Dollo-Ado Shelter Project

34
I nternational O rganization for M igration

Transcript of Dollo-Ado Shelter Project

Page 1: Dollo-Ado Shelter Project

International Organization

for Migration

Page 2: Dollo-Ado Shelter Project

Objective………..

Construction of 1145 Transitional shelters

for the Year 2013

Page 3: Dollo-Ado Shelter Project

Funding source :- UNHCR / DFID

Page 4: Dollo-Ado Shelter Project

Brief description about IOM

Shelter design

Floor area - 6.0mx3.5m=21.0Sqm

Wall Height - 2.4m

Ridge Height - 3.4m

Main components of the shelter………

Eucalyptus timber frame work

Bamboo walling

CGI sheet roofing

Page 5: Dollo-Ado Shelter Project

Floor Plan of the shelter

Page 6: Dollo-Ado Shelter Project
Page 7: Dollo-Ado Shelter Project

Sequence of operation in shelter

construction……….

At workshop….

Preparing timber columns and components

for frames.

Preparing roof trusses .

Preparing doors and windows .

Slicing bamboo poles .

Page 8: Dollo-Ado Shelter Project

Preparing timber columns and

components for frames.

Page 9: Dollo-Ado Shelter Project

Preparing timber columns and

components for frames.

Page 10: Dollo-Ado Shelter Project

Preparing roof trusses

Page 11: Dollo-Ado Shelter Project

Preparing doors and windows

Page 12: Dollo-Ado Shelter Project

Slicing bamboo poles

Page 13: Dollo-Ado Shelter Project

Sequence of operation in shelter

construction……….

At site…..

Setting out and column erection.

Fabricating timber Skelton.

Fixing roof trusses.

Attaching bamboo slices.

Roofing

Fixing door and windows

Page 14: Dollo-Ado Shelter Project

Setting out and column erection

Page 15: Dollo-Ado Shelter Project

column erection

Page 16: Dollo-Ado Shelter Project

Fabricating timber Skelton

Page 17: Dollo-Ado Shelter Project

Attaching bamboo slices

Page 18: Dollo-Ado Shelter Project

Roofing

Page 19: Dollo-Ado Shelter Project

Materials and prefabricated items

delivered to the site for shelter

construction…..

From Workshop….

Page 20: Dollo-Ado Shelter Project

Transporting shelter components to

the site……

Page 21: Dollo-Ado Shelter Project

Materials and prefabricated items

delivered to the site for shelter

construction…..

From Store….

Page 22: Dollo-Ado Shelter Project

Quality Control monitoring…….

At workshop…….

Page 23: Dollo-Ado Shelter Project

Quality Controlling at workshop…...

Page 24: Dollo-Ado Shelter Project

Quality Control monitoring…….

At site….

Page 25: Dollo-Ado Shelter Project

Shelters completed per Zone

. ZONE # OF SHELTERS COMPLETED

ZONE A 26

ZONE B 69

ZONE C 51

ZONE D 51

ZONE E 54

ZONE F 29

ZONE G 35

ZONE H 50

ZONE I 55

ZONE J 59

ZONE K 62

ZONE L 56

ZONE M 50

ZONE N 54

ZONE O 77

ZONE P 73

ZONE Q 100

ZONE R 70

ZONE S 64

ZONE T 70

TOTAL 1155

Page 26: Dollo-Ado Shelter Project
Page 27: Dollo-Ado Shelter Project
Page 28: Dollo-Ado Shelter Project

Monthly Progress-2013

MELKEDIDA SHELTER CONSTRUCTION

PROGRAM & PROGRESS-2013

0.0

100.0

200.0

300.0

400.0

# O

F SH

ELTE

RS

ORIGINEL PROGRAM 100.0 120.0 140.0 140.0 140.0 140.0 140.0 140.0 85.0

PROGRESS 54.0 108.0 105.0 67.0 56.0 120.0 102.0 197.0 346.0

Apr- May- Jun- Jul-13 Aug-1 Sep- Oct- Nov- Dec-

Page 29: Dollo-Ado Shelter Project
Page 30: Dollo-Ado Shelter Project
Page 31: Dollo-Ado Shelter Project
Page 32: Dollo-Ado Shelter Project

A tool using to find the impact of IOM shelters and gathering beneficiary

details

Page 33: Dollo-Ado Shelter Project

Major challenges Encountered

Delay in Commencement of the project

Failure in supplying the materials in time by local

suppliers from Dollo-Ado

Poor quality materials by the local supplier

Delay in material supply due to road taxation

Delay in supplying the materials due to rain in

November.

Road condition between Dollo and Melkedida

Page 34: Dollo-Ado Shelter Project

THANK YOU