Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

37

Transcript of Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Page 1: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)
Page 2: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

HistorySuperior Boiler Works & Welding was founded in 1962 on Superior Street in Hamilton, Ontario Canada.

Initially the primary business was the installation, service and repair of boilers & pressure vessels.

However through the years as we have grown, developed and matured we have developed from a boiler & pressure vessel service company to a respected manufacturer of pressure vessels, heat exchangers & boiler parts.

Page 3: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

SBWW TodaySBWW has grown into one of our areas largest General Mechanical/Electrical Contractors and Boiler Pressure Vessel Manufacturers.

With over 125 employees and growing we are able to design, fabricate and install for a wide variety of applications.

Over the years Superior has taken on complex projects and delivered on time and on budget solutions. We have become a one stop shop.

Recently we have constructed a new 88,000 square foot manufacturing facility allowing us to greatly increase our shop capacity as well the size and weight of vessels we can construct.

Page 4: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

New Corporate Headquarters375 McNeilly Road, Stoney Creek

Ontario, Canada L8E 5H4Tel: (866) 561-1413, Fax: (905) 561-2725

88,000 Sq/Ft Manufacturing Plant

Sitting on 13-1/2 Acre Site

Page 5: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)
Page 6: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)
Page 7: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

PREFAB BAY

2 – Overhead Cranes 1 - 20 Ton with 5 Ton Aux 1 - 30 Ton

4 – 3 Ton Rolling Gantry Cranes

NC Rotary Tube Bending (4” OD -24”Radius)

CNC Burning Table½” x 10’ Shear

250 Ton Brake Press

6 Fit up Welding Stations4 Sub Arc StationsMachining Center1” x 10’ Plate Roll

CNC Band Saw

Page 8: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

MAIN ASSEMBLY HIGH BAY

2-90 Ton Over Head Cranes•40’Under Hook

4 – 5 ton Rolling Gantry Cranes

2 – Tandem Sub Arc Stations: •1200AC /1000 DC Amp •35’and 25’ mast heights •26’ boom

Page 9: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Storage Space

10,000 Sq/Ft Indoor •30’ High Narrow Isle Pallet Storage

10,000 Sq/Ft Outdoor •20 – Ton and 10- Ton Cranes •25 Foot Under Hook

8 Acres of Compacted Granular Surface •45 Ton Crawler

Future 35,000 Sq/Ft Outdoor •100 – Ton Gantry Crane•40 Foot Under Hook

Page 10: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Site Equipment and Access

Transportation Access• 1 Mile to QEW, Major Highway• Rail on Property• 2 Miles to Water

Under Construction• Bottom Car Furnace 24’(wide) x 24’(high) x 100’(long)• Sand Blast and Paint Booth

•Completion December 2008

Page 11: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

ASME• CONSTRUCTION & ASSEMBLY OF POWER BOILERS IN THE SHOP & FIELD.

• (“S” STAMP)•CONSTRUCTION OF PRESSURE VESSELS IN THE SHOP & FIELD.

• (“U” STAMP)

NATIONAL BOARD• AUTHORIZATION TO APPLY THE “NB” MARK AND REGISTER “U” & “S” STAMPED ITEMS.

TSSA (Jurisdictional Authority, Ontario Authorized Inspection Agency )• REPAIRS & ALTERATIONS TO BOILERS, PRESSURE VESSELS, PIPING & FITTINGS• CONSTRUCTION & ASSEMBLY OF POWER BOILERS TO ASME SECTION I & CSA B51• CONSTRUCTION OF PRESSURE VESSELS TO ASME SECTION VIII DIVISION 1 & CSA B51• CONSTRUCTION OF CATEGORY H FITTINGS TO CSA B51• CONSTRUCTION OF POWER PIPING TO ASME B31.1• CONSTRUCTION OF PROCESS PIPING TO ASME B31.3• CONSTRUCTION OF REFRIGERATION PIPING TO CSA 52 & ASME B31.5

CWB (Canadian Welding Bureau)• CERTIFICATION TO CSA W47.1-03

• FOR FUSION WELDING OF STRUCTURAL STEEL.

SBWW Certifications

Page 12: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Custom Pressure Vessels - Any Size Required

Sulfuric Acid Storage Tank (Rubber Lined)12 feet x 80 feet

Page 13: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Stack Manufacture

10 ‘ Diameter - 316L SS - 85’ Long Two 45 Degree Offsets

Page 14: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

2850 psi @700F High Pressure Steam

Steam Boiler

Page 15: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Steam Boiler- Interior

Page 16: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

VacuumDegasifierFitted Ladders

& Platforms

Page 17: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

15’ Davey Level Control Tank

Page 18: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Organic Fluid Separation Unit

Stainless Steel

Page 19: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

80’ x 84” Diameter Degasifier

Stainless SteelCarbon Steel Skirt

Page 20: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Coke Hopper for Steel Mill

Page 21: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Economizer

Page 22: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Ammonia Still

Part of Ammonia Destruction Unit

Page 23: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Tank Car Style Spray Tray Deaerator

Page 24: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

SBWW Boiler Deaerator 150,000 Lbs/Hr

Page 25: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Custom Heat Exchangers

Page 26: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

10 ft Diameter4000 - 1¼” Tubes

Custom Waste Heat Boiler

Page 27: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Waste Heat Boiler

CustomHeat Exchanger

Page 28: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Deep SeaPressure

Compensator

Page 29: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

48” Natural Gas Sphere5,000 psi - 5” wall

Page 30: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Condensate Polisher600 psig @ 250 F

PED Certified Vessel

Page 31: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Duplex Stainless Steel Strainers

Page 32: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Duplex Filter Design & Fabrication

Page 33: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Custom Boilers Components

Basic O2 Furnace Boiler PanelsTungsten Carbide Coated

350,000 Lbs/Hr

Page 34: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Fabrication & Installation

Page 35: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Process Pipe Bridge Installation

Page 36: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Process Pipe Installation

Page 37: Download Current SBWW PowerPoint Presentation (2.3 mb - PDF)

Selected List of Clients• AECL

• Air Liquide

• Bechtel

• Bunge

• Inco, Falconbridge, CVRD

•Dofasco, Arcelor, Mittal

• Fluor

• Foster Wheeler

• Intel

• Petro Canada

• GE

• Siemens Westinghouse

• Spence Engineering

• Stelco, US Steel

• Campbell Soup

• Tesoro