Dona Bay Conveyance System Water Quality Project Update August 27, 2014 Subtitle here 1

Transcript of Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT...

Page 1: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Dona Bay Conveyance SystemWater Quality Project Update

August 27, 2014

Subtitle here

1

Page 2: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Today’s Presentation

Project Update

Ø Dona Bay Conveyance System (Amendment 1)

Ø Dona Bay Water Storage Facility – Venice Minerals (Amendment 2)

Ø Facilitating Agricultural Resource Management Systems (FARMS)

program

Ø Cooperative funding agreement with SWFWMD

Ø Bid Phase

Next Update in December

Ø Bid Phase update for the Dona Bay Conveyance System - Water

Quality Project

2

Page 3: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Amendment No. 1 Update

Ø Proposed North Pinelands Diversion Weir (AlbrittonWeir replacement)

Ø Proposed North Pinelands Storage Facility - storage, Storage Facility - storage, conveyance and treatment area

Ø Proposed Open Gravity

Conveyance to Central

Pinelands Lakes

Page 4: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Amendment No. 1 Update

Ø Flood-Stage Relief Structure to

Cow Pen Slough

Ø Control Structure to Pinelands

Rehydration AreaRehydration Area

Ø Modify existing control structure

to allow future gravity flow to

Venice Minerals via pipe

4

Page 5: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Amendment No. 1 Update

Ø Benefits:

Ø Diversion of over 50% of water into the treatment facility

Ø Reduce total nitrogen loads to Dona Bay by over 15%

Ø Potential alternative water supply

Ø Increased storage for larger storm eventsØ Increased storage for larger storm events

5

Page 6: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Amendment No. 2 Update

Dona Bay Water Storage Facility – Venice Minerals

Ø Evaluating water stages, berms and control levels

Ø Joining the Northern and Southern components

Ø Improving water quality benefitsØ Improving water quality benefits

Consistent with the Water Goals and Objectives of the

Comprehensive Plan.

Plan supports future alternative water supply development.

6

Page 7: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

North Pinelands System - FARMS

Facilitating Agricultural Resource Management Systems (FARMS)

Ø FARMS provides up to 75% funding assistance to reduce agricultural

groundwater withdrawals and provide water quality benefitsgroundwater withdrawals and provide water quality benefits

Ø North Pinelands System is not eligible for FARMS funding

Ø Future projects may use North Pinelands as a water source for a

FARMS project

Ø SWFWMD staff is available to respond to questions

7

Page 8: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

SWFWMD Grant Agreement

Estimated Eligible Cost for Cost Sharing $12,500,000

Current SWFWMD Grant Funding $ 3,100,000

8

Current SWFWMD Grant Funding $ 3,100,000

SWFWMD Grant Funding for FY16 cycle $ 3,150,000

SWFWMD Total Contribution $ 6,250,000

Page 9: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

SWFWMD Grant Agreement

Measurable Benefits:

North Pinelands - North Cell 20 acres

North Pinelands Storage Facility – Main Cell 80 acres

Central Pinelands – North and South Lakes 180 acres

Total Wet Detention 280 acres

Pinelands Rehydration Area 83 acres

9

Pinelands Rehydration Area 83 acres

Project Milestones:

Land Acquisition Complete

Data Development and Preliminary Design Options Complete

Initiate Design and Permitting 06/01/2013

Complete Design and Permitting 12/31/2014

Initiate Construction 06/01/2015

Construction Complete 12/31/2017

Page 10: Dona Bay Conveyance System Water Quality Project Update ... · PPT TEMPLATE 1- TV Compliant PPT Author: Sarasota County Keywords: TV Compliant PPT Template 1 Created Date: 10/2/2007

Next Steps

Ø Responding to SWFWMD Request for Additional Information

Ø Approval of SWFWMD Grant agreement

Ø Stakeholder meeting with property owners

Ø Initiate Bid Phase

Ø Return to the Board in December for an update