Doc.: IEEE 802.11-13/0214r1 Report March 2013 Adrian Stephens, Intel CorporationSlide 1 802.11 March...

116
doc.: IEEE 802.11-13/0214r1 Report March 2013 Adria n Steph Slide 1 802.11 March 2013 Closing Reports Date: 2013-03-22 Authors: N am e C om pany A ddress Phone em ail A drian Stephens Intel Corporation +44 792 008 4900 (m obile) [email protected]

Transcript of Doc.: IEEE 802.11-13/0214r1 Report March 2013 Adrian Stephens, Intel CorporationSlide 1 802.11 March...

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Adrian Stephe

ns, Intel

Corporation

Slide 1

802.11 March 2013 Closing Reports

Date: 2013-03-22

Name Company Address Phone email Adrian Stephens Intel

Corporation +44 792 008

4900 (mobile)

[email protected]

Authors:

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Adrian Stephe

ns, Intel

Corporation

Slide 2

Abstract

• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the March 2013 closing plenary meeting.

doc.: IEEE 802.11-13/0214r1

Report

Attendance SummaryMarch 2013

Adrian Stephe

ns, Intel

Corporation

Slide 3

Breakout Meetings Avg Attendance

Sum Attendance

Max Attendance

Min Attendance

802.11 Newcomer Training 1 22ARC 1 29Editors Meeting 1 15JTC1 3 10 30 11 9PAR Comments 2 7 14 7 7REG SC 4 35 142 38 32Social 1 21

TGac 2 46 93 48 45TGaf 5 37 187 49 21TGah 4 100 402 141 78TGai 8 110 881 145 60TGai / TGaq 1 112TGaj 2 38 77 61 16TGak 2 24 48 24 24TGak - Joint Meeting with 802.1 1 35TGaq 2 64 128 64 64TGmc 7 21 152 32 13Tutorials 1 172WG CAC 3 9 27 12 6WG Closing Plenary 1 3

WG Mid-Session Plenary 1 214

WG Opening Plenary 1 220

WNG 1 178

WNG SC 1 206

doc.: IEEE 802.11-13/0214r1

Report

Attendance Histogram (Thu)March 2013

Adrian Stephe

ns, Intel

Corporation

Slide 4

doc.: IEEE 802.11-13/0214r1

Report

Type of Groups

March 2013

Adrian Stephe

ns, Intel

Corporation

Slide 5

Type of Group DescriptionWG Working GroupTG Task GroupSG Study GroupSC Standing

Committee

doc.: IEEE 802.11-13/0214r1

Report

GroupsMarch 2013

Adrian Stephe

ns, Intel

Corporation

Slide 6

Type Group Description Chair

WG WG11 The IEEE 802.11 Working Group Bruce Kraemer

TG MC Maintenance (Revision C) Dorothy StanleyTG AC Very High Throughput (<6 GHz bands) Osama Aboul-MagdTG AF Operation in TV Whitespace bands Richard KennedyTG AH Operation in 900 MHz bands Dave Halasz TG AI Fast Initial Link Setup Hiroshi ManoTG AJ China Millimeter Wave (CMMW) Xiaoming PengTG AK General Link Setup Donald Eastlake 3rd TG AQ Pre-association Discovery Stephen McCannSC WNG Wireless Next Generation Clint ChaplinSC ARC Architecture Dave BagbySC JTC1 ISO/IEC/JTC1/SC6 shadow committee Andrew MylesSC REG Regulatory Richard Kennedy

doc.: IEEE 802.11-13/0214r1

Report Slide 7

802.11 WG Editor’s Meeting (Mar ‘13)

Date: 2013-03-10

Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,

MS SJ-14-4, San Jose, CA 95134-1706

+1-408-527-0815 [email protected]

Authors:

Adrian Stephe

ns, Intel

Corporation

from slide 1/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Slide 8

Volunteer Editor Contacts• TGmc – Adrian Stephens – [email protected]• TGac – Robert Stacey – [email protected] • TGaf – Peter Ecclesine – [email protected] • TGah – Minyoung Park – [email protected]• TGai – Lee Armstrong– [email protected], Ping FANG [email protected]• TGaq – Dan Gal – [email protected]

• Editors Emeritus:– TGaa – Alex Ashley – [email protected]– TGad – Carlos Cordeiro – [email protected] – TGae – Henry Ptasinski – [email protected]

Adrian Stephe

ns, Intel

Corporation

March 2013

from slide 2/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

802.11 Style Guide• See 11-09-1034-07-0000-wg11-style-guide.doc

– We updated 802.11 WG Style Guide based on 2012 IEEE Standards Style Manual and consistency changes in final publication of the 802.11 standard

• Editor’s responsibility includes checking the 2012 IEEE Standards Style Manual when creating or updating drafts. https://development.standards.ieee.org/myproject/Public/mytools/draft/styleman.pdf

• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual

• Note that the Style Guide evolves with our practice

Slide 9 Adrian Stephe

ns, Intel

Corporation

from slide 3/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Slide 10

Editor Amendment Ordering

Amendment Number Task Group REVCOM Date802.11-2011 Amendment 1 TGae Mar 2012

802.11-2011 Amendment 2 TGaa Jun 2012

802.11-2011 Amendment 3 TGad Oct 2012

802.11-2011 Amendment 4 TGac Feb 2014

802.11-2011 Amendment 5 TGaf Jun 2014

802.11-2011 Amendment 6 TGah Jan 2016

802.11-2011 Amendment 7 TGai Feb 2015

• Data as of Mar 2013• See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm

Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers!

Adrian Stephe

ns, Intel

Corporation

from slide 4/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Most current

doc shaded green.

TG Published or Draft Baseline DocumentsSource MEC

Style Guide Editor

Snapshot Date

Publishe

d

ac af ah ai mc aj aq

ac Y 5.0 Frame 10.0

Yes 2012 Robert Stacey 19-Mar

af Y 5.0 3.0 Frame 10.0

No 2012 Peter Ecclesine 21-Mar

ah Y 3.0 2.0 0.0 Frame10.0

No 2012 Minyoung Park 13-Nov

ai Y 4.0 2.2 0.0 0.4 Frame 9.0

No 2012 Lee ArmstrongPing FANG

19-Mar

mc Y 1.2 Frame 10.0

No 2012 Adrian Stephens 19-Mar

aj Y

aq Y

Changes from last report shown in red.

Slide 11

Mar 2013 Draft Development Snapshot

Slide 11 Adrian Stephe

ns, Intel

Corporation

March 2013

from slide 5/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

MIB style, Visio and Frame practices

• I’m going to suggest going forward we use a single style with appropriately set tabs,  and use leading Tabs to distinguish the syntax and description parts. (Adrian Stephens Feb 9, 2010)

•  Keep embedded figures using visio as long as possible– Near the end of sponsor ballot,  turn these all into .wmf (windows

meta file) format files (you can do this from visio using “save as”).   Keep separate files for the .vsd source and the .wmf file that is linked to from frame.

• Frame templates for 11aa, 11ac, 11af • Text version of MIB is available (2012, ae2012, aa2012,

ad2012)Adrian Stephe

ns, Intel

Corporation

Slide 12from slide 6/6 of 11-13/0276r2 by Peter Ecclesine (Cisco Systems)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 13

March 2013 PublicityDate: 2013-03-21

Name Company Address Phone email

Stephen McCann Research in Motion (RIM) UK Ltd

200 Bath Road, Slough, Berkshire, SL1 3XE, UK

+44 1753 667099 [email protected]

Authors:

from slide 1/2 of 11-13/0386r0 by Stephen McCann, RIM

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 14

• HEW Press Release– Draft press release regarding the creation of a new

High Efficiency WLAN (HEW) study group, based on the WNG SC presentations from Tuesday evening.

• Mentor Copy– https://

mentor.ieee.org/802.11/dcn/13/11-13-0385-00-0000-high-efficiency-wlan-press-release.doc

from slide 2/2 of 11-13/0386r0 by Stephen McCann, RIM

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 15

Closing ReportDate: 2013-03-22

Authors:

Name Company Address Phone email

Jim Lansford CSR Technology 100 Stirrup Cir, Florissant, Colorado 80816

+1-719-286-9277 [email protected]

from slide 1/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 16

Abstract

Closing report for WNG SC for March 2013, Orlando, Florida, USA

from slide 2/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 17

• Presentations at March 2013 meeting– Agenda:

https://mentor.ieee.org/802.11/dcn/13/11-13-0340-02-0wng-agenda-for-march-2013.ppt

• Tuesday AM1 session– https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimental-test-report-o

f-fils.pptx – Hiroshi MANO

– https://mentor.ieee.org/802.11/dcn/13/11-13-0314-00-0wng-on-future-enhancements-to-802-11-technology.pptx - Juho PIRSKANEN

• Tuesday PM3 (evening) session– https://mentor.ieee.org/802.11/dcn/13/11-13-0313-00-0wng-usage-models-for-next-genera

tion-wi-fi.pptx - Osama ABOUL-MAGD

– https://mentor.ieee.org/802.11/dcn/13/11-13-0343-00-0wng-operator-oriented-wi-fi.pptx – LIU Dapeng

– https://mentor.ieee.org/802.11/dcn/13/11-13-0309-00-0wng-next-gen-wlan.pptx – Ron PORAT

– https://mentor.ieee.org/802.11/dcn/13/11-13-0287-03-0wng-beyond-802-11ac-a-very-high-capacity-wlan.pptx - Yasuhiko INOUE

– https://mentor.ieee.org/802.11/dcn/13/11-13-0331-05-0wng-high-efficiency-wifi.ppt – Laurent CARIOU

– https://mentor.ieee.org/802.11/dcn/13/11-13-0339-10-0wng-high-efficiency-wlan-straw-poll.ppt - Laurent CARIOU from slide 3/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

• Straw poll during PM3 to indicate support for creation of a “High Efficiency WLAN” study group– Vote was (Y/N/A): 128/1/27

• Attendance– AM1: ~126– PM3: ~165

• Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0352-00-0wng-wng-meeting

-minutes-orlando-mar2013.doc

• Plans for May 2013– One 2-hour session

Adrian Stephens, Intel CorporationSlide 18from slide 4/4 of 11-13/0355r0 by Jim Lansford, Vice-chair (CSR Technology)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 19

ARC Closing Report Date: 2013-03-20

Name Affiliations Address Phone email Mark Hamilton Spectralink 1765 W 121st Ave,

Westminster, CO, 80234

720-872-7445 [email protected]

Authors:

from slide 1/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Abstract

This document is the closing report for ARC SC,

March 2013, Orlando meeting

Adrian Stephens, Intel CorporationSlide 20from slide 2/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 21

Work Completed• IETF/802 coordination

– Reviewed RFC 4441 update. Trying to balance between redundant with CBPs versus enough information here.

– Still open for comments – please get comments to Dorothy Stanley– Also, Operations Area working group has gotten submissions on

CAPWAP, and will be considering.• Brief update on General Links (GLK SC) and 802.1

bridging discussions– Most presentations will be in Thursday AM1 joint session– Looks like changes are needed in 802.1AC, which will need a PAR

• 802 Overview and Architecture Draft 1.6 sponsor ballot– Ballot deadline extended to Mar 22. Some comments addressed this

week, more on telecons. – Reviewed 802.11 section (Annex B.2) and comments submitted.

Noted that PLCP/PMD split is being removed from 802.11, so need to describe potential changes in our architecture pictures

from slide 3/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 22

Work Completed (cont)• Architecture of APs/DS/Portals, and 802.1 concepts

– Reviewed submission: https://mentor.ieee.org/802.11/dcn/13/11-13-0115-03-0arc-considerations-on-ap-architectural-models.doc

– Agreed 802.11 Figure 5-1 (MAC data plane architecture) has issues and confusing parts. Started work toward a proposed replacement.

– Need to get clarification on all (architectural) interface points within 802.11 specification – all MAC-SAPs (are there more than one?), etc.

Minutes are in 11-13/0367r0

Teleconferences:– None expected, if needed, will schedule with 10 days notice

from slide 4/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 23

March 2013 Goals

• One meeting slot planned:– Continue discussion on architectural model for AP

(and DS and Portal) and where MAC-SAP interface(s) appear, and how this relates to the 802.1 concepts

– 802 O&A sponsor ballot, as appropriate– IETF/802 RFC 4441, as appropriate

from slide 5/5 of 11-13/0366r0 by Mark Hamilton, Spectralink, Corp.

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 24

IEEE 802 JTC1 SC closing report (Mar13)Date: 2013-3-22

Name Company email

Andrew Myles Cisco [email protected]

Authors:

from slide 1/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 25

Abstract

Closing report for IEEE 802 JTC1 SCfor March13 in Orlando

from slide 2/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel Corporation

JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting

• Reviewed latest liaisons to SC6– 802.11ac D5.0 liaised– Responses to comments on 802.11-2012 liaised

• Reviewed status of PSDO activity– Pre-ballots in SC6 on 802.1X & 802.1AE passed

• 5 month ballot delayed until comments resolved• 11-13-336r5 on 802.1X, 11-13- 337r4 on 802.1AE will be considered

by EC– Pre-ballots in SC6 on 802.11aa/ad/ae are still open

• Close on 7 April– 802.3 WG will submit 802.3-2012 under PSDO– 802.1 WG will submit 802.1AS, 802.1AB, 802.1AR under PSDO

Slide 26from slide 3/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel Corporation

JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting

• Reviewed status of various China NB proposals in SC6– No known changes to status for :

• WAPI• TEPA-AC • TLSec• TAAA

– IETF are now tracking TISec and may send representative to next SC6 meeting

– Nufront will present on EUHT and coexistence with 802.11 in March in Hawaii; possibly in SC?

Slide 27from slide 4/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel Corporation

JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting

• Prepared for next SC6 meeting in June in Korea– Reviewed agenda– Empowered Bruce Kraemer as HoD– Completed contribution process for SC6 NBs to “participate” in

development & maintenance of 802 standards• 11-13-1454r8 will be will be considered by EC • Also discussed in 802.1 WG & 802.3 WG

– Discussed a Swiss NB “explanatory report” on the SC6 resolutions from Graz• Further discussion and any action will occur in Hawaii

– Discussed a response to Swiss NB comparison of 802.1X and TEPA-AC• Will be completed in Hawaii

Slide 28from slide 5/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel Corporation

JTC1 SC have plans for May 13 in Hawaii focused on prep for SC6 meeting

• Review status of liaisons to SC6• Review status of pre-ballots/ballots in SC6

– 802.11aa/ad/ae, 802.1X/AE/AS/AB/AR, 802.3

• Prepare for SC6 meeting in June– Review final agenda– Consider response to Swiss NB “explanatory report”– Complete response comparison of 802.1X &TEPA-AC– Update table of status of IEEE 802 contributed ISO/IEC

documents– Develop status information about 802.1/3/11 for SC6– Liaise with IETF on TISec

• Possibly host Nufront presentation on EUHTSlide 29

from slide 6/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Motions for EC

Adrian Stephe

ns, Intel

Corporation

Slide 30from slide 7/15 of 11-13/0383r0 by Andrew Myles, Cisco

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that Bruce Kraemer be

appointed as HoD of the IEEE 802 delegation to the SC6 meeting in June 2013 and be authorised to:• Appoint the IEEE 802 delegation• Approve any necessary submissions• Call any necessary preparation teleconferences

– Result: 8/0/1• Abstain was Bruce Kraemer

Adrian Stephens, Intel

Corporation

Slide 31from slide 8/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends empowerment of the IEEE 802 HoD to the next SC6 meeting

• Motion for consideration by IEEE 802 EC– The IEEE 802 SC appoints Bruce Kraemer as HoD of the IEEE

802 delegation to the SC6 meeting in June 2013 and authorises Mr Kraemer to:• Appoint the IEEE 802 delegation• Approve any necessary submissions• Call any necessary preparation teleconferences

– Moved:– Seconded:– Result:

Adrian Stephens, Intel

Corporation

Slide 32from slide 9/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends a response to SC6’s requests for collaboration

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that 11-13-1454r8 be

approved as a response to the ISO/IEC JTC1/SC6 requests that IEEE 802:• Establish a mechanism that allows SC6 NBs to contribute to the

revision process in IEEE 802.1/3/11• Exchange information with SC6 about new work items that are within

the scope of SC6 and the respective IEEE 802 WG for information and potential coordination

– Result: 9/0/0

Adrian Stephens, Intel

Corporation

Slide 33from slide 10/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends a response to SC6’s requests for collaboration

• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves 11-13-1454r8 as a response to the

ISO/IEC JTC1/SC6 requests that IEEE 802:• Establish a mechanism that allows SC6 NBs to contribute to the

revision process in IEEE 802.1/3/11• Exchange information with SC6 about new work items that are within

the scope of SC6 and the respective IEEE 802 WG for information and potential coordination

– Moved:– Seconded:– Result:

Adrian Stephens, Intel

Corporation

Slide 34from slide 11/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends approving the responses related to the 802.1X pre-ballot

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that the responses in

11-13-336r5 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6

– Result: 9/0/0

Adrian Stephens, Intel

Corporation

Slide 35from slide 12/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends approving the responses related to the 802.1X pre-ballot

• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves the responses in 11-13-336r5 to the

comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1X approves their liaising to ISO/IEC JTC1/SC6

– Moved:– Seconded:– Result:

Adrian Stephens, Intel

Corporation

Slide 36from slide 13/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends approving the responses related to the 802.1AE pre-ballot

• Motion from IEEE 802 JTC1 SC – The IEEE 802 JTC1 SC recommends that the responses in

11-13-337r4 to the comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE under the PSDO process be approved and liaised to ISO/IEC JTC1/SC6

– Result: 9/0/0

Adrian Stephens, Intel

Corporation

Slide 37from slide 14/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report

The SC recommends approving the responses related to the 802.1AE pre-ballot

• Motion for consideration by IEEE 802 EC – The IEEE 802 EC approves the responses in 11-13-337r4 to the

comments from the China NB in the pre-ballot in ISO/IEC JTC1/SC6 on IEEE 802.1AE approves their liaising to ISO/IEC JTC1/SC6

– Moved:– Seconded:– Result:

Adrian Stephens, Intel

Corporation

Slide 38from slide 15/15 of 11-13/0383r0 by Mar 2013

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 39

IEEE 802.11 Regulatory SCOrlando Closing Report

Date: 2013-03-22

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 40

Abstract

This presentation is the closing report for the March 2013 IEEE 802.11 Regulatory Standing Committee meeting in Orlando.

from slide 2/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Agenda

• The regulatory summaries• Action items and issues• WP5A liaison from IEEE 802 on 5 GHz • The NPRM FCC 13-22• Transmit beamforming antenna gain presentations• Adjourn

Adrian Stephe

ns, Intel

Corporation

Slide 41from slide 3/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Accomplishments

• Approved Vancouver meeting and teleconference minutes• Heard regulatory update summaries for North America, the EU

and Asia• Approved a liaison to ITU-R WP5A on expansion of the 5 GHz

spectrum• Heard two presentations on transmit beamforming antenna gain

(relating to a TCB test document for multiple antennas)• Developed and approved a framework document for the

development of Comments for NPRM FCC 13-22 (proceeding 13-49)

• Planned for teleconferences– Thursdays, at 12:30ET for 90 minutes (starting April 4th)

Adrian Stephe

ns, Intel

Corporation

Slide 42from slide 4/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Teleconferences

• Weekly on Thursdays, 12:30 to 14:00 ET– Starting April 4th

Adrian Stephe

ns, Intel

Corporation

Slide 43from slide 5/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

References

• NPRM FCC 12-118• NPRM FCC 12-148• NPRM FCC 13-22• FCC request for comment on WRC-15• FCC authorization of TVWS databases nationwide• Early draft of EN301 598 (v0.0.16)• Technical feasibility of IMT in the bands above 6 GHz• RECOMMENDATION ITU-R F.1763• RECOMMENDATION ITU-R M.1651• WP5A liaison re M.1651• IEEE 802.11 liaison to ITU-R WP5A on expansion of the 5 GHz band• Industry outline for NPRM FCC 13-22 response• NPRM FCC 13-22 Dissected• FCC 13-22 Comment Framework• Transmit Beamforming Antenna Gain• Beamfoming Array Gain to Intended and Unintended Users

Slide 44 Adrian Stephe

ns, Intel

Corporation

from slide 6/6 of 11-13/0369r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 45

IEEE 802.11mc Closing Report forMarch 2013Date: 2013-03-21

Name Affiliations Address Phone email Dorothy Stanley

Aruba Networks 1322 Crossman Ave Sunnyvale, CA 94089

+1 630-363-1389

[email protected]

Authors:

from slide 1/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 46

Abstract

This document contains the TGmc closing report for March 2013.

from slide 2/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Status: comment resolution

• Continued processing comments received in the recent Initial Letter Ballot– 801 comments (713 LB, 88 remaining 2012 Call for comments)– Approved resolutions to approximately 350 comments

Adrian Stephe

ns, Intel

Corporation

Slide 47from slide 3/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 48Slide 48

TGmc Plan of Record• 20 July 2012 – 12 Sept 2012 – Call for Comment/Input• 29-30 Aug 2012 – NesCom, SASB PAR Approval• Sept 2012 – Begin to process input • Sept 2012 – 11aa, 11ae integration• Jan – First WG Letter ballot - without 11ad• Dec 2012 – March/May 2013 – 11ad integration – May/July ballot

on D2.0• Dec 2013 – March 2014 – 11ac integration• Feb 2014 – Mandatory Draft Review• Feb-March 2014 – Form Sponsor Pool (45 days) • April/May 2014 – Initial Sponsor Ballot • TBD – integration of additional completed amendments (e.g. 11af)• Nov 2014 – WG/EC Final Approval• March 2015 – RevCom/SASB Approval

from slide 4/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Teleconferences

• Conference Calls 10am Eastern (2 hours) – April 5, 12, 19, 26 (Friday)

Adrian Stephe

ns, Intel

Corporation

Slide 49from slide 5/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Next Steps

• Continued Comment Resolution• Recirculation Letter ballot (expect July)

Adrian Stephe

ns, Intel

Corporation

Slide 50from slide 6/6 of 11-13/0384r0 by Dorothy Stanley (Aruba Networks)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 51

TGac March 2013 Closing ReportDate: 2013-03-20

Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,

Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw

ei.com

Authors:

from slide 1/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 52

Abstract

This document is the closing report for the TGac for the March 2013 session.

from slide 2/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Work Completed • Approved resolutions to comments received on draft

D5.0 (LB 191).– Comment spreadsheet is available at:

https://mentor.ieee.org/802.11/dcn/13/11-13-0199-03-00ac-lb191-comments-tgac-d5-0.xls

• A motion passed to start a 15-day recirculation ballot on draft D5.0.

• Reviewed and approved the report to the IEEE 802 EC requesting conditional approval for Sponsor ballot.– https://mentor.ieee.org/802.11/dcn/13/11-13-0320-01-00ac-p8

02-11ac-report-to-ec-on-conditional-approval-to-go-to-sponsor-ballot.pptx Adrian

Stephens,

Intel Corpor

ation

Slide 53from slide 3/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Next Ad Hoc Meeting

• None scheduled for May 2013.• A motion passed to authorize an ad hoc meeting in July

2013, somewhere in Europe.

Adrian Stephe

ns, Intel

Corporation

Slide 54from slide 4/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 55

May 2013 Goals

• Start working on Sponsor Ballot comment resolution

from slide 5/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 56

Conference Call Times

• Previously Approved– March 28 - 20:00 - 22:00 ET– April 4 - 10:00 - 12:00 ET

– Not needed since the dates coincide with ballots

• May 09 – 20:00 – 22:00 ET• May 23 - 10:00 – 12:00 ET• May 30 - 20:00 – 22:00 ET

from slide 6/6 of 11-13/0358r1 by Osama Aboul-Magd (Huawei Technologies)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 57

TGaf Orlando Closing Report

Date: 2013-03-22

Name Affiliations Address Phone email Rich Kennedy BlackBerry 7305 Napier Trail

Austin, TX 78729 +1-972-207-3554 rikennedy@blackberr

y.com

Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134

+1-408-527-0815 [email protected]

Authors:

from slide 1/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 58

AbstractThis presentation is the closing report for the 19th face-to-

face meeting of IEEE 802.11 TGaf, taking place the week of January 14th, 2013 at the IEEE 802 Wireless Interim in Vancouver.

from slide 2/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Plan for the Week

• Approve meeting and teleconference minutes• Regulatory update• Review the results of LB192• Review of the progress since January• Editorial review; spreadsheet 11-12/1017r35• Review and Approve all comment resolution submissions• Update the draft and comment resolution spreadsheet with

approved changes, and request a recirculation letter ballot• Plan for May meeting and teleconferences

Adrian Stephe

ns, Intel

Corporation

Slide 59from slide 3/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

TGaf Accomplishments • Reviewed the comment spreadsheet and resolved all of

the remaining comments from LB192• Requested the Editor to prepare D4.0 and the asked

WG to start a recirculation letter ballot• Planned for May meeting, and weekly teleconferences

– Tuesdays at 21:00 ET for 2 hours

Adrian Stephe

ns, Intel

Corporation

Slide 60from slide 4/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Plan for May

• Approve Orlando and Teleconference minutes• Review and resolve comments from the recirculation

letter ballot on Draft 4.0• Ask the WG for a recirculation letter ballot• Prepare PAR extension request• Plan for July and Teleconferences, and begin the

process of starting the first TGaf Sponsor ballot

Adrian Stephe

ns, Intel

Corporation

Slide 61from slide 5/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 62

TGaf Timeline – Affirmed March 2013

• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: July 2012• Recirculation Letter Ballot: January 2013• Form Sponsor Ballot Pool: June 2013• Initial Sponsor Ballot: July 2013• Recirculate Sponsor Ballot: November 2013• Final WG/EC Approval: March 2014• RevCom/Standards Board Approval: June 2014

from slide 6/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Teleconferences

• Weekly on Tuesdays through May 28th

– Until recirc is complete, calls will be used for regulatory updates as required

• Time: 21:00 ET for up to 2 hours

Adrian Stephe

ns, Intel

Corporation

Slide 63from slide 7/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Motion

• Having approved comment resolutions for all of the comments received from LB192 on TGaf D3.0 as contained in document 11-12/1017r37

• Instruct the editor to prepare Draft 4.0 incorporating these resolutions and,

• Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D3.0 be forwarded to Sponsor Ballot?”

•  Moved by Rich Kennedy on behalf of TGaf• Second:• Discussion?• Results:

• TGaf vote: • Moved: Al Petrick Seconded: Tevfik Yucek Result: 14-0-0

Adrian Stephe

ns, Intel

Corporation

Slide 64from slide 8/8 of 11-13/0356r1 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 65

IEEE 802.11ah Closing Report forMarch 2013

Date: 2013-3-20

Name Affiliations Address Phone email David Halasz Self 330-283-2715 [email protected]

Authors:

from slide 1/5 of 11-13/0359r0 by David Halasz

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Activity in TGah

• Work continued on specification framework– Update to the spec framework adopted– 11-11-1137-14-00ah-specification-framework-for-tgah.docx

• Timeline move out two months– Draft text not available beyond 12/1257. Hence internal task group

letter ballot move out to May of 2013.

Adrian Stephe

ns, Intel

Corporation

Slide 66from slide 2/5 of 11-13/0359r0 by David Halasz

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Going forward

• Wrap up on specification framework• Move forward with draft text.• Start internal task group letter ballot

Adrian Stephe

ns, Intel

Corporation

Slide 67from slide 3/5 of 11-13/0359r0 by David Halasz

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Teleconference

• May 8 at 10 AM ET 1 hour– Prepare for May face-to-face meeting

Adrian Stephe

ns, Intel

Corporation

Slide 68from slide 4/5 of 11-13/0359r0 by David Halasz

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Timeline – Move out two months

• Current– Internal Task Group Ballot : May 2013– Initial Letter Ballot : September 2013– Initial Sponsor Ballot : March 2015– EC Approval : January 2016– Revcom Approval : March 2016

Adrian Stephe

ns, Intel

Corporation

Slide 69from slide 5/5 of 11-13/0359r0 by David Halasz

March 2013

doc.: IEEE 802.11-13/0214r1

Report

IEEE 802.11TGaiClosing Report

Date: 2013-3-21

Authors:

Name Company Address Phone email

Hiroshi MANO AlliedtelesisR&D center,K.K.

8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN

+81-3-5719-7630 [email protected]

March 2013

Slide 70 Adrian Stephe

ns, Intel

Corporation

from slide 1/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

AbstractThis presentation is the closing report for the Orlando

meeting of the IEEE 802.11 TGai.

March 2013

Slide 71 Adrian Stephe

ns, Intel

Corporation

from slide 2/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

IEEE 802.11 FILS TGai – Orland March 2013

• Goals for the Meeting:– Approve minutes of past meeting and teleconference– Comment resolution to volunteer review comments– Approve final technical contribution – Move to forward TGai call for comment – Joint meeting with TGaq– Approve Timeline– Approve Teleconference schedule– Approve Plan for May

March 2013

Slide 72 Adrian Stephe

ns, Intel

Corporation

from slide 3/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Accomplishments TGai 1/2

• Review and approve January 2013 Vancouver Session Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0182-01-00ai-

january-2013-vancouver-session-minutes.doc

• Review and approve January-March Teleconference Minutes – https://mentor.ieee.org/802.11/dcn/13/11-13-0191-04-00ai-

january-march-teleconference-minutes.doc

March 2013

Slide 73 Adrian Stephe

ns, Intel

Corporation

from slide 4/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Accomplishments TGai 2/2

• 8 regular slots and 1 Joint adhoc with TGaq were held.• Experimental-test-report-of-FILS was reported on

adhoc.• 63 unsolved open technical before this session.• All comments were resolved.• 21 Technical motions ( 20 passed/ 1 failed)• Instructed editor to prepare draft 0.5 and

incorporating these resolutions and, approve 20 day peer review starting on/or after April 8th , 2013 to assist with producing an improved draft for working LB.

March 2013

Slide 74 Adrian Stephe

ns, Intel

Corporation

from slide 5/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Plan for May

• Goals for the Meeting:

– Approve minutes of past meeting and teleconference– Comment resolution of Task Group review of TGai

draft.– Approve Timeline– Approve Teleconference schedule– Approve Plan for July

March 2013

Slide 75 Adrian Stephe

ns, Intel

Corporation

from slide 6/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Time line of TGai (no change)

PAR Approved, Modified, or Extended 2010-12-08– WG Letter Ballots Initial / Recirc Jul 13/ Nov13– Form Sponsor Ballot Pool / Reform Mar14– MEC Done Mar 14– IEEE-SA Sponsor Ballots Initial / Recirc Jul14/ Sep14

– Final 802.11 WG Approval Nov14– final or Conditional 802 EC Approval Nov14– RevCom & Standards Board Final or

Continuous Process Approval Feb15– ANSI Approved N/A

March 2013

Slide 76 Adrian Stephe

ns, Intel

Corporation

from slide 7/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Teleconference Schedule • Motion:

– Approve the following schedule of weekly teleconferences. – Tuesdays 10:00 ET from 26th March 2013 until 21st May 2013.– Duration 1Hour– Using WEB-EX that will be provided by Task Group Chair

• Approved by unanimous consent

March 2013

Slide 77 Adrian Stephe

ns, Intel

Corporation

from slide 8/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel Corporation

Reference • Agenda /13-0321r2

– https://mentor.ieee.org/802.11/dcn/13/11-13-0321-02-00ai-tgai-agenda-march-2013-orland.pptx

• Submission list / 13-0322r3– https://mentor.ieee.org/802.11/dcn/13/11-13-0322-03-00ai-tgai-submissio

n-list-orlando.xls

• Motions / 13-0341r1– https://mentor.ieee.org/802.11/dcn/13/11-13-0341-00-00ai-tgai-motion-str

aw-poll-march-2013-orlando.pptx

• TGai Draft Review Combined Comments 13-0036r14– https://mentor.ieee.org/802.11/dcn/13/11-13-0036-14-00ai-tgai-draft-revie

w-combined-comments.xls

• Experimental-test-report-of-FILS /13-0323r2– https://mentor.ieee.org/802.11/dcn/13/11-13-0323-02-00ai-tgai-experimen

tal-test-report-of-fils.pptx

March 2013

Slide 78from slide 9/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Thanks to all who participated!

March 2013

Slide 79 Adrian Stephe

ns, Intel

Corporation

from slide 10/10 of 11-13/0382r0 by Hiroshi Mano (ATRD Root Lab)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 80

Date: 2013-03-21

Name Company Address Phone email Eldad Perahia Intel

Corporation

2111 NE 25th Ave Hillsboro, OR 97124

503-712-8081 [email protected]

Authors:

TGaj March 2013 Closing Report

March 2013

from slide 1/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Work Completed

• Task Group documents reviewed: – Usage model, 12/1245r2, Jiamin Chen

• Submissions– 13/292r0, Backward compatibility of 11aj with 11ad, Carlos

Cordeiro– 13/0177r1, Proposal of RoF Extension Link Backhaul for

Category 4, Hiroyo Ogawa

Adrian Stephe

ns, Intel

Corporation

Slide 81

March 2013

from slide 2/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Goals for April

• Target to approve TG Usage model, Functional Requirement, Evaluation Methodology, Selection Procedure baseline document

• Continue to develop channel model for 45GHz

Adrian Stephe

ns, Intel

Corporation

Slide 82

March 2013

from slide 3/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation

March 2013

doc.: IEEE 802.11-13/0214r1

Report

Conference call times

• April 18th 19:00-20:00 ET

Adrian Stephe

ns, Intel

Corporation

Slide 83

March 2013

from slide 4/4 of 11-13/0380r0 by Eldad Perahia, Intel Corporation

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 84

TGak March Closing Report• Date: 2013-03-21

Authors:

Name Address Affiliations Phone Email

Donald EastlakeHuawei

Technologies

155 Beaver Street, Milford, MA 01757 USA

+1-508-333-2270 [email protected]

from slide 1/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 85

Abstract

• Closing Report of IEEE 802.11 Task Group AK at the 802.11 Working Group Meeting, March 2013, in Orlando, Florida.

from slide 2/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 86

TGak Closing Report

• Accomplishments• Received and discussed 4 submissions (see list next

page)• Met jointly with 802.1 Thursday morning.• The minutes of this TGak meeting will be in 11-13/375

and an annotated agenda is in 11-13/0273r5.

• Teleconferences• TGak voted to hold 1 hour teleconferences on

Mondays, April 8th, April 22nd, and May 6th, at 5pm Eastern US time joint with 802.1Qbz.

from slide 3/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 87

TGak Closing Report

• Presentations• 11-13/0183r0, “Proposal of Preliminary Functional Requirements

for 802.1Qbz-802.11ak”, Mitsuru Iwaoka (Yokogawa Electric Co.)• 11-13/185r1, “Problems to be solved by 802.11ak/802.1Qbz”,

Donald Eastlake (Huawei Technologies)• 11-13/221r2, “802.11 QoS Queue Architecture and Possible

802.1bz Bridge Model”, Philippe Klein (Broadcom)• 11-13/0253r0, “Changes to 802.1Q required by 802.1Qbz”, Norm

Finn (Cisco)

from slide 4/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephens, Intel CorporationSlide 88

TGak Closing Report

• May Plans• Develop a firm list of Problems to be solved by this effort.• Develop an architectural model for 802.11ak.• Receive and discuss technical presentations• Develop process and timeline for TGak

from slide 5/5 of 11-13/0374r0 by Donald Eastlake, Huawei

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 89

TGaq Closing ReportDate: 2013-03-22

Name Company Address Phone email

Stephen McCann Research in Motion (RIM) UK Ltd

200 Bath Road, Slough, Berkshire, SL1 3XE, UK

+44 1753 667099 [email protected]

Authors:

from slide 1/3 of 11-13/0370r1 by Stephen McCann, RIM

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 90

Abstract

Closing report for TGaq (Pre-Association Discovery) for March 2013, Orlando, FL,

USA

from slide 2/3 of 11-13/0370r1 by Stephen McCann, RIM

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 91

• Summary– Use case

• 11-13-0125-04-00aq-use-case-analysis.docx• Use case collection now closed

– Requirements and terminology documents• 11-13-0299-00-00aq-draft-tgaq-terminology.docx

– Initial protocol design discussion• 11-13-0057-02-00aq-design-options.ppt

– Detailed scoping discussion– Teleconference : Monday 22nd April 10:00 ET

• Plans for May 2013– Initial technical presentations

from slide 3/3 of 11-13/0370r1 by Stephen McCann, RIM

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Adrian Stephens, Intel CorporationSlide 92

802.15 Liaison ReportDate: 2013-03-22

Name Affiliations Address Phone email Al Petrick Jones-Petrick

and Associates 12201 Treetop Ct. Orlando, Florida

+1-321-235-3269 [email protected]

Authors:

from slide 1/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 93

Abstract

Liaison report on 802.15 as presented to 802.11

Adrian Stephens, Intel Corporationfrom slide 2/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 94Slide 94

802.15.4kLow Energy Critical Infrastructure Monitoring

(LECIM)• Resolved Sponsor Ballot letter ballot comments• Issue recirculation Sponsor Ballot• Seek conditional approval by EC to forward RevCom

Adrian Stephens, Intel Corporationfrom slide 3/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 95Slide 95

802.15.4mTV White Space

• LB #87 passed with 88% of Approval in March 2013– Voting Results (Yes 83, No 11, Abstain 3)

• Resolved 551 Comments (Editorial 302, Technical & General 249)– Resolved all Technical, Editorial and General comments

• FSK, OFDM, NB-OFDM, Ranging, General PHY, and Coexistence Assurance

• 2 re-circulation letter ballots planned between March 2013 and May 2013

• Appointed BRC to resolved comments from re-circulation letter ballots

Adrian Stephens, Intel Corporationfrom slide 4/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 96Slide 96

802.15.4nChinese Medical Band

• Heard updated Proposals Presentations– O-QPSK– FSK– Ranging

• Reviewed and updated the TG4n web page• Will continue call for proposals

Adrian Stephens, Intel Corporationfrom slide 5/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 97Slide 97

802.15.4pPositive Train Control

• Continued to flush out combined contribution to reflect the technical proposals presented

• Completed Coexistence Document (15-13-0212-01)• Completed draft d1P802-15-4p_Draft_Standard.pdf• Issue WG letter ballot after close of March 2013

session

Adrian Stephens, Intel Corporationfrom slide 6/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 98Slide 98

802.15.4qUltra Low Power

• Second meeting as a Task Group• Began work on technical guidance and channel

modeling framework • Worked on applications • Released call for contributions to application, TGD

and channel modeling efforts• Heard FSK and PPM PHY related technical

presentations

Adrian Stephens, Intel Corporationfrom slide 7/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 99Slide 99

802.15.8 Peer Aware Communications

Adrian Stephens, Intel Corporationfrom slide 8/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 100Slide 100

802.15.9 Key Management Protocol

Adrian Stephens, Intel Corporationfrom slide 9/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 101Slide 101

Layer 2/Mesh Under Routing (L2R) SG• Completed Preliminary Draft PAR and 5c

• Preliminary Draft PAR - doc.#15-13-0231-00• Preliminary Draft 5c - doc. #15-13-0232-00

• Finalize PAR and 5c in May 2013

Adrian Stephens, Intel Corporationfrom slide 10/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 102Slide 102

Better Use of Spectrum Resources in WPANs (SRU) IG

• Heard and discussed two presentations– IG SRU will focus on Radio resource measurement and management

(RRMM) for drafting PAR and 5C in May 2013.

Adrian Stephens, Intel Corporationfrom slide 11/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 103Slide 103

THz IG• Heard 5 technical presentations

– MAC layer, Optical interconnects, Study Group formation, Propagation Aspects of Terahertz Outdoor Fixed Wireless Links.

• Update of the Technical Expectations Document (11/0745r7)• Discussed spinning-off a Study Group on “Beam switchable

wireless point-to-point 40/100 Gbps links”• Next meeting in July 2013

Adrian Stephens, Intel Corporationfrom slide 12/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 104Slide 104

WNG SC

• Review two (2) technical presentations– Launching a SG on THz by Thomas Kürner (15-

13-0139-01)– Review and Amendment of IEEE802.15.6 BAN

to Focus on Dependable Wireless BAN of Things by Prof Ryuji Kohno (15-12-0192-01)

Adrian Stephens, Intel Corporationfrom slide 13/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 105Slide 105

Maintenance SC

• Reviewed document (doc 15-13-0194-01) “802.15.4 use by external SDOs”

• The IEEE 802.15 Work Group (WG) is in the process of considering a number of significant changes to the 802.15.4 standard, Low-Rate Wireless Personal Area Networks (LR-WPANs), and is soliciting input from all Standard Development Organizations (SDOs), businesses, and individuals that would be impacted by these changes.  The changes are described in his presentation and summarized here:

1. Using a Frame Type ID value as an extension to indicate following bits are new Frame types

2. Restructuring Information Element IDs to allow IDs to be assigned to external SDOs

3. Changing the order of the Information Element length and type fields.

Adrian Stephens, Intel Corporationfrom slide 14/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report

March 2013

Slide 106Slide 106

References

• This document• All Documents

– https://mentor.ieee.org/802.15/documents• Current draft is in the members-only area

– http://www.ieee802.org/15 Members_Only_Area

– 802.11 members log in using 802.11 username and password

Adrian Stephens, Intel Corporationfrom slide 15/15 of 11-13/0387r0 by Al Petrick, (Jones-Petrick and Associates)

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 107

RR-TAG (802.18) to 802.11 Liaison Report

Date: 2013-03-22

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 108

Abstract

This presentation is the liaison report from the RR-TAG for the March 2013 IEEE 802.11 Plenary in Orlando.

from slide 2/5 of 11-13/0376r0 by Rich Kennedy, BlackBerry

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 109

FCC Documents Reviewed and Approved by the RR-TAG

• There were no documents approved for submission to the FCC at this meeting.

• The RR-TAG expects to finalize and approve comments to the FCC 5 GHz U-NII Band Rules Revision NRPM at a teleconference meeting to be held on on Friday April 19th, at 1:00 PM ET.– Link to NPRM: 18-13/016r0

from slide 3/5 of 11-13/0376r0 by John Notor, Notor Research

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 110

ITU-R Documents from 802.16 and 802.11 REG SC

Reviewed and Approved by the RR-TAG

• The RR-TAG approved the following documents from 802.16 for EC review and submission to ITU-R WP 5D:– 18-13/034r1, Proposed LS to ITU-R WP 5D: Update toward Rec. ITU-R

M.1457-12 (Meeting X Notification) Link: 18-13/034r1

– 18-13/035r1, Proposed Cont. to ITU-R WP 5D- Update of WirelessMAN-Advanced RIT of Rec. ITU-R M.2012 (Meeting Y+2) Link: 18-13/035r2

• The RR-TAG approved the following document from the 802.11 Regulatory Standing Committee for EC review and submission as an IEEE 802 document to ITU-R WP 5A:– 18-13/038r3, IEEE 802 Input to WP5A on 5 GHz Link: 18-13/038r3

from slide 4/5 of 11-13/0376r0 by John Notor, Notor Research

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 111

Other Documents Reviewed and Approved by the RR-TAG

• The RR-TAG approved the following document from 802.16 for EC review and submission to IETF, copy to the FCC:– 18-13/036r0, Proposed Statement to IETF LMAP on IEEE P802.16.3 Activity

Link: 18-13/036r0

• The RR-TAG approved the following document from 802.16 for EC review and submission to the Broadband Forum, copy to the FCC:– 18-13/037r1 Proposed statement to BBF: Response to liaison of 8 March on

Performance Measurements Architecture Link: 18-13/037r1

from slide 5/5 of 11-13/0376r0 by John Notor, Notor Research

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 112

Liaison Report for OmniRAN EC SGDate: 2013-03-22

Authors:

from slide 1/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 113

Abstract

This presentation contains the March 2013 IEEE 802.11 liaison report for OmniRAN EC SG.

from slide 2/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 114

Key Activities• Currently focused on defining the problem statement

and scope, leading to the creation of a PAR and 5C.• Review of feedback from presentations to IETF, IEEE

802.1, and EC.• Review OmniRAN use case proposals• Discussion with IEEE 802.21 on the scope of OmniRAN

relative to the scope of IEEE 802.21• Liaison to 3GPP to obtain clarification on some

technical aspects of SAMOG (3GPP TS 23.402)• Request for PAR extension.

from slide 3/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 115

Objectives for May• Teleconferences: April 11th, May 2nd at 9am – details on

OmniRAN SG website• Incorporate proposed use cases into an OmniRAN use

case document• Develop PAR submission documents – Target PAR

submission on Jun 15

from slide 4/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013

doc.: IEEE 802.11-13/0214r1

Report Adrian Stephe

ns, Intel

Corporation

Slide 116

References

• OmniRAN website– http://www.ieee802.org/OmniRANsg/

• Document repository for OmniRAN:– https://mentor.ieee.org/omniran/documents

• Link to March 2013 OmniRAN Agenda:– https://mentor.ieee.org/omniran/dcn/13/omniran-13-0014-03-

ecsg-march-2013-orlando-agenda.pptx

from slide 5/5 of 11-13/0357r0 by Michael Montemurro, Research in Motion

March 2013