Donaldson Run Tributary B
Stream Restoration Project Update
Donaldson Run Stakeholder Advisory Group MeetingJune 2, 2011
![Page 2: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/2.jpg)
Review of changes from 30% to 60% design
ØReducing width of channel/floodplain to reduce footprint and tree/valley impacts
Ø Limiting re-location of pathway and narrowing pathway
ØReducing disturbance and tree impacts below the footbridge
![Page 3: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/3.jpg)
Updates from 60% design to 75% in February 2011
Ø Step pool ‘grade control’ and ‘riffle’ structures
Ø Initial analysis of hillside and storm pipe drainage inputs
Ø Initial water main surveyØ Preliminary planting plan Ø Invasive plant management framework
![Page 4: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/4.jpg)
Updates from 75% design to 90% design
Ø Hydraulic analysesØ Vertical elevation of water main (pending)Ø Hillside and storm pipe drainage inputs
l Meetings with specific property ownersl Easement researchl Preliminary design
Ø Advancement of planting plan and invasive plant management strategy
Ø Consideration of construction access, equipment type, future maintenance access
![Page 5: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/5.jpg)
Hillside drainage inputsØ Working with specific
property ownersØ Accommodating flow
inputs in project design
![Page 6: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/6.jpg)
![Page 7: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/7.jpg)
Storm pipe drainage inputsØ Verifying
easements/pipe conditions
Ø Incorporating needed repairs/modifications into project design
![Page 8: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/8.jpg)
Storm pipe drainage inputs –next steps
ØComplete easement research – meet with specific property owners
Ø At least one new easement may be neededØ TV inspection of all three pipesØ Finalize designs that control stream energy
and minimize future maintenance
![Page 9: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/9.jpg)
30” Water Main
Ø Interim work completed to protect exposed pipeØ Completed horizontal location survey in JanuaryØ May - Small borings excavated to confirm pipe
elevationsØ Data analysis pendingØ Few apparent conflicts with stream restoration
design except at stilling basin – TBDØ Considering reinforced streambed crossings for
future access to main if needed
![Page 10: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/10.jpg)
![Page 11: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/11.jpg)
![Page 12: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/12.jpg)
Trees
ØNo change in tree impacts from project from 60% designs to current design
ØOne tree removed to protect water main (previously listed as a potential removal)
ØOne tree has fallen (previously listed as a removal)
Ø Project impact: 36 trees>10” diameter, 72 trees overall
![Page 13: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/13.jpg)
Invasive Management & Planting Plan
Goals:Ø To restore forest structure and
functionØ To support recreational use and
aesthetics
![Page 14: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/14.jpg)
Kudzu
Invasive PlantsØ 85-95% invasive species in the shrub and ground layersØ invasive species present on both park and private properties Ø 27 different species
![Page 15: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/15.jpg)
ImplicationsØ Invasive management considerable
component of the projectØ Project requires integrated planting and
invasive plant removalØ 4-6 year planting and invasive plant
maintenance scheduleØComplete removal of invasive species is
likely not possibleØMost successful if private citizens are
involved in invasive management
![Page 16: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/16.jpg)
Invasive Management Actions to Date
Ø Invasive plant removal workday, April 2 Ø Invasive Plant Workshop – Upshur St, May 1
– Hosted by Amy WhiteØ Invasive Plant Workshop – Stuart St, May 17
– Hosted by Sarah & Jeffrey KnightØ PRCR sprayed lesser celandine along both
Tributary B and Tributary A
Need help from the Civic Association to generate volunteer turn out and ideas on how to recruit additional volunteers
![Page 17: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/17.jpg)
Invasive Management Actions - Next Steps
Ø In the future, a spring and fall event will be held on both Tributary A and Tributary B
Ø Coordination with or expansion of the 2 existing RIP teams (Remove Invasive Plants) working in Zachary Taylor Park and coordination with Arlington Master Naturalists is being pursued
Ø Possibly one more invasive plant workshop to engage homeowners is under consideration for fall 2011
![Page 18: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/18.jpg)
Invasive Management –Looking Ahead
Ø During construction/plantingl “Clean” equipmentl Mulch or mats for trees/shrubsl Seed heavilyl Protect deer candy
Ø Post-Project/Maintenance• Protect trees and shrubs• Focus on stream banks• Target species• Coordinate invasive removal and planting• Timing of control will depend on plant life cycle• Flexible and adaptive
![Page 19: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/19.jpg)
Planting Plan
Ø Site specificØ All plants will be native to Zachary Taylor
ParkØ Planting “zones” to account for habitat
changes with elevation and distance from the stream.
Ø Special plantings for sensitive areasØMulti-year to account for invasive control
and natural forest succession
![Page 20: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/20.jpg)
![Page 21: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/21.jpg)
Zoned Planting - Example
SlopeFloodplain
![Page 22: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/22.jpg)
Special Areas – Bare Slopes
![Page 23: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/23.jpg)
Scarlet oakQuercus coccinea
ArrowwoodViburnum dentatum
Bluestem goldenrodSolidago caesia
![Page 24: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/24.jpg)
Construction methods, equipment, & materials
![Page 25: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/25.jpg)
Smaller materials and equipment
![Page 26: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/26.jpg)
Smaller materials and equipment
![Page 27: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/27.jpg)
Tree protection mats
![Page 28: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/28.jpg)
![Page 29: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/29.jpg)
Step pools and Step run feature
![Page 30: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/30.jpg)
Next StepsØ Continue work with property owners on
hillside drainage inputs and design work for storm pipe drainage inputs
Ø Finalize planting plan and invasive plant management plan
Ø Develop construction access/staging planØ Complete specifications including tree
protection planØ Target design completion by end of yearØ Construction schedule still TBD
![Page 31: Donaldson Run Tributary B Stream Restoration Project Update€¦ · 02-06-2011 · Donaldson Run Stakeholder Advisory Group Meeting June 2, 2011. Review of changes from 30% to 60%](https://reader033.fdocuments.in/reader033/viewer/2022043011/5fa3c3a2461bba723928aafa/html5/thumbnails/31.jpg)
Learn more at: www.arlingtonva.us – search “Donaldson Run.”
Tributary A, June 2010
Stream restoration, watershed retrofits, Chesapeake Bay Preservation Ordinance, Stormwater Permit and more….