Draft Yearbook 2010-11

146
DRAFT YEAR BOOK 2010-11 Page 1 With Standard Construction Practices & Technical Data for Distribution Works 20010-11

Transcript of Draft Yearbook 2010-11

Page 1: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 1

With Standard Construction Practices & TechnicalData for Distribution Works

20010-11

Page 2: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 2

ContentsCHAPTER-1

An Account of Growth of Power Sector in J&K State.

1.1 Chronology of important events in J&K State…………………………............................................................6-12

CHAPTER-2

Organizational Structure, Profile and Details of Manpower2.1 Organizational Structure……………………………………………………………………………………………...132.2 Profile of Various Wings of Power Development Department……………………………………………………14-152.3 Organizational Structure of M&RE Wing, Kashmir…………………………................................................... 162.4 Organizational Structure of M&RE Wing, Jammu………………...…………………………………. …………..172.5 Organizational Structure of S&O Wing, Kashmir……………………………………………………..……………182.6 Organizational Structure of S&O Wing, Jammu ……………………………………………………..…………….192.7 Organizational Structure of Planning & Design Wing, Jammu…………………………………………………....192.8 Organizational Structure of Procurement & Material Management Wing………………………………………..202.9 Organizational Structure of Commecial & Survey wing …………………………………………………..………202.10 Organizational Structure of Director TTIC…………………………………………………………………………..212.11 Year Wise Statement of No. of Employees………………………………………………................................... 222.12 Category Wise Sanctioned/Existing Strength of PDD Employees..………………………….……………………23-25

CHAPTER-3

Infrastructure Available3.1 Abstract of Transformation Capacity & Line Length in J&K State……………………………………………… 263.2 Details of 220/132kV Transformation Capacity in Jammu & Kashmir Regions………………………….…… 273.3 Details of 132/33kV Transformation Capacity in Kashmir Region……………………………………………… 28-293.4 Details of 132/33kV Transformation Capacity in Jammu Region…………………………………………………30-313.5 Details of Transmission Lines at 220kV Level in Jammu & Kashmir Regions…………………………………..32

Page 3: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 3

3.6 Details of Transmission Lines at 132kV Level in Kashmir Region…………..………….……………….………..333.7 Details of Transmission Lines at 132kV Level in Jammu Region………………………………………………....343.8 Circle-wise HL/LT Ratio at Distribution Level ………………….……………......................................................353.9 Abstract of 66/33/11/6.6 kV Sub stations of EM&RE Wing Jammu ……………………………………………….363.10 Capacity Wise list of 66/ 33/11/6.6 KV R/Stations of Jammu Province…………………………………………..37-443.11 Division wise Transformers and their capacities at 33/11 and 33/6.6 kV level in EM&RE Wing, Kashmir ….453.12 Capacity Wise list of 33/11 KV Receiving Stations in EM&RE Wing, Kashmir………………………………….46-553.13 Capacity Wise list of 33/11 KV Receiving Stations in EM&RE Wing, Kashmir………………………………….56

CHAPTER-4

Electric Power- Installed Capacity, Its Availability & Consumption

4.1 Electric Power-Installed Generating Capacity & Hydel Projects in Operation underState & Central Sector........................ …………………………………………………………………………..57-58

4.2 Upcoming Power Houses under State and Central Sector…………………………………………………….594.3 Generation in Ladakh Region (Owned by JKPDD)……………………………………………………………..604.4 List of the DG Sets with Installed Capacities in Leh District………………………………………. ………….61-634.5 List of the DG Sets with Installed Capacities in Kargil District…………………………………………………64-654.6 List of the DG Sets with Installed Capacities in Keran,Gurez &Machil……………………………………..…664.7 Entitlement from CPSUs and Other External Sources………………………… ……………………………....67-684.8 Demand and Availability Scenario (POWER)………………………………... ……………………………….. 694.9 Demand and Availability Scenario (ENERGY)……………………………….................................................704.10 Seasonal Power Deficit…………………………………………………………………………….......................714.11 Year-wise Statement of Energy Consumption…………………………………………………………………...724.12 Year-wise Statement of Energy Purchased from Northern Grid …………………………………………….…734.13 Year-wise Statement of Self Generated Energy of State available to PDD……………………………… ….744.14 Gross Per Capita Power Consumption of J&K…………………………………………………………………...754.15 Average Cost of Supply (ACS), Average Revenue Realized (ARR) and AT&C Losses ……………………76-774.16 Bifurcation of Transmission and Distribution Losses for 2010-11………………………………………………78

Page 4: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 4

CHAPTER-5

Electricity Consumers, Connected Load and Revenue Realization and Arrears

5.1 Category wise Number of Consumers as on 31-3-2011.………………………………………………………...795.2 Category wise Consumption for 2010-11…………………………………………………………………………..805.3 Category wise Connected Load (in MWs) ………………….……………………………………………………. 815.4 Metering Status upto 31-3-2011.………………………………………………………………………………….....825.5 Year wise Revenue Realization……………………………………………………………………………………...835.6 Category wise Revenue Realized for the period 2008-09 to 2010-11 in J&K..………………………………....845.7 Category wise Revenue Realized for 2008-09 to 2010-11 in respect of EM&RE wing Jammu ……………. 855.8 Category wise Revenue Realized for 2008-09 to 2010-11 in respect of EM&RE wing Kashmir …………….865.9 Category wise Subsidy Component for 2009-10 to 2010-11.........................................................................875.10 Arrears of Non Govt. and Govt. Consumers from 2002-03 to 2010-11 ……………………….……………….88.

CHAPTER-6Computerized Billing

6.1 Status of Computerized Billing EM&RE Wing, Jammu as on 31/03/2011……………………………….…….896.2 Status of Computerized Billing EM&RE Wing, Kashmir as on 31/03/2011……………………………………..90

CHAPTER-7

Schemes under Implementation

7.1 RGGY Schemes……………………………………………………………………………………………………….917.2 Districts wise REC Sanctioned/Approved Cost, Amount Released By REC, Expenditure under RGGVY....927.3 Physical Progress report ending 3/2011 under RGGVY ………………………………………………………….937.4 Accelerated Power Development and Reforms Programme (APDRP)……………………….…………………94-957.5 Summary of Achievements under APDRP ………………………………....…………………………………… 95

Page 5: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 5

7.6 Scheme Wise Achievements…………………………………………………………………………..………. 96-987.7 Hon’ble Prime Ministers Reconstruction Programme……………………………………………………..… 997.8 New / Augmentation of Grid Station in Jammu & Kashmir Divisions…………………………….………... 1007.9 Achievement Ending 03/2011……………………………………………………………………………………101

CHAPTER-8

Power Sector Reforms8.1 Benchmarks Under Ist Tripartite MOU…………………………………..…………………………..……………1028.2 Benchmarks Under IInd Tripartite MOU……………………………………………………………………….….1038. 3 Benchmarks Under IIIrd Tripartite MOU………………………………………………….……………….……....104-1068. 4 Targets and Achievements under Ist & IInd Tripartite MOUs…………………………………………….……..107

CHAPTER-9

STANDARD CONSTRUCTION PRACTICES & TECHNICAL DATA FOR SUB-TRANSMISSION &DISTRIBUTION WORK 108

9.1 Recommended Type & Size of Multi core Cables/Single Core Cables ……………………………………...109-1109.2 Current Rating of Distribution & Power transformers………………………………………………..…….…….1119.3 Fuse ratings………………………………………………………………………………………………….. ….….1129.4 CT Ratios applicable for HT/LT Metering………………………………………………………………………….1139.5 Economic Design for Pre stressed Concrete Poles……………………………………………………….……...1149.6 Specification of Swaged Type Steel Tubular Poles(IS 2713)……………………………………...…………….115-1169.7 Weight per meter for various types of steel…………………………………………………………....................1179.8 Rating of Capacitors for KVAR Compensation…………………………………………………………………….1189.9 Extract from Record Note of meetings of KEECC………………………………………….. ……………………119-1319.10 Construction Drawings for X arms, Substation-frame etc……………………………………….………………...132-146

Page 6: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 6

Chapter-1

An Account of Growth of Power Sector in J&K State.The State of Jammu & Kashmir is located in the Extreme North of India and is bound on the North by China and on the

South by Himachal Pradesh and Punjab and on the west by Pakistan. The State has a Population of 10,143,700 with1,568,159 House Holds as per 2001 Census.

The state is traversed by three main rivers i.e. Indus, Jehlum and Chenab. The Indus traverses through Ladakh, whilethe Jehlum flows through Kashmir and Chenab drains Jammu.

The average rainfall is about 100 Cms.

There are Huge Glaciers in the state and the existence of high mountains with glaciers and rainfall makes it heaven forhydel generation.

As per Preliminary survey an estimated potential of 16000 MWs of power has already been identified while the actualPotential is much more.

The state of Jammu and Kashmir was the second only to the Mysore State in having Hydro Power as far back as the 1stdecade of this Century.

P o we r Deve lo p m e n t Dep a r t m en t

Page 7: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 7

1.1 CHRONOLOGY OF IMPORTANT EVENTS IN J&K POWER SYSTEM

1908 4×1 MVA,23KV, 25 Hz Mohra Power project commissioned

Head 430 Feet, Pelton wheel Turbine.

2nd in India after Mysore

Constructed by GE (General Electric ) America

Commissioned in 1908, Moharra Power Station served to light thousands of Kashmiri homes besides a small number ofsmall industrial units comprising rice huskers, flour and oil grinders, bandsaws, silk reeling, weaving, spinning and like. Theonly available route to Kashmir Valley those days was Jhelum Valley road ( Muzzafarabad road) along the banks of riverJhelum. The heavy equipment could be easily transported to Mohra on this road. No formal transport was Available exceptsome Horse driven carts and the only Navigable area at that time was from Khannabal to Khadiyar.

25 Hz, AC power generated at 2300 Volts was stepped upto 30 kV for its transmission to Sopore, Braramulla and Srinagar.30/2.3 kV Receiving Sub Stations were in operation at Silk Factory and Narwara in Srinagar, at Amargarh in Sopore and atBaramulla. 2.3 kV Supply was also available at Pampore, Pattan, Tangmarg and Gulmarg.

Mohora was the only source of power supply in Kashmir Valley till the year 1955. In June,1955, 2x3 MW Ganderbal HydelProject was Commissioned. The Mohora however continued generating till July 1959 when it was struck by the unprecedentedfloods in Jhelum. The flood waters hit the Power House, sharing its building into two halves, longitudinally.

1948 Work started for construction of Ganderbal Power House

The Sindh Valley Multipurpose Project with its power house at Ganderbal had been investigated in forties. Civil works wereentrusted to the Irrigation Department while its electric works were to be done by the then Electrical and MechanicalDepartment. Construction of Civil Works had been taken in hand in 1948. The electromechanical plant of 2x3 MW Capacitywas ordered on M/s Associated Electrical Industries Calcutta who supplied the Electrical Equipment of M/s MetropolitanVickers and Matching Hydro Equipment made by Escherwyss, Switzerland.

Page 8: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 8

1954 Electrification in Anantnag, Khanabal, Bijbehara and Awantipora town started.

Extension of 33 kV transmission line from Srinagar to Anantnag.

66 kV line (on wooden poles) from Pathankote Grid station (Punjab) to Canal receiving station (Jammu) wascommissioned.

Real boost to power availability came.

1955 Ganderbal Project commissioned by the then Indian President Dr Rajendra Prasad.

Srinagar city was divided into two zones , Zone 1 receiving 25 Hz, 230 V, 3Ø supply from Mohra and zone 2 receiving 50Hz, 400-230 V, 3Ø supply from Ganderbal .

1957 A project report for adding 9 MW in Ganderbal Project was approved.

Mohra Power project was revived and its frequency was changed from 25 Hz to 50 Hz in order to meet the severe overloading .

1961 Additional 9 MW Units of Ganderbal project commissioned.

Old Mohra closed and abandoned.

Ganderbal was the lone source of power

1962 New Mohra (9MW) commissioned and synchronized through 66 kV over head line (on wooden poles) with Ganderbal.

Local grid to which two sources were connected came into existence for the first time in the state. (It was an extremelyexciting event for the Engineers).

New transmission line from Sarna to Glandi (Ghandinagar) (66 kV, 20 MW) on steel poles was commissioned.

Page 9: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 9

1964 Mini Hydel project (2× 350 KVA) at Rajouri commissioned

1965 Mini Hydel project (2× 350 KVA) at Bhaderwah commissioned

1967-68 132 KV Transmission line between Kalakote and Chenani was constructed by Electric Department along with 132 / 66

kV Grid station at Janipora.

Circuits were split into two at Banihal Tunnel, one overhead circuit crosses Pir Panjal Top and 2nd through JawaharTunnel as Gas Filled Cables.

Upper Sindh–I (2×11.3 MW) commissioned.

1969 Three units (3×7.5 MW ) of Kalakote commissioned.

Grid operation became a reality in Jammu region

1971 Chenani power plant ( 3×5 MW ) commissioned.

Parallel operation or synchronization with Punjab Grid between two generating station of state in Jammu on one sideand Punjab on the other was established.

Jammu became surplus while Kashmir had shortage.

1972 Constitution of Jammu and Kashmir Electricity Board in pursuance of J&K Electricity Supply Act 1971.

1976 A major event in 1970’s was interconnection of Kashmir and Jammu through 132 kV Udhampur Srinagar Double Circuit

Line.

Page 10: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 10

Advantages due to this interconnection:• Boosted generation Capability.• Stabilized the supply frequency .• Reliable Power Supply.• Efficiency of the system increased.• Faults reduced to large extent.

Formation of POWER DEVELOPMENT DEPARTMENT Headed by Commissioner and Secretary to Govt.

1983-84 Karnah HEP (2 MW) commissioned

1987-1990 Salal HEP of 345 MW commissioned.

Stakna (4 MW) at Leh was commissioned.

Salal - Gladni 220 KV Single Circuit and 220 kV Double Circuit Transmission Lines Energized.

GlAdni - Miran Sahib 132 KV Double Circuit line commissioned.

35 MVAR Shunt at Pampore (supplied by Crompton & Greaves).

Series Capacitor Bank at Wanpoh (supplied by BHEL) . These measures were taken to increase the transmissioncapacity of 132 kV line from 60 MW to 155 MW.

With the Commissioning of Salal ( HEP) which was thought to make up for the power deficit of valley also, departmentfell handicapped because in spite of surplus power in Jammu region there was no adequate transmission facilities toKashmir Valley in addition to Udhampur-Bemina 132-KV line which could not carry more than 70 MW , while as deficit inthe valley was around 300 MW.

To overcome this problem various options were considered like

Reactive compensation (installation of 33 kV shunt capacitors at various Grid Stations and Series Compensation(Installation of Series Capacitor bank) of the line.

Page 11: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 11

Changing this Double Circuit line to HVDC link, the study was undertaken by the Department and the choice fell onCompensation.

To manage the peak load by reviving Bemina Diesel or Gas Turbine.

Lower Jehlum Hydel Project (105 MW ) was commissioned.

Sumbal (22.6 MW)(exact dates of commissioning of these projects not mentioned)

Kishenpore – Double Circuit Line Commissioned.

1990-2000 220 KV Inter-regional Transmission line between Jammu and Kashmir commissioned in 1996(220 KV Kishenpur-

Pampore Transmission Line)

220/132 KV Pampore Grid Station Commissioned in 1996

220/132/33 KV Grid station at Zainakote commissioned in 1998

2001-2011 USHP-II, 105 MW Power Project commissioned at Kangan

400 KV Inter-regional Transmission Line between Kishenpur and Srinagar commissioned by PGCIL

First ever Tariff Order for electricity determined and issued by JKSERC in March 2007.

J&K PDD launched its Website under URL: www.jkpdd.gov.in in 2007.

Computerized billing of consumers of Jammu & Srinagar city completed in 2007-08.

Second Tariff Order for electricity issued by JKSERC in Sep.2009.

160 MVA,220/132 kV Barn Grid Sub Station commissioned in 2008.

20 MVA , 132/33 kV Draba Grid Station commissioned in 2008.

50MVA132/33 kV Grid Station Khanmoh Commissioned in April-2009

100MVA 132/33KV Grid station Bari-Brahmana-II Commissioned in 2009

Page 12: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 12

50 MVA 132/33 kV Gangyal Grid Station Commissioned in May-2009

50MVA132/33 kV Grid Station Tethar Commissioned in Oct -2009

50MVA132/33 kV Grid Station Mahanpur Commissioned in Aug -2009

Third Tariff Order issued by SERC in April 2010

Electricity Act 2010 notified by GoJ&K in April 2010

120 MWs HEP SEWA II on Ravi Basin commissioned in September 2010.

Page 13: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 13

Chapter-2

Organizational Structure, Profile and Details of Manpower

2.1 - Organizational Structure

ChiefEngineerM&REWingKashmir

ChiefEngineerM&REWingJammu

ChiefEngineerS&OWingKashmir

ChiefEngineerP&MMWing(Moving)

ChiefEngineerC&SWing(Moving)

ChiefEngineerS&OWingJammu

ChiefEngineerP&DWing(Moving)

DirectorTraining, Testing,

Inspection andCommissioning Wing

(Moving)

DevelopmentCommissioner

(Power)

Page 14: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 14

2.2 - PROFILE OF VARIOUS WINGS OF POWER DEVLOPEMENT DEPARTMENT

PROFILE-Maintenance & RE Wings Overall distribution at 66 & 33 KV level and below.

Setting up, maintenance and operations of 66-33/11-6.6 KV Sub-transmission systems

Setting up, maintenance and operations of 11KV/433V distribution system

The billing of energy to consumers and collections

The face of PDD in dealings with individual consumers.

PROFILE-System and Operation Wings Overall transmission above 66 / 33 KV level.

Setting up, maintenance and operations of 220/132/33 KV Grid stations

Setting up, maintenance and operations of 220KV and 132 KV transmission lines.

PROFILE-Planning & Design Wing Technical study and approval of Projects

Setting up standards of quality control for projects

Procurement process of equipment for Grid stations and transmission lines above 66/33 KV.

PROFILE- Procurement and Material Management Wing Procurement of line material and equipment for the Sub-transmission level and below.

Maintaining inventory of material for M&RE wings in its stores

Page 15: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 15

PROFILE-Commercial and Survey Wing POWER PURCHASES

Scheduling at merit order

Power arrangements under exchange with other states and agencies.

Setting up, maintenance and operations of Communication network between different Grids and power houses

Enforcement of power curtailments as per schedule for of strict grid discipline

Managing operations of the SLDC and Sub LDC

Testing of Electric Protection for all electric installations

PROFILE- Training, Testing, Inspection and Commissioning Wing Arranging Training for the staff

Technical Inspection of all new electric installations before their commissioning

Setting Standards for Electric Contractors and issuing licenses after gauging their abilities

Technical Investigation of all electric accidents

Electrical testing and commissioning .

Page 16: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 16

2.3 - Organizational Structure, M&RE Wing, Kashmir

Circle-IstSrinagar

Circle-IIndSrinagar

Circle-NorthSopore

ED-Ist Srinagar

ED-IV Srinagar

STD-IstSrinagar

CentralWorkshopPampore

ED-II Srinagar

ED-III Srinagar

ED-Budgam

STD-II,Srinagar

ED-Baramulla

Circle-SouthBijbeharaag

ED-Handwara

ED-Sopore

ED-Sumbal

STD-Sopore

ED-Anantnag

ED-Kulgam

ED-Bijbehara

STD-Bijbehara

Circle-Leh

ED-Leh

ED-Kargil

Direction Office, Srinagar

Circle-South

Pulwama

ED-Pulwama

STD-Pulwama

ED-Shopian

ED-Awantiporaaaa

Circle-Ganderbal

ED-Bandipora

ED-Ganderbal

STD -Ganderbal

Page 17: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 17

2.4 - Organizational Structure, M&RE Wing, Jammu

CircleJammu

Circle-Rajouri

Circle-Batote

ED-Ist Jammu

ED-II Jammu

ED-III Jammu

STD-Ist Jammu

ED-Rajouri

ED-Poonch

ED-Batote

ED-Udhampur

STD-Udhampur

STD-II Jammu

STD-IVKalakote

Direction Office, Jammu

Circle-Kuthua

ED-Vijaypur

STD-III,Kathua

ED-Kathua

Circle-Kishtwar

ED-Doda

STD-Doda

ED-Kishtwar

ED-Reasi

CentralWorkshopJammu

Page 18: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 18

2.5 - Organizational Structure, S&O Wing, Kashmir

Circle-Ist.Srinagar

Circle-IISrinagar

TLMD-I, Srinagar

TLMD-II,Pampore

TLMD-III,Sopore

TLCD-I, Srinagar

TLCD-II, Srinagar

GCD, Srinagar

TLMD-IV,Pampore

Direction Office, Srinagar

Page 19: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 19

2.6 - Organizational Structure, S&O Wing, Jammu

2.7- Organizational Structure, Planning & Design Wing

Circle-I.Jammu

Circle-IIJammu

TLMD-I, Jammu

TLMD-II, Jammu

TLMD-III, Udhampur

TLCD-I, Jammu

TLCD-II,Jammu

GCD,Jammu

P&D Circle, Srinagar P&D Circle, Jammu

Direction Office, Jammu

Direction Office, Moving

Page 20: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 20

2.8 - Organizational Structure, Procurement & Material Management Wing

2.9- Organizational Structure, Commercial & Survey Wing, Jammu

Purchase Circle, Srinagar Purchase Circle, Jammu

Elect. Central StorePampore

Elect. Central StoreJammu

Survey Division, Srinagar

Commercial Division,Srinagar

LDM&T Division ,Srinagar

Survey Division, Jammu

Commercial Division,Jammu

LDM&T Division, Jammu

Direction Office, Moving

Direction Office, Jammu(CE Moving)

Circle Office-Srinagar

Page 21: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 21

2.10- Organizational Structure, Training, Testing, Inspection and Commissioning Wing

Inspection Division,Srinagar

Inspection Division,Jammu

DirectorTTIC Wing Moving

Page 22: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 22

2.11 - Year Wise Statement of No. of Employees

S.No. Year No. ofEmployees

1 1998-99 20500

2 1999-2000 20700

3 2000-01 20925

4 2001-02 21010

5 2002-03 21300

6 2003-04 21500

7 2004-05 22600

8 2005-06 22600

*9 2006-07 23274

*10 2007-08 23816

*11 2008-09 24862

*12 2009-10 26178

*13 2010-11 31010

* This includes 13325 No daily wagersas well

Page 23: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 23

2.12 CATEGORYWISE SANCTIONED/EXISTING STRENGTH(GAZETTED/NON-GAZETTED) OF VARIOUSWINGS OF J&K PDD AS ON 31-03-2011

S.No

Category of post

DCPOffic

e

M&REWingKmr.

M&REWingJammu

S&O WingKmr.

S&O wingJammu

P&MMWing

C &SWing

P&DWing

Director TTIC

Total

Total

S E S E S E S E S E S E S E S E S E S E

1Dev. CommissionerPower J&K

1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1

2 Chief Engineer 0 0 1 1 1 1 1 1 1 1 1 0 1 1 1 1 0 0 7 6

3SuperintendingEngineer

0 0 7 7 5 5 2 2 2 1 2 2 1 1 2 2 1 1 22 21

4ExecutiveEngineer

2 2 27 26 20 20 8 8 7 7 8 7 6 5 7 7 2 2 87 84

5Special MobileMagistrate

0 0 5 2 3 2 0 0 0 0 0 0 0 0 0 0 0 0 8 4

6Asstt. Ex. EngineerC/ E /M

2 0 113 76 96 71 29 22 28 14 25 22 24 12 15 10 7 5 339 232

7 Asstt. Engineer (E / C/M) 0 0 97 76 82 80 20 17 18 18 1 1 13 11 0 0 4 4 235 207

8Jr. Engineer includingcontractual.

3 3 429 379 328 328 130 130 132 123 67 67 94 94 23 23 4 4 1210 1151

9Jr. EngineerCivil

1 0 9 2 7 4 8 4 7 4 0 0 0 0 0 0 0 0 32 14

10SeniorForeman

0 0 60 40 45 20 25 10 20 5 0 0 5 0 0 0 0 0 155 75

11 Tech-I 0 0 100 100 82 82 0 0 29 8 0 0 10 6 0 0 4 1 225 197

12 Tech-II 0 0 223 223 122 103 29 19 32 21 0 0 1 1 0 0 6 1 413 368

13 Tech-III 0 0 1727 1426 1241 1195 211 181 261 207 0 0 439 304 0 0 38 24 3917 3337

14 Tracer 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 1

15 Tech-IV 0 0 2833 2431 1469 1263 0 0 123 100 0 0 17 16 0 0 0 0 4442 3810

Page 24: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 24

16

Helper/Lineman/SBA/BillDistributor/TechV/Gatekeeper/Store Attendent/Attendent

0 0 3433 1777 1963 1963 437 323 348 324 8 6 0 0 0 0 0 0 6189 4393

17 Meter Reader 0 0 497 453 160 153 1 1 1 0 0 0 0 0 0 0 0 0 659 607

18 Technician ITI 0 0 0 0 0 28 0 0 0 0 0 0 0 0 0 0 0 0 0 28

19 Geological Asstt. 0 0 0 0 2 0 1 1 1 1 0 0 0 0 0 0 0 0 4 2

20Chief AccountsOfficer

0 0 1 1 1 1 0 0 0 0 1 1 0 0 0 0 0 0 3 3

21Sr. Law Officer/Law Officer/Legal Asstt.

0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 2

22 Adm. Officer 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3 3

23Accounts Officer /Rev. Officer

1 1 4 1 4 1 1 1 0 0 3 2 2 1 1 1 0 0 16 8

24 Head Computer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9 9

25 Dy. Director Pl. 1 0 1 1 1 1 1 0 1 1 0 0 0 0 0 0 0 0 5 3

26 Pvt. Secretary 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0

27Asstt. AccountsOfficer

1 0 25 21 20 18 8 8 7 7 7 7 2 2 1 1 0 0 71 64

28 Section Officer 1 1 5 5 5 5 1 1 1 1 1 1 2 2 1 1 0 0 17 17

29 Sr. Stenographer 1 1 1 1 1 1 1 1 1 1 1 1 0 0 1 1 0 0 7 7

30 Statistical Officer 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 4 3

31 Jr. Stenographer 1 0 7 1 7 4 3 2 3 2 4 3 1 0 3 1 1 1 30 14

32 Head Asstt. 3 3 27 21 26 13 11 10 10 8 7 4 14 5 3 1 3 2 104 67

Page 25: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 25

33Rev.Superintendent

0 0 21 12 16 13 0 0 0 0 0 0 0 0 24 14 0 0 61 39

34 Sr. Asstt. 7 3 200 152 95 85 36 31 32 27 31 28 34 27 0 0 6 4 441 357

35 St. Asstt. 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0

36 Accounts Asstt. 1 0 18 12 17 12 7 6 0 0 12 9 0 0 1 1 0 0 56 40

37 Steno Typist 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 1

38 Jr. Asstt.15

13

395 307 105 136 53 47 44 34 52 36 62 55 34 28 11 8 771 664

39 Rev. Examiner 0 0 10 0 45 39 0 0 0 0 0 0 0 0 0 0 0 0 55 39

40 Ledger Clerk 0 0 0 0 96 96 0 0 0 0 0 0 0 0 0 0 0 0 96 96

41 Head Draftsman 1 1 3 1 20 20 2 2 7 7 3 3 2 2 1 1 1 1 40 38

42 Draftsman 0 0 29 18 26 21 10 10 9 8 17 9 1 1 9 7 3 1 104 75

43 Driver / Chauffer 1 1 63 46 66 54 25 23 26 24 22 9 16 14 3 2 3 3 225 176

44Orderlies / Chowkidar /Jamadar / Dak Runner

16

15

496 407 335 326 61 46 66 66 69 50 54 29 38 25 12 9 1147 973

45 Computer Operator 0 0 5 5 9 9 0 0 0 0 0 0 30 25 0 0 0 0 44 39

46Computer Assistants (3050-4910)

0 0 0 0 0 0 0 0 0 0 0 0 35 31 0 0 0 0 35 31

47 Cleaner 2610-3540 0 0 3 2 0 0 0 0 5 0 2 0 0 0 0 0 0 0 10 2

48 Lineman Grade I 0 0 398 296 3 2 0 0 0 0 0 0 0 0 0 0 0 0 401 298

49 Lineman Grade II 0 0 0 0 0 0 0 0 0 0 0 0 91 79 0 0 0 0 91 79

50Daily Rated Workers/Casual

labours /N eed Base C/Ls0 0 0 7571 0 4254 0 1227 0 257 0 9 0 7 0 0 0 0 0

13325

Total 21800 31010

Page 26: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 26

Chapter-3Infrastructure Available as on 31-03-2011

3.1- AbstractAb of Transformation capacity in J&K State

Description Jammu Kashmir TotalNo MVA No MVA No/MVA

220/132 kV Grid Sub Stations 4 1590 2 900 6/2490.00

132/66-33 kV Grid Sub Stations 22 1422 20 1836.64 42/3258.64

a) 66/33 kV Sub Station 2 52.50 ….. ….. 2/52.50b) 66/11 kV Sub Station 26 269.10 ….. ….. 26/269.10

c) 66/6.6 kV Sub Station 4 20.0 ….. ….. 4/20a) 33/11 kV Sub Stations 196 1547.9 204 2279.70 400/3827.60b) 33/6.6 kV Sub Stations 5 32.90 7 71.30 12/ 104.2c)33/0.4 kV Sub Stations 1 5 7 62.55 8/67.55d)11/0.43 kV Sub Stations 17561 2021.48 16939 2638.12 34500/4659.60e)6.6/0.43 KV Sub-Stations 91 9.39 591 95.24 682/104.63f)No of 11/6.6 KV feeders 800 712 1512

Abstract of Line Length of Transmission lines in J&K state

Description Jammu Kashmir TotalCkt.Km Ckt. Km Ckt.Km

220 kV Line Length (Km) 422.26 200 622.26132 kV Line Length (Km) 877.12 734 1611.12

66 kV Line Length (Km) 221.8 ….. 221.833 kV Line Length (Km) 2147.53 1766.00 3913.53

11 kV Line Length (Km) 15980.44 12370.51 28350.95

6.6 kV Line Length 157.30 175.00 332.30LT Line Length(Km) 32916.376 27530.00 60446.375

Page 27: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 27

3.2 - Details of 220/132kV Transformation Capacity in Jammu & Kashmir

a) Kashmir Region

b) Jammu Region

SNo.

Name of the220/132 KV Grid

sub station

Capacity Date ofcommissioningof Grid Station

Name of the schemeunder which sub station

constructed

No. ofoutgoing132 KVfeeders

Remarks

No. MVA / X-MVA Total MVA

1 Gladni

3+1spare 133.33 400 1985 State Sector 7

#2 160+150 310 2008

2 Udhampur 6+1spare 40 240 1981 State Sector 5

3 Hira Nagar

3+1spare 66.67 200 2001

State Sector 43+1spare 40 120 1996

4 Barn 2(3Ph) 160 320 2008 PMRP 2

TOTAL 1590

S.No.

Name of theGrid Sub Station

Transformation Capacity Date of

Commissioning

Name of the schemeunder which Sub Station

Constructed

No.ofoutgoing

132 kVfeeders

RemarksNo MVA /

Tfm. Total (MVA)

1 Pampore 9 +1 50 450 +50(spare Jully-1996

220 kV Kishanpur-Pampore

Transmission Line Project4

2 Zainakote 9+1 50 450 +50(spare) Dec.1998

300 MVA 220/132 kV GridStation at Zainkote with220 kV D/C Wagoora-Zainkote Transmission

Line

6The Sub Station ishaving 33kV level

also

TOTAL 900+100

Page 28: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 28

3.3 - Details of 132/33 kV Transformation Capacity in Kashmir Region

Name of theGrid Sub Station

Transformation CapacityTOTAL (MVA)

Date of Commissioning /Name of the scheme under

which Sub StationConstructed

No.of33 kV

feedersRemarks

No MVA /Tfm. Total (MVA)

Bemina3 50 150

185.64 1973 66+1 5.94 35.64+5.94

Wanpoh

1 50 50

120 1973 62 20 40

2 15 30

Amargarh

1 50 50

95 1977 61 20 20

2 12.5 25

Habak2 50 100

120 1981 61 20 20

Pampore9+1 16.66 150+16.66

200 1982 10 50MVA capacity addedduring 2007-081 50 50

Pattan 3 20 60 60 1987 4

Cheshmashahi

1 50 50

105 1987 42 20 40

1 15 15

Rawalpora1 50 50

110 1993 63 20 60

Page 29: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 29

Name of theGrid Sub Station

Transformation Capacity

TOTAL (MVA)Date of Commissioning /

Name of the scheme underwhich Sub Station

Constructed

No.of33 kV

feedersRemarks

No MVA /Tfm.

Total(MVA)

Arampora 21

2050

4050 90 1995

50MVA added in 2009-10 3

Wanganpora 6+1 25 150+25 150 1996 5

Zainkote 3 +1 25 75 +25 75Dec.1998/Const.of 300

MVA 220/132kV Grid StnZainkote

3

Awantipora 3+11

2550

75+2550 125 1999/Const.of 75 MVA

50MVAadded in 2009 6 Added by virtue of Depositcontribution.

Lassipora 3+1 25 75+25 75 05.04.2003 /Const.of75 MVA 132/33 kV

G/Stn.Lassipora

4

Badampora1 50 50

6616.10.2004/Const.of 36

MVA 132/33kVG/Stn.Badampora

1

Augmented to 66MVAreplacing 20MVA

transformer by 50MVAtransformer during 2007-081 16 16

Kangan 1 20 20 2029.04.2006/Const. of 20

MVA 132/33kV G/Stn.Kangan

3

Sheree 1 50 50 5006.05.2006/Const.of 50MVA 132/33 kV G/ Stn.

Sheree3

Mattan1 50 50 50

23.09.2006/Const. of 50MVA 132/33 kV G/Stn.

Mattan2

Kulgam 2 20 40 4002.12.2006/Const. of 40MVA 132/33 kV G/Stn.

Kulgam1

Khonmoh 1 50 50 50 2-10-2009 3 Under PMRP

Tethar 1 50 50 50 28-05-2009 3 Under PMRP

TOTAL 1836.64

Page 30: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 30

3.4 Details of 132/33 kV Transformation Capacity in Jammu Region

Name of the132/66/33 KV

Grid sub station

CapacityDate of commi. Of

G/StnName of the scheme

under which sub stationconstructed

No. ofoutgoing66/33 KVfeeders

Remarks

No.MVA / X-

MVA Total

132/66 KV

Kathua 2 50 100 1994 State sector 3 (66 KV)

Hira Nagar1 50

72.5 1990 State sector 3 (66 KV)3 7.5

Samba 2 50 100 2001 State sector 2 (66 KV)

132/33 KV

Gladni 2 50 100 1985 State sector 5

Bari Brahmana2 50

131.50 1988 State sector6

(132/33 KV) 50(132/11) 31.5

1 31.5 1

Miran Sahib1 50

90 1989 State sector 42 20

Janipur 2 50 100 1967 State sector 71 no. 50 MVA Xmer is under outage

& replaced b 31.5 MVA Xmer.ofJhajjar Kotli G/Stn.

Canal 2 50 100 1993 State sector 6

Akhnoor 1+1 20+20 40 1979 State sector 6

Jhajjar Kotli 2 31.50 70 1977 State sector 71 no. 31.5 MVA Xmer replaced by 15

MVA Xmer & shifted to JanipurG/Stn.

Udhampur 1 5070 1981 State sector 4

1 20

Page 31: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 31

Batote 1+1 15+20 35 1978 State sector 4

Khellani 2 20 40 1995-96 State sector 2NHPC(Kishtwar) 1 20 20 - NHPC 1

Sidhra 1 20 20 1995 State sector 3

Barn 2 20 40 2005 PMRP 2

Rajouri 3 20 60 1994-95 State sector 5

Kalakote 1 20 20 1987 State sector 1

Bari-Brahmana-II 2 50 100 2008 PMRP 2

Draba (Poonch) 1 20 20 2008 State sector 1

Gangyal 1 50 50 2009 PMRP 3

Mahanpur 1 50 50 2009 State sector

TOTAL 1422

Page 32: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 32

3.5 - Details of Transmission Lines at 220kV level Jammu & Kashmir regions

a) Kashmir Region

b) Jammu Region

S.No

Name of the Double / Singleckt line

LineLength

KmTotal Circuit

kms.Date of

CommissioningName of the scheme under

which Line Constructed

1Kishenpur-Pampore

(Pampore-Tethar Section)D/C Line

72 144 July.1996 220 kV Kishanpur-PamporeTransmission Line Project

2 Wagoora-ZainkoteD/C Line 28 56 Dec.1998

300 MVA 220/132 kV GridStation at Zainkote with 220

kV D/CWagoora-Zainkote Trans.

LineTotal 100 200

S.No. Name of the Double / Singleckt line

LineLengthKms.

Total ckt.Kms.

Date ofcommissioning

Name of the scheme underwhich line constructed

1 220 KV D/C KPTL upto Tather 102.00 204..00 1996 State sector

2 220 KV S/C Udhampur - Sarna 124.00 124.00 1983 State sector

3 220 kV D/C Kishenpur-Barn 37.40 74.80 2008 PMRP

4 220KV D’C Miran-Sahib Bishnah 9.73 19.46 2010 PMRP

Total 273.13 422.26

Page 33: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 33

3.6 - Details of Transmission Lines at 132kV level in Kashmir Region

S.No. Name of the Double/SingleCircuit Transmission Line

TotalCircuitkms.

Date ofCommissioning

Name of the scheme underwhich Line Constructed Remarks

1 D/C CSTL

1973 Construction of 132 kVChenani-Srinagar Transmission Line

i Bemina-Rawalpora-Pampore 50.40

ii Pampore-Awantipora-Wanpoh 80.74

iii a. Wanpoh-Tether (D/C) 76.00

b. Wanpoh-Tether (S/C over Pir top) 4.00

2 Single Circuit USHP-I – Habak 50.00 1975 21.6 MW USHP Sumbal

3 D/C LJHP -Amargarh-Pattan- Zainakote 153.60 1977 105 MW LJHP Gantmulla

4 D/C Pampore – Chesmashahi 27.70 19875 D/C Chesmashahi – Habak 30.00 1987

6 D/C Amargarh - Arampora (Kupwara) 68.00 1995

7 D/C Bemina -Wanganpora- Habak 20.60 1996

8 D/C Bemina – Zainakote 19.00 Jan.1998

9 D/C Zainakote – Wanganpora 21.70 Dec.1998

10 D/C USHP-II – Habak 49.40 June.2002 105 MW USS-II Kangan

11 S/C Awantipora - Lassipora 24.70 05.04.2003 132 kV ALTL S/C line on D/C towers

12 D/C Ganderbal –Badampora 17.00 16.10.2004 132 kV GBTL

13 LILO of LJTL at Sheree 1.50 06.05.2006 Const.of 50 MVA 132/33 kV G/Stn. Sheree

14 D/C Wanpoh-Mattan 19.20 23.09.2006 Const. of 50 MVA 132/33 kVG/Stn. Mattan

Conductor on II circuit laidfor 7Kms upto Lissartapping point.

15 S/C Wanpoh-Kulgam 11.30 02.12.2006 Const. of 40 MVA 132/33 kVG/Stn. Kulgam S/C line on D/C towers

16 LILO of Pampore-C/Shshi Line forKhammoh Grid station 7.4 28-05-2010 PMRP .

17 LILO of CSTL at Tethar 0.9 02-10-2010 PMRP

TOTAL 734.00

Page 34: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 34

3.7 - Details of Transmission Lines at 132kV level in Jammu Region

S.No. Name of the Double / Single ckt line Total ckt. Kms. Date ofcommissioning

Name of the scheme under whichline constructed

1 132 KV D/C Ring Main around Jammu city 136.56 2000 State sector

2 132 KV D/C Udhampur - Bemina upto Thather (CSTL) 166.00 1974 State sector

3 132 KV S/C Janipur – Kalakote 77.00 1968 State sector

4 132 KV S/C Chenani-Udhampur-J. Kotli 52.50 1967 State sector

5 132 KV S/C Janipur – Gladni 7.70 1985 State sector

6 132 KV D/C Gladni - Hira Nagar 84.46 1987 State sector

7 132 KV D/C Hira Nagar – Kathua 76.00 1990-91 State sector

8 132 KV D/C Gladni - Bari Brahmana 30.12 1987 State sector

9 132 KV D/C Bari Brahmana - Miran Sahib 27.76 1988 State sector

10 132 KV D/C Miran Sahib – Canal 32.18 1988 State sector

11 132 KV D/C Barn – Janipur 29.58 2005 State sector

12 132 KV D/C Kalakote – Rajouri 57.00 1994 State sector

13 132 KV D/C Tap line for Samba 3.62 2001 State sector

14 132 KV D/C Tap line for Grid Stn B.B-II 5.40 2007 PMRP

15 132 KV D/C Rajouri –Draba Line 70.24 2008 PMRP

16 LILO 132 kV for Gangyal 2.00 2009 PMRP

17 132KV Barn-Siot alongwith LILO(Akhnoor Section) 19.102 38.204 PMRP

TOTAL 877.12

Page 35: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 35

3.8 - Circle-wise HT/LT Ratio at Distribution Level as on 31-03-2011

S.No. Name of Circle HT/LT Ratio

1 Circle-Ist, Jammu 1 : 2.16

2 Circle – 2nd Kuthua 1 : 1.64

3 Circle Rajouri 1 : 1.92

4 Circle Batote 1 : 1.68

5 Circle Kishtwar 1 : 1.31

6 Circle-I, Srinagar 1 : 2.42

7 Circle-2, srinagar 1 : 2.48

8 Circle-Ganderbal 1 : 2.37

9 Circle-South Bijbehara 1: 2.08

10 Circle-South Pulwama 1: 2.20

11 Circle-North,Sopore 1: 2.30

12 Crcle-Leh, Ladakh 1 : 1.61

Page 36: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 36

3.9 Abstract of 66/33/11/6.6 KVA Sub-Stations of EM&RE Wing, Jammu.

S.No.Name of Receiving

StationCapacity MVA

TotalMVA

No. ofFeeders

1.25 1.6 1.87 2.5 3.0 3.15 4.00 5.00 6.00 6.3 10.00 15.00 20.00 31.50

1 . STD-I, Jammu 0 0 0 2 0 13 3 1 0 26 29 0 0 516.75 178

2 . STD-II, Jammu 0 0 0 0 0 2 3 3 0 34 30 0 0 1 579 203

3 . STD-III, Kathua 0 1 0 3 0 8 0 14 0 5 15 1 2 0 334.5 100

4 . STD-IV, Kalakote 2 5 0 2 0 21 0 3 0 12 2 0 0 0 192.25 123

5 . STD- Udhampur 0 1 0 2 0 11 2 2 0 19 3 0 0 0 208.95 139

6 . STD-Doda 0 0 0 1 0 6 2 2 0 5 2 0 0 0 90.9 57

G. Total 2 7 0 10 0 61 10 25 0 101 81 1 2 1 1922.35 800

Page 37: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 37

3.10 Capacity wise List of 66/33/11/6.6 KVA Sub-Station of Elect. Maintt. & RE Wing, Jammu.

S#

Name of ReceivingStation

voltageLevel of

R/Station

Capacity MVATotalMVA

No. ofFeeders1.25 1.6 1.87 2.5 3.0 3.15 4.00 5.00 6.00 6.3 10.00 15.00 20.00 31.50

STD-I, Jammu1 New Secretariat 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 82 Residency 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 63 Wazarat 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 34 Medical 33/11KV 0 0 0 0 0 0 0 0 0 1 2 0 0 26.30 85 Parade 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 26 Canal 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 67 Company Bagh 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 48 Sheetli 33/11KV 0 0 0 0 0 0 0 0 0 3 2 0 0 38.90 49 Nagrota 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 310 Dhounthaly 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 711 Jindhrah 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 612 Jajjar Kotli 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 313 Dansal 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 214 Janipur 33/11KV 0 0 0 0 0 0 0 0 0 0 3 0 0 30.00 1315 Denis gate 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 216 Purkhoo 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 417 Shamachak 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 118 Akhnoor 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 819 Jourian 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 420 Pahariwala 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

21 Khour 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

22 Barmal 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 2

23 Sohal Bhalwal 33/11KV 0 0 0 0 0 1 0 0 0 0 1 0 0 13.15 2

Page 38: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 38

24 Sarote 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 225 Tanda 33/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 326 Maira Mandrian 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 227 Chowki Choura 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 228 Pargwal 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 329 Balli Gulaba 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 330 Subash Nagar 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 431 Roop Nagar 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 332 Bantalab 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 433 Thather 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 334 Bhalwal 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 335 Marh 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 236 Gajansoo 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 237 Toph Sherkhania 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 438 Muthi 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 539 Talab Tillo 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 240 Udhwywala 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 341 Kanachak 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 242 Batera 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 143 Machillian 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 244 Gharata 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 245 Bohri 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 246 Nagrota-II 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 4

47 SuperspecialityHosp 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 2

48 Planwala 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 249 Kleeth 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 250 Jogwan 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 2

Total 0 0 0 0 0 13 2 1 0 25 29 0 0 501.45 173

51 Ranjan 33/6.6KV 0 0 0 2 0 0 0 0 0 0 0 0 0 5.00 2

52 Trilokpur 33/6.6KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 1

53 Gho-Manhasan 33/6.6KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 2

Total 0 0 0 2 0 0 1 0 0 1 0 0 0 15.30 5

Page 39: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 39

STD-II, Jammu

54 Samba-I 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 3

55 Samba-II 66/11KV 0 0 0 0 0 0 1 1 0 0 0 0 0 9.00 3

56 IGC-I Samba 66/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 6

57 IGC-II Samba 66/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 8

Total 0 0 0 0 0 0 1 2 0 0 4 0 0 54.00 2058 Chatha 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 5

59 Parladpur 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

60 Gadigarh 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 361 Satwari 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 662 Miltary Cantt 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 363 Sunderpur 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 664 Badyal Brahmana 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 265 Rangpur Mulana 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 366 Chakroi 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 267 Bishnah 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 368 Chak Hasla 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 269 Salehar 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 570 Miran Sahib 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 571 Shatraiyan 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 272 Kullian 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 273 Chak Shera 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 474 Suhagpur 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 275 Biaspur 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 376 Nandpur 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 477 Seora 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 378 Ashok Nagar 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 379 JDA Complex 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 680 Railway Complex 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 6

Page 40: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 40

81 Nanak nagar 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 7

82 Gangyal 33/11KV 0 0 0 0 0 0 0 0 0 0 3 0 0 30.00 7

83 Trikuta Nagar 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

84 Channi Himmat 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 5

85 Transport Nagar 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

86 Bathindi 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

87 Babliana 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

88 Sainik Colony 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

89 Sidhra 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

90 Malhori Jagir 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 1

91 Greater Kailash 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

92 BB-II 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 20.00 5

93 BB-I 33/11KV 0 0 0 0 0 0 0 0 0 0 3 0 1 61.50 12

94 Raya 33/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 5

95 Birpur Complex 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

96 Smailpur 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 3

97 Ramgarh 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 4

98 Vijaypur 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 3

99 Gurha 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3

100 Mandal 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 2

101 Kartholi 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 4

102 Rangoor 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

103 Jakh 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 10.00 3

104 Sarore 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3

105 Ratnu chak 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 2

106 Bahu Fort 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 5

Total 0 0 0 0 0 2 2 1 0 34 26 0 1 525.00 183

Page 41: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 41

STD Kuthua

107 Hatli village 66/33/11KV 0 0 0 1 0 0 0 0 0 0 1 0 0 0 12.50 3

108 Hiranagar 66/33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 1 0 40.00 7

Total 0 0 0 1 0 0 0 0 0 0 3 0 1 0 52.50 10109 Hatlimore 66/11KV 0 0 0 0 0 1 0 0 0 1 1 0 1 0 33.15 11110 Keerian Gandyal 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 1111 Lakhanpur 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4112 Basantpur 66/11KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 1113 C.T.M 66/11KV 0 0 0 0 0 0 0 0 0 0 1 1 0 0 25.00 1114 Knit Fab 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1115 Industry 66/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 2116 Nagri 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4117 Palli 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4118 Nanan 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 2119 Changran 66/11KV 0 0 0 0 0 0 0 1 0 0 1 0 0 0 15.00 3120 Taraf Pajwal 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 0121 Ghagwal 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3122 Chann Arorian 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2123 Marheen 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4124 Nichila 66/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3125 Rajpura 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3126 Sherpur 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1127 Pharpur 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2128 Hatlimori-II 66/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3129 Barnoti 66/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 1130 Palli -II 66/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

Total 0 0 0 1 0 2 0 9 0 2 12 1 1 0 215.10 58

131 Lift irr.Lakhanpur-1 66/6.6KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

132 Lift irr.Lakhanpur-II 66/6.6KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

133 Lift irr.Basantpur-I 66/6.6KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

134 Lift irr.Basantpur-II 66/6.6KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

Total 0 0 0 0 0 0 0 4 0 0 0 0 0 0 20.00 4 Total

Page 42: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 42

135 Challan Prajali 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2136 Phinter 33/11KV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 6137 Ramkot 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2138 Kalyal 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3139 Mahanpur 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2140 Basohli 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4141 Bhoond 33/11KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3142 Bani 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3143 Bagan 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1144 Machaddi 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 1145 Martha Nagrota 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

Total0 1 0 1 0 6 0 1 0 3 0 0 0 0 46.90 28

STD-IV, Kalakote146 Kalakote 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5147 Siot 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2148 Sunderbani 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5149 Phall 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2150 Sunderbani 33/11KV 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2.50 1151 Nowshera 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 10152 Chowki-Hundan 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2153 Kangri 33/11KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3154 Marchola 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2155 Mogla 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2156 Kheora 33/11KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 6157 Thudi 33/11KV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 10158 Darhal 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2159 Manjakote 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3160 Thannamandi 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4161 Dhanwan 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2162 Dhangri 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1163 Kotranka 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3164 Darhali Bridge 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2165 Palma 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2166 Sial Suri 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

Page 43: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 43

167 Kamsar 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 7168 Haveli 33/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3169 Gulpur 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3170 Jhallas 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3171 Chandak 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2172 Mandi 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3173 Lassana 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2174 Surankote 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5175 Draba 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2176 J.W.G 33/11KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 2177 B.G 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3178 Mendhar 33/11KV 0 0 0 0 0 2 0 0 0 0 0 0 0 0 6.30 4179 Mankote 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2180 Jhallas-II 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2181 Budhal 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2182 Bandi Chechian 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2183 Solki 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 0184 Loran 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2185 Chatral 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2186 Rajal 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 0187 Qila Daral 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 0

Total 2 5 0 2 0 21 0 2 0 12 2 0 0 0 187.25 122188 Kala-koteII 33/6.6KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

STD- Udhampur189 Dairy farm 33/11KV 0 0 0 0 0 0 0 0 0 1 1 0 0 16.30 10190 Devik 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 7191 Dhar Road 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 6192 Ramnagar 33/11KV 0 0 0 1 0 0 0 0 0 1 0 0 0 8.80 6193 Phalatta 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 5194 Jakhani 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 4195 Battal Ballian 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3196 Stanev 33/11KV 0 0 0 0 0 1 1 0 0 1 0 0 0 13.45 5197 Chenani 33/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 5198 Pathi 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3199 Battaql 33/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 4200 Dhuna 33/11KV 0 1 0 0 0 0 0 0 0 0 0 0 0 1.60 2

Page 44: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 44

201 Jib 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3202 Katra 33/11KV 0 0 0 0 0 0 0 0 0 0 2 0 0 20.00 9203 Tarakote 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 4204 Reasi 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 7205 Pouni 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3206 Panthal 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 6207 Dharmari 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 4208 SMVD University 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3209 Dharmound 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 4210 Meetra (Ramban) 33/11KV 0 0 0 0 0 1 0 0 0 1 0 0 0 9.45 7211 Ramsoo 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3212 Banihal 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 7213 Assar 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3214 Patnitop 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3215 Tethar 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 3216 Sangaldan 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 4217 Johnu 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3218 Sarhbaga 33/11KV 0 0 0 1 0 0 0 0 0 0 0 0 0 2.50 3

Total 0 1 0 2 0 11 2 2 0 19 3 0 0 0 208.95 139STD-Doda

219 Doda 33/11KV 0 0 0 0 0 0 0 0 0 2 0 0 0 12.60 4220 Thathri 33/11KV 0 0 0 0 0 0 0 0 0 1 0 0 0 6.30 3221 Prem Nagar 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 5222 Bhalla 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 4223 Gandoh 33/11KV 0 0 0 0 0 0 0 1 0 0 0 0 0 5.00 6224 Bhaderwah 33/11KV 0 0 0 0 0 0 0 1 0 1 0 0 0 11.30 6225 ganika 33/11KV 0 0 0 1 0 0 0 0 0 0 0 0 0 2.50 3226 Changa 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 2227 Bhatyas 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3228 Dallian (Bhaderwah) 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 4.00 3229 Sappa (Army) 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 1230 Kishtwar 33/11KV 0 0 0 0 0 0 0 0 0 1 2 0 0 26.30 6231 Mandal 33/11KV 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 4232 Dedpeth 33/11KV 0 0 0 0 0 1 0 0 0 0 0 0 0 3.15 3233 Dod-II 33/11KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 4

Total 0 0 0 1 0 6 2 2 0 5 2 0 0 0 90.90 57

Page 45: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 45

3.11 Division wise Transformers and their capacities at 33/11 and 33/6.6 kV level inEM&RE Wing, Kashmir

S.No

Name of ReceivingStation Capacity (MVA)

Total MVA No. of Out-going feeders2.5 3.15 3.75 4 5 6.3 10

1 STD - Ist Srinagar(33/11 kV) 0 0 0 0 3 31 32 530.30 109

2 STD - Ist Srinagar(33/6.6 kV) 0 1 1 1 1 5 0 47.40 16

3 STD - IInd Srinagar 0 1 0 2 4 46 28 600.95 156

4 STD - Sopore 0 11 0 5 3 32 13 401.25 159

5 STD - Bijbehara 0 3 0 2 1 30 14 351.45 117

6 STD -Ganderbal 1 6 0 2 1 18 3 177.80 68

7 STD -Pulwama(33/11 kV) 1 7 0 5 2 18 5 217.95 80

8 STD - Pulwama(33/6.6 kV) 0 0 0 0 1 3 0 23.90 7

Total No / MVA 2 29 1 17 16 183 95 2351 712

Page 46: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 46

3.12 Capacity wise List of 33/11 KVA Sub-Station of Elect. Maintt. & RE Wing, Kashmir.

STD - Ist Srinagar

S # Sub StationCapacity (MVA)

Total MVA No. of Out-goingfeeders2.5 3.15 4 5 6.3 10

1 Ahmad Nagar 0 0 0 0 1 0 6.3 22 Awanta Bhawan 0 0 0 0 2 0 12.6 23 B.A.M. Khan 0 0 0 0 3 0 18.9 44 Bagwanpora 0 0 0 0 0 2 20 25 Balhama 0 0 0 0 1 0 6.3 46 Barbarshah 0 0 0 0 0 2 20 27 Brane 0 0 0 0 0 2 20 38 Buchwara 0 0 0 0 0 2 20 29 Centaur 0 0 0 0 2 0 12.6 4

10 Fateh kadal 0 0 0 0 0 2 20 411 Habak 0 0 0 0 3 0 18.9 312 Harwan 0 0 0 0 2 0 12.6 213 Illahi Bagh 0 0 0 0 2 0 12.6 214 Kathidarwaza 0 0 0 0 3 0 18.9 415 Kawdara 0 0 0 0 0 2 20 316 Khanyar 0 0 0 0 1 2 26.3 517 Khayam 0 0 0 0 0 2 20 419 Lal Bazar 0 0 0 1 0 1 15 320 Mughal Masjid 0 0 0 0 0 2 20 1121 Nedous 0 0 0 0 2 0 12.6 222 Nishat 0 0 0 0 0 2 20 423 Basantbagh 0 0 0 0 0 2 20 324 Omer Hair 0 0 0 0 2 0 12.6 2

Page 47: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 47

S # Sub StationCapacity (MVA)

Total MVA No. of Out-goingfeeders2.5 3.15 4 5 6.3 10

25 Rainawari 0 0 0 0 0 2 20 426 Shalimar 0 0 0 0 2 0 12.6 327 Sidco F P Khunmoh 0 0 0 1 0 0 5 228 Sonwar 0 0 0 0 0 2 20 429 Soura 0 0 0 0 1 2 26.3 530 T.R.C. 0 0 0 0 0 2 20 631 Tailbal (Burzahama) 0 0 0 0 1 0 6.3 132 Zakoora 0 0 0 1 0 1 15 333 Zoonimar 0 0 0 0 1 0 6.3 134 Hazratbal 0 0 0 0 2 0 12.6 3

Total 0 0 0 3 31 32 530.3 109

STD - IInd Srinagar

S # Sub Station Capacity (MVA) TotalMVA

No. of Out-goingfeeders

2.5 3.15 4 5 6.3 101 B.K.Pora 0 0 0 0 2 0 12.6 32 Baghi-Mehtab 0 0 0 0 2 0 12.6 43 Batmalloo 0 0 0 0 0 2 20 24 Beerwah 0 0 0 1 1 0 11.3 65 Bemina-IInd 0 0 0 0 1 2 26.3 46 Bemina-Ist 0 0 0 0 2 0 12.6 57 Bone & Joint Hospital 0 0 0 0 2 0 12.6 48 Brenwar 0 0 0 0 1 0 6.3 29 Budgam 0 0 1 0 0 2 24 7

Page 48: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 48

S # Sub Station Capacity (MVA) TotalMVA

No. of Out-goingfeeders

2.5 3.15 4 5 6.3 109 Budgam 0 0 1 0 0 2 24 710 Chadoora 0 0 0 0 2 1 22.6 511 Chanapora 0 0 0 0 0 2 20 512 Chari Shareef 0 0 0 0 2 0 12.6 613 Danderkhah 0 0 0 0 2 0 12.6 314 Exhibition 0 0 0 0 0 2 20 415 Ichgam 0 0 0 0 1 0 6.3 216 J V C (Bemina III) 0 0 0 0 1 0 6.3 217 Jawaharnagar 0 0 0 0 0 2 20 218 K.P.Bagh 0 0 0 0 2 0 12.6 419 Karan Nagar 0 0 0 0 0 2 20 720 Khag 0 0 0 0 1 0 6.3 321 Khan Sahib 0 0 0 0 1 0 6.3 422 Kremshore 0 0 0 1 0 1 15 423 M.R.Gunj 0 0 0 0 2 0 12.6 524 Magam 0 0 0 1 1 0 11.3 325 Nagam 0 0 1 1 0 0 9 226 Narbal 0 1 0 0 2 0 15.75 527 Peerbagh 0 0 0 0 2 0 12.6 328 Rajbagh 0 0 0 0 0 2 20 429 Rangreth 0 0 0 0 0 2 20 430 Rawalpora 0 0 0 0 0 2 20 431 Safa Kadal 0 0 0 0 0 2 20 4

Page 49: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 49

S # Sub Station Capacity (MVA) TotalMVA

No. of Out-goingfeeders

2.5 3.15 4 5 6.3 1032 Shalistore 0 0 0 0 0 2 20 333 Shalteng 0 0 0 0 2 0 12.6 534 Shariefabad 0 0 0 0 1 0 6.3 135 Shreen bagh 0 0 0 0 2 0 12.6 436 Silk Factory 0 0 0 0 3 0 18.9 537 Syed Hamid pora 0 0 0 0 2 0 12.6 338 Wadwan 0 0 0 0 1 0 6.3 239 Wanganpora 0 0 0 0 1 0 6.3 140 Zainakoot 0 0 0 0 1 1 16.3 841 Narkara 0 0 0 0 0 1 10 142 Bakshipora 0 0 0 0 1 0 6.3 143 PC Depot 0 0 0 0 2 0 12.6 2

Total 0 1 2 4 46 28 600.95 156

STD - Sopore

S # Sub Station Capacity (MVA) TotalMVA

No. of Out-goingfeeders

2.5 3.15 4 5 6.3 101 Arampora 0 0 0 0 2 0 12.6 22 Audoora 0 0 0 0 1 0 6.3 43 Baramulla-II 0 0 0 0 1 1 16.3 34 Baramulla-Ist 0 0 0 0 0 2 20 75 Cable Car 0 1 0 0 0 0 3.15 26 Chandoosa 0 0 0 0 1 0 6.3 2

Page 50: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 50

S # Sub Station Capacity (MVA) TotalMVA

No. of Out-goingfeeders

2.5 3.15 4 5 6.3 107 Chakloo Rafiabad 0 0 0 0 1 0 6.3 38 Chogul 0 0 0 0 1 0 6.3 29 Delina 0 0 0 0 2 0 12.6 310 Dooru Sopore 0 0 0 0 1 0 6.3 311 Dhobiwan 0 1 0 0 0 0 3.15 212 Drugmulla 0 0 0 0 1 0 6.3 313 Drungbal 0 0 0 0 1 0 6.3 214 Ganapora 0 0 0 0 1 0 6.3 315 Gulmarg 0 0 1 0 0 0 4 416 Hamray 0 1 1 0 0 0 7.15 317 Handwara 0 0 0 1 1 0 11.3 618 Kangamdar (Pattan) 0 0 0 0 1 0 6.3 219 Kanilbagh 0 0 0 0 1 0 6.3 320 Khumriyal 0 0 0 0 1 0 6.3 321 Kralpora 0 0 0 0 0 1 10 422 Krusan 0 0 0 0 0 1 10 423 Kunzar 0 0 1 0 1 0 10.3 324 Ladoora 0 2 0 0 0 0 6.3 425 Malpora Narwah 0 0 0 0 1 0 6.3 226 Nowpora 0 0 0 0 1 0 6.3 327 Nowshera 0 0 1 0 0 0 4 228 Panzipora Tarzoo,Sopore 0 1 0 0 0 0 3.15 224 Ladoora 0 2 0 0 0 0 6.3 425 Malpora Narwah 0 0 0 0 1 0 6.3 226 Nowpora 0 0 0 0 1 0 6.3 3

Page 51: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 51

S # Sub Station Capacity (MVA) Total MVA No. of Out-goingfeeders

2.5 3.15 4 5 6.3 1026 Nowpora 0 0 0 0 1 0 6.3 327 Nowshera 0 0 1 0 0 0 4 229 Pattan 0 0 0 0 1 1 16.3 330 Rohama 0 0 0 0 1 0 6.3 331 Rampora Uri 0 0 0 0 1 0 6.3 332 Sangrama 0 0 0 0 1 0 6.3 333 Seeloo 0 0 0 0 0 1 10 534 Sheeri 0 0 0 1 0 0 5 335 Singhpora 0 0 0 0 1 0 6.3 236 Sopore- 2nd 0 0 0 0 1 1 16.3 537 Sopore-1st 0 0 0 0 0 2 20 638 Tangdar 0 0 0 0 1 0 6.3 439 Tangmarg 0 1 0 0 0 1 13.15 440 Tikker Kupwara 0 0 0 0 0 2 20 841 Trehgam 0 0 0 0 1 0 6.3 242 Uri Salamabad 0 0 0 0 1 0 6.3 443 Wagoora 0 1 0 1 0 0 8.15 444 Watlab 0 0 0 0 1 0 6.3 345 Watrigam 0 1 0 0 1 0 9.45 546 Willgam (Doolipora) 0 0 1 0 1 0 10.3 347 Zachaldara 0 2 0 0 0 0 6.3 3

TOTAL 0 11 5 3 32 13 401.25 159

Page 52: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 52

STD - Ganderbal

S # Sub StationCapacity (MVA) Total

MVANo. of Out-

going feeders2.5 3.15 4 5 6.3 10

1 Ajas 0 0 0 1 0 0 5 32 Aloosa 0 0 0 0 1 0 6.3 23 Ajar Bandipora 0 0 0 0 2 1 22.6 64 Mansbal 0 0 0 0 1 0 6.3 35 Markundal 0 0 0 0 2 0 12.6 56 Nadihal 0 0 1 0 0 0 4 27 Shadipora 0 1 1 0 0 7.15 38 Hajin 0 2 0 0 0 0 6.3 49 Ganderbal 1 0 0 0 2 0 15.1 5

10 Manigam 0 0 0 0 1 0 6.3 411 Nagbal 0 0 0 0 1 0 6.3 112 Alesteng 0 0 0 0 1 0 6.3 213 Tulla Bagh 0 0 0 0 1 0 6.3 314 Ganda Singh 0 1 0 0 0 0 3.15 215 Lar 0 0 0 0 1 0 6.3 316 Kheer Bhawani 0 1 0 0 0 0 3.15 217 Doderhama 0 0 0 0 3 0 18.9 518 Khurhama 0 0 0 0 2 0 12.6 419 Kangan 0 0 0 0 0 1 10 420 Wussan 0 0 0 0 0 1 10 321 Surfraw 0 1 0 0 0 0 3.15 2

Total 1 6 2 1 18 3 177.8 68

Page 53: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 53

STD Pulwama

S.No 33/11 kV sub stationName

Capacity(MVA)

TotalCapacity(in MVA)

No. of o/gFeeders2.5 3.15 4 5 6.3 10

1 Lassipora 0 0 0 0 0 1 10 32 Pulwama 0 0 0 0 0 2 20 73 Keegam 0 0 0 0 1 0 6.3 24 Shadimargh 0 0 0 1 1 0 11.3 45 Mitrigam 0 1 0 0 1 0 9.45 36 Reshipora 0 0 0 0 2 0 12.6 47 Landoora 0 0 0 0 1 0 6.3 48 Shopian(Gagren) 0 0 0 0 2 0 12.6 49 Pinjoora 0 0 1 0 0 0 4 210 Batpora 0 0 0 0 1 0 6.3 311 Chowdrigund 0 0 0 0 1 0 6.3 312 Konibal 0 0 1 0 1 0 10.3 413 Lethpora 0 0 1 1 0 0 9 314 Kakapora 0 0 0 0 1 0 6.3 215 Newa 0 0 1 0 1 0 10.3 316 Tral 0 0 0 0 0 2 20 517 Lurgam 0 1 0 0 1 0 9.45 318 Lalgam 1 1 0 0 0 0 5.65 219 Chewa 0 0 0 0 1 0 6.3 320 Awantipora 0 0 0 0 2 0 12.6 721 Naroo 0 1 0 0 1 0 9.45 322 KachachKoot 0 1 1 0 0 0 7.15 323 Nowgam Panzgam 0 2 0 0 0 0 6.3 3

Total 1 7 5 2 18 5 217.95 80

Page 54: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 54

STD - Bijbehara

S # Sub StationCapacity (MVA) Total

MVANo. of Out-going

feeders2.5 3.15 4 5 6.3 10

1 Achabal 0 0 0 0 2 0 12.6 4

2 Aishmuqam 0 0 0 0 1 0 6.3 4

3 Akura 0 0 0 0 1 0 6.3 3

4 Arwani 0 0 0 0 1 0 6.3 3

5 Ashajipora 0 0 0 0 0 2 20 4

6 D.H.pora 0 0 0 0 0 1 10 4

7 Dialgam 0 0 0 0 1 0 6.3 3

8 Dooru 0 0 0 1 0 1 15 3

9 Harnag 0 0 0 0 2 0 12.6 3

10 Hiller 0 0 0 0 1 0 6.3 3

11 Hiller Dooru 0 0 0 0 1 0 6.3 3

12 Hutmurah 0 0 0 0 2 0 12.6 3

13 Janglat Mandi 0 1 0 0 1 0 9.45 3

14 Khiram 0 0 0 0 1 0 6.3 2

15 Kokernag 0 0 0 0 1 1 16.3 3

16 Kulgam 0 0 0 0 0 2 20 4

17 Kund 0 1 0 0 0 0 3.15 2

Page 55: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 55

S # Sub StationCapacity (MVA) Total

MVANo. of Out-going

feeders2.5 3.15 4 5 6.3 10

18 Malaknag 0 0 0 0 1 0 6.3 3

19 Mattan, Gopalpora 0 0 0 0 1 0 6.3 3

20 Mir Bazar 0 0 0 0 1 0 6.3 4

21 Nai Basti, Anantnag 0 0 0 0 1 0 6.3 3

22 Nillow 0 0 0 0 2 0 12.6 3

23 Nowgam (Chowgund) 0 1 0 0 0 0 3.15 2

24 Nowgam (Shangus) 0 0 0 0 1 1 16.3 3

25 Pahalgam 0 0 0 0 1 0 6.3 5

26 Qaimoh 0 0 1 0 0 1 14 3

27 Qazigund 0 0 0 0 0 1 10 4

28 Salia 0 0 0 0 1 0 6.3 2

29 Saller 0 0 0 0 1 0 6.3 3

30 Sangam 0 0 0 0 0 2 20 4

31 Sarnal 0 0 0 0 0 2 20 7

32 Shankerpora 0 0 0 0 1 0 6.3 3

33 Sicop Bijbehara 0 0 0 0 1 0 6.3 3

34 Veeri, Bijbehara 0 0 0 0 1 0 6.3 3

35 Yaripora 0 0 0 0 2 0 12.6 3

36 Zirpora 0 0 1 0 0 0 4 2Total 0 3 2 1 30 14 351.45 117

Page 56: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 56

3.13 CAPACITY-WISE LIST OF 33 / 6.6 kV SUB STATIONS OF M&RE WING KMR.

STD-Ist, Srinagar

S.No Sub StationCapacity MVA Total

Cap. No. of Out-going feeders

3.15 3.75 4 5 6.3 (MVA)

1 Badami Bagh 0 0 0 0 2 12.6 4

2 Khonmoh 1 0 0 0 1 9.45 4

3 Pantha Chowk 0 0 0 1 0 5 2

4 Pampore-I 0 1 1 0 2 20.35 6

5 Pampore -II 0 0 0 1 1 2.00 3

6 Khrew 0 0 0 0 1 6.3 2

7 Wuyan 0 0 0 0 1 6.30 2

Total 1 1 1 2 8 62.00 23

Page 57: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 57

CHAPTER 4

4.1 ELECTRIC POWER-INSTALLED CAPACITY

STATE SECTORUNDER POWER DEVELOPMENT CORPORATION

HYDRO 758.70 MWTOTAL NO. OF HYDEL PROJECTS 20THERMAL 175MW

TOTAL NO. OF THERMAL PROJECTS(Operated only in case of emergency in view of highper unit generation cost) 2

UNDER POWER DEVELOPMENT DEPARTMENTDIESEL 31.667 MW

CENTRAL SECTOR

HYDRO 1680 MWTOTAL NO. OF HYDEL PROJECTS 4

INDEPENDENT POWER PRODUCERS

Hydro 17.5Total No of Hydel Projects 2

POWER HOUSES UNDER OPERATION IN THE STATE

Name of Power House Configuration Installed Capacity in MWSTATE SECTORJhelum River BasinLower Jhelum 3 x 35 105Upper Sindh-I 2x11.3 22.6Ganderbal 2x3+2x4.5 15

Page 58: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 58

Upper Sindh-II 3x35 105Pahalgam 2 x 1.5 3Karnah 2x1 2Chenab BasinChenani-I 5x4.66 23.3Chennai-II 2x1 2Chenani-III 3x2.5 7.5Bhaderwah 2 x 0.5 1Baglihar 3x150 450

SUB TOTAL 736.40Ravi Basin

Sewa-III 3x3 9Indus Basin

Iqbal 3x1.253.75

Hunder 2x0.20 0.4Sumoor 2x0.05 0.1

Igo-Mercellong 2x1.50 3Haftal 2x0.50 1

Marpachoo 3x0.25 0.75Bazgo 2x0.15 0.3

Stakna (with J&KPDD) 2x2 4SUB TOTAL 22.3

TOTAL 758.70Independent Power Producers(IPP)

Athwatoo 2X5 10Branwar 3X2.5 7.5TOTAL 17.50

CENTRAL SECTORSalal HEP 6x115 690

Uri –I 4x120 480Dul-Hasti 3x130 390Sewa-II 2X60 120

Total 1680Note: Out of 450 MW Bhagliar project only 225 MW power is available to J&K PDD

Page 59: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 59

4.2 UPCOMINGPOWER HOUSES IN THE STATE

Name of Power Project Capacity in MWSTATE SECTORSawalkote 1200Baglihar Stage-II 450Kirrthai-I 240Ganderbal 93Lower Kalnai 50Parnai 37.5Pahalgam (3rd Unit) 1.5Matchil 0.35Baderwah (3rd Unit) 0.5Sanjak 1.26IPP 690Total 2764.11

CENTRAL SECTORBursar 1020PakulDul(Project is being implemented in Joint Venture of NHPC, JKSPDC and PTC ) 1000

Kishenganaga 330Uri-II 240Nimo Bazgo 45Chutak 44Total 2679

Page 60: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 60

4.3 - GENRATION IN LADAKH REGION (Owned by JKPDD)

Installed Capacity: MWEnergy Genrated : MU

S.No PowerStation

2008-09 (A) 2009-10(A) 2010-11 (A) 2011-12 (E)

InstalledCapacity

EnergyGenrated

InstalledCapacity

EnergyGenrated

InstalledCapacity

EnergyGenrated

InstalledCapacity

EnergyGenrated

I. THERMAL

a Diesel 20.92 16.64 25.745 19.90 28.97 19.60 29.50 20.00

Total (T) 20.92 16.64 25.745 19.90 28.97 19.60 29.50 20.00

II. HYDEL

a. Stakna 4.00 5.59 4.00 4.88 4.00 3.98 0.00 0.00

Total (H) 4.00 5.59 4.00 4.88 4.00 3.98 0.00 0.00

GRAND TOTAL (I+II) 24.92 22.23 29.745 24.78 32.97 23.58 29.50 20.00

Page 61: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 61

4.4 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN LEH DISTRICT

S.No. Name of the D.G station/LocationNo. ofUnits(Nos.)

Capacity of each Unit(KVA)

Total Installed Capacity(KVA)

1 4.5 MVA Choglamsar 3 1500 4500

2 4.5 MW New Choglamsar 5 750 3750

3 1500 4500

3 1 MW Leh 2 750 1500

4 Nyoma 1 160 160

5 Tangtse 1 250 250

6 Chumathang 1 160 160

7 Kungiam 1 160 160

8 Hemis 1 75 75

9 Anlay 1 160 160

10 Rongo 1 75 75

11 Tsaga 1 75 75

12 Korzok 1 82.5 82.5

13 Puga 1 10 10

14 Saspol 1 160 160

15 Temisgam 1 160 160

16 Tia 1 160 160

17 Khalsi 1 250 250

Page 62: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 62

18 Lamayuru 1 160 160

19 Domkhar 1 160 160

20 Skurbuchan 1 250 250

21 Hemisshukpachan 1 160 160

22 Alchi 1 160 160

23 Mangue 1 100 100

24 Wanla 1 320 320

25 Sku Kaya 1 30 30

26 Rumbak 1 10 10

27 Hanu 1 125 125

28 Bema 1 75 75

29 Achmathang 1 200 200

30 Phyang Gonpa 1 12 12

31 Deskit-I 1 250 250

32 Deskit-II 1 160 160

33 Turtuk 1 125 125

34 Bogdang 1 75 75

35 Panamik 1 160 160

36 Chamshain 1 75 75

37 Tigger 1 320 320

38 Tyakshi 1 160 160

Page 63: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 63

39 Hundri 1 35 35

40 Chulunngkha 1 35 3541 Charasa 1 30 30

42 Kuri 1 30 30

43 Tongsted 1 30 3044 Odmaroo 1 30 30

45 Murgi 1 15 15

46 Nungsted 1 15 1547 Khemi 1 15 15

48 Burma 1 15 15

49 Gontoo 1 12.5 12.5

Total 59 19537

Page 64: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 64

4.5 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN KARGIL DISTRICT

S.No. Name of the Power House No.ofUnits(Nos.)

Capacity of each Unit(KVA)

Total InstalledCapacity (KVA)

1 2 MW 9 250 2250

2

New DG Stn. Khurbathang 2 750

6040New DG Stations 3 1500

Auxillary 1 40

3 Mulbeck 1 250 250

4 Shargole 1 250 250

5 Khangral 1 320 320

6 Haniskot 1 75 75

7 Chiktan 1 160 160

8 Hagnis 1 160 160

9 Shakar 1 320 320

10 Y-Kharboo 1 75 75

11 Shakar Rong 1 30 30

12 Sanjak 1 75 75

13 Batalik1 160 160

1 75 75

14 Silmoo 1 160 160

15 Garkone 1 75 75

16 Padum1 250 250

1 160 160

17 Junkhore 1 160 160

18 Sani 1 160 160

19 Karsha 1 380 320

20 Parkachik 1 75 75

21 Panikhar 1 250 250

Page 65: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 65

22 Nam-Suru 1 250 250

23 Purtikchey 1 160 160

24 Sangrah 1 160 160

25 Sankoo1 320 320

1 160 160

26 Lankarchey 1 160 160

27 Stakpa 1 125 125

28 Saliskote 1 250 250

Trespone1 250 250

29 1 250 250

30 Thasgam 1 160 160

31 Drass

1 250 250

1 320 320

1 160 160

32 Pandrass 1 75 75

33 Matayeen 1 75 75

34 Barsoo 1 160 160

35 Phey 1 320 320

36 Tambis 1 320 320

37 Kharboo 1 200 200

38 Choskore 1 250 250

39 Kharcheykhar 1 200 200

Total 58 16425

Page 66: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 66

4.6 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN GUREZ,MACHIL AND KERAN

S.No. Name of the D.Gstation/Location

No. of Units(Nos.)

Capacity of each Unit(KVA) Total Installed Capacity (KVA)

A Gurez1 Kanzalwan 1 320 3202 Dawar 1+1 250+320 5703 Wanpora 1 250 2504 Tarbal 1 100 1005 Bagtoor 1 75 1006 Nayal 1 75 757 Achoora 1 75 758 Churwan 1 200 2009 Burnai 1 75 7510 Bodugam 1 200 20011 Gujran 1 75 7512 Zedgay 1 250 2013 Koragbal 1 62.5 62.514 Khprihaijin 1 20 2015 Hassangam 1 100 10016 Purana Tulal/Sheikhpora 1 320 32017 Buglender 1 320 32018 Neeru 1 100 100

Total 2982.5B

Machil 1 320 320C

Keran 1 320 320GRAND TOTAL 3622.5

Page 67: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 67

4.7 Entitlement from CPSUs and Other External SourcesJammu and Kashmir Share in CPSUs and Joint Ventures (JVs) as on 31-03-2011

S.No. Name of Power HouseInstalled Capacity

(MW)%age share for

J&KShare in MWs

%age Share inMWs

Share inMWs

1 2 3 Firm Non-Firm

NTPC1 Anta 419 6.92 29 2.18 92 Auraiya 663 6.64 44 1.51 103 Dadri (G) 830 6.75 56 1.01 84 Unchahar-1 420 3.33 14 0.69 35 Unchahar-2 420 7.14 30 2.18 96 Unchahar-3 210 6.19 13 2.14 47 Rihand-1 1000 7.00 70 2.16 228 Rihand-2 1000 9.40 94 2.18 229 Singrouli 2000 0.00 00 2.18 4410 Jhajjar 500 0.00 00 1.39 711 Tlchr 1000 00 00 00 00

12 Khlgn I 840 00 00 00 00

13 Khlgn II 1000 00 00 00 00

Sub-Total 350 138NPC

1 NAPP 440 7.50 33 2.11 92 RAPP-B3-B4 440 7.95 35 0.00 03 RAPP-C 440 0.00 0 3.88 17

68 26NHPC

3 Salal 690 34.39 237 0 04 Tanakpur 94 7.68 7 0 01 Chamera I 540 3.9 21 0 02 Chamera II 300 6.33 19 2.61 85 Uri 480 33.96 163 0 07 Dul hasti 390 21.15 82 2.17 86 Dhaulinganga 280 6.07 17 2.18 67 Sewa-2 120 19.17 23 2.61 3

Sub-Total 569 25

Page 68: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 68

C- SJVNL(JV)1 N-Jhakahri 1500 7 105 1.44 22

D- Eastern Region

1 FAKKA 1600 0.65 14 0 02 KHLGN-I 840 3.69 31 0 03 KHLGN-II 1500 2.87 43 2.69 40

4 MEHA-6 250 7.08 18 0 0Sub-total 105 40

TEHRI 1000 4.80 48 1.44 14Tala 1020 0.00 0 1.77 18

Total 1246 283GRAND TOTAL 1530

Page 69: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 69

4.8 - Demand And Availability Scenario Peak (POWER)MW

Year 2004-05(A) 2005-06(A) 2006-07(A) 2007 -08 (A) 2008-09 (A) 2009-10 (A) 20010-11 20011-12(RE)

Peak Demand 1706 1800 1925 2020 2120 2290 2425 2500

Peak Met 1350 1242 1306 1350 1340 1407 1550 1650

Peak Deficit 356 558 619 670 780 883 875 850

Peak Deficit (%) 20.87% 31.00% 32.16% 33.17% 36.79% 38.56% 36.08% 34.00%

Page 70: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 70

4.9 - Demand And Availability Scenario (ENERGY)MU

YEAR 2004-05(A) 2005-06(A) 2006-07 (A) 2007 -08 (A) 2008-09(A) 2009-10(A) 2010-11 (A 2011-12(RE)

Energy Requirment 9640 10503 11343 14037 14750 15656 16544 17323

Restricted EnergyAvailability 7306 7916.38 8236.53 8743.96 9147.21 10370 10667.00 10972.06

Energy Deficit 2334 2586.62 3106.47 5293.04 5602.79 5286 5877 5570

Energy Deficit (%) 24.21% 24.63% 27.39% 37.71% 37.99% 33.76% 35.52% 32.15%

Page 71: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 71

4.10 Seasonal Power Deficit (Minimum-Maximum) (MWs)

S.No. ParticularYear 2010-11 (A) Year 2011-12 (E)

Summer Winter Summer Winter

I. Unrestricted Demand 2130 2425 2200 2500

II. Restricted Demand 1388 1550 1436 1650

III.

Power Availability

(i) Self Generated 200-400 150-300 375-600 150-300

(ii) CPSUs 750-1150 450-950 700-1150 500-950

Total (i+ii) 950-1550 600-1200 1075-1750 650-1250

IV. Deficit(-) 162 to -438 -350 to -950 +314 to -361 -400 to -1000

*Summer = 6 hours curtailmentWinter = 10 hours curtailment

Page 72: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 72

4.11 - Year Wise Statement of Energy Consumption

S.No Year Energy Purchased(MU)

1 1998-99 5429.57

2 1999-2000 4978.65

3 2000-01 5374.65

4 2001-02 5606.04

5 2002-03 6280.38

6 2003-04 7148.29

7 2004-05 7306.36

8 2005-06 7916.38

9 2006-07 8236.53

10 2007-08 8743.96

11 2008-09 9147.21

12 2009-10 10370.65

13 2010-11 10667.23

14 2011-12(E) 10972.06

Page 73: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 73

4.12 - Year Wise Statement of Energy Purchased from Northern Grid

S.No YearEnergy

PurchasedMU

1 1997-98 3966.53

2 1998-99 4723.38

3 1999-2000 2637.69

4 2000-01 4808.30

5 2001-02 4989.48

6 2002-03 5778.65

7 2003-04 6232.70

8 2004-05 6560.71

9 2005-06 7045.91

10 2006-07 7265.19

11 2007-08 7873.40

12 2008-09 7488.62

13 2009-10 8269.424

14 2010-11 8356.41

15 2011-12(E) 8578.09

Page 74: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 74

4.13 - Year Wise Statement of Self-Generated Energy of State Available to PDDMU

S.No Year Energy (MU)

1 1997-98 951.36

2 1998-99 713.32

3 1999-2000 638.34

4 2000-01 572.07

5 2001-02 622.78

6 2002-03 506.80

7 2003-04 924.84

8 2004-05 745.66

9 2005-06 870.47

10 2006-07 971.34

11 2007-08 879.34

12 2008-09 1658.58

12 2009-10 2101.23

13 2010-11 2310.82

14 2011-12(E) 2393.97

Page 75: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 75

4.14 - Gross Per Capita Power Consumption of Jammu & Kashmir State

S.No Year Consumption(MU)

Population (Million)

Per CapitaConsumption

(kWHr)

1 1998-99 5429.57 9.24 587.62

2 1999-2000 4978.65 9.50 524.07

3 2000-01 5374.65 9.78 549.56

4 2001-02 5606.04 10.14 552.66

5 2002-03 6280.38 10.41 603.22

6 2003-04 7148.29 10.68 669.37

7 2004-05 7306.36 10.95 667.44

8 2005-06 7916.38 11.25 703.80

9 2006-07 8236.53 11.52 715.24

10 2007-08 8752.75 11.78 742.80

11 2008-09 9147.217 12.05 759.03

12 2009-10 10370.65 12.32 841.85

13 2010-11 10667.229 12.55 849.98

14 2011-12(E) 10972 12.82 856.00

*Population source: www.censusindia.gov.in

Page 76: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 76

4.15 - Calculation of Gap between Average Cost of Supply(ACS) and Average Revenue Realised (ARR)and AT&C Losses

S# ITEM Unit 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-112011-12

(Projected)

1 Self Generation in State MU 506.8 924.84 745.66 870.47 971.34 870.56 1649.07 2101.23 2310.8 2408.850

2 Import from CPSUs MU 5778.7 6232.7 6560.71 7045.91 7265.19 7873.4 7776.5 8269.424 8356.4 8578.090

3 Total Energy (1+2) MU 6285.5 7157.54 7306.37 7916.38 8236.53 8743.96 9425.57 10370.65 10667.2 10986.940

4 Billed Energy MU 3326 3718.8 3856 4188.55 4030.84 3331.6 3478 3833 4059.5 4424.844

5 Billing Efficiency (4/3x100) 52.92 51.96 52.78 52.91 48.94 38.10 36.90 36.96 38.06 40.27

6 Energy Costs

7i. Power Purchased fromCPSUs

Cr. 1267.9 1343.15 1339.62 1671.51 1415.45 1744.34 1459.5 1961.02 2157.6 2297.26

8ii. Power Purchased fromState

Cr. 103.99 107.72 103.88 124.76 129.86 81.43 324.18 599.93 639.53 652.32

9Total Power Purchase Cost(6+7)

Cr. 1371.8 1450.87 1443.5 1796.27 1545.31 1825.77 1783.68 2560.95 2797.2 2949.58

10 I. O&M Cr. 18.12 26.27 32.43 28.28 28.78 41.27 43.34 40.85 48.72 55.36

11 ii. Establishment Cr. 105.8 115.07 155.59 123.93 211.52 288.95 237.58 315.27 410.82 432.15

12 iii. Depreciation Cr. 48.07 49.1 55.1 57.15 58.52 62.58 68.94 82.73 87.85 105.14

13 iv. Intrest Cr. 32.87 22 32.89 22.67 21.46 16.97 14.37 14.97 11.2 12.99

14Total Cost ofSupply(9+10+11+12+13)

Cr. 1576.7 1663.31 1719.51 2028.3 1865.59 2235.53 2147.91 3014.77 3391.05 3555.22

Page 77: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 77

15Cost of Supply* (After lossesI,e on billed energy) (14/4)

Paisa/U 474.05 447.27 445.93 484.25 462.83 671.01 606.97 791.94 835.34 803.47

16Average Cost of Supply**(Before Losses i,e on inputenergy) ACS (14/3) *100

Paisa/Unit 250.85 232.39 235.34 256.22 226.5 255.67 235.06 292.70 317.89 323.59

17Pure Revenue Billed orAssessed (Gross)

Cr. 446.44 549 543.70 590.59 592.53 816.24 829.50 928.00 1180.65 1194.71

18Average Revenue Realised(ARR) (17/3)

Paisa/U 71 77 74 74 72 971 90.99 89.48 110.68 108.74

19Gap between ACS and ARR(ACS-ARR) (16-18)

Paisa/Unit

179.82 155.68 161.1 181.79 154.44 158.59 144.07 148.65 148.65 148.65

20Revenue Realised (withoutED)

Cr. 293.65 308.67 341.47 371.54 393.41 591.97 628 702.30 802.82 923.24

21 Average Tariff Rs./Unit 1.34 1.41 1.41 1.41 1.47 2.45 2.385 2.42 3.10 3.35

22 Energy Realised (20/21) MU 2191.4 2189.15 2421.77 2635.04 2676.26 2416.20 2633.12 2902.07 2749.38 3419.42

23Collection Efficiency(20/17*100)

% 65.78 56.22 62.95 63.06 66.28 69.74 75.71 75.68 68.00 77.28

24 T&D Losses ((3-4)/3*100) % 47.08 48.04 47.22 47.09 51.06 61.90 63.10 63.04 61.94 59.73

25 AT&C Losses (3-22)/3*100) % 65.14 69.41 66.85 66.71 67.51 72.37 72.06 72.02 74.23 68.88

Page 78: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 78

4.16 – Bifurcation of T&D Losses for 2010-2011

ENERGY PURCHASED FROM CPSUs ( A) 8356.413

SELF GENERATION OF THE STATE (B) 2310.816

TOTAL ENERGY INPUT(C=A+B) 10667.23

INTER STATE TRANSMISSION LOSSES i.e. POOL LOSSES (D= 4.87 % OF A) 406.9573

NET ENERGY INPUT TO THE STATE (E=C-D) 10260.27

INTRA STATE TRANSMISSION LOSSES i.e. LOSSES AT 200/132 kV LEVEL( F=5.45 % OF E) 559.18

ENERGY AVAILABLE FOR DISTRIBUTION AT 33 kV LEVEL (G=E-F) 9701.09

ENERGY BILLED H 4059.49

DISTRIBUTION LOSSES i.e. (I= G-H) AT 33/11/6.6/.4 kV LEVEL 5641.60

DISTRIBUTION LOSSES (J= I/Cx100) 52.89

Note:- Since J&K PDD is looking after both Transmission and distribution sectors, the T&D losses forboth of these sectors are of the order of 61.94 %, out of which distribution losses are of the order of52.89 %

Page 79: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 79

Chapter 5Electricity Consumers, Connected Load and Revenue Realization

5.1 - Category Wise Number of Consumers as on 31-03-2011

S.No Category Jammu (No.)Kashmir

(with Ladakh)(No.)

Total (No.)

1 Domestic 483099 602316 1085415

2 Non- Domestic/Commercial 76520 69323 145843

3 LT Industrial 8562 10069 18631

4 HT Industrial 485 441 926

5 HT Power IntensiveIntensity 13 0 13

6 Irrigation/ Agriculture 14623 384 15007

7 Public Lighting 178 199 377

8 LT Public WaterWorks 1159 399 1558

9 HT Public WaterWorks 33 193 226

10 State/ Central Deptt. 4941 4289 9230

11 General PurposeBulk Supply 105 38 143

Total 589718 687651 1277369

Page 80: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 80

5.2 - Category-wise Consumption for 2010-11

S.No Category JammuMU

KashmirMU

J&KMU %age

1 Domestic 501.28 742.3 1243.58 30.63

2 Non- Domestic/Commercial 186.8 219.5 406.3 10.01

3 Industrial 648.38 223.6 871.98 21.48

4 Irrigation/Agriculture 194.97 5.4 200.37 4.94

5 Public Lighting 24.23 1.9 26.13 0.64

6 Public WaterWorks 315.79 21.4 337.19 8.31

7 State/ CentralDeptt. 351.3 513.8 865.1 21.31

8General

Purpose BulkSupply

77.44 31.4 108.84 2.68

Total 2300.19 1759.3 4059.49

Page 81: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 81

5.3 - Category Wise Connected Load (in MWs) as on 31-03-2011

S.No CategoryConnected

LoadJammu (MW)

ConnectedLoad

Kashmir (MW)

J&KConnected Load

(MWs)

1 Domestic 297.529 298.9 596.429

2 Non- Domestic/Commercial 78.58 90.78 169.36

3 LT Industrial 130.028 85.89 215.918

4 HT Industrial 152.028 52.38 204.408

5 HT PowerIntensive Industry 25.02 0 25.02

6 Irrigation/Agriculture 74.931 36.34 111.271

7 Public Lighting 3.704 1.93 5.634

8 LT Public WaterWorks 46.04 13.03 59.07

9 HT Public WaterWorks 7.839 6.28 14.119

10 State/ CentralDeptt. 77.154 69.75 146.904

11 General PurposeBulk Supply 29.97 10.95 40.92

Total 922.823 666.23 1589.053

Page 82: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 82

Metering Status upto 31-03-2011

Description Jammu Kashmir Total

Total Consumers 589718 687651 1277369

Electronic Meters 282739 226946 509685

Percentage Electronic Metering 47.94 33.00 39.90

Electromechanical Meters 130669 0 130669

Percentage Electromechanical Metering 22.16 0 10.5

Total meters 413408 226946 640354

Total Percentage Metering 70.10 33.00 50.13

Page 83: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 83

5.5 - Year-wise Revenue Realization

S# YearTotal Revenue

Realization(Cr)

ED(Crs)

Rev.Pure+Misc.

(Crs)

1 2001-02 267.39 27.54 239.85

2 2002-03 323.19 29.14 294.05

3 2003-04 342.62 33.1 309.52

4 2004-05 398.77 54.75 344.02

5 2005-06 436.20 64.46 371.74

6 2006-07 455.47 60.21 395.26

7 2007-08 693.24 99.31 593.93

8 2008-09 737.51 108.00 629.51

9 2009-10 823.53 120.32 703.21

10 2010-11 950.4 147.58 802.82

Page 84: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 84

5.6 Category-wise Revenue Realized for the year 2008-09 to 2010-11 in J&K

Rs in Crores

S.No. Category of Consumres

2008-09 2009-10 2010-11Pure

Revenue ED Total PureRevenue ED Total Pure

Revenue ED Total

1 . Domestic 105.75 23.99 129.73 136.56 29.95 166.51 170.52 38.48 209.00

2 . N. Domestic/ Commercial 61.34 13.25 74.59 58.27 12.50 70.77 80.07 18.25 98.32

3 . Irri/Agriculture 32.66 7.71 40.37 31.18 6.84 38.02 31.47 7.24 38.71

4 . State/Central 166.34 8.16 174.50 202.67 11.16 213.83 208.38 11.82 220.20

5 . Public Lighting 0.04 0.01 0.05 0.02 0.01 0.03 0.11 0.03 0.14

6 . L.T Industrial 48.85 17.67 66.52 29.44 6.44 35.88 39.00 9.02 48.02

7 . H.T Industrial 78.42 17.08 95.50 112.36 24.98 137.34 132.60 30.61 163.21

8 . Power Intensive Industries 15.65 2.21 17.87 32.11 6.95 39.06 24.17 7.70 31.87

9 . L. T Public Water Works 60.70 12.57 73.27 64.72 14.12 78.84 68.18 16.67 84.85

10 . H. T Public Water Works 21.44 3.46 24.90 17.28 3.95 21.23 15.82 2.19 18.01

11 . Gen. Purpose Bulk Supply 36.90 1.81 38.71 17.26 3.42 20.68 30.59 5.57 36.16

Total:- 628.10 107.91 736.01 701.87 120.32 822.19 800.91 147.58 948.49

Rev. Miscl. 1.91Grand Total 950.40

Page 85: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 85

5.7 Category-wise Revenue Realized for the year 2008-09 to 2010-11 in respect of Elect. Maintt. & REWing, Jammu

(Rs. in Crores)

S.No. Category of Consumres2008-09 2009-2010 2010-11

PureRevenue

ElectricityDuty Total: Pure

RevenueElectricity

Duty Total: PureRevenue

ElectricityDuty Total:

1 . Domestic 42.65 9.95 52.59 51.65 11.25 62.90 67.41 15.80 83.21

2 . N. Domestic/ Commercial 30.07 6.61 36.68 32.88 7.16 40.04 43.45 10.19 53.64

3 . Irri/Agriculture 22.58 5.38 27.96 21.93 4.78 26.71 21.90 5.14 27.04

4 . State/Central 91.74 2.17 93.91 122.68 4.97 127.65 122.97 5.01 127.98

5 . Public Lighting 0.00 0.00 0.00 0.02 0.01 0.03 0.06 0.02 0.08

6 . L.T Industrial 31.07 12.51 43.58 20.35 4.44 24.79 29.98 7.03 37.01

7 . H.T Industrial 64.69 13.09 77.78 80.62 17.58 98.20 98.65 23.14 121.79

8 . Power Intensive Industries 15.65 2.21 17.87 32.11 6.95 39.06 24.17 5.67 29.84

9 . L. T Public Water Works 52.86 10.83 63.69 57.11 12.45 69.56 58.95 13.83 72.78

10 . H. T Public Water Works 9.34 0.78 10.12 5.31 1.16 6.47 2.91 0.68 3.59

11 . Gen. Purpose Bulk Supply 33.84 1.15 34.99 9.70 2.10 11.80 23.75 5.57 29.32

Total:- 394.50 64.67 459.17 434.36 72.85 507.21 494.20 92.08 586.28

Rev. Miscl. 0.90

Grand Total 587.18

Page 86: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 86

5.8 Category-wise Revenue Realized for the year 2008-09 to 2010-11 in respect of Elect. Maintt. & REWing, Kashmir

(Rs. in Crores)

S.No. Category of Consumres

2008-09 2009-10 2010-11Pure

RevenueElectricity

Duty Total: Pure Revenue ElectricityDuty Total: Pure

RevenueElectricity

Duty Total:

1 . Domestic 63.10 14.04 77.14 84.91 18.70 103.61 103.11 22.68 125.79

2 . N. Domestic/ Commercial 31.27 6.64 37.91 25.39 5.34 30.73 36.62 8.06 44.68

3 . Irri/Agriculture 10.08 2.33 12.41 9.25 2.06 11.31 9.57 2.10 11.67

4 . State/Central 74.60 5.99 80.59 79.99 6.19 86.18 85.41 6.81 92.22

5 . Public Lighting 0.04 0.01 0.05 0.0006 0.0001 0.0007 0.05 0.01 0.06

6 . L.T Industrial 17.78 5.16 22.94 9.09 2.00 11.09 9.02 1.99 11.01

7 . H.T Industrial 13.73 3.99 17.72 31.74 7.40 39.14 33.95 7.47 41.42

8 . Power Intensive Industries 0.00 0.00 0.00 0.00 0.00 0 0.00 2.03 2.03

9 . L. T Public Water Works 7.84 1.74 9.58 7.61 1.67 9.28 9.23 2.84 12.07

10 . H. T Public Water Works 12.10 2.68 14.78 11.97 2.79 14.76 12.91 1.51 14.42

11 . Gen. Purpose Bulk Supply 3.06 0.66 3.72 7.56 1.32 8.88 6.84 0.00 6.84

Total:- 233.60 43.24 276.84 267.511 47.4701 314.981 306.71 55.50 362.21Rev. Miscl. 1.01Grand Total 363.22

Page 87: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 87

5.9 CATEGORYWISE SUBSIDY COMPONENT FOR 2009-10 & 2010-11

S# Name of Category

2009-10 2010-11

EnergyBilled(MU)

Per unitCost of

supply(Rs)Cost of

Supply(Crs)Revenue

Billed(Crs)Subsidy

(Crs)%age

subsidyEnergy

Billed(MU)Per unitCost of

supply(Rs)Cost of

Supply(Crs)Revenue

Billed(Crs)Subsidy

(Crs)%age

subsidy

1 Domestic 1380.00 7.75 1069.50 195.05 874.45 81.76 1243.58 8.29 1031.06 176.59 854.47 82.87

2 Commercial 295.00 7.75 228.63 67.85 160.78 70.32 406.30 8.29 336.87 109.29 227.57 67.56

3 LT Industrial 202.00 7.75 156.55 42.62 113.93 72.78 206.75 8.29 171.42 50.86 120.56 70.33

4 HT Industrial 528.00 7.75 409.20 138.34 270.86 66.19 542.6 8.29 449.87 157.90 291.98 64.90

5 HT PowerIntensive 126.00 7.75 97.65 38.56 59.09 60.51 122.63 8.29 101.67 40.47 61.21 60.20

6 Irrigation/Agr. 295.00 7.75 228.63 38.06 190.57 83.35 200.37 8.29 166.13 28.45 137.68 82.87

7 Public lighting 14.00 7.75 10.85 4.62 6.23 57.42 26.13 8.29 21.66 10.58 11.08 51.15

8 LT PublicWater Works 295.00 7.75 228.63 97.35 131.28 57.42 282.17 8.29 233.95 113.71 120.23 51.39

9 HT PublicWater Works 88.00 7.75 68.20 27.54 40.66 59.62 55.02 8.29 45.62 20.69 24.93 54.65

10 State CentralDeptt 532.00 7.75 412.30 252.17 160.13 38.84 865.1 8.29 717.26 423.90 293.36 40.90

11 GeneralPurpose Bulk 78.00 7.75 60.45 25.97 34.48 57.04 108.84 8.29 90.24 41.14 49.10 54.41

Total 3833.00 2970.575 928.13 2042.45 4059.49 3365.75 1173.59 2192.17

Page 88: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 88

5.10 - Arrears of Non Govt. and Govt. Consumers From 2002-03 to 2010-11 (Rs Crores)

S.NoYear

Jammu(A)

Kashmir(B) Total

Grand TotalNon Govt. Govt.

Deptts. Total (A) Non Govt. Govt.Deptts. Total (B) Non Govt. Govt.

Deptts.

1 2 3 4=2+3 5 6 7=5+6 8=2+5 9=3+6 10=8+9

1 2002-03 18.54 239.76 258.3 128.05 113.47 241.52 146.59 353.23 499.82

2 2003-04 37.39 282.3 319.69 156.27 127.35 283.62 193.66 409.65 603.31

3 2004-05 81.21 311.51 392.72 170.14 188.17 358.31 251.35 499.68 751.03

4 2005-06 101.70 377.31 479.01 158.96 194.82 353.78 260.66 572.13 832.79

5 2006-07 101.72 424.46 526.18 165.69 207.83 373.52 267.41 632.29 899.7

6 2007-08 74.84 443.65 518.49 189.11 218.7 407.81 263.95 662.35 926.3

7 2008-09 95.12 448.74 543.86 205.58 223.08 428.66 300.7 671.82 972.52

8 2009-10 121.59 445.01 566.60 191.97 228.83 420.8 313.56 673.84 987.4

9 2010-11 149.36 505.86 655.22 197.5 233.53 431.03 346.86 739.39 1086.25

Page 89: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 89

CHAPTER 6Computerized Billing

6.1 - STATUS OF COMPUTERISED BILLING IN EM&RE WING JAMMU AS ON 31/03/2011.

S.No. CIRCLE DIVISION TOTAL SUBDIVISIONS

HARDWAREPROCURED &INSTALLED

HARDWAREPROCURED

BUT NOTINSTALLED

HARDWAREYET TO BEPROCURED

1 Circle Ist

ED-I Jammu 4 4 0 0

ED-I I Jammu 4 4 0 0

ED-III Jammu 4 4 0 0

2 Circle KathuaED- VIJAYPUR 4 4 0 0

ED- KATHUA 5 5 0 0

3 Circle RajouriED- RAJOURI 5 1 0 4

ED -POONCH 4 0 0 4

4 Circle Batote

ED-Udhampur 4 2 0 2

ED-Reasi 3 1 0 2

ED- BATOTE 3 1 0 2

5 Circle KishtwarED- DODA 3 1 0 2

ED-KISHTWAR 4 1 0 3

TOTAL EM&RE WING JAMMU 47 28 0 19

Page 90: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 90

6.2 - STATUS OF COMPUTERISED BILLING IN EM&RE WING, KASHMIR AS ON 31/03/2011

S.No. CIRCLE DIVISION TOTAL SUBDIVISIONS

HARDWAREPROCURED &

INSTALLED

HARDWAREPROCURED

BUT NOTINSTALLED

HARDWAREYET TO BEPROCURED

1 Circle IstDIV-I BASANT BAGH 5 5 0 0DIV-IV KHANYAR 5 5 0 0TOTAL 10 10 0 0

2 Circle IInd

DIV-II RAJ BAGH 5 5 0 0DIV-III SHEREEN BAGH 5 5 0 0DIV-VI BADGAM 5 4 0 0TOTAL 15 14 0 1

3 Bejbehara

DIV-ANANTNAG 3 1 0 2DIV-BIJBEHARA 3 3 0 0DIV-KULGAM 3 2 0 1TOTAL 9 6 0 3

4 Sopore

DIV-BARAMULLA 5 4 0 1DIV-SOPORE 4 4 0 0DIV-HANDWARA 5 2 0 3DIV-SUMBAL 4 2 0 2TOTAL 18 12 0 6

5 GanderbalDIV-V GANDERBAL 4 4 0 0DIV-BANDIPORA 3 3 0 0TOTAL 7 7 0 0

6 Pulwama

DIV-PULWAMA 3 2 0 1DIV-AWANTIPORA 3 3 0 0DIV-SHOPIAN 3 0 0 3TOTAL 9 5 0 4

7 Circle LehDIV-LEH 2 0 0 2DIV-KARGIL 2 0 0 2TOTAL 4 0 0 4

TOTAL EM&RE WING KASHMIR 72 54 0 18

Page 91: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 91

CHAPTER 7Schemes under implementation

7.1 - RGGVY:• RGGVY is basically a scheme for 100% Rural Electrification.

• 14 Schemes covering whole of J&K State were submitted to REC at a total estimated DPR (Detailed ProjectReport) cost of Rs. 637.39 crores. All these schemes have been sanctioned by REC at a cost of Rs.821.62crores

• Above RGGVY Schemes envisages electrification of 365 no. virgin villages, un-electrified villages and de-electrified villages, which are financially viable for electrification within the Grid System.

• 303682 no. Rural Household connections are proposed to be provided under these RGGVY schemes.

• 96321 no. BPL households are earmarked to be electrified free of cost and 5889 no. already electrified villagesto be covered for intensive electrification under the scheme.

• As per guidelines of RGGVY, the execution of work for 7 districts each has been ensured to NHPC andJ&KSPDC as under:

NHPC: Udhampur, Kathua, Jammu, Srinagar, Budgam, Leh and Kargil.

J&KSPDC: Kupwara, Anantnag, Doda, Baramullah, Pulwama, Rajouri and Poonch.

Page 92: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 92

7.2 - Districts wise REC Sanctioned/Approved Cost, Amount Released by REC, Expenditureunder RGGVY

S.No. Districts DPR(Rs in Lacs)

REC Sanctioned/Approved cost( Rs. in lacs)

Amount Releasedby REC

(Rs.in Lacs.)

Expenditure tillending 03/2011

(Rs.in Lacs.)Sanctioned Schemes

A) JAMMU1 Rajouri 6910.41 4335.00 1318.00 1270.002 Udhampur 5602.00 4116.36 3140.00 3078.003 Kathua 5477.07 3229.76 2868.00 2572.004 Jammu 5174.05 3546.21 3106.00 2401.005 Doda 7251.65 5005.00 1596.00 12.006 Poonch 5476.32 2137.00 645.00 631.00

A Sub-Total 35891.5 22369.3 12673 11152

B) KASHMIR1 Kupwara 2426.35 2815.29 2297.00 1463.002 Anantnag 5830.00 6388.00 5584.00 4485.003 Baramullah 3392.40 1976.00 618.00 256.004 Pulwama 4057.83 2413.00 761.00 313.005 Budgam 917.00 811.29 326.00 260.006 Srinagar 1389.00 1170.00 878.00 476.00B Sub-Total 18012.58 15573.6 10464.00 7253.00C) LADAKH1 Leh 26645.27 28807.00 25637.00 20251.002 Kargil 24623.46 15413.00 13726.00 11199.00

C Sub-Total 51268.73 44220.00 39363.00 31450.00A+B+C G. Total: 105172.80 82162.91 62500.00 49855.00

Page 93: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 93

7.3 Physical progress Report ending 3/2011 under RGGVYS.

No

Nam

e of

Dis

tric

t

Cod

e N

o

Impl

e-m

entin

g A

genc

y

Targ

et N

o. o

f un-

elec

trifi

ed/

de-e

lect

rifie

d vi

llage

s.

Cum

.Ach

. Of

un-e

lect

rifie

d/de

-ele

ctrif

ied

villa

ges.

No.

of e

lect

rifie

d vi

llage

s co

vere

dfo

r HH

s el

ectr

ictr

if-ic

atio

n.

Cum

.Ach

. On

acco

unt O

f el

ectr

ified

villa

ges

cove

red

for H

Hs

elec

tric

trif-

icat

ion.

.

Tota

l vill

ages

cov

ered

for

HH

s co

nnec

t-ion

s

Targ

et N

o. o

f un-

elec

trifi

ed/

de-e

lect

rifie

d ha

mle

ts

Cum

.Ahi

evem

ents

of u

n-el

ectr

ified

/de

-ele

ctrif

ied

ham

lets

No.

of e

lect

rifie

d ha

bita

tions

cov

ered

for H

Hs

elec

t-rifi

catio

n.

Cum

.Ach

. On

acco

unt O

f el

ectr

ified

habi

tatio

ns c

over

edfo

r HH

s e

lect

rictr

if-ic

atio

n..

Tota

l ham

lets

cov

ered

for

elec

trifi

catio

n.

Tota

l No.

of h

ouse

hold

s to

be

elec

trifi

ed in

the

sche

me

( inc

ludi

ng B

PL h

ouse

hold

s)A

spe

rsch

eme

No.

of B

PLco

nnec

tions

in R

HH

Cum

.Ach

. Of h

ouse

hold

elec

trifi

red

in th

e sc

hem

ein

cl. B

PL H

HS

1 Srinagar 900040 NHPC 7 4 161 0 168 304 0 550 49 854 9212 3748 1707

2 Baramulla 900034 SPDC 22 0 SurveyU/P 0 Survey

U/P 172 0 0 0 172 15994 0 0

3 Pulwama 900036 SDPC 19 0 SurveyU/P 0 Survey

U/P 333 0 0 0 33 20606 0 0

4 Budgam 900039 NHPC 9 1 461 0 470 1418 71 130 1 1548 10135 1519 100

5 Kupwara 900001 SPDC 33 16 332 0 373 196 373 0 74 196 8099 5308 1100

6 Anantnag 900002 SPDC 5 4 600 0 605 596 0 0 0 596 27016 13821 3316

7 Leh 900043 NHPC 35 20 77 0 112 136 0 147 1965 283 6909 3755 2101

8 Kargil 900042 NHPC 27 11 101 0 128 118 0 458 585 576 1614 1038 585

9 Jammu 900035 NHPC 0 0 1019 845 1019 1375 78 4511 289 5886 36697 6314 6914

10 Kathua 900005 NHPC 44 44 534 501 578 604 0 1110 1061 1714 31632 6461 6461

11 Rajouri 900037 SPDC 98 0 158 0 248 864 0 0 0 687 41092 5127 0

12 Poonch 900049 SPDC 26 0 104 0 105 250 17 0 0 250 7288 1328 0

13 Udhampur 900005 NHPC 18 18 578 333 596 1345 0 1367 440 2712 59357 47902 11279

14 Doda 900033 SPDC 22 0 132 0 154 253 0 0 0 253 28031 0 0

Total: 365 118 1679 7964 539 8273 4464 15760 303682 96321 33563

Page 94: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 94

4 -Accelerated Power Development and Reforms Programme (APDRP)

Under the program, Government of India has sanctioned 6 No Schemes so far, with the main objectives as:

1. Reduction in AT and C Losses.

2. Infrastructure Development and Strengthen.

3. 100% metering of all categories of consumers.

The details of sanctioned / ongoing Schemes are as under. (Rs. in Crores)

District CircleCost of

theScheme

Year ofSanctioned

AmountReleased

ending 3/2010

Expenditure,ending3/2010

Srinagar andBudgam

Electric Circle-I andII., Srinagar 227.03 2002-03 215.73 189.537

Jammu EM & RE, Circle-I,Jammu 174.07 2002-03 167.63 165.351

Kathua, Rajouri andPoonch

EM & RE , Circle-II, Jammu 145.55 2004-05 117.03 113.309

Doda andUdampur

EM & RE, Circle-III, Jammu 95.62 2004-05 86.52 82.943

Baramulla andKupwara

EM & RE, Circle-North, Kashmir 240.08 2004-05 121.53 117.983

Anantnag andPulwama

EM & RE, Circle-South, Kashmir 217.78 2004-05 121.69 109.884

P&MM Wing forprocurement ofConsumer meters

6.53 6.51

One more scheme with scheme cost of Rs. 48.73 Crores under APDRP for Leh Circle covering both districts Leh andKargil of Ladakh region has been approved by CEA and is awaiting release of funds by Ministry of Finance (Govt. of India)

Page 95: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 95

The following is the scheme coverage of APDRP Schemes

S.No. Name of scheme Unit Quantity

1. Construction of Receiving Station Nos/MVA 113/928

2. Construction of Distribution Sub Stations Nos/MVA 10862/12433. Augmentation of R/Stations Nos/MVA 76/457.6

4. Augmentation of Distribution Sub Stations Nos/MVA 2965/315.835. Erection of 66/33 KV Lines KM 1235

6. Erection of 11 KV Lines KM 5451

7. LT Lines KM 8100

7.5 - Summary of Achievements under APDRP ending 03/2010

Object Unit Completed U/Progress

33/11 KV New Receiving Stations No. 77 41

11/0.4 KV New Distribution Sub/Stations No. 5701 293

Augmentation of 33/11 KV Receiving Stations No. 107 05

Augmentation of 11/0.4 KV Distribution Sub/Stations No. 3637 80

Installation of consumer meters No. 492508 56395

Page 96: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 96

7.6 – Scheme wise Achievement (APDRP)

District Srinagar and Budgam

S.No Description Unit Completed U/Progress

1 33/11 KV New Receiving Stations No. 20 4

2 11/0.4 KV New DistributionSub/Stations No. 1510 38

3 Augmentation of 33/11 KVReceiving Stations No. 12 0

4 Augmentation of 11/0.4 KVDistribution Sub/Stations No. 378 3

5 Installation of consumer meters No. 154601 0

District Anantnag and Pulwama

S.No Description Unit Completed U/Progress

1 33/11 KV New Receiving Stations No. 13 16

2 11/0.4 KV New DistributionSub/Stations No. 738 115

3 Augmentation of 33/11 KVReceiving Stations No. 18 01

4 Augmentation of 11/0.4 KVDistribution Sub/Stations No. 395 46

5 Installation of consumer meters No. 514460 957

Page 97: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 97

District Baramulla and Kupwara

S.No Description Unit Completed U/Progress

1 33/11 KV New Receiving Stations No. 5 7

2 11/0.4 KV New DistributionSub/Stations No. 1163 176

3 Augmentation of 33/11 KV ReceivingStations No. 14 0

4 Augmentation of 11/0.4 KVDistribution Sub/Stations No. 402 31

5 Installation of consumer meters No. 39404 18016

District Jammu

S.No Description Unit Completed U/Progress

1 33/11 KV New Receiving Stations No. 22 4

2 11/0.4 KV New DistributionSub/Stations No. 1281 0

3 Augmentation of 33/11 KV ReceivingStations No. 28 0

4 Augmentation of 11/0.4 KVDistribution Sub/Stations No. 950 0

5 Installation of consumer meters No. 156129 18661

Page 98: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 98

District Kathua, Rajouri and Poonch

S.No Description Unit Completed U/Progress

1 33/11 KV New Receiving Stations No. 13 7

2 11/0.4 KV New DistributionSub/Stations No. 824 2

3 Augmentation of 33/11 KV ReceivingStations No. 9 4

4 Augmentation of 11/0.4 KVDistribution Sub/Stations No. 535 3

5 Installation of consumer meters No. 45814 0

District Doda and Udhampur

S.No Description Unit Completed U/Progress

1 33/11 KV New Receiving Stations No. 4 3

2 11/0.4 KV New DistributionSub/Stations No. 414 0

3 Augmentation of 33/11 KV ReceivingStations No. 10 0

4 Augmentation of 11/0.4 KVDistribution Sub/Stations No. 405 0

5 Installation of consumer meters No. 42570 100

Page 99: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 99

7.7- Hon’ble Prime Ministers Reconstruction Programme.

The Hon`ble Prime Minster during his visit of J&K in November, 2004 announced a Re-construction Planinfrastructure for J&K and the objective of Schemes under the Re-Construction program is develop infrastructure at 220KV

and 132KV level by way of construction/ Augmentation of Grid Stations, construction of New lines and thickning of

Conductor of Existing lines. Originally the project was estimated to cost of Rs. 707.00 Crores based on cost data 2003. theproject was scrutinized by CEA and on their observations , the project was revised to the cost of Rs. 1006.51 crores The

CEA subsequently advised to revise the Project Report necessitated due to further cost escalation during the intervening

period. Accordingly, the revised project amounting to Rs. 1351.00 Crores was furnished to CEA for approval and finally theProject Report was approved for 1350.00 Crores. Out of this cost, an amount of Rs. 920.20 Crores has been spentending 03/2011

The Scheme envisages construction/ augmentation of following transformation and Transmission capacities.

o Construction of 7 No. new 220/132 KVA, Grid sub Stations of 1880 MVA capacity.

o Augmentation of 1 No. , 220/13 KVA, Grid Sub Station of 150 MVA Capacity.

o Construction of 22 No., 132/33 Grid Sub Stations of 1180 MVA Capacity.

o Augmentation of 4 No. 132/66-33 Grid Sub Stations of 160 MVA Capacity.

o Laying of 373.5 Km of 220KV, D/C, Transmission Lines.

o Laying of 446.35 Km of 132KV, D/C, S/C transmission Lines.

Besides, the Scheme includes other works like Stringing of II Circuit of existing 220KV, D/C TransmissionLines (40.40 Km), Stringing of II Circuit of 132 KV, D/C, Transmission lines (21.00 Km), thickening of conductor etc.

Page 100: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 100

7.8 - New / Augmentation of Grid Stations in Jammu & Kashmir Divisions:

Kashmir Division:

• B u d g a m ( 3 2 0 / 1 0 0 M V A )• M i r b a z a r ( A n a n t n a g )• A m a r g a r h ( 3 2 0 M V A )• A l u e s t a n g h ( 3 2 0 / 1 0 0 M V A )• S h o p i a n ( 5 0 M V A )• B a n d i p o r ( 5 0 M V A )• L i s s a r ( 5 0 M V A )• K h a n m o h ( 5 0 M V A• B a n i h a l ( T e t h e r ) ( 5 0 M V A )• V i l g a m• M a g a m ( 5 0 M V A ) a n d• A u g m e n t a t i o n o f Z a n a k o t e / P a m p o r e G r i d S t a t i o n s .

Jammu Division:• 2 N o . i n B i s h n a ( 2 X 1 6 0 M V A a n d 1 0 0 M V A )• 2 N o . i n R a m b a n ( 3 X 4 0 M V A a n d 2 0 M V A )• K i s h t w a r ( 2 x 1 6 0 M V A )• K a t t r a ( 1 x 5 0 M V A )• B h a l e s s a ( 2 0 M V A• P o o n i c h e c k ( 5 0 M V A )• B a t t a l m a n w a l ( 5 0 M V A )• C h a n d a k , S i o t ( 2 0 M V A )• B a r i b r a h m n a - I I ( 2 x 5 0 M V A )• G a n g y a l ( 1 x 5 0 M V A )• S i o t ( ( 5 0 M V A )• A u g m e n t a t i o n o f K a t h u a , S a m b a a n d H i r a n a g a r G r i d S t a t i o n s .

The first ever State owned 132 KV Transmission Line from Ramban to Kishtwar and Rajouri-Poonch, ring aroundJammu cities are included in the package which are based on Technical requirement and survey done by CEA. The powerrequirements under the Plan for Industries have been given due focus and priority.

Page 101: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 101

7.9- Achievements ending 03/2011

Jammu

• 220/132/kV, 320MVA Barn Grid Sub Station Commissioned alongwith allied 132/33kV, 40 MVAtransformer.

• 132/33kV, 100 MVA Bari Brahamana-II Grid Sub Station Commissioned.• 132/33kV, 50 MVA Gangyal Grid Sub Station Commissioned.• Augmentation of 132/66 KV Grid Sub Station Kuthua from 70 MVA to 100 MVA copmleted• Augmentation of 132/66 KV Grid Sub Station Samba from 50 MVA to 100 MVA• Augmentation of 132/33 KV Grid Sub Station Hira Nagar from 42.5 MVA to 72.5 MVA• 132kV D/C Rajouri-Draba Line Commissioned• 132/33 kV , 50 MVA Grid Station Gangyal commissioned• LILO of 132, Gladni-Miran Sahib Transmission Line for Grid Station Gangyal.• 220 kV D/C Burn-Kishenpur Transmission Line completed in• 220 kV D/C Miran Sahab-Bishnah.Transmission Line commissioned• 132 kV Barn-Siot alongwith LILO(Akhnoor section) Transmission Line commissioned• LILO of 132 KV D/C , Gladni-Hiranagar Transmission Line for Grid Station Bari Brahmana-II completed.• 132 KV D/C Barn-Katra Transmission line completed.• Stringing of conductor on II circuit of 132KV Burn-Reasi Transmission line completed.• LILO of 132 KV D/C , CSTL-I for G/Stn Ramban completed.• Reconductoring and stabilization of 132KV S/C Gladni-Janipur transmission line completed• Reconductoring of 132KV D/C Ring main around Jammu city completed

Kashmir

• Augmentation of 220/132KV Grid Sub Station Zainakote from 300 MVA to 450 MVA• Augmentation of 132/33KV Grid Sub Station Pampore from 150 MVA to 200 MVA• Construction of 50MVA,132/33KV Grid station Tethar completed & Commissioned in 10/09• Construction of 50MVA,132/33KV Grid station Khonmoh completed & Commissioned in 5/09• LILO of Pampore-cheshmashahi line for Khonmoh Grid station.• LILO of CSTL at Tethar for Grid station Tethar..

Page 102: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 102

Chapter- 8Power Sector Reforms

With a view to reform power sector, three tripartite MOUs have been signed so far between J&K PDD, PlanningCommission, GOI and Ministry of Finance GOI. Bench marks were fixed under these MOUs in a phased manner fromthe date of signing. In respect of Ist and 2nd tripartite MOUs, benchmarks have been achieved by and large as has beenduly certified by the Independent Auditor, M/S Batliboi Consultants. The details of these benchmarks are as under:

8.1 Bench Marks under 1st Tripartite MOU:Phase-I

1. Independent Auditor approved by Planning Commission to be appointed upon signing of MOU.

2. SERC to give tariff order.

3. All 11 kV feeders metered using electronic meters.

4. Energy Accounting for each 11kV feeder to be instituted with responsibility assigned to specific JE.

5. Formation of Distinct distribution profit centers with responsibilities of energy flow accounting.

6. Filing of ARR before the SERC by J&K PDD.

Phase-II

1. Total revenue for the preceding 12 months period must at least equal to 40% of the bulk power purchase costfor the same period. (This may be achieved by a combination of improved billing, collection and tariff hikes.).

2. Specific Proposal of PDD for reduction of Est. and O&M Cost by Rs. 15.00 Crores.

3. Computerized billing covering at least 40%of the billed energy.

4. Consumer metering to be 50%

Page 103: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 103

8.2 Bench Marks under 2nd Tripartite MOU:1. Certification of Benchmarks established under the MoU by an independent auditor.

2. Filing of ARR for the year 2008-09 before JKSERC.

3. SERC to issue Tariff Order for 2008-09

4. Full energy flow audit for the preceding twelve months covering all major consumers with a load of25kVA or more. Audit should cover energy (kWh) supplied, energy billed and cash collected to suchconsumers.

5. Capacitor banks to be added at sub-station/feeders that feed energy to at least 65 % of the consumerscovered under paragraph 4 above at 33 kV and below.

6. Total cash collected from the large consumers under para 4 above should be at least 70 % of theamount billed.

7. Total cash collected for the preceding 12 months period must at least equal 50 % of the bulk powerpurchase cost for the same period. In case this milestone is achieved, the milestones under para 4 and6 will be subsumed in this milestone.

8. Computerized billing covering at least 65 % of the billed energy.

9. Sixty five percent consumer metering in place.

10. Specific proposal for reduction of establishment and O & M cost for the period of the second MOU toRs 20 Crs inclusive of Rs 15 Crs saved under the first MOU.

11. JKPDD to submit a blue print for turn around of the power sector in J&K within 6 months from the dateof this MOU.

Page 104: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 104

8.3 Bench Marks under 3rd Tripartite MOU:

A. Basic Premise of Reforms Roadmap

a GOJK will take steps to reduce T&D losses by at least 3% considering the guidelines of Restructured APDRPissued by Ministry of Power.

b Detailed Terms of Reference (TORS) for carrying out system and commercial studies for strategizing action onthe basis of a SWOT analysis of the transmission and distribution sector so as to reduce AT&C losses shall beframed by GOJK in consultation with the Ministry of Power (Central Electricity Authority).

c While framing the TORs, GOJK shall make use of available reports such as the Blue Print on PDD beingprepared by TERI.

B. Independent Auditors.

a Certification of the conditions (benchmarks) established under this MOU shall be done by an independentAuditor,

b The auditor, so appointed, will be used by GOJK effectively.

C. Corporate governancea GOJK shall take steps to restructure the T&D sector.

b GOJK shall take steps to unbundle the transmission functions being carried out by the Government asdepartmental activity.

c GOJK shall take steps to establish a transmission company (TRANSCO) under the companies Act. 1956.

dThe relations between company’s management, its board of directors, its shareholders and the other involvedstakeholder bodies in the Corporation shall be defined in the Memorandum/Articles of Association of theTRANSCO for clearly delineating parameters of corporate governance in the transmission sector.

e Reforms in the Distribution Sector shall be continued.

f A road map for addressing consumer grievances shall be laid out considering the emphasis given in theguidelines of R_APDRP.

Page 105: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 105

g Steps shall be taken to make the State Load Dispatch Centre (SLDC) function without the control of the T&Dutility, under the direct control of GOJK, as on interim measure, before autonomous SLDC comes into being.

D. Energy Accounting.

a GOJK will issue detailed guidelines for Energy Accounting in case of 11 KV feeders and above for effectivemonitoring through regular inspections at different levels.

b GOJK will fix responsibility at different levels of supervisory engineers for inspection of installations for demandvis-à-vis load as per agreement with the utility (department).

c

GOJK will carry out quick studies to pin point high loss areas in the coming six months. Based on the studies,the high loss areas and installations shall be addressed through a range of specific measures such aselectronic metering, adherence to publicized curtailment schedule, timely billing and monitoring of revenuerecovery.

dA web based Management Information System (MIS) shall be put in place by dovetailing APDRP or R-APDRPor other funds to monitor and take corrective steps on progress in reducing AT&C loss parameters. The MISshall be put in place within 12 months.

eFull energy flow audit for the preceding twelve months covering all major consumers with a load of 25 KVA ormore. Audit should cover energy (kWh) supplied to such consumers, energy billed to such consumers and cashcollected from such consumers.

f Capacitor banks to be added at sub stations/feeders that feed energy to at least 75% of the consumers coveredunder paragraph “e” above at 33 KV and below.

g

Considering the fact that due to law and order disturbances in the summer of 2008, electronic meters weredamaged by miscreants in Jammu division and that a large number of meters earlier installed in KashmirDivision have become non functional, 100% of the meters installed under earlier two MOU will be madefunctional.

a

Considering the fact that J&K is integrated with the rest of the country in respect of the flow of electrical energy,and also, considering the fact that power sector of the country is managed under the overall provisionscontained in the Central Electricity Act, 2003 which is not yet applicable to the State of J&K, GOJK will placebefore its legislature, within next six months, for consideration and adoption an Electricity Act on the lines of theCentral Electricity Act, 2003.

Page 106: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 106

bConsidering the importance of energy conservation, GOJK will place before its legislature, within next twelvemonths, for consideration and adoption energy Conservation Act on the lines of the Central EnergyConservation Act, 2001.

c.GOJK will take steps to bring in legislation for adoption by Regulator (SERC),of tariff determined throughcompetitive bidding, so as to reduce regulatory risk in projects and also to align the power sector of J&K withthe rest of the country.

F Regulatory Related Issues

a GOJK will file ARR for the year 2009-10 before the J&K State Electricity Regulatory Commission.

G. Commercial Issues

a Total cash collected from the larger consumers under paragraph “D-(e)” above should be at least 85% of theamount billed.

b Total cash collected for the preceding 12 months period must be at least equal to 60% of the bulk powerpurchase cost.

c Computerized billing covering at least 75% of the billed energy.

H. Dovetailing of Schemes.

aGOJK will establish a Single Nodal Agency in the Power Development Department for dovetailing variousschemes being implemented in the State in the power sector such as RGGVY, APDRP, R-APDRP, PMRP(T&D sector) etc. with the power Reform Grant for deriving optimum benefits from the investments.

b Various reports on Power Sector including the Blue Print for Turn Around of the power sector being preparedby TERI and outcome of studies mentioned in this MOU shall be referred to while dovetailing the schemes.

c System strengthening and up-gradation will be carried out as per the Detailed Project Reports prepared underRGGVY, PMRP, APDRP (X Plan) and R-APDRP.

d Dovetailing of schemes will also consider felt needs to people expressed by public representatives.

Page 107: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 107

8.4 Targets and achievement of benchmarks under Ist, 2nd & 3rd Tripartite MOU

S.No Description of Benchmark

Ist Tripartite MoUsigned on August 24, 2006

(for period September 2006to August 2007)

2nd Tripartite MoUsigned on

February 29, 2008(for period September2007 to August 2008)

3rd Tripartite MoU

Target Achievement Target Achievement Target Achievement1. Appoint of Independent Auditor 100% 100% 100% 100% 100% 100%2. Feeder metering 100% 100% Nil - Nil -3. Energy Accounting of Feeders,

Designation of JEs as feeder managers100% 100%

Nil-

Nil-

4. Establishment of distribution profitcenters with responsibility of energyflow accounting

100% 100% Nil - Nil -

5. Filing of ARR/ Issuance of Tariff Orderby JKSERC

100% 100% 100% 100%

6. Revenue Collection as %age of PowerPurchase Cost

40% 40.06% 50% 35.92% 44.57 28.86%

7. Proposal of PDD for reduction of Est. &O&M cost by 15 Crores in Ist TripartiteMoU and by 20 Crores in 2nd TripartiteMoU

100% 100% 100% 100%

8.Computerization of billed energy 40% 40% 65%

64.38% ending9/ 2008

60.72%

9.Consumer metering 50% 49.54% 65%

48.95% ending9/2008

55.04%

10. Energy flow audit of 25kVA and aboveconnections

Nil - 100% 100%

11. Capacitor banks to be added at S/Stnsand Feeders of 25kVA and aboveconnections

Nil - 65% 59.36%

12. Cash Collected from Consumers withload 25kVA and above

Nil - 70% 75.29%

Page 108: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 108

Chapter 9STANDARD CONSTRUCTION PRACTICES & TECHNICAL DATA FOR SUB TRANSMISSION &

DISTRIBUTION WORK

IMPORTANT NOTES:-

i. Since errors and omissions in this chapter cannot be ruled out, standard drawings, tables & other data in thissection are for guidelines only. Practicing Engineers are requested to refer to the original source of data.The DCP’s office does not bare any responsibility for any damage or loss which may occur as aconsequence of implementation of any erroneous drawing or data in this section.

ii. Any suggestions for rectification/improvement may please be emailed at [email protected]

Page 109: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 109

9.1 RECOMMENDED TYPE AND SIZE OF MULTI-CORE CABLES

REC CONSTRUCTION STANDARDF-8

DistributionTransformer

Capacity in kVAType Size (Nominal area of

Cross Section)

25 PVC insulated and sheathed un-armoured four core alumunium cable 16mm2.

63 PVC insulated and sheathed un-armoured four core alumunium cablewith reduced neutral conductor 70mm2.

OR

PVC insulated and sheathed alumunium armoured three core solidalumunium conductored cable 70mm2.

100 PVC insulated and sheathed un-armoured four core alumunium cablewith reduced neutral conductor 120mm2.

OR

PVC insulated and sheathed alumunium armoured three core solidalumunium conductored cable 120mm2.

Note:1 The cable would be laid in air.

2 In case of PVC armoured cables, aluminum amour shall serve as neutral for 63 and 100 KVA distributiontransformer centers.

3 Size of reduced neutral conductor shall comply with the main -neutral conductor combination as per IS:1554 (Part-I)-1976

4 Type and size of single core cables which can be used for the same purpose are given in REC constructionstandard F-18

Page 110: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 110

RECOMMENDED TYPE AND SIZE OF SINGLE CORE CABLES

REC CONSTRUCTION STANDARDF-18

DistributionTransformer Capacity

in kVAType Size (Nominal area of

Cross Section)

25 PVC insulated and sheathed un-armoured aluminiumconductor cable 10mm2

63 PVC insulated and sheathed un-armoured aluminiumconductor cable 50mm2.

100 PVC insulated and sheathed un-armoured aluminiumconductor cable 120mm2.

Note:1 The cable would be laid in air.2 The cables shall be as per IS:1554(part-1)-1976

3 Type and size of single core cables which can be used for the same purpose are given in REC constructionstandard F-8

Recommended cable dimensions for service lines

Max. loadCurrentmarked

on meter

Copperconductor- Cross

section

Aluminiumconductor--

Cross sectionType of cable Insulation peel off length

(mm). Remarks

≤ 10A 4.0mm2 N/A Single / multi core

≤ 20A 6.0mm2 N/A Single / multi coreAs recommended by metermanufacturer or measured

terminal hole depth +2.0mm

Reference standard:IS7098 (Part-1) and

IS:1554 (Part-1)

≤ 30A 10mm2 16mm2 Single / multi core≤60A 16mm2 25mm2 Single / multi core≤80A 25mm2 N/A Minimum -25mm2

≤100A 35mm2 N/A Minimum -35mm2

Notes: Always use multi-strands conductor instead of solid conductor Manufacturer’s instruction should be followed while using lugs for terminations Do not use any lugs for floating cage type terminals

Page 111: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 111

9.2 CURRENT RATING OF DISTRIBUTION & POWER TRANSFORMERS

Voltage Ratio: 11/.433 kVTransformer Capacity kVA 11 kV side LV Side

16 0.84 21.33

25 1.31 33.34

63 3.31 84.00

100 5.25 133.34

250 13.12 333.35

400 21.00 533.36

630 33.07 840.05

1000 52.49 1333.41

Voltage Ratio: 33/11 kVTransformer Capacity MVA 33 kV side 11 kV Side

1.0 17.50 52.49

3.2 55.11 165.34

5.0 87.48 262.44

6.3 110.22 330.67

10.0 174.96 524.88

Voltage Ratio: 132/33 kVTransformer Capacity MVA 132 kV side 33 kV Side

20.0 87.48 349.92

50.0 218.70 874.80

Voltage Ratio: 220/132 kVTransformer Capacity MVA 220 kV side 132 kV side

150.0 393.66 656.10

Page 112: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 112

9.3 FUSE RATING:

The size of tinned copper fuse wire for use on HV and LV side of the transformer should be as follows:

3 phase TransformerCapacity in KVA

Size of T. C. - Fuse11 KV LV

mm(SWG) mm (SWG)

25 0.160 (38) 0.800 (21)

50 0.224(34) 1.25 (18)

63 0.224(34) 2 of 1.25 (18)

75 0.224(34) 2 of 1.25 (18)

100 0.315(30) 2 of 1.40 (17)

The size of tinned copper fuse wire if used at 33 KV and 11 KV side of the transformer shall be as follows: -

3 phase Transformer Capacity kVASize of T.C. Fuse wire

33 KV/ mm (SWG) 11KV / mm(SWG)

5000 1.80 (15) -

3150 1.25 (18) -

1600 0.80 (21) -

630 0.63 (23) 0.90 (20)Source: RE Standards

Page 113: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 113

9.4 CT RATIOS APPLICABLE FOR HT METERING

Page 114: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 114

9.5

Page 115: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 115

9.6 SPECIFICATION OF SWAGED TYPE STEEL TUBULAR POLES AS PER IS2715WIDELY USED IN J&K POWER DEVELOPMENT DEPARTMENT

Desi

gn

ati

on

Ove

r all

len

gth

L

Pla

nti

ng

dep

th

Load

ap

pli

ed

fro

m t

op

at

ad

ista

nce

of

Hg

t. a

bo

veg

rou

nd

H

Length

Outsidediameter andthickness of

sections

Ap

p.

Wt

of

Ple

Bre

akin

g L

oad

Cri

pp

ing

Lo

ad Working

Load

Load

fo

rp

erm

an

nen

tset

no

t exce

ed

ing

13

mm

Load

fo

rte

mp

ora

ryd

ele

ctio

n o

f1

57

.5 m

m

Btmh3

Mdl

h2

Top

h1

Btmh3

Mdlh2

Toph1

Col14(2)

Col13

(2.5)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18(m) m m m m m m m mm mm mm kg (kg) N n N N N

(kg) (kg) (kg) (kg) (kg)

410SP7.5 1.25 0.3 6.25 4.5 1.5 1.5

139.7 114.3 88.9

1034630 3280 1650 1850 2250 1480

-8 x x x -472 -335 -168 -189 -229 -1514.85 3.65 3.25

410SP7.5 1.25 0.3 6.25 4.5 1.5 1.5

139.7 114.3 88.9

1105100 3620 1810 2040 2480 1600

-9 x x x -520 -369 -185 -208 -253 -1635.4 3.65 3.25

410SP8 1.5 0.3 6.5 4.5 1.7

5 1.75139.7 114.

3 88.9111

4440 3160 1580 1770 2160 1280

-14 x x x -453 -322 -161 -181 -220 -1314.85 4.5 3.25

4108 1.5 0.3 6.5 4.5 1.7

5 1.75139.7 114.

3 88.9119

4890 3470 1740 1960 2380 1380

SP-15 x x x -499 -354 -177 -200 -243 -1405.4 4.5 3.25

4109 1.5 0.3 7.5 5 2 2 165.1

x 4.50

139.7 x

4.50

114.3

147 5070(517)

3600(367)

1800(184)

2030(207)

2460(251)

1360(139)SP-31 x

3.65

4109 1.5 0.3 7.5 5 2 2 165.1

x 4.85

139.7 x

4.50

114.3

154 5430(554)

3850(393)

1930(197)

2180(222)

2640(269)

1430(146)SP-32 x

3.65

4109 1.5 0.3 7.5 5 2 2 165.1

x 5.40

139.7 x

4.50

114.3

154 6000(612)

4270(435)

2130(217)

2410(245)

2910(297)

1540(157)SP-33 x

3.65

Page 116: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 116

41011 1.8 0.6 9.2 5.6 2.7 2.7 193.7

x 4.85

165.1 x

4.50

139.7

227 6370(650)

4530(462)

2260(231)

2550(260)

3100(316)

1270(130)SP-55 x

4.5

41011 1.8 0.6 9.2 5.6 2.7 2.7 193.7

x 5.40

165.1 x

4.50

139.7

241 6990(713)

4820(502)

2480(253)

2790(285)

3400(347)

1370(140)SP-56 x

4.5

41011 1.8 0.6 9.2 5.6 2.7 2.7 193.7

x 5.90

165.1 x

4.85

139.7

256 7620(777)

5410(552)

2710(276)

3050(311)

3710(378)

1470(150)SP-57 x

4.5

41013 2 0.6 11 5.8 3.6 3.6 219.1

x 5.60

193.7 x

4.85

165.1

333 7720(787)

5480(559)

2740(279)

3090(315)

3750(382)

1160(118)SP-71 x

4.5

41013 2 0.6 11 5.8 3.6 3.6 219.1

x 5.90

193.7 x

4.85

165.1

343 8120(828)

5770(588)

2880(294)

3250(331)

3940(402)

1190(121)SP-72 x

4.5

41014.5 2 0.6 12.5 6.5 4 4 219.1

x 5.60

193.7 x

4.85

165.1

370 6750(688)

4790(488)

2390(244)

2700(275)

3780(334) 775 (79)SP-75 x

4.5

41014.5 2 0.6 12.5 6.5 4 4 219.1

x 5.90

193.7 x

4.85

165.1

380 7100(724)

5040(514)

2520(257)

2840(290)

3450(352) 794 (81)SP-76 x

4.5

41016 2.3 0.6 13.7 7 4.5 4.5 219.1

x 5.60

193.7 x

4.85

165.1

405 6130(625)

4350(444)

2180(222)

2450(250)

2980(304) 569 (58)SP-79 x

4.5

41016 2.3 0.6 13.7 7 4.5 4.5 219.1

x 5.90

193.7 x

4.85

165.1

416 6440(657)

4570(466)

2280(233(

2580(263)

3130(319) 568 (60)SP-80 x

4.5

RECOMMENDED SHADES FOR PAINTING ST POLES

1. Poles should be painted in Silver or orange only, as these colours are conspicuous and therefore safe for traffic and pedestrians.2. Paint the poles with black and yellow strips upto the height of 180 CM, so as to protect them against the possible

damage during the night by fast moving vehicles.

3. Green paint is not recommended, since it conveys safety and is used to identify earth conductors

Page 117: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 117

9.7

Page 118: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 118

9.8 RATING OF CAPACITORS FOR kVAR COMPENSATION

S# Rating of Individual Induction Motor kVAR rating of LT Capacitor

1 3BHP and above upto 5BHP 1

2 Above 5 BHP to 7.5 BHP 2

3 Above 7.5 BHP to 10 BHP 3

4 Above 10 BHP to 15 BHP 4

5 Above 15 BHP to 20 BHP 5

6 Above 20 BHP to 30 BHP 6

7 Above 30 BHP to 40 BHP 7

8 Above 40 BHP to 50 BHP 8

9 Above 50 BHP to 100 BHP 9

10 Above 100 HP As approved by the utility

Page 119: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 119

9.9 Extracts from Record note of meetings of Coordination Committee constituted videDevelopment Commissioner (Power) communication no. DC/PD/TO-I/51/1659-1667Dated 17-06-2005.

A) Pole Erection The planting depth of poles up to and including 9Mtr. Shall be 1500mm (REC Construction standards).

The planting depth of poles of 11Mtr. Length shall be 1.83 Mtr. (One – sixth of pole length) (CBIP publication no 58).

PCC Poles shall be provided with base plates as per REC construction drawing no. K-1.

Base Plates for steel tubular poles shall be provided with a hole and shall be welded to pole bottom.

Steel tubular poles shall be provided with steel pole cap.

Drilling of holes in steel tubular shall be avoided as far as possible. Back up clamps shall be used to fix cross arms/cross braces.

All HT/LT poles shall be earthed as per REC standard drawing no. J-1. (REC construction drawings, J&K PDDEarthing Booklet Page No. 12)

At tension points PCC poles shall be installed in Transverse/ Lateral Position.

The Steel Tubular poles shall be concrete bottomed.

Earthing spiral shall be kept outside concrete portion.

Two pole, Three pole and four pole structures shall be provided with cross bracings as per REC construction drawingno. A-21.

B) Guys for Overhead lines The 33kV, 11kV and LT poles at angle locations (greater than 50o ), dead ends, tap off and tension points shall be

provided with guys.

Page 120: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 120

Various accessories of guys shall be as per REC construction drawing no. G-1.

Accessories of guys shall be assembled as per REC construction drawing no. G-3.

The no. of guys for various angle locations shall be as per REC Construction Standard G-5 to G-9.

The guy angle shall be 30 o to 45 o as per REC construction drawing no. G-3.

Anchor plate (or guy stone) shall be provided as per REC construction drawing no. K-1 and K-4.

Turn buckle shall be mounted at the pole end of the guy and guy wire shall be so fixed that the turn buckle is halfway in the working position thus giving the maximum movement for tightening or loosening.

Minimum two no. Guys shall be provided to two-pole structure of each distribution sub station.

For two pole tension points minimum four guys along the line two in each direction shall be provided.

Storm guys shall be provided for each section of line because Kashmir Valley is in wind zone of 100 Kg/cm2(greater than 50 Kg/cm2). (CBIP Publication no. 88 Page 123)

Fixing of guys to trees, buildings, structures, poles, pipe lines etc. Shall not be allowed in any case whatsoever.

Guy strain insulators: These are used in the guys so that in case of any mishap if the live conductor comes intocontact with the guy wire and continues to be in contact and if the line does not trip then the bottom portion of theguy wire would have no voltage due to the insulation provided by the guy insulator. The insulator is fixed between theguy wire almost in middle. The bottom portion of the wire thus gets insulated. Any human being or animal if comingin contact with the bottom portion of the guy-wire will be provided safety. No guy insulator shall be installed less than2.6m from the ground. (CBIP Publication no. 88 Page 39,40 and 124)

Two types of insulators are standardized:

(i) A type for 415/240 V lines

(ii) C type for 11kV lines.

Two C-type insulators are used in series for 33kV lines.

The minimum failing load for A type insulator is 44kN and for C type insulator is 88 kN. If space for installation of normal guys is not available then fly guy, bow guy and strut shall be used as per REC

construction standard no. G-4.

Page 121: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 121

C) ACSR for Overhead LinesNomenclature/ Dimensions:

The conductors shall be specified by their code names and the cross sectional area shall be mentioned in sq. mm only.

Equivalent copper area in sq. inch is no longer being used. Given below is an example to convert conductor sizes intosq. mm if it is given in equivalent copper area in sq. inch:

Size of ACSR Dog in equivalent Copper area = 0.1 inch2= 0.1 X 25.4 X 25.4 = 64.51 mm2

Conductivity of Copper = 1.6 X Conductivity of Aluminum (for same area of copper)

Therefore cross sectional area of ACSR Dog in sq. mm = 1.6 X 64.51=100 mm2 (Approx)

Following table gives technical details of conductors widely used in Sub Transmission and Distribution networks:

Code Nameof ACSR

EquivalentCopper

Area (Inch2)

NominalAl. Areain mm2

Stranding andwire diameter

(mm)

Approx.Mass

(Kg/Km.)

CalculatedResistance

at 200 C(Ohm/Km)

Approx.calculatedbreaking

load)KN

Current ratingfor AmbientTemperature

of 350 C (Amp)

Al SteelSquirrel 0.02 20 6/ 2.11 1/ 2.11 85 1.394 7.61 110Weasel 0.03 30 6/2.59 1/2.59 128 0.9289 11.12 145Rabbit 0.05 50 6/3.35 1/3.35 214 0.5524 18.25 200Racoon 0.08 80 6/4.09 1/4.09 319 0.3712 26.91 255Dog 0.1 100 6/4.72 7/1.57 394 0.2792 32.41 305Leopard 0.125 125 30/2.36 7/2.36 603.8 0.2221 56.56 380Wolf 0.15 150 30/2.59 7/2.59 727.4 0.1844 67.59 420Panther 0.2 200 30/3.00 7/3.00 976.0 0.1375 89.66 510

REC Specification 1/1971 (Revised 1993) Table-II, IS 398 -1961

Page 122: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 122

The design of conductor shall be based on Voltage Regulation, Thermal rating and mechanical loading.

The conductor for overhead lines shall be designed with following regulation:

( CBIP Publication no 198 page 10)

The calculation for voltage regulation shall be based on KW-KM for 1% voltage drop to be taken from following REC ConstructionStandards:

Nominal voltage of line Reference to REC construction standard forKW-KM

LT Lines B-911kV A-933kV M-12

General Guidelines for Installation of ACSR

For 11kV lines, at straight runs and light angles (00 to 100) pin insulators shall be used. The conductor shall be tied to theinsulator at the top groove at straight runs and to side groove on top of insulator through helically formed fittings (RECConstruction drawing no. C-3 and C-4).

Tying of conductor to insulator skirt shall not be allowed in any case whatsoever. It reduces the creepage path of insulatorand causes surface flashover and earth fault in dirty, humid and rainy conditions and leads to premature failure of insulator.

Use of pin insulator at sharp angles, tap off points and dead ends for taking conductor load shall not be allowed in any casewhatsoever. Pin insulator is not designed for such applications.

At sharp angles, tap off points and dead ends disc insulators shall be used as per REC Construction drawing no. C-5. Tension points caused by ascend or descend of terrain shall be provided with disc insulators.

Nominal voltage of line Voltage Regulation

33kV 9%11kV 9%LT Lines 6%

Page 123: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 123

The shackle insulators at straight runs shall be installed such that D-fitting of insulator is at right angles to the conductor andat dead ends the D-fitting is in line of the conductor. This will require installation of poles in such a way that holes provided forfixing insulators are at right angles to the conductor at straight runs and in line to the conductor at tension points and deadends. (REC Construction drawing no. D-6).

Conductor joints shall be crimped. Crimping sleeves shall be used for this purpose as per REC construction drawing no. E-26. The conductor shall be strung at specified sag and tension as per REC construction drawing no. E2 to E22. The sag chart

pertaining to 100Kg/m2 wind zone shall be used from REC standards. 11kV main lines in Srinagar City and Towns shall be constructed with ACSR Dog (100 mm2 ). However the tap lines and in

rural areas lower sizes of ACSR can be used.

Clearances of Sub Transmission and Distribution LinesThe clearances of 33KV, 11KV and LT lines from ground and from buildings shall be as per J&K Electricity Rules which are

as under:

(a) Minimum clearance above ground of the lowest conductor:

Line Voltage(Phase to phase)

Clearance acrossstreet (Mts)

Along Street(Mts)

Elsewhere than along or acrossany street (Mts)

LT Lines 5.791 5.486 4.57211kV Lines 6.069 5.791 4.57233kV Lines 6.965 6.965 5.182

(J&K Electricity Rules 1978 page 44)(b) Clearance from buildings

Where an electrical line passes above or adjacent to or terminates on any building, the following minimum clearance from anyaccessible point, on the basis of maximum sag shall be observed:

S.No Line Voltage (Phase tophase)

Vertical Clearance fromhighest point of building

(Mts)

Horizontal Clearance fromnearest point of building (Mts)

1 LT Lines 2.439 1.2192 11kV Lines 3.658 1.3193 33kV Lines 3.658 1.529

(J&K Electricity Rules 1978 page 45&46)Note: The horizontal clearances shall be measured when the line is at a maximum deflection from the vertical due to wind

pressure.

Page 124: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 124

(c) Phase to phase Clearances

The phase-to-phase clearances of 33kV, 11kV and LT lines shall be as per Rural Electrification Corporation ConstructionStandards, which are as under:

S.No Line Voltage (Phase tophase)

Minimum Phase to PhaseClearance (mm) Preferred configuration

1 LT Lines300 Vertical450 Horizontal

2 11kV Lines 1070 Triangular on V-Cross Arm

3 33kV Lines 1525 Triangular on V-Cross Arm

The preferred configuration for LT lines is vertical due to economic considerations.

11kV/ 433V Distribution Sub Station Installation

(a) Clearances: As per REC standard specification no. F-1, F-2, F-3 and F-4 and TATA Consultants report onremodeling of distribution scheme in Srinagar City, following clearances shall be maintained for 11/0.433kV Sub Stations:

Description Polemounted

Transformer

Padmounted

Transformer

References

Capacity Up to andincluding250kVA

Above250KVA

TATA Consultants report, Drg. No. 7-3

Phase to Phase spacing ofdown conductors

760mm 460mm REC Standards Drg. No. F1,F2,F3 and F4,TATA Consultants report, Drg. No. 7-3

Phase to ground clearance ofdown conductors (Horizontal)

460mm 460mm REC Standards Drg. No. F1,F2,F3 and F4,TATA Consultants report, Drg. No. 7-3

HT terminal of 11kV bushingupto ground 5440 mm 2200 mm

REC Standards Drg. No. F1,F2,F3 and F4,TATA Consultants report, Drg. No. 7- 4

Note : The transformer jumpers and bushing terminals of pad mounted transformers shall be insulated with PVCsleeves or coated with epoxy compound.

Page 125: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 125

(b) Earthing

1. Three independent earths shall be provided to 11/0.433kV Sub Stations as per REC Construction Drawing no. F-5 and F-10

2. To one of the earth electrodes one direct connection shall be provided from three Lightening Arresters.3. To each of remaining two electrodes

(a) one separate connection from the neutral of the transformer.(b) one separate connection from the transformer body and the handle of 11kV AB switch.(c.) one separate connection from the earthing of poles.

4. The earthing electrodes shall be 2.5meter perforated GI pipe 40mm dia or 20mm GI rod as per REC constructiondrawing no. J-1

(c.) 11kV Air Break Switches

11kV link sets shall not be used henceforth. The link sets are a safety hazard. Instead 3-phase gang operated Air BreakSwitches shall be used. The air break switches shall be installed as per REC Construction Drawing no. F-2, F-3 and F-4.

Earthing of 33/11kV Sub Stations

An earth mat shall be laid inside 33/11kV sub station designed as per standard practice. The earth mat shall bedesigned so that step and touch potential is kept within 32 volts.

The minimum size of steel electrodes shall be 22mm dia and 3 mtrs long buried in ground at a minimum depth of750mm.

The number of electrodes required in a sub station may be selected in such a way that each rod does not carrymore than 500 Amps of ground fault current. The number of electrodes may have to be increased if the combinedearthing resistance exceeds 2 ohms. .

The electrodes shall be uniformly distributed within the sub station area. Spacing between the electrodes shall bemore than twice the depth of the electrodes driven below ground level so as to keep resistance to minimum.

Page 126: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 126

The top end of the earth electrode shall be interconnected with steel flat of minimum size of 50X6 mm.

Separate earthing electrodes shall be driven for neutral point of power and auxiliary power transformers and foreach lightening arrester. These electrodes shall be interconnected to main earth mat.

An earth ring shall be formed around sub station at a distance of 2 meters to earth the sub station fencing. This ringshall be interconnected to the main mesh. Alternate fencing posts shall be earthed.

Sufficient risers shall be provided to earth non current carrying parts such as tank of power transformer, frame workof circuit breaker, Isolator operating handle, all steel structures, power cable sheath and armour. Each connectionshall be made in duplicate so as to ensure that at least one safety earth remains in case any one of the two fails.

The risers to equipment or risers to steel structure shall not be welded. All these connections shall be bolted. Therisers shall be connected to steel structures through bolts/nuts of minimum size of 16mm and the riser toequipment connection shall be through the bolts/nuts provided with the equipment by manufacturer.

The risers shall not be embedded in concrete.

All welded mesh joints shall be painted with red lead and aluminum and later coated with bituminous.

The power cables shall be grounded at one end only. If the cables are grounded at both ends, the induced currentsflow through a continuous loop formed by armor/ sheath through ground and may damage the cable and/ortermination due to overheating.

Crushed rock may be used as surface layer as it provides high resistivity, keeps away the reptiles and also avoidsformation of pools of oil in case of leakage. It also helps in presence of moisture in the under layer of soil and thushelps in maintaining low resistivity.

Crushed rock of size 3cm to 5cm to a depth of approximately 10 cm may be spread in the yard area. Electricequipments and structures supporting live conductors may be surrounded be a surface layer of crushed rock withina distance of above two meters. This is so as a person is not likely to be exposed to touch voltage when he is twometers away from any live equipment or structure swith yard.

(Source : REC Earthing Manual; PDD Earthing Booklet; PDD Const. Practice)

Page 127: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 127

Electrical Clearances in 33/11kV Sub Stations (Receiving Stations)

Minimum phase – phase clearance of 33kV Bus shall be 1200mm.(REC Construction Drawing no. L-1)

Minimum phase – column clearance of outermost conductors of 33kV Bus shall be 1050mm. (REC ConstructionDrawing no. L-1)

Minimum Phase to ground clearance of 33kV Bus shall be 4500mm.(REC Construction Drawing no. L-1)

Minimum ground clearance of HV terminal of 33KV Circuit Breaker and 33/11kV Transformer shall be 3660mm.

Minimum phase – phase clearance on 11kV gantry shall be 900mm .(REC Construction Drawing no. L-1)

Minimum distance from 33kV switchyard up to control room shall be 7500mm (REC Construction Drawing no.L-1)

Minimum spacing between 11kV panels and control room wall shall be 1000mm (with back door open)

Tilting of V-Cross ArmsSome field engineers have approached the committee with complaint regarding tilting of V-Cross Arms at angle locations. Thecommittee examined the issue and following clarifications are hereby given:

The tilting problem has been noticed mostly at angle locations more than 100 .

The committee has recommended V-Cross arm for tangent locations (straight runs) and light angles (upto100) only. Forangle locations 100 to 600 two pole structure shall be used and for angle locations 600 to 900 4 pole structure shall be used.(KEECC Record note no dated 09-07-2005 ) (REC Construction Drawing no. A-10)

At some locations the cross arms have slipped and/ or tilted because back clamp for the cross arm was not fabricated asper REC Construction drawing no. K-2. Please note 20mm gap is to be left between the cross arm and back clamp afterfirm tightening

Still if the field engineers have apprehensions that the cross arm may slip/ tilt they can use supporting braces as perenclosed drawing (CBIP publication no 88 page 58 )

Page 128: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 128

Standardized V-Cross arm has been in use in the country since September 1972. This cross arm is considered to be thebest choice of power engineers all over the country in view of its advantage of reducing the bird faults considerably. Due tothis advantage Central Board of Irrigation and Power has also upheld its use. TATA consultants have also recommended itsuse in Srinagar and Jammu Cities. REC has again standardized this cross arm for RGGVY Schemes (REC Guide Line forRGGVY Schemes- Attachment-I)

Since Kashmir Valley is gifted with vast variety of birds some of which are large sized like crows, Kites, Vultures etc. the birdfaults are very common here. The bird sits on the flat cross arm and its beak or tail touches the live conductor resulting inearth fault. This problem was not widespread earlier because wooden poles and wooden cross arms were used in SubTransmission and Distribution System in Kashmir Valley. These poles/ cross arms provided sufficient insulation to ground.Ever since the wooden poles and wooden cross arms have been replaced by Steel/PCC poles and steel cross arms, theoccurrence of bird faults has become a regular feature reducing reliability of power supply.

The V-cross arm has been designed in such a way that bird cannot sit on it due to its slanting design.

Under the circumstances the committee considers the V-Cross Arm is the best choice for Sub Transmission and DistributionSystem in Kashmir Valley for reliability and safety of the system.

HVDS (High voltage distribution system)

HVDS stands for High Voltage System. In this system high voltage line is drawn as near the load as possible andsmall capacity distribution transformer is installed. This system is best suited to meet scattered rural loads. Theadvantages of this system are:

(i) Reduction in losses because LT line length is reduced.

(ii) Improvement in voltage at the consumers premises.

(iii) Theft of energy by direct tapping of long LT lines eliminated.

(iv) Frequent faults on LT side are reduced.

(v) Failure of Transformers prevented because transformer is feeding 3-5 consumers and these consumers havesense of belonging of the transformer and they take care of the transformer.

Page 129: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 129

REC specification no. 50/1987 specifies the Single Phase Distribution Transformers. Fig.1, Fig.2, Fig.4 and fig.5 attached tothis specification gives the connection diagram of the single phase transformers. In each drawing continues 11kV neutral is shown onHT side connected to the transformer. In order to accomplish this scheme a continuous neutral shall have to be run on existing polesfrom the star point of 33/11kV Power Transformer right up to the distribution sub station.

The prevailing practice of HVDS in Kashmir Valley is to use a single conductor for HVDS transformer. The other terminal ofHT winding of the single-phase transformer is grounded locally. This connection is nothing but Single Wire Earth Return System(SWER).

REC specification no 14/1979 specifies SWER distribution transformers. This specification was issued for gaining experienceonly. REC did not issue any construction standard for SWER system till 1994. The REC standards available with the committeeare amended up to 30-07-1994.

The committee tried to obtain information from World Wide Web on SWER systems and following are the findings:

A record note regarding HVDS (High Voltage Distribution System) was issued on 23-09-2005. The issue remainedinconclusive at that time because of non-availability of sufficient information on the subject.

REC has recently issued Standard Technical Specification (Specification No. 75/2005) for 5kVA HVDSTransformers, wherein it has been made clear that in case of single phase 11/3 HVDS transformers, 3 ph., 4Wire system at 11kV (with separate neutral wire running continuously from 33/11kV sub-station) shall beadopted and proper earthing of neutral wire separately at both ends shall be ensured. In view of thisdevelopment the committee decided to issue following guideline for construction of HVDS substations:

The standard rating of HVDS transformers shall be 5, 6.3, 10 & 16kVA for 11/√3 (Phase to Neutral) transformersand 10 & 16kVA for 11kV (Phase to Phase) transformers. (REC Specification no. 50/1987 & 75/2005)

5kVA transformers will be of great help in feeding small habitations were small loads are to be supplied in ruralareas. Also 5kVA transformers can be used as a dedicated transformer for every consumer in urban area. (Fore-word to REC Specification no. 75/2005)

The 3 phase and 2 phase HVDS transformers shall be fed from 3 wire 11kV system in conventional manner.However in case of single phase HVDS transformers (11/√3 kV primary), 3 Ph, 4 wire system at 11kV withseparate neutral wire running continuously from 33/11kV sub-station shall be adopted and proper earthing ofneutral wire separately at both ends shall be ensured. (REC Specification no. 50/1987 & 75/2005)

Page 130: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 130

The transformers shall be mounted on single poles. The neutral wire shall be of minimum size ACSR/AAACrecommended for 11kV by REC (eg ACSR 7/2.11mm, 20mm2 aluminum area)( REC Specification no. 1/1970revised 1993 & A-32, F-13& F14)

The neutral shall be run on LT shackle insulators installed on 11kV pole directly through D-clamps. The point ofattachment of neutral wire shall be 800mm below lowermost 11kV phase conductors.( REC Specification no. A-16)

The single phase HVDS transformers shall be distributed equally on the 3 phases of 11kV system to ensurebalancing of load at 33/11kV sub station feeding the single phase HVDS system.

METER INSTALLATION

In view of ongoing metering drive in the department a guideline was issued for consumer meter installation for wallmounted and pole mounted meters. However APDRP task force set up by Ministry of Power has devised acomprehensive guideline for meter installation. It was decided to issue the same to the field engineers forimplementation. This guideline supersedes the guideline devised by the committee.

The first Para of the guideline states: “Choose a location where the meter will be protected from exposure to directsunlight and rainwater. The location should be away from children's approach and should have enough ventilationand light for meter installation, testing, meter reading, etc. There should be free space for meter mains fuseinstallation and maintenance”.

In view of above and also for convenience of downloading the readings from meter to the AMR/ Laptop computerthe committee felt that meters shall be installed on walls of the consumer installations only. However in case ofextreme necessity where installation on wall is not feasible or for the purpose of exposing of unscrupulousconsumers, the meters may be installed on poles as per guideline issued by the committee earlier.

The present practice of tying the meters to poles, especially in Srinagar city, with steel standards without clamps,lugs and meter seal and with undersized service line is a sub standard practice and shall not be acceptable toinspection wing.

Page 131: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 131

TECHNICAL SPECIFICATION FOR CROSS-ARMS FOR 33 kV AND 11 kV OVERHEAD POWER LINES

1.0 ‘V’ SHAPE M.S. CROSS ARM WITH CLAMPS

1.1 X-arms shall be made out of 100 x 50 x 6 mm and 75 x 40 x 6 mm M.S. Channel for 33KV and 75x40X6mm for11KV.

1.2 The cross arm shall be hot dipped galvanized generally conforming to IS – 2633/72.

1.3 The X-arm should not be welded/ jointed at any place except as specified.

1.4 The clamps for the X-arm shall be of G.I. & shall be hot dipped galvanized generally conforming to IS – 2633/72.

1.5 The clamps shall be designed to fit for the specified rail & PSC poles.

2.0 Shape & Size

2.1 The cross arms shall be of MS channel.

2.2 The cross arms shall have two holes of 22 mm dia (for 11kV line) and 26 mm dia (for 33kV line) for fixing of pininsulators. The center-to-centre distance between the holes shall be 1070 mm (for 11kV) and 1525 mm (for 33kV)and holes shall be in the middle of the top width of cross arm.

2.3 If required by the owner, holes of specified size and spacing shall also be provided for fixing of pole back clamp tosuit the pole.

3.0 Marking

The following information shall be marked on each cross arm:

a) Manufacturer’s name or trademark.

b) Year of manufacture

Page 132: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 132

9.10 COSNTRUCTION DRAWINGSOF

CROSS ARMS, SUB STATION FRAME ETC

Page 133: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 133

1 2

3 4

Unstable ConfigurationEach pole demands a guyProne to bird fautsHigh reactive dropNeeds poles of high strengthNot speicified in standardsHence not recommonded

Unstable ConfigurationEach pole demands a guyProne to bird faultsHigh reactive dropNeeds poles of high strengthVery difficult to get phase clearanceNot speicified in standardsHence not recommonded

Very difficult to get phase phase clearanceProne to bird fautsHigh reactive dropNot speicified in standardsHence not recommonded

Unstable ConfigurationEach pole demands a guyProne to bird faultsNeeds poles of high strengthNot specified in standardsHence not recommended

SU STANDARD CROSS ARMS AND CONDUCTOR CONFIGURATION ( 5 Cases)

Page 134: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 134

5

Prone to bird faultsNot specified in standards

Not recommended for straight runs

CONDUCTOR FORMATION AND CLEARENCE OF 11 KV AND 33 KV LINES

1070

100100

650 75x40 mm MSChannel

PCC/ST Pole

75x40 mm MS ChannelV Cross Arm ( Refer toREC drawing No A-6)

11KV LINES (TANGENT LOCATIONS

100x50 mm MSChannel Piecewelded on 75x40MS Channel

PCC/ST Pole

100x50 mm MS Channel VCross Arm (Refer to RECdrawing No A-6)

33 KV LINES (TANGENT LOCATIONS

50X6 mmMS Strip

1525

100100

1320

Page 135: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 135

Page 136: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 136

Page 137: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 137

Page 138: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 138

Page 139: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 139

Page 140: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 140

Page 141: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 141

Page 142: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 142

Suspension and Dead end clamps for Aerial Bunched Cable (ABC)

Page 143: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 143

Page 144: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 144

INSTALATTION OF METERS ON PCC & ST POLES

Leave 20mm fortightening

4 no 5X30 mmbolts with nuts andwashers

25X4 mm MSClamp

PCC Pole

Leave 20mm fortightening

4 no 5X30 mmbolts with nuts andwashers

25X4 mm MSClamp

PCC Pole

Leave 20mm fortightening

4 no 5X30 mm boltswith nuts andwashers

25X4 mm MSClamp

Electronic Meter

Electronic Meter

STPole

Electronic Meter

Page 145: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 145

Note:- This Drawing is Not to Scale

Combined 3PhaseCT/PTUnit

33 kVincomingLine

33 KVIsolator

WeatherProof MeterBox

33/11 KVPowerTransformer

33 KV DOFuse

75 mm GIPipe(threadedboth ends)4000 mm

ACSRACSR

Title :- 33 kV Consumer Metering SchemeDrawing No. :- Drg-33 kVMTR-1Drawn By :- Checked By:-

SurgeArrestor

Combined3 Phase

CT/PT Unit

Page 146: Draft Yearbook 2010-11

DRAFT YEAR BOOK 2010-11 Page 146

07

08

03

05

07

04

02

1625

710 710

710

710

10

09

1500

SR.NO DESCRIPTION1 11 KV EPOXY CAST CT 3 NOS.2 11 KV EPOXY CAST 3 Ø PT 1 NO.3 MOUNTING CHANNEL 2 NOS. SIZE 100X50X504 BUSBAR TO CONNECT THE CTS 40 mm COPPER STRIP5 BUSBAR TO CONNECT THE PTS FLEXIBLE COPPER PLATE6 SIZE OF MS PLATE 2 mm7 SIZE OF WIREMESH SQUARE OF 35 mm8 SIZE OF ACRYLIC SHEET 3 mm9 RS 232 PORT10 HINGED COVER FOR RS 232 PORT WITH LOCKING ARRANGEMENT

TITLE : 11 kV Consumer Metering Scheme