
Site-work site utilities are ongoing, Main walkway canopy north half is complete
OUTSTANDING DEVIATION NOTICES: (List “Notice Numbers” used on forms DSA 154.)
Notice issued for storefront window system being installed without approval from DSA on the deferred approval
RESOLVED DEVIATION NOTICES: (List the “Notice Numbers” used on forms DSA 154.)
None.
School District/Owner: Arcadia Unified School District DSA File #: 19 - H32
Project Name/School: Arcadia High School – Campus Enrichment DSA App. #: 03 - 111889
From: Building #(s)
(As identified on the plans): C, D, E, F, G, H, K, O, P, W, and Rally Court (site)
Kenneth Burr
DSA Project Inspector Certification #: Cert 5654, Class 1
Report #: 44 Page 1 of 2 Date of Report: 4/18/2014 DSA 152 Card #(s):
N/A
(List above all building numbers and inspection card numbers for which this report applies.)
REPORTING PERIOD DATES
From: 4/16/14 To: 4/30/14
Construction project is estimated to be 78 % complete at this time.
DSA 155
PROJECT INSPECTOR SEMI-MONTHLY REPORT Issued 03/21/13
Issued 03/21/13 Page 2 of 2 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA
Report #: 44 Page 2 of 2 Date of Report: 4/18/2014 DSA App. #: 03 - 111889
PROVIDE THE FOLLOWING INFORMATION FOR THE REPORTING TIME PERIOD (Continued from Page 1)
QUESTIONS OR UNUSUAL CONDITIONS: (List any questions or unusual conditions encountered.)
None
PROBLEMS OR NON-COMPLYING CONDITIONS:
(List any problems or non-complying conditions and how they were resolved.)
[1] All Addenda are approved
[2] Storefront Deferred Approval Submittal not DSA-Approved. A/E review comments returned to GC and sub-contractor 4.18.13.
INSTRUCTIONS RECEIVED FROM THE ARCHITECT OR REGISTERED ENGINEER: (List any.)
None.
OFFICIAL SITE VISITORS: (List any and whom they represent. May include, architects, registered engineers, school district representatives, DSA field representative, etc.) .
Weekly Owner/Architect/Contractor meetings. Owner’s Rep and Architect in attendance.
Submit completed form electronically to the DSA Regional Office with construction oversight authority for the project:
DSA OAKLAND
DSA SACRAMENTO
DSA LOS ANGELES
DSA SAN DIEGO
Arcadia High SchoolWeek of April 04, 2014
Top right termite damage to header in the cafeteriaTop left Ductwork delivery to the libraryBottom Right laying out for circle soffitBottom left framing block for circle soffit
Arcadia high SchoolWeek of April 11, 2014
Top Right duct being installed in the libraryTop Left framing the circle soffitBottom Right framing the circle soffitBottom Left trenching for the storm drain at the library
Arcadia High SchoolWeek of April 18, 2014
Top Right waste and vent lines in the restrooms by student storeTop Left site demo south side of JBottom Right circle soffit framing in the libraryBottom Left restroom walls in the library
Arcadia High SchoolWeek of April 30, 2014
Top Right site water valves south side of JTop Left water valves and gas linne under storm drainBottom Right ductwork installed with flexes attachedBottom Left circle soffit framing with recessed lighting
KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107
Campus Enrichment Project Daily Report
Daniel Alberico Phone: none
DSA #4269 Fax: none
Cell: (818) 402-7163
Email: [email protected]
April 1, 2014 Overcast, 65
Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32
180 Campus Dr, Arcadia, Ca 91007
Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 7-Carpenters on framing crew at the library installing steel beams for the Hvac roof units, forming for bathroom curbs and epoxing allrthread bolts. 2- Miller Demolition workers at building P continue demolition at the restrooms in building P and start demolition of shear wall on west side of building. 2-Murry company Plumbers continue roof drain installation. 3- Insulation workers installing wall insulation at building B. 4- TSI steel workers installing steel beams at roof for Hvac units. SPECIAL INSPECTION: Nino and Moore Steel Inspector on site at building U repair to existing beams Per RFI #83. MEETINGS: none DEVIATIONS: none REMARKS: DSA field Engineer-Natu Patel on site and issued Field Note #9 and jobwalk.
KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107
Campus Enrichment Project Daily Report
Daniel Alberico Phone: none
DSA #4269 Fax: none
Cell: (818) 402-7163
Email: [email protected]
April 2, 2014 Clear, 65
Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32
180 Campus Dr, Arcadia, Ca 91007
Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 5-Carpenters on framing crew at the library installing roof blocking, misc, forming for bathroom curbs. 2- Miller Demolition workers continue demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing gas line, and roof drain strubs on the north side of building U. 3- Drywall workers start installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units.
SPECIAL INSPECTION: none
MEETINGS: none DEVIATIONS: none REMARKS: none
KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107
Campus Enrichment Project Daily Report
Daniel Alberico Phone: none
DSA #4269 Fax: none
Cell: (818) 402-7163
Email: [email protected]
April 3, 2014 Clear, 65
Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32
180 Campus Dr, Arcadia, Ca 91007
Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 5-Carpenters on framing crew at the library installing roof blocking, misc, forming for bathroom curbs, rebar. 2- Miller Demolition workers completed demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing gas line, and roof drain strubs on the north side of building U. 3- Drywall workers continue installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units.
SPECIAL INSPECTION: none
MEETINGS: none DEVIATIONS: none REMARKS: none
KNOWLAND CONSTRUCTION SERVICES 2181 E. FOOTHILL BOULEVARD, SUITE 203, PASADENA, CA 91107
Campus Enrichment Project Daily Report
Daniel Alberico Phone: none
DSA #4269 Fax: none
Cell: (818) 402-7163
Email: [email protected]
April 4, 2014 Clear, 65
Project: Arcadia High School-Campus Enrichment A#03-111-889 File No. 19-H32
180 Campus Dr, Arcadia, Ca 91007
Architect: LPA Architects Construction Manager: McCarthy Building Companies Testing Laboratory: Nino and Moore General Contractor: McCarthy Building Companies WORK COMPLETED: 5-Carpenters on framing crew at the library installing soffits, misc, forming for bathroom curbs, rebar. 2- Miller Demolition workers removing demolition of building U masonry screen wall on the north-west corner of building. 2-Murry company Plumbers installing roof drain lines at building U. 3- Drywall workers continue installing drywall at building P. 4- TSI steel workers installing steel beams at roof for Hvac units.
SPECIAL INSPECTION: none
MEETINGS: none DEVIATIONS: none REMARKS: none
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/7/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
6 Framers framing soffits and wall sin building U
7 Electrical roughing in conduits in building B and conduits in the walls at U
3 Plumbers roughing in waste and vent lines in the student store
5 Demo demoing walls in the cafeteria
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/8/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
6 Framers framing soffits and wall sin building U
7 Electrical roughing in conduits in building B and conduits in the walls at U
3 Plumbers roughing in waste and vent lines in the student store
5 Demo demoing walls in the cafeteria
4 Painters painting canopy east side of the finger buildings
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/9/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
6 Framers framing soffits and wall sin building U
7 Electrical roughing in conduits in building B and conduits in the walls at U
3 Plumbers roughing in waste and vent lines in the student store
5 Demo demoing walls in the cafeteria
4 Painters painting canopy east side of the finger buildings
3 SS erecting the supports on the underside of library roof for hvac supports
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/10/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
6 Framers framing soffits and wall sin building U
5 Plumbers roughing in waste and vent lines in the student store
5 Demo demoing walls in the cafeteria
4 Painters painting canopy east side of the finger buildings
2 Glazers installing blackout windows in the finger buildings
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/11/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
5 Framers framing soffits and wall sin building U
5 Demo demoing walls in the cafeteria
4 Painters painting canopy east side of the finger buildings
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/14/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
5 Framers framing soffits and walls in building U
5 Demo demoing walls in the cafeteria
4 Painters painting canopy east side of the finger buildings
1 Lather placing expanded metal in plaster patch areas
3 Plumbers waste and vent in the student store, welding gas line for U
6 Electrical conduits and boxes rough in the library
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/15/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
5 Framers framing soffits and walls in building U
4 Demo demoing walls in the cafeteria
4 Painters painting canopy east side of the finger buildings
1 Lather placing expanded metal in plaster patch areas
4 Plumbers waste and vent in the student store, welding gas line for U
8 Electrical conduits and boxes rough in the library
2 HVAC setting controls on the rooftop units
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/16/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
5 Framers framing soffits and walls in building U
2 Concrete floating bottoms of windows in U to level the aluminum frames
4 Painters painting canopy east side of the finger buildings
4 Plumbers waste and vent in the student store, welding gas line for U
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/17/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
5 Framers framing soffits and walls in building U
2 Concrete floating bottoms of windows in U to level the aluminum frames
4 Plumbers waste and vent in the student store, welding gas line for U
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/17/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
5 Framers framing soffits and walls in building U
3 Concrete floating bottoms of windows in U to level the aluminum frames
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/21/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 Graders grading the restroom and the student store
4 SS erecting the equipment screen on the roof of the library
6 Framers framing soffits, walls and window infills in the library
3 Utility trenching for gas and water on the south side of building J
7 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/22/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 Graders grading the restroom and the student store
3 SS erecting the equipment screen on the roof of the library
7 Framers framing soffits, walls and window infills in the library
3 Utility trenching for gas and water on the south side of building J
7 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P
5 Paint painting classrooms in building B
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/23/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 Graders grading the restroom and the student store
3 SS erecting the equipment screen on the roof of the library
9 Framers framing soffits, walls and window infills in the library
3 Utility trenching for gas and water on the south side of building J
8 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P
5 Paint painting classrooms in building B
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/24/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 SS erecting the equipment screen on the roof of the library
9 Framers framing soffits, walls and window infills in the library
8 Electrical roughing in conduits in the library and trenching and placing conduits under slab in P
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/25/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 SS erecting the equipment screen on the roof of the library
9 Framers framing soffits, walls and window infills in the library
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/28/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 SS erecting the equipment screen on the roof of the library
6 Framers framing soffits, walls and window infills in the library
4 Demo sealing columns in the library with exposed mastic
3 Plumbers sewer and water tie in at student store
5 Electrical rough in at U and P
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/29/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 SS erecting the equipment screen on the roof of the library
6 Framers framing soffits, walls and window infills in the library
4 Demo sealing columns in the library with exposed mastic
3 Plumbers sewer and water tie in at student store
5 Electrical rough in at U and P
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None
Knowland Construction
33 Narcissa Dr. Palos Verdes, CA. 90275
KNOWLAND CONSTRUCTION SERVICES
Daily Report
Kenneth Burr Phone: (951) 258-5174 DSA Project Inspector Email: [email protected] Class 1 #5654
Date: 4/30/2014
Project: Arcadia High School Arcadia USD Campus Enrichment A03-111889 Architect: LPA Architects Testing Laboratory: Ninyo and Moore General Contractor: McCarthy WORK COMPLETE
4 SS erecting the equipment screen on the roof of the library
6 Framers framing soffits, walls and window infills in the library
4 Demo sealing columns in the library with exposed mastic
4 Plaster scrath coat at the patches and breezeway in building B
5 Electrical rough in at U and P
SPECIAL INSPECTIONS
None DEVIATIONS:
None REMARKS
None