DRILLSHIP IADC SPECIFICATION
Page 2 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
DRAFT VERSION
OCEAN R IG STATEMENT:
THE DRILLSHIP IS A NEW BUILD UNDER CONSTRUCTION ANDTHE BELOW INFORMATION IS BASED ON THE BUILD INGSPECIF ICAT ION AND NOT “AS BUILT ” DOCUMENTATION
-
8/19/2019 DrillShip Specfication IADC
3/28
DRILLSHIP IADC SPECIFICATION
Page 3 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
1. Certificates
ITEM A. - UNIT Specifications
A.01. Unit Availabi li ty A.02 Third Party systems and equipment actually on board A.03. Unit general data A.04. Main Dimensions A.05. Operational Capabil it ies A0.6. Storage Capaciti es A.07. Unit Dynamic Positi oning System A.08. Envi ronmental Operat ion l imits A.09.Operational Conditi ons and L imits A.10.Survival Condit ions and Limi ts
ITEM B. - General Rig Specifi cations
B.01. Derrick and SubstructureB.02. Drawworks And Associated EquipmentB.03. Derrick Hoisting Equipment
B.04. Rotation Sys temB.05. Derrick Winches
ITEM C - Power Supply Systems
C.01. Rig Power PlantC.02. Air/Hydraulic Auxiliary Equipment
ITEM D - Blow Out Prevention Equipment And Accessories
D.01. BOP and Subsea EquipmentD.02. Marine RisersD.03. BOP Control Sys temD.04. Subsea Control SystemD.05. Choke/Kill System
D.06. Surface BOP Test f acilit ies
ITEM E - Drill String and Handling Tools
E.01. Tubulars
ITEM F - Bulk Mud And Cement, Mud Treating And Circulating System
F.01. High Pressure Mud SystemF.02. Low Pressure Mud Sys temF.03. Bulk StorageF.04. Cementing Equipment
ITEM G – ACCOMODATION
G.01. OfficesG.02. Living Quarters
ITEM H - Miscellaneous Equipment
H.01. Cranes &Handling EquipmentH.02. Helicopter Facilit ies
ITEM I - Environmental Equipment
I.01Environmental Equipment Provided and Systems in place
-
8/19/2019 DrillShip Specfication IADC
4/28
DRILLSHIP IADC SPECIFICATION
Page 4 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
CONTRACTOR’S SHORT EQUIPMENT LISTING.
1 Certificates:
Nr. CERTIFICATESISSUING
AUTHORITYISSUING
DATEEXPIRING
DATE
1 Certificates of Class for Mobile Drilling Units, Hull and Machinery ABS TBA New build
2 Certificates of Fitness of Offshore Installation ABS TBA New build
3 Certificate of Registration as an Offshore Installation ABS TBA New build
4 Certificate of Examination and Record of Survey, Fire Fighting Regs 1978 (SUR 226 and 218) ABS TBA New build
5 Certificate of Examination and Record of Survey Life Saving Appliances Regs 1977 ABS TBA New build
6 Annual Load Line Certificate. ABS TBA New build
7 Cargo Ship Safety RadioTelephone Certificate. ABS TBA New build
8 Cargo Ship Safety Construction Certificate. ABS TBA New build
9 Cargo Ship Safety Equipment Certificate. ABS TBA New build10 Certificate of Registry ABS TBA New build
11 Certificate of Measurement ABS TBA New build
12 Record of Independent Inspection of Cargo Gear. ABS TBA New build
13 Record of Independent Inspection of Lifting Equipment. ABS TBA New build
14 Approved Operating Manual. ABS TBA New build
15 Proof of and Results of Inclining Experiment. ABS TBA New build16 Certificates of Lifting Gear and Containers ABS TBA New build17 Crane Slew Ring Safety Certificate. ABS TBA New build
18 Toolpusher's and Barge Master's Certificate. ABS TBA New build
19 Compliance with Department of Energy second edition guidance notes "Guidance on Designand Construction, Structural Fire Protection for Accommodation and Control Spaces",or equivalent.
ABS TBA New build
20 Documentary evidence of compliance with a recognized standard for fired and unfiredpressure vessels, hydrostatic test on all pumps used solely for drilling purposes and electricalequipment located in hazardous areas, as laid down in Department of Energy Constructionand Survey Regulations 1974, Schedule 2, Part VII, Equipment or equivalent.
ABS TBA New build
21 Certificate of Insurance ABS TBA New build
22 Compliance with SI 1976 No. 1019. The offshore installation regulations (operational safety,health and welfare), or equivalent.
ABS TBA New build
Other documents required: 23 Compliance with MARPOL Annex 1 (International Oil Pollution Prevention Certificate);
Evidence of compliance with MARPOL Annex 2;Evidence of compliance with MARPOL Annex 5;Stability booklets.
ABS TBA New build
24 Certificate of Registration of Offshore Installation. ABS TBA New build
25 International Load Lines Certificate. ABS TBA New build26 Liberian Tonnage Certificate. ABS TBA New build
27 Safety Construction Certificate. ABS TBA New build
28 Safety Equipment certificate. ABS TBA New build
29 Safety RadioTelephone Certificate. ABS TBA New build
30 Ship Radio Station Certificate. ABS TBA New build
31 Mandatory Annual Survey reports as per IMO MODU CODE. ABS TBA New build
32 Certificate of Annual Inspection of Cargo Gear. ABS TBA New build
-
8/19/2019 DrillShip Specfication IADC
5/28
DRILLSHIP IADC SPECIFICATION
Page 5 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM A. - UNIT Specifications
ITEM DESCRIPTION CONTRACTOR'S DATA
A.01. Unit Avai labil ity Actual status (Drilling/Iddle....) New build, at Samsung Heavy Industries, Korea
Actual location (March 2009)
Availability
⇒ End of Actual Commitment (Date)⇒ Estimated Moving Time to Angola
⇒ Estimated time of arrival in Angola
Mandatory Inspections:
1. Last 5-yars inspection/certification expires on (Date):
2. Next planned 5-years inspection/certification:
⇒ Planned Date:
⇒ Planned Location
ITEM DESCRIPTION CONTRACTOR'S DATA
A.02 Third Party systems and equipment actually on board
Cementing unit & ancillary equipmentSchlumberger Electric Cementing Unit will be installed. Freeplacement agreement
ROV unit(s) & ancillary equipment Third party utilities part of the installationElectric wireline unit & ancillary equipment Third party utilities part of the installation Mudlogging unit & ancillary equipment Third party utilities part of the installation MWD/LWD unit & ancillary equipment Third party utilities part of the installation Drill stem test surface equipment Third party utilities part of the installation Marine supply vessels currently assigned to rig None
Other 3rd party service equipment currently on rig None
Other 3rd party services not mentioned above None
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.03. Unit general dataOwner Ocean Rig
Unit Name To be advised, Unit #1 hull no 1837, unit #2 hull no 1838, unit #3 hullno 1865, unit #4 hull no 1866
Unit Flag Malta (presently)
Registered Number TBA
Unit Classification ABS, A1 Drilling Unit, AMS, ACCU, DPS-3, NBLES, SH-DLA, CDS
Unit Type Drillship, dual derrick
Rated drilling depth (with 5" DP) ft 35,000
Year of construction 2010, 2011
Construction yard Samsung Heavy Industries, Korea
Unit design Saipem 10000 design
Positioning system (Anchored / DP) Req. DP DP, DP Class 3
-
8/19/2019 DrillShip Specfication IADC
6/28
DRILLSHIP IADC SPECIFICATION
Page 6 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.04. Main DimensionsMain deck dimensionsh m Unit overall length, 228 meterNo. and diameter of main columns No./ ft NA
No. and diameter of small columns No./ ft NA
Light Ship Weight MT 35,850
Gross tonnage MTDrilling Draft / Displacement m / MT 96,000Transit draft / Displacement m / MT 66,500
Survival draft / Displacement m / MT 96,000Moon pool dimensions: m x m 25,6 m x 12,48 m
Max. opening through spider deck m
heightPontoon m NA
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.05. Operational Capabi li tiesA.05.1. Operational Capabilities
Transit speed towed/thrusters Knots Self propelled 12 knots, design criteria
Fuel consumption: transit/drilling MT/day TBA
Designed Operating water depth: Min/Max m 500 m to 3000 mMaximum water depth as equipped m 3000 m
Accommodation for personnel No. 217
A.05.2. Variable LoadsTotal drilling variable load MT 20,000
Total survival variable load MT 20,000
Total transit variable load MT 16,500
A.05.3. Helicopter facilities.Size and capacity of helideck m x m / MT 27,2 m x 27,2 m 21,3 MT (Chinook)
Helideck Load Capacity (Gross and Specific): 21,3 MT
Helicopter fuel storage capacity gal 3 x 766 gal (3 x 2900 liter tanks)
Heli-refueling system type In accordance with CAP 437
-
8/19/2019 DrillShip Specfication IADC
7/28
DRILLSHIP IADC SPECIFICATION
Page 7 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.06. Storage Capaci tiesFuel STon 7,500 MTDrilling water m3 2,600
Potable water m3 1,300
Active liquid mud m3 960
Reserve liquid mud m3
952Base oil storage m3 478Brine storage m3 476
Waste liquid (mud and washing water) m3 478Bulk bentonite/barite MT Bentonite/barite 4 x 113 m3 tot 452 m3
MT per tank:
• Bentonite 108 (0,96 mt/m3)
• Barite 244 (2,16 mt/m3)
Bulk cement MT 4 x 113 m3 tot 452 m3MT per tank:
• Cement 158 (1,4 mt/m3)
Sack storage No / m2 1 large sack store, area TBA
Pipe racks x area MT / m2 Forward and aft pipe racks, Deck loading plan TBACasing joints racking capacity No./ft Variable Finger board racking capacity (stands of triple joints):
Condition 1:• 13 3/8” casing, 80 stands
Condition 2:
• 9 5/8” casing, 105 standsCondition 3:
• 7” casing 105 stands
DP/DC racking capacity No./ft Variable fingerboard DP racking capacity (stands of quadruple joints):Condition 1:
• 6 5/8” DP 260 stands
• 5 7/8” DP 110 stands
• 4 ¾” DC 11 stands
• 6 ¾” DC 6 stands
• 8 ¼” DC 12 stands
• 9 ½” DC 6 standsCondition 2:
• 5 7/8” DP 370 stands
• 4 ¾” DC 11 stands
• 6 ¾” DC 6 stands
• 8 ¼” DC 12 stands
• 9 ½” DC 6 standsCondition 3:
• 6 5/8” DP 206 stands
• 3 ½” DP 110 stands
• 4 ¾” DC 11 stands
• 6 ¾” DC 6 stands
• 8 ¼” DC 12 stands
• 9 ½” DC 6 stands
Riser racks x area MT / m2 Ref attached GA planTotal riser joints racked with buoyancy No./ft 110 / 9,990
Total riser joints racked w/out buoyancy No./ft 12 / 1,080
BOP storage MT / m2 Ref attached GA plan
X-Tree test area MT / m2 Ref attached GA plan
Well Test Eq. area m2 Ref attached GA plan
Miscellaneous storage area m2 Ref attached GA plan
-
8/19/2019 DrillShip Specfication IADC
8/28
DRILLSHIP IADC SPECIFICATION
Page 8 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.07 Unit Dynamic Posit ioning System.07.1. Thrusters
Distance underside keel to underside thrusters 5,87 meter
Thruster manufacturer Rolls Royce
Number and location of thrusters 6 ea. 3 sets bow and 3 sets stern
Thruster output (each) (MT) 5,500 kW each thrust 900 kN each (100 MT)
Total installed power (kW) 6 each 7,000 kW total power 42,000 kW
Total available thrust (MT) 600
A.07.2. Dynamic positioning Control systemDP System Classification DP Class 3
Manufacturer / Make / Type Kongsberg ICMS
Main DP Computer Control system (Number/Type) 2 each SDP
Back-up DP Computer Control system (Number/Type) 1 each SDP
A.07.3. Acoustic positioning system (including well spud-in reference point)D.P. Acoustic Position reference Kongsberg
Number / Type 2 each HIPAP 501
A.07.4. Vertical Reference Units
Number / Type3 each MRU/Gyro
A.07.5. D.P.G.S. Position Reference SystemQuantity / Type 2 each DPS 132, DPS 200
A.07.6. Wind & Current Speed & Direction Sensors.Quantity and Type 3 each Gill wind sensors
A.07.7. Heading Sensors.Quantity And Type Ref A.7.4
A.07.8. Riser angle Indicators.Quantity And Type Riser angle displayed at DP consol, through NOV Shaffer
multiplex BOP control system. Not part of the DPpositioning system
A.07.9. Uninterrutable Power system.(UPS)Unit Numbers and Types 3 each 230VAC 3kVA, 1-phase
UPS running time of each Unit at full load As per ABS requirements
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.08. Environmental Operation limitsLimits given for water depth m 3000 meter
Maximum wind speed knots Wind velocity (10m, 10 minute) Vw=27 m/sec
Maximum wave height m Significant wave height Hs= 6.7 meter
Related wave period (to maximum wave height) sec Wave period (zero crossing) Tz= 7.0 – 10.0 sec
Maximum surface current speed knots Current velocity (wind) Vc= 0.2 m/secCurrent velocity (tidal) Vc= 0.6 m/sec
Air gap (below main deck) m NA
A.08.1 Environmental Survival LimitsMaximum wind speed knots 100 knots
Maximum wave height m Significant wave height Hs=14.4 meterRelated wave period (to maximum wave height) sec Wave period Tp=17.0 sec
Maximum surface current speed knots
Air gap (below main deck) m NA
-
8/19/2019 DrillShip Specfication IADC
9/28
DRILLSHIP IADC SPECIFICATION
Page 9 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.09. Operational Condit ions and Limits1. Operational Condition
Contractor hereby states that the drilling unit meets the requirements under environmental conditions at least equal to the followingcriteria which shall be considered as acting simultaneously and from any compass direction.
Wind speed (10 min.) : 50 knots TBA, based on RAO curves when available
Maximum wave height : 10 meters TBA, based on RAO curves when availableSignificant wave period : 10 seconds TBA, based on RAO curves when available
Surface Current Speed : 1 knots TBA, based on RAO curves when availableDrilling: Shall include but not be limited to all normal drilling operations i.e. drilling, reaming, circulating, running casing, cementing,
round trips, etc.
Wind speed (10 min.) : 50 knots Yes
Maximum wave height : 10 meters Yes
Significant wave period : 10 seconds Yes
Surface Current Speed : 1 knots Yes
2. Operational Limits
Limits given for water depth (Minimum / Maximum) meters Ref item A7 & A8
Maximum Wind Speed knots
Maximum wave height meters
Related wave period sec.
Surface current speed knots Air gap meters
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
A.10. Survival Conditions and Limits.1. Survival Conditions.
The conditions under which the drilling rig is capable of remaining safely on location, although not necessary operational, are the followingcriteria which shall be considered as acting simultaneously and from any compass direction:
Maximum “1 minute” wind speed km/hr
Maximum “10 minute” wind speed km/hr 31 m/sec (112 km/kr)
Maximum “2 hour” wind speed km/hr
Maximum “24 hour” wind speed km/hr
Maximum wave eight feet Significant height Hs=8.5 meter (28 ft)
Associated wave period second Wave period (zero crossing) Tz=8.0 – 11.0 secMaximum surface current velocity Knots Current velocity (wind) Vc=0.25 m/sec
Current velocity (tidal) Vc=0.6 m/sec
2. Survival Limits.
Maximum wind speed km/hr 185.2 km/hr (100 knots)
Maximum wave eight feet Significant wave height Hs=14.4 meter (47.25 ft)
Maximum wave period sec. Wave period Tp=17.0 sec
Maximum surface current velocity Knots
Air gap (below main deck) meters NA
-
8/19/2019 DrillShip Specfication IADC
10/28
DRILLSHIP IADC SPECIFICATION
Page 10 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM B - General Rig Specif ications
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
B.01. Derrick and SubstructureDerrick/mast
Make type. Build as per rules Dual derrick, ABS CDS Class
Rated for wind speed with empty setback load knots TBA
Rated for wind speed with full setback load knots TBA, under engineering (100 survival, 70operating)
Gross nominal capacity MT 907
Number of lines No 14
Static Hook Load Capacity with max. number of lines MT 907 / 14
Copy of Mast certification to be submitted: Derrick mast to be fitted with heavy duty, tight, fluorescent lighting system,certified for use in division 1 or division 2 areas as required by IP, API orother national codes.
Yes/No Yes
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
B.02. Drawworks And Associated EquipmentB.02.1. Drawworks
Make and Type 2 each NOV, SSGD-1000Input power continuous / Input power maximum kW AC driven 4290 / 6006
Main Drum type and dimensions (OD x Length) 55” (1397mm) x 82” (2083mm)Main Drum rated maximum line pull with:
- 12 lines / 10 lines / 8 lines MT
Maximum pull on travelling block with maximum nr. of lines / number of lines MT / No 907 / 14
Low Speed Main Drum clutch make and type and Rated Pull Direct drive, gear ratio 1:10,5
B.02.2 Drawworks BrakeB.02.1.1 Brake Mechanism
Make / Model Regenerated braking system with disc brake
Independent backup system Yes/No Yes dual brake system
B.02.1.2 Auxiliary Brake
Make / Model NA
Independent back-up system Yes/No
-
8/19/2019 DrillShip Specfication IADC
11/28
DRILLSHIP IADC SPECIFICATION
Page 11 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
B.03 Derrick Hoisting EquipmentB.03.1 Crown Block
Make/Type. Builded as per rules: 2 each NOV, ABS CDS
Rated capacity MT 907
No. of sheaves No 6 plus deadline and fast line sheave
B.03.2 Travelling BlockMake/Type. Builded as per rules: 2 each NOV, ABD CDS
Rated capacity MT 907
B.03.3 Hook
Make/Type. Builded as per rules: NA
Rated capacity MT
B.03.4 Swivel HeadMake/Type. Builded as per rules: Integrated in the top drive
Rated capacity and Working pressure MT / PSI 7500 psiCompleted with access fitting for wireline entry on top of gooseneck Yes/No Yes
B.03.5 Drilling LineBuilded as per rules: ABS CDSType / Size (min.) / Length (approx. left on drum) Inch / m 2 each 2” x 2286 meter (7500 ft)
Completed with support frame for drum/cover Yes/No YesDrilling line drum power driven Yes/No Yes
Anchor Deadline Block Guidance System. Yes/No YesSpare reel of drilling line (approx. length available on spare reel) Yes/No Yes 1 each 2286 meter
B.03.6 Anchor Dead LineMake/Type. Builded as per rules: 2 each NOV, ABS CDS
Rated capacity 200,000 lbs
Completed with weight sensor. If Yes specify type. Yes/No Yes compression type load cell
B.03.7 Block Guidance SystemMake/Type NOV integrated to the top drive
Completed with dolly/rails Yes/No Yes
B.03.8 Retraction System For Traveling Block (If fitted) Yes/NoMake/Type 2 each NOV hydraulic retract. Integrated to
the top driveB.03.9 Top Drive Guidance System Yes/NoMake/Type 2 each NOV, hydraulic retract system
B.03.10 Heave CompensatorCrown or Travelling Block Mounted Crown mounted
Make/Type 2 of each NOV,CMC (Crown Mounted Compensator)
AHC (Active Heave Compensator)
Stroke ft 25
Rated Capacity compensated / locked MT 454 / 907
-
8/19/2019 DrillShip Specfication IADC
12/28
DRILLSHIP IADC SPECIFICATION
Page 12 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
B.04 Rotation SystemB.04.1 Rotary Table
Make/Type Main well center:NOV RST 605 hydraulic driven
Aux well center:
NOV RST 605 false rotary table
Maximum opening Inch Main well center: 60 ½”Main well center: 60 ½”
Rated static capacity MT Main well center: 910Main well center: 910
Rated rotation capacity (@100 RPM) MT Main well center: NA, max RPM 15Main well center: NA
Two speed gearbox. Yes/No Main well center: No hydraulic drivenMain well center: NA
Emergency chain drive electric motor. Yes/No NASoft Torque Rotary System Yes/No NA
B.04.4 Top DriveMake / Type. Builded as per rules: 2 each NOV, HPS-03-1000, ABS CDS
Static rated load capacity MT 907
Test / working pressure PSI 7500
Maximum speed RPM 280
Driven by electric/hydraulic motor Yes/No Electric AC driven
B.04.4.1 Top Drive Inside BOP:a. Remote operated Inside BOP make and type Yes/No Yes
For DP sizes Inch Mounted onto drive shaft and lower IBOP
Maximum working pressure PSI 15,000b. Manual operated Inside BOP make and type Yes/No Yes
For DP sizes Inch Mounted onto upper IBOP and saver sub with
5 7/8” TT5/8 connection. Can be made forany connection up to 8 ¼”
Maximum working pressure PSI 15,000
B.04.4.2 Top Drive Pipe Handler System
Unit fitted with pipe handler for make up and break out Yes/No Yes
Make / type NOV
Maximum Break-Out Torque ft.lbs 115,100 (156,000 Nm)
-
8/19/2019 DrillShip Specfication IADC
13/28
DRILLSHIP IADC SPECIFICATION
Page 13 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
B.05 Derrick WinchesB.05.1 Rig Floor Winches
Quantity 4
Make / Type (Air or Hydraulic) NOV, hydraulic winches
Rated Capacity MT 5
B.05.2 Rig Floor 'Man-Riding' WinchQuantity 3
Make / Type (Air or Hydraulic) NOV, hydraulic winches
Rated Capacity MT 0.150 (150 kg)
Certified man-riding Yes/No Yes
B.05.3 Derrickman Platform Work-WinchQuantity NA
Make / Type (Air or Hydraulic)
Rated Capacity MT
B.05.4 Utility WinchB.05.4.1.
Main Deck Winch
Quantity NA
Make / Type (Air or Hydraulic)
Rated Capacity MT
Certified man-riding Yes/No
B.05.4.2.
Cellar Deck Hoisting Winch
Quantity 4
Make / Type (Air or Hydraulic) NOV, hydraulic winches
Rated Capacity MT 5
Certified man-riding Yes/No Utility winches not certified for man riding
3 each dedicated man riding winches locatedon cellar deckCap 150 kg, certified for man riding
-
8/19/2019 DrillShip Specfication IADC
14/28
DRILLSHIP IADC SPECIFICATION
Page 14 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM C - Power Supply Systems
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
C.01 Rig Power Plant
Maximum power available for drilling operations kW 12,960 (12.6 Mw)
C.01.1. Engine Room
Engine room walls type No. 3 each engine roomsEngine room positive pressurized Yes/No No
C.01.2. Diesel EnginesMake, Type, Quantity No. 6 each STX-B&W 16V32
Maximum continuous power kW 6 x 8000 kW total 48,000 kW
C.01.3 GeneratorMake / Type and Quantity 6 each ABB AMG 900 LSE
In the drilling mode sufficient power must be available to control andpower simultaneously three mud pumps and TDS / Rotary Table bothat full load and the drawworks at half load with one diesel enginegenerator as a stand-by.
Yes/No Yes
AC or DC AC
Maximum continuous power of each kW 6 x 7,000 kW, total 42,000 kW
C.01.4 SCR SystemMake / Type and Quantity of SCR's No ABB, AC variable frequency drives (VFD)Maximum continuous power kW 12,960
SCR Output Amperage / Voltage Amps
No. of motors that SCR can run simultaneously No./kW 16 / 12,960
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
C.02 Air/Hydraulic Auxiliary EquipmentC.02.1 Hydraulic Power Pack(s)
Make / Type and Quantity NOV Ringline HPU unit
Maximum continuous power HP 1,126
C.02.2 Hydraulic Operated Functions on RigFunctions (Tenderer to specify) • All Pipe handling systems, including catwalk
machines• BOP handling systems
• Utility winches
• Man riding winches
• Rotary table
• Active heave compensator
C.02.3 Rig Service Air SystemAir compressors:
Make / Model and Quantity No EMD, 4 eachRated flow capacity scfm 1200 m3/hr
Air vessel total capacity scfm 2 each 5,5m3
Working pressure psi 131 (9 bar)
Air dryers:
Make / Type and Quantity No 2 each desiccant typeCapacity cf 2,400 Nm3/hr
-
8/19/2019 DrillShip Specfication IADC
15/28
DRILLSHIP IADC SPECIFICATION
Page 15 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM D - Blow Out Prevention Equipment And Accessories
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.01 BOP and Subsea Equipment
General DataBOP stack size Inch x psi 18 ¾” 15,000 psi
Builded as per: NOV Shaffer Extended Triple NXT 6 rams 2 eaannulars
Last BOP periodical inspection New build
Last BOP Overhaul Inspection
D.01.1 Flex Joint
Quantity / Make / Type No. 1 each Oilstate
Size Inch 18 ¾”
Maximum deflection Deg 10
D.01.2 Diverter BOP (for installation in fixed bell nipple)Make / Model NOV Shaffer 500 psi
Size Inch 21 ¼”
Working Pressure Psi 500
D.01.3 Diverter Flow Lines
Quantity No 3OD of flow lines running from diverter to valves Inch 18”
OD of flow lines running from valves to end of lines 18” nominal
Diverter lines running to (starboard/side) Yes
Control valves Type and Make Actuated ball valves
Remote controlled from Drillers house, central control room
D.01.4 BOP Stack18¾" BOP stack, 15,000 PSI suitable for H2S service comprising:
a) One adapter to fit the hydraulic connector. Yes/No Yesb) Four ram type preventers with ram locks. Yes/No Yes 6 rams
The Top and Bottom Rams shall be suitable to fit pipe rams (standardor variable) and the two middle rams shall be capable to shearing rig’sdrill pipe.
Yes/No Yes
Each ram type preventer to be provided with two side outlets.
In total four are to be blanked off.
Yes/No Yes
Spacing between two ram preventers shall be 27 inch Yes/No yes
c) One hydraulic wellhead connector to fit the wellhead provided with hottap for underwater intervention.
Yes/No Yes, Vetco Super HD H4 DWD type 15,000 psi for30” Well Head
d) - Two 3⅛" dedicated choke and two 3⅛" dedicated kill line outletswith each two hydraulic fail-safe valves, solid block;
Yes/No 3 1/6” outlets
e) Necessary subsea accumulators. Yes/No Yesf) BOP control system (with dedicated UPS, if applicable) state reaction
time in seconds (time between operating control unit and BOP closed).Yes/No Yes NOV Shaffer multiplex control system
Annular Sec TBA
Ram Sec TBA
g) Stack complete with guide frame, pick-up attachment and transportbase.
Yes/No Yes
h) One test stump for testing BOP stack Yes/No Yes
i) Up-dated drawing of BOP stack and control system to be submitted asrequired.
Yes/No Yes
-
8/19/2019 DrillShip Specfication IADC
16/28
DRILLSHIP IADC SPECIFICATION
Page 16 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
Notes For Used Equipment: a) Marine risers to be inspected by Tuboscope, Vetco or equivalent. All pipe welds
(circumferential or longitudinal) and coupling welds are to be ultrasonically ormagnetic particle inspected. Spot checks are to be made on used risers to determinewall thickness and to verify whether here has been any excessive internal wear. Allcouplings are to be cleaned and inspected.
The frequency of inspection must be as per API regulation.
Contractor statement:
All new risers, new build
b) Choke and kill lines to be pressure tested to working pressure connections to be MPIinspected and wall thickness spot checks of body are required (Yes/No).The frequency of inspection must be as per API regulation.
Contractor statement:
All new choke and kill lines, new build
c) Used blow-out preventers to be completely dismantled, inspected by a Companyapproved established inspection party and re-assembled. They are to be shop testedby blanking off the top and bottom and the body tested to the original body testpressure (normally 1.5 time the WP). Rams and bag type preventer to be tested totheir working pressure.The frequency of inspection must be as per API regulation.
Contractor statement:
Yes, new build
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.01.5 BOP Stack (From Bottom To Top)
D.01.5.1 Wellhead ConnectorMake / Type Vetco, Super HD H4 DWD type, 15.000 psi for 30”
wellhead
Size and Working Pressure Inch / PSI 18 ¾” 15,000 psi
Spare connector same type Yes/No Yes
Hot tap for underwater intervention Yes/No Yes
D.01.5.2 Ram Type Preventer (with two 3⅛" side outlets)
Single or double. Quantity, Make / Type Tripple, 6 ram, NOV Shaffer Extended Triple NXTBOP, 3 1/16” side outlets
Size and working Pressure PSI 18 ¾” 15,000 psi
D.01.5.3 Bag Type Preventer
Make / Type NOV Shaffer,
Size and working Pressure PSI 10,000 psi
D.01.5.4 MandrelMake / Type NOV Shaffer
Size /and Pressure Rating PSI 10,000 psi
-
8/19/2019 DrillShip Specfication IADC
17/28
DRILLSHIP IADC SPECIFICATION
Page 17 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.01.6 Lower Marine Riser Package (from Bottom to Top)D.01.6.1 Hydraulic Connector
Make / Type Vetco, EXF HAR H4 18 ¾”
Size Working Pressure Inch / PSI 18 ¾” 10,000 psi
Hot tap for underwater intervention Yes/No Yes
D.01.6.2 Bag Type PreventerQuantity, Make / Type 2 each, NOV Shaffer, Spherical Blowout Preventer
Size and Working Pressure Inch / PSI 18 ¾” 10,000 psi
D.01.6.3 Flex Joint
Make / Type Oilstate, 18 ¾”
Size and Maximum Deflection Angle Inch / Deg. 18 ¾”, 10 deg
D.01.6.4 Riser Adapter
Size / Make / Type Inch 18 ¾” NOV Shaffer
D.01.7 Pipe Rams Available (incl. Spares as required)Shearing blind rams sets quantity No. 2
Size and DP rams sets quantity (Size suitable for rig DP's) Inch / No. 2
3½" rams sets quantity No. Variable ram4½" rams sets quantity No. Variable ram
Variable rams sizes and sets quantity No. 4
D.10.8 BOP Stack Handling SystemDescription:
General remarks:
1. All necessary clamps, bolts, nuts and gaskets for above BOPs Yes/No Yes
2. Submit drawing giving detailed data on pressure ratings anddimensions of BOP stacks and its components
Yes/No Yes, new build note preliminary drawings
-
8/19/2019 DrillShip Specfication IADC
18/28
DRILLSHIP IADC SPECIFICATION
Page 18 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.02 Marine Risers
D.02.1 Marine Risers JointsMake / Model. OD x ID NOV Shaffer, “H” FT H
Type of riser connectors Flanged
Average Length of a single joint Meters 27.43 m (90 ft)Weight of one complete joint lbs 35,858 (7/8” wall) - 36,973 (15/16” wall) withoutbuoyancy elements
Quantity No 112 (10,000 ft water depth)
Date/Type of last inspection All new riser
D.02.2 Marine Risers Pup JointsQuantity and Length No / meters
D.02.3 Telescopic Joint.One 13.7m stroke telescoping joint (double seals are required) complete with rotating support ring for tensioning lines 10,000 or 15,000psi - 3" bore kill and choke, booster line/hoses. Spare telescopic joint is required.
Make / Type NOV Shaffer, FT
Size inch Outer ballel 24” OD, Inner barrel 21” OD
Maximum stroke meters 19,81 (65ft)
Spare telescopic joint Yes/No Yes
D.02.4 Instrumented Joint.Make / Type NA
Data recorded
D.02.5 Kill/Choke/Glycol Injection Lines (one of each):Outside / Inside diameter Inch 6 ½” – 4 ½”Working Pressure PSI 15,000
Dedicated glycol injection line available Yes/No No
Gylcol to be pumped through kill/choke lines Yes/No Yes
D.02.6 Booster Line (required)Outside / Inside diameter Inch 5” – 4”
Working Pressure PSI 7,500
Hydraulic Shut off valve (required) Yes/No Yes
D.02.7 Riser Control BOP lines
Quantity 2 each Conduit linesOutside / Inside diameter Inch 2.875” OD 0.276” wall 5000 psi
D.02.8 Last Riser Inspection ReportDate and type of last inspection performed All new risers
D.2.9 Ball (Flex) JointMake / Type Oilstate flexjoint
Size inch 18 ¾”
Maximum deflection Deg. 10
Spare ball (flex) joint Yes/No Yes
D.02.10 Buoyancy Modules (Required)Make and Quantity Riser equipped with buoyancy elements for
operation up to 3000 m water depth
Water depth rating meters 3000
Buoyancy in sea water lbs
-
8/19/2019 DrillShip Specfication IADC
19/28
DRILLSHIP IADC SPECIFICATION
Page 19 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.03 BOP Contro l System
D.03.1 General DataBOP Control System (Hydraulic-Electric/Hydraulic) Multiplex
Pressure assisted (if hydraulic) Yes/No
D.03.2 Surface Accumulator UnitMake / Model / Type NOV Shaffer
Installation siteSoluble oil reservoir capacity litres 3,785
Oil/water mixing capacity lt/min 378Glycol reservoir capacity litres 1.893
No. of bottles installed / Capacity each bottle. Total bottles capacity No / gal 81 / 15 / 1,215
Bottle working pressure psi 5000
D.03.2.1 Accumulator Bottles on BOP Stack
No. of bottles installed on BOP/LNRP No. 142Capacity of each and total bottles capacity litres 56.78
Bottles working pressure psi 5000
D.03.3 Triplex PumpsMake / Type / Model and Quantity No. NOV Shaffer, triplex, 2 each
Each driven by motor of kW 112
Flow rate of each pump at maximum operating pressure Gpm / psi 43.5 / 5000
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.04 Subsea Control SystemTwo reels with hydraulic control hoses with a length suitable for thespecified water depth for the control of the BOP functions. A third hosereel should be available as a back-up, or alternatively enough length tobe available on the two main reels to serve as back-up.
Yes/No 2 each multiplex cables and 1 each hydraulic hotline
D.04.1 Control Pods AssemblyMake / Type / Quantity (min. one spare assembly required) No. NOV Shaffer, 2 each
Control valves quantity No. 122 per control podD.04.2 Hose Reels
Make / Type / Quantity No. NOV Shaffer, 1 each hotline reel
Maximum length meters 3,000
D.04.3 Pod HoseQuantity No. 2 each multiplex control cables
Total / Useful length meters 3000 m eachPilot hoses quantity No. NA
D.04.4 Pod Hose ManifoldMake / Model NA
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.05 Choke/Kill SystemD.05.1 Choke Manifold
Make NOV Shaffer
Size and Working Pressure Inch / psi 3 1/16” valves , 15,000 psi
D.05.2 BOP Choke/Kill Lines From Riser To Choke Manifold Flexible section Rigid SectionMake / Type Coflexip
Inside Diameter and Working Pressure Inch / psi 15,000 5” nominal, 15,000 psi
-
8/19/2019 DrillShip Specfication IADC
20/28
DRILLSHIP IADC SPECIFICATION
Page 20 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
D.06 Surface BOP Test facil ities.D.06.1 Hydraulic BOP Test Stump
Make / Model Vetco, H4
Pressure rating psi 15,000
D.06.2 POD Test Stump
Availability Yes/No TBAModel / Make
ITEM E - Drill String and Handling Tools
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
E.01 Tubulars
E.01.1 Drill Pipe a. b. c. d.
OD / ID 5 7/8”OD(pipe body)-4 ¼” (tool
joint ID)Grade S-135
Range 2
Weight lb/ft 23.4
Connection 7” TT585(GrantPrideco TurboTorque)
Actual API classifications inch NS1
Date of last inspection New
Total Joints Available 7,500 meter
E.01.2 Hevi-wate Drill Pipe a. b. c. d.
OD/ID 5 7/8” / 4”Grade HW-120
Range 2
Weight lb/ftConnection 7” TT585
(GrantPrideco TurboTorque)
Actual API classifications inch NS1
Date of last inspection New
Total Joints Available meters 40
E.01.3 Drill Collars a. b. c. d.
Quantity of joints No. 9 30 30
API steel grade
OD / ID Body Inch 9 ½” / 3” 8 ¼” / 2,812” 6 ¾” / 2.812”
Length of each joint meters 9.45 9.45 9.45
Connection 7 5/8” REG 6 5/8” REG NC 50
Actual API classifications NS1 NS1 NS1Date of last inspection New New New
Drill Collars (Continue) e. f. g. h.
Quantity of joints No.
API steel grade
OD / ID Body InchLength of each joint meters
Connection
Actual API classifications
Date of last inspection
-
8/19/2019 DrillShip Specfication IADC
21/28
DRILLSHIP IADC SPECIFICATION
Page 21 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM F - Bulk Mud And Cement, Mud Treating And Circulating System
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
F.01 High Pressure Mud System..
F.01.1 Mud PumpsThree triplex pumps, each equipped with an independent driven centrifugal charging pump. Minimum pump power rating 1150-1275kW.
Minimum output of 2.3m3/min. each at 90% of maximum SPM. Working pressure 5,000psi. It shall be possible to line up 2 mud pumpson the well and 1 on the riser booster line simultaneously.
a) Forged steel fluid ends Yes/No Yes
b) Quick change system for liners and pistons Yes/No No
c) Quick change valve covers Yes/No No
d) Cooling/lube oil system for liners Yes/No Yes
e) High pressure pulsation dampeners (if YES - Make/Type) Yes/No Yesf) Reset relief valve (if YES - Make/Type) Yes/No Yes
g) Suction and discharge filter Yes/No Yes
h) Full range of liners and pistons to operate at the optimumvolume/pressure as required by the drilling programme
Yes/No Yes, two different sizes
i) Each pump equipped with a pressure gauge before isolation valve. Yes/No
F.01.1.1. Mud Pumps No: No. 1 No. 2 No. 3 No. 4 & No. 5
Make / Model NOV/
14P-220
NOV/ 14P-
220
NOV/ 14P-
220
NOV/14P
Rated Input Power kW 1640 1640 1640 1640 Mud pump motors: Quantity No 2 2 2 2
- Make / Model Baylor /CM628TUT
Baylor /CM628TUT
Baylor /CM628TUT
Baylor /CM628TUT
- Continuous rating power of each kW 918 918 918 918 Liner sizes available Inch 6 ½” 6 ½” 6 ½” 6 ½” Surcharging pump type Centrifuga
lCentrifugal Centrifugal Centrifugal
Fluid end type
Suction line diameter (OD x ID) Inch 10 10 10 10 Mud Pumps - Rig floor mud manifold line diameter (OD x ID) Inch 5” nom 5” nom 5” nom 5” nom Working pressure Psi 7,500 7,500 7,500 7,500
F.01.2 Standpipe ManifoldTwo standpipes with goosenecks connected to a H-type standpipe manifold c/w:
Standpipe Line (number) No. 4
Dimensions OD x ID Inch 5” nom
Working pressure Psi 7,500
Test pressure Psi 10,000
Kill line outlet Yes/No Yes
Fill-up/bleed-off line outlet (i.e. manual choke) Yes/No Yes
Two 2" outlets c/w hammer Lug wing unions (Fig. 1502) typeconnections
Yes/No Yes
-
8/19/2019 DrillShip Specfication IADC
22/28
DRILLSHIP IADC SPECIFICATION
Page 22 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
F.02 Low Pressure Mud System
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
F.02.1 Mud Pits (Active, Reserve and Mixing) System. At least four main mud tanks with a total capacity of 250m3 and reserve capacity to store the marine riser content in case of anemergency. Each tank equipped with a mud mixer giving a turn- over time of 45 - 75 sec. The mud active tank to be dimensioned suchthat a volume change of 1m3 is indicated by a level change of at least 10cm. Mud tanks to be sectionalized for a series treatment by solids
removal equipment (e.g. shaker, D-gas, D-sand, D-silt, suction tanks).a) Mud system to be capable of mixing/treating/maintaining muds up to 2kg/lt. at circulation rates up to 5bbl/min.
Yes/No Yes
b) All mud tanks to be covered and a forced ventilation system installed.
Tanks covered Yes/No Yes
Forced ventilation system Yes/No Yes
c) Storage space to be available for contaminated/waste mud fortransport to shore.
Yes/No Yes
F.02.1.1 Active Mud Tanks
Tank Number 10 each2 each
Capacity (Single active tank) cubic m. 8040
Total capacity cubic m. 880
Tank Degasser Desander Desilter Mud Clean.Capacity cubic m. 20 20 20 20
F.02.1.2 Reserve Mud Tanks
Tank Number 41
ReserveWaste mud
Capacity (Single reserve tank) cubic m. 238478
ReserveWaste mud
Total capacity cubic m. 952478
ReserveWaste mud
Tank Degasser Column port Column stbd Other
Capacity cubic m.
F.02.1.3 Drill Water Tanks No. 1 No. 2 No. 3 No. 4
Capacity (single drill water tank)
Total capacity 2.600
F.02.1.4 Potable Water Tanks No. 1 No. 2 No. 3 No. 4
Capacity (single tank) cubic m.
Total capacity cubic m. 1,300
F.02.1.5 DMA (Low Toxicity Base Oil) Tanks No. 1 No. 2 No. 3 No. 4
Capacity (single tank) cubic m.
Total capacity cubic m. 450
F.02.1.6 Brine Tanks No. 1 No. 2 No. 3 No. 4
Capacity (single tank) cubic m.
Total capacity cubic m. 450
F.02.1.7 Settling Tank (One setting tank of about 15m3 capacity with sloping bottom and two quick acting dump valves with ½ m2 openings)
No. 1 No. 2 No. 3 No. 4Capacity (single tank) cubic m.
Total capacity cubic m. 98 drainholding tank
F.02.1.8 Pill/Slug TankDrillwater, sea water and DMA (base oil) supply lines complete with one paddle mixer. C/w mud mixer as detailed in F.2.1
Capacity cubic m. 20
F.02.1.9 Trip TankComplete with centrifugal pump and mud level indicator readable from the Driller's position and console, with the ability to isolate trip tanksystem from mud return system. Able to handle mud gradient up to 2 kg/lt.
Location
Capacity cubic m. 1,2 stripping tank10 trip tank
Linear Capacity m3 / m TBA
-
8/19/2019 DrillShip Specfication IADC
23/28
DRILLSHIP IADC SPECIFICATION
Page 23 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
Level indicator Type (Mechanical….) Electronic
Level indicator Location (Driller's side) Yes
Alarm and strip chart recorder Yes/No Yes
Electric pump make / model 2 ea 100m3/hr
ITEM DESCRIPTION UNIT CONTRACTOR’S DATA
F.02.3. Mud Return Treatment System
F.02.3.1 Flow LineShape and Size Inch 5 deg slope, 18” nominal
F.02.3.2 Sand Trap
Quantity and total Capacity No. / bbls NA
F.02.3.3 Shale ShakerIndependently driven linear motion shale shakers capable of handling 4.5m3/min. of 50/60 secs. March Funnel viscosity mud through
API mesh 60 screens. A full range (20 mesh - 300 mesh inclusive) of screens must be available by the Contractor at all times.Contractor to maintain at least Company approved minimum consumables (screens, etc.) stocking levels.
a. Primary Shale Shakers No. 1 No. 2 No. 3 & 4 No. 5 & 6
Make / Type Brandt VSM300
Brandt VSM300
Brandt VSM300
Brandt VSM300
Maximum flowrate per shaker, (screen size dependent) lt/min 2000 2000 2000 2000 Size and type of screens As per contract
b. Secondary Shale Shakers No. 1 No. 2 No. 3 No. 4
Connected mode to primary shale shakers (cascade…. Etc.)Make / Type
Maximum flowrate per shaker lt/min
Size and type of screens
F.02.3.4 Desander A full range of screens must be available by the Contractor at all times. Contractor to maintain at least Company approved minimumstocking levels.Make and Type and Quantity 1 ea 3 cone 12”
Max. flowrate lt/min
F.02.3.5 Desilter
Make and Type Quantity 1 ea 24 cones 4”
Max. flowrate lt/min
F.02.3.6 Mud Cleaner
Full range of screens 50 mesh - 300 mesh to be available from Contractor.Contractor to maintain at least Company approved minimum stocking levels.
Make and Type and Quantity NA
Max. flowrate lt/min
F.02.3.7 Mud/Gas Separator (Poor Boy)Make and type RB Pipetech, poor boy
Outside Diameter size Inch 78Height feet 14
Mud inlet connection (from choke) size and working pressure Inch/psi 5” / 10,000
Mud outlet connection (from choke) size and working pressure Inch/psi
Mud liquid seal height ft 24
Gas discharge line OD Inch 12Gas discharge line running to Above derrick top
Equipped with pressure sensor Yes/No Yes
Equipped with temperature sensor Yes/No YesF.02.3.8 Degasser
Make / Type and Quantity 2 each NOV Brandt / DG SeriesDischarge line running to Degasser tank
Discharge line O.D. Inch 8Location of degasser suction tank Mud pit room
F.02.3.9 Mudsaver Sub
Two (2), to be used with all pipe pulling/running/drilling, etc. Yes/No As per contract
F.02.3.10
Mud Saver Bucket
Quantity 1
Pipe size Inch 5 7/8”
-
8/19/2019 DrillShip Specfication IADC
24/28
DRILLSHIP IADC SPECIFICATION
Page 24 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
Complete with 4" return hose to flowline/flow nipple Yes/No Yes
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
F.02.4. Mud Mixing SystemMud Mixing system shall allow simultaneously mixing of new mud and weighting active or reserve mud.
F.02.4.1 Mud HopperSystem to be able to treat mud in the active system or mixing a pill or reserve mud whilst not interfering with the mud pump and chargingpump operation 6" piping with a minimum velocity in the lines of 10 ft/sec.Output of pumps (Requested 27 - 40bbl/min at 27 psi.) NOV automatic mud mixing system with sack cutting
systemMake / Model and Quantity No. NOV
F.02.4.2 Mixing Pumps
Make / Model / Type and Quantity No 3 each 8x6x14 227 m3/hr
F.02.4.3 Chemical Mixing Tank
Number No 2Capacity 20 m3 each
Completed with electrical mixer Yes/No Yes
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
F.03 Bulk Storage
F.03.1 Barytes/Bentonite Silos No. 1 No. 2 No. 3 No. 4Capacity m3 113 113 113 113
Total capacity m3 452
Type Weight loadcell Hyd/electric Hyd/electric Hyd/electric Hyd/electric Last internal inspection (Type and Date) New New New New Relief valve(s) installed Yes/No Yes Yes Yes Yes
F.03.2 Cement Silos, at Deck Level/Below Deck No. 1 & daytank
No. 2 & daytank
No. 3 No. 4
Capacity at deck level/main storage of each m3 113 & 40 113 & 40 113 113 Total Capacity at deck level/main storage m3 452 & 80
Type Weight loadcell Hyd/electric Hyd/electric Hyd/electric Hyd/electric Last internal inspection (Type and Date) New New New New Relief valve(s) installed Yes/No Yes Yes Yes Yes Separate barite, bentonite /cement loading possibilities Yes/No Yes Yes Yes Yes Discharge line for cement should be independent from barite/bentonite
discharge line.Yes/No Yes Yes Yes Yes
F.03.3 Surge Tank for Barite/Bentonite No. 1 No. 2 No. 3 No. 4
Capacity of each m3 6 6 Total Capacity m3 12
Type Weight loadcell Hyd/electric Hyd/electric Last internal inspection (Type and Date) New New Relief valve(s) installed Yes/No Yes Yes
F.03.4 Surge Tank for Cement No. 1 No. 2 No. 3 No. 4
Capacity of each m3 2 2
Total Capacity m3 4
Type Weight loadcell Hyd/electric Hyd/electric
Last internal inspection (Type and Date) New newRelief valve(s) installed Yes/No Yes Yes
F.03.5 Bulk Transfer SystemIndependent air system for the storage and surge tanks consisting of a high-volume low-pressure compressor and air drier.
Barite transfer feed rate MT/hr 100
Cement transfer feed rate MT/hr 120
Air compressor quantity, make and type 4 ea EMD
Air vessel capacity Cubic m. 2 x 5,5
C/w chemical drier/dehydration unit Yes/No Yes
Alternatively (or as back-up) air may be drive from the main air supplyand reduced to 40psi through dual pressure regulators. This systemthen to be provided with separate volume tank and drier.
Yes/No Yes, the rig air compressors are also used for bulktransfer. The pressure is reduced by regulators.Dedicated air vessels for the bulk system
-
8/19/2019 DrillShip Specfication IADC
25/28
DRILLSHIP IADC SPECIFICATION
Page 25 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
Handling of 1 tone "Big Bags", mud/brine mixing system to be capableof efficiently storing, handling and loading "big bags” of salt, etc.
Yes/No Yes
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
F.04 Cementing EquipmentF.04.1 Cementing Unit (to be supplied by Other Contractor)
Cementing system to be capable to kill a well at 10,000psi (prefereble 15,00 PSI) and to be able of mixing and pumping slurries with adensity up to 2.0 kg/lt
Owner of unit currently installed Schlumberger, free placement agreement
Make / Type CPS-763
No. of triplex pumps No. 2
Maximum working pressure psi 15,000
Unit powered by (electric or diesel) Electric
Re-circulating mixing system Yes/No TBA
Capacity bbl TBA
Liquid additive system Yes/No TBA
No. of tanks No. TBA
No. of measuring tanks No. TBA No. of transfer pumps No. TBA
Rated capacity of each bbl/min TBA
Premix/batch tank Yes/No TBA
Capacity bbl TBA Pressure recorder range psi TBA
Batch mixer type/capacity bbl TBA
Certified relief valve(s) type Yes/No TBA
F0.4.2 Cementing ManifoldThe cementing unit to be connected to the 15,000psi WP cement/wash down/kill standpipe manifold on the drillfloor with a HP 3" ID fixedline. The system shall be separate from the normal standpipe.
Flexible section Rigid section
Lines from cementing unit to Rig Floor Cementing Manifold No. 2
Outside / Min. Inside Diameter inch 5
Working pressure psi 15,000
-
8/19/2019 DrillShip Specfication IADC
26/28
DRILLSHIP IADC SPECIFICATION
Page 26 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM G - ACCOMODATION
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
G.01 OfficesG.01.1. Company drilling supervisor's office.
Complete with desk, filing cabinets, personal computer with Windows and Microsoft Office installed, printer Laser Jet 4+ or equivalent,photocopier, and all necessary furniture.
Quantity No. 2
Size sq. meters
Monitor linked to a remote controlled TV camera system to observe theracking platform
Yes/No Yes
G.01.2. Company operations engineer's office.Complete with desk, filing cabinets, personal computer with Windows and Microsoft Office installed, printer HP 4+ Laser Jet orequivalent, photocopier, and all necessary furniture
Quantity No. 1Size sq. meters
G.01.3 Contractor Toolpusher office Yes/No YesG.01.4 Radio room Yes/No Yes
G.01.5 Hospital roomHospital room containing two beds/bunks, wash basin, medical cabinet,dangerous drop locker.
Yes/No Yes
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
G.02 Living QuartersTotal accommodation for Personnel No. 217
Separate accommodation for Company staff(Company Man, Engineer, Night Company Man).
No. 4
Complete with own shower/bathroom Yes/No Yes
Accommodation for Company's Other Contractor staff No. As per contract
Accommodation for Contractor staff No. As per contract
Accommodation for Government representative No. As per contract Galley No. 1
Conference/meeting rooms No. 2Recreation rooms No. 2
Laundry/showers No. 1 laundry, all cabins has its own bathroom
Dryfood store No. 2
Refrigerator room No. 2
-
8/19/2019 DrillShip Specfication IADC
27/28
DRILLSHIP IADC SPECIFICATION
Page 27 of 28 11 June 2009
VERSION 04
Ocean Rig P.O.Box 409, N-4067 Stavanger Norway. Telephone +47 51 96 90 00 Fax +47 51 96 90 99 E-mail [email protected]
www.ocean-rig.com
ITEM H – Miscellaneous Equipment
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
H.01 Cranes &Handling Equipment
H.01.1. Pedestal CranesQuantity No. 4, knuckle boom cranes
Certification (API, etc.) ABS
Manufacturer / Type NOV
Minimum capacity and hoistings speeds MT-m/sec 85 MT. Hoisting speed at 17 MT 50m/min. Reducedload 100m/min
Boom Length feet Capacity at radius of:18 meter 85 MT, 36.5 meter 34 MT, 42.3 meter 17MT
Line length feet
Maximum Rated Capacity at 25 ft radius MT 85
Maximum Rated Capacity at maximum radius MT 17
Cranes to be fitted with:
a) Hook load indicator with visual or audible overload warning deviceautomatically corrected for boom angle.
Yes/No Yes
b) Hook fitted with safety latch. Yes/No Yes
c) Automatic brake (deadman's handle). Yes/No Yes
d) Crown savers Yes/No Yes
H.01.2. Pipe Rack Overhead CraneQuantity No. Ref section H.11.
Certification (API, etc.)
Manufacturer / Type
Rated capacity MT
H.01.3. Riser Rack Overhead CraneQuantity No. Ref section H.11.
Manufacturer / Type
Rated capacity MTH.01.4. BOP handling System
Quantity No. 1
Manufacturer / Type NOV BOP transporter system
Rated capacity MT 440
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
H.02 Helicopter Facilit iesH.02.1 Helicopter Fuel Storage Tanks
Rig site quantity No. 3 ea tanks
Total rig site capacity gal 2,298
H.02.2 Helicopter Refueling SystemCompany approved helicopter refueling facility and safe storage system for min. 6m3 helicopter fuel.
Make TBAStorage capacity gal 2,298
-
8/19/2019 DrillShip Specfication IADC
28/28
DRILLSHIP IADC SPECIFICATION
Page 28 of 28 11 June 2009
VERSION 04
ITEM I - Environmental Equipment
ITEM DESCRIPTION UNIT CONTRACTOR'S DATA
I.01 Environmental Equipment Provided and Systems in placeI.01.2 Closed Drilling Fluids Drainage System Yes/No Yes
Draining fluids collected from:
Rotary Table Yes/No Yes
Rig Floor Yes/No Yes Main deck Yes/No Yes
Sand Traps Yes/No Yes
Trip Tank Yes/No Yes
Mud Tank Yes/No Yes
Rate and Mouse hole Yes/No Yes
I.01.3 OBM Handling Equipment Yes/No
Cutting chutes, 12" oil resistant hoses, 40' below the water line, fromcascade and shale shakers
No
Anti-spill metal walls for pumps and valve areas. Yes
2 oil water separators for spider deck. No
Foam system in Pit Room, Mud Pump Room and Mixing Pump area TBA
Boot washing station as required YesManual pit volume indicator in active tank No
Kick plates in front of shakers Yes
Dump box with piping for centrifuges TBA
Proper isolation of water system in mud pit room. Yes
Drill pipe and drill collar rack draining system on Drill Floor. Yes
Kick plate around stripping tank and pump. Yes