Doc.: IEEE 802.11-09/1162r0 Submission Nov 2009 Adrian Stephens, Intel CorporationSlide 1 802.11 Nov...
-
Upload
roger-hardy -
Category
Documents
-
view
221 -
download
3
Transcript of Doc.: IEEE 802.11-09/1162r0 Submission Nov 2009 Adrian Stephens, Intel CorporationSlide 1 802.11 Nov...
Nov 2009
Adrian Stephens, Intel Corporation
Slide 1
doc.: IEEE 802.11-09/1162r0
Submission
802.11 Nov 2009 Closing Plenary Reports
Date: 2009-11-20
Name Company Address Phone email Adrian Stephens Intel
Corporation +44 792 008
4900 (mobile)
Authors:
Nov 2009
Adrian Stephens, Intel Corporation
Slide 2
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the Nov 2009 closing plenary meeting.
Nov 2009
Adrian Stephens, Intel Corporation
Slide 3
doc.: IEEE 802.11-09/1162r0
Submission
Agenda for 2009-11-17
• Roll Call / Contacts / Reflector
• Go round table and get brief status report
• Review action items from previous meeting
• Numbering Alignment process
• Amendment Ordering / ANA Status / Draft Snapshots
• Lessons learned from TGw/TGn RevCom
• Lessons learned from initial editing of TGn
• Style Guide for 802.11 09/1034r0
• Conference Calls
from slide 1 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 4
doc.: IEEE 802.11-09/1162r0
Submission
Most current doc shaded green.
TG
Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
802.11
k r y w n z p v u s mb aa
z 2007 2008 2008 2008 10.0 11.0 6.0 Word Yes 2007 Menzo Wentink
17-July
p 2007 2008 2008 2008 10.0 11.0 5.0 9.0 Frame 7.2 Yes 2009 Wayne Fisher 2-Nov
v 2007 2008 2008 2008 2009 2009 6.0 9.0 7.03 Frame 7.2 No 2007 Emily Qi 18-Nov
u 2007 2008 2008 2008 2009 2009 6.0 9.0 7.0 8.0 Frame 7.2 Yes 2007 Necati Canpolat
18-Nov
s 2007 2008 2008 2008 9.0 10.0 4.0 6.01 5.01 6.01 3.04 Frame 8.0 No 2007 Kazuyuki Sakoda , pro-
tem
18-Nov
mb
2007 Inc
2008 Inc
2008 Inc
2008 Inc
- - - - - - - 1.03 - Frame 7.2 No 2009 Adrian Stephens
12-May
aa 2007 2008 2008 2008 9.0 10.0 4.0 6.0 6.0 7.0 3.0 0.02 No Hang Lui 18-Nov
Changes from last report shown in red.
Nov 2009 Draft Development SnapshotNov 2009
Slide 4from slide 2 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 5
doc.: IEEE 802.11-09/1162r0
Submission
802.11 Style Guide
• See 11-09-1034-00-0000-wg11-style-guide.doc
from slide 3 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 6
doc.: IEEE 802.11-09/1162r0
Submission
Closing ReportDate: 2009-11-20
Name Company Address Phone email
Clint Chaplin Samsung Electronics 75 W. Plumeria Drive San Jose, Ca 95134
+1 408 544 5815 [email protected]
Authors:
from slide 1 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 7
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
Closing report for WNG SC for November 2009, Atlanta, Georgia, USA
from slide 2 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung)
November 2009
Adrian Stephens, Intel Corporation
Slide 8
doc.: IEEE 802.11-09/1162r0
Submission
• Three presentations at this meeting– Continuous network discovery using Opportunistic Scanning (11-09-
1207-01) – Marc Emmelmann• Straw Poll: Should IEEE 802.11 WNG receive further presentations analyzing if
existing mechanisms can be used to support seamless handoff for (highly) mobile users?
• Result: Yes - 21; No - 0; Abstain - 4.
– Time-based ranging technology for IEEE802.11 (11-09-1212-00) – Dong Kyoo Kim
– IEEE802.11 for High Speed Mobility (11-09-1000-02) – Hiroki Nakano• Does WNG think that we need further presentations exploring the need for support
for mobile communication.• Result: Yes - 25; No - 0; Need More Discussion - 3; Don’t Care - 1.
• Minutes– 11-09-1208r0
• Plans for January 2010– 2 hour session
from slide 3 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 9
doc.: IEEE 802.11-09/1162r0
Submission
November 2009 TGmb Closing ReportDate: 2009-11-19
Name Affiliations Address Phone email Matthew Gast Trapeze Networks 5753 W. Las Positas Blvd,
Pleasanton, CA 94588 USA +1 (925) 474-2273 [email protected]
Authors:
from slide 1 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 10
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
Closing report for TGmb for November 2009 plenary meeting in Atlanta, Georgia, USA.
from slide 2 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 11
doc.: IEEE 802.11-09/1162r0
Submission
TGmb Status
Photo credit: Matthew Gast; used with permission (duh)
Time to (re)circulate…
from slide 3 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 12
doc.: IEEE 802.11-09/1162r0
Submission
Accomplishments
• No interpretation requests received
• Comment processing from LB149 is complete– Asking for recirculation ballot
– 15 days is standard recirculation time, we have requested approximately four weeks due to holiday season and incorporation of 802.11w-2009
• Roll-up of 802.11n-2009 will commence in parallel to letter ballot– Recirculation anticipated in March 2010 that includes 802.11n-
2009
from slide 4 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 13
doc.: IEEE 802.11-09/1162r0
Submission
Onward to January
• No change to end date in plan of record– Staying in working group ballot longer
• Requesting weekly teleconferences every Friday for 90 minutes at 11 am ET beginning January 29
• Goal: Recirculation letter ballot after March meeting
from slide 5 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 14
doc.: IEEE 802.11-09/1162r0
Submission
Revised TGmb Plan of Record(changes from start of week underlined)
May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot
– (includes All published Amendments as of May 2009) Nov 2009 – Recirc start• May 2010 – Form Sponsor Pool (45 days)• July 2010 – Sponsor Ballot Start
– (Include all published amendments as of July 2010)• November 2010 – Sponsor Recirc• March 2011 – WG/EC Final Approval• June 2011 – RevCom/SASB Approval
from slide 6 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 15
doc.: IEEE 802.11-09/1162r0
Submission
References
• Agenda: 11-09/1134r10
• Minutes: 11-09/1190r0
from slide 7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
Adrian Stephens, Intel Corporation
Slide 16
doc.: IEEE 802.11-09/1162r0
Submission
TGp Closing ReportDate: 2009-09-24
Name Affiliations Address Phone email Lee Armstrong Employer:
Armstrong Consulting, Inc.
Affiliation: USDoT
132 Fomer Road Southampton, MA 01073 USA
+1 617 620 1701
Author:
from slide 1 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 17
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
TGp closing report for November meetings
from slide 2 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 18
doc.: IEEE 802.11-09/1162r0
Submission
November Meetings Summary
• LB158 completed since September meeting, passed, no new comments
• Sponsor Ballot #0 started, will close on 22 November
• Current comment resolution document, 11-09-1200-02-000p, represents the 49 comments received as of Wednesday afternoon
• 4 time slots during the week
• Majority of meeting time in discussions of key comments, not in voting on resolutions
from slide 3 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 19
doc.: IEEE 802.11-09/1162r0
Submission
Status
• D9.0 is the current draft
• Waiting on ballot closing this weekend
• TGp designated as P802.11p Comment Resolution Committee (CRC)
• Weekly teleconferences planned for every Thursday @ 1500 Piscataway time will be CRC meetings
• Plan is to complete comment resolution prior to January meetings
from slide 4 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 20
doc.: IEEE 802.11-09/1162r0
Submission
TGs Atlanta Closing ReportDate: 2009-11-20
Author:
Name Address Affiliation Phone Email
Dee Denteneer HTC 37; 5656 AE Eindhoven; The Netherlands
Philips +31 40 2749743
from slide 1 of 11-09/1243r1 by Dee Denteneer
Nov 2009
Adrian Stephens, Intel Corporation
Slide 21
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
TGs closing report for the November 2009 meeting.
Resolved outstanding comments and ready to go to recirculation.
from slide 2 of 11-09/1243r1 by Dee Denteneer
Nov 2009
Adrian Stephens, Intel Corporation
Slide 22
doc.: IEEE 802.11-09/1162r0
Submission
Status• TGs passed LB 147 with 79% approval rate (May 2009)
• Before the meeting:
• Comment resolution spreadsheet 11-09/471r18 with 118 comments open
• Most recent TGs Draft is D3.04
• After meeting
• Most recent TGs comment resolution spread sheet is 11-09/471r23, with resolutions to all comments
• An annotated agenda for TGs at this meeting in 11-09/1099r9
• The TGs draft minutes will be uploaded as 11-09/1223r0
from slide 3 of 11-09/1243r1 by Dee Denteneer
Nov 2009
Adrian Stephens, Intel Corporation
Slide 23
doc.: IEEE 802.11-09/1162r0
Submission
Next Steps• Produce Draft 4.0 and go to recirculation
• TGs is holding teleconferences on Wednesdays through the January Plenary at 4pm (ET)for up to 1½ hours on the Following Dates
• December 2, January 6, January 13
• Goal for the November 2009 TGs meeting in Los Angeles, USA:
– Start resolving comments received in recirculation
from slide 4 of 11-09/1243r1 by Dee Denteneer
Nov 2009
Adrian Stephens, Intel Corporation
Slide 24
doc.: IEEE 802.11-09/1162r0
Submission
• Motion:– Having approved comment resolutions for all of the comments
received from LB#147 on P802.11s Draft 3.0 as contained in document 11-09/471r23,
– Instruct the editor to prepare Draft 4.0 incorporating these resolutions and,
– Approve a Working Group Recirculation Ballot of at least 15 days asking the question “Should P802.11s Draft 4.0 be forwarded to Sponsor Ballot?”
• Moved by Theodorus Denteneer on behalf of TGs
• TGs vote: – Moved: Guido Hiertz Seconded: Dan Harkins Result: y: 9-n: 0-a: 0
from slide 5 of 11-09/1243r1 by Dee Denteneer
Nov 2009
Adrian Stephens, Intel Corporation
Slide 25
doc.: IEEE 802.11-09/1162r0
Submission
Moved to schedule TGs teleconferences on December 2 , January 6, and January 13 at 4pm for a maximum of 90 minutes to resolve comments and discuss agendas.
Approved by unanimous consent
from slide 6 of 11-09/1243r1 by Dee Denteneer
Nov 2009
Adrian Stephens, Intel Corporation
Slide 26
doc.: IEEE 802.11-09/1162r0
Submission
Closing ReportDate: 2009-11-20
Name Company Address Phone email
Stephen McCann Research in Motion (RIM) UK Ltd
200 Bath Road, Slough, Berkshire, SL1 3XE, UK
+44 1753 667099 [email protected]
Authors:
from slide 1 of 11-09/1279r2 by Stephen McCann, RIM
Nov 2009
Adrian Stephens, Intel Corporation
Slide 27
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
Closing report for TGu Interworking with External Networks for November 2009,
Atlanta, Georgia, USA
from slide 2 of 11-09/1279r2 by Stephen McCann, RIM
November 2009
Adrian Stephens, Intel Corporation
Slide 28
doc.: IEEE 802.11-09/1162r0
Submission
• Initial Sponsor Ballot (#0) progress– Initial meeting of TGu CRC
– Resolved 83 technical comments this week, with 73 remaining
– 6 submissions presented and approved to resolve comments• 11-09-1120r5
– Next sponsor re-circulation ballot in early January 2010
• Teleconferences– Wednesdays at 11 ET (from 2nd December 2009)
• Plans for January 2010– Review CRC sponsor ballot activities
– Continue to resolve sponsor ballot comments
from slide 3 of 11-09/1279r2 by Stephen McCann, RIM
November 2009
Adrian Stephens, Intel Corporation
Slide 29
doc.: IEEE 802.11-09/1162r0
Submission
• Expert Review– List of 10 experts compiled (11-09-1271r0)
– Send out invitation emails to participate
– For positive responses, then send copies of IEEE 802.11u D8.0 for review and comments to further the draft (with time duration)
– TGu chair will then place response comments into future re-circulation sponsor ballot.
from slide 4 of 11-09/1279r2 by Stephen McCann, RIM
Nov 2009
Adrian Stephens, Intel Corporation
Slide 30
doc.: IEEE 802.11-09/1162r0
Submission
November 2009 Closing ReportDate: 2009-11-19
Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave
Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 31
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
This document contains the TGv closing report for November 2009.
from slide 2 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 32
doc.: IEEE 802.11-09/1162r0
Submission
Goals and Accomplishments
• Comment resolution from Initial Sponsor Ballot– 327 comments, 208 resolutions completed, 119 remain
• Teleconferences– Dec 1, 8, 15, Jan 12, noon-2pm Eastern
from slide 3 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 33
doc.: IEEE 802.11-09/1162r0
Submission
Output Documents
• 11-09-1290-00-000v-TGv-November-2009-closing-report.ppt
• 11-09-1130-03-000v-November-2009-agenda.ppt
• 11-09-1166-00-000v-November-2009-meeting notes
from slide 4 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 34
doc.: IEEE 802.11-09/1162r0
Submission
TGv Timeline – Updated Sept, 2009 • Initial Working Group Letter Ballot: July 07 – completed
– Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0
• Re-circulation Working Group Letter Ballot: November 08 (D4.0)– Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged)
• Form Sponsor Ballot Pool: August 09 (was June 09)• Initial Sponsor Ballot: Oct 09
– Oct 09 – D7.0 (was Sept 09)
• Approved Sponsor Ballot: Nov 09– Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0– May 12th ( or so) for Revcom June Approval
• Final WG/EC Approval: July 2010 • RevCom/Standards Board Approval: June 4th/June 5th(or so)• Note: TGv PAR is authorized through Dec 2010
from slide 5 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 35
doc.: IEEE 802.11-09/1162r0
Submission
Goals for Nov 09 - Jan 2010
• Complete initial Sponsor Ballot comment resolution
• Recirculation Sponsor Ballot
from slide 6 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 36
doc.: IEEE 802.11-09/1162r0
Submission
References
from slide 7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 37
doc.: IEEE 802.11-09/1162r0
Submission
TGz Atlanta Closing ReportDate: 20 November 2009
Name Company Address Phone email Menzo Wentink Qualcomm Straatweg 66,
Breukelen, the Netherlands
+31-65-183-6231
Authors:
from slide 1 of 11-09/1292r0 by Menzo Wentink (Qualcomm)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 38
doc.: IEEE 802.11-09/1162r0
Submission
TGz Accomplishments in November
• TGz made significant progress in reaching consensus on comments received on the initial sponsor ballot– The comments are in 11-09/1185r0
– Text submissions are in 11-09/1218r4 (TDLS discovery), 11-09/1281r0 (TDLS path switch) and 11-09/1230r3 (Off-channel selection)
• We expect to start a first recirculation sponsor ballot after the Los Angeles meeting in January
from slide 2 of 11-09/1292r0 by Menzo Wentink (Qualcomm)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 39
doc.: IEEE 802.11-09/1162r0
Submission
802.11aa – Robust Audio Video Transport Streaming Atlanta Closing Report
Date: 2009-11-18
Authors:Name Affiliation Address Phone email Ganesh Venkatesan
Intel Corporation
JF3-336 2111NE 25th Ave
+1 503 334 6720
Alex Ashley NDS Ltd One London Road, Staines, Middlesex, TW18 4EX, England
+44 1784 848770
from slide 1 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 40
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
TGaa Closing Report for the IEEE 802.11 Atlanta, Georgia Session (November 2009)
Slide 40from slide 2 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 41
doc.: IEEE 802.11-09/1162r0
Submission
• Continue listening to technical proposals and adopting corresponding text into the TGaa draft
• Joint meeting with 802.11ac on approaches to OBSS• Joint meeting with 802.1AVB• Resolve comments from Internal review of Draft D0.01/D0.02
Goals for the session
from slide 3 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 42
doc.: IEEE 802.11-09/1162r0
Submission
Technical Presentations
Slide 42
Document number
Title Author(s)
1150/r1Feedback-jamming Multicast ARQ results with capture effect
Jochen Miroll
1139/r3 OBSS Management Text Graham Smith
1138/r2 Outline of Proposed OBSS Solution Graham Smith
1137/r1 EDCA Bandwidth Factor Graham Smith
1136/r1 AP Shut Out Neighborhood Effect Graham Smith
0926/r5 Interworking with 802.1Qat Ganesh Venkatesan
1215/r0Non-contentious (internal review) comments assigned to BrianH
Brian Hart
1251/r0 Intra-AC Prioritization Use Cases Alex Ashley
1157/r1Explain OBSS issue as well as possible simulation scenarios for OBSS in TGac
Takatori Yasushi
from slide 4 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 43
doc.: IEEE 802.11-09/1162r0
Submission
1. Listened to 9 technical presentations2. Adopted resolutions to some internal review
comments into TGaa draft (1215r0)3. Listened to the complete OBSS solution and
adopted the corresponding (updated) text (1139r3)
4. Brainstormed on intra-AC prioritization Use Cases
5. Met jointly with 802.1AVB6. Approved 09/926r5 as the guiding document
describing the work that needs to be done in 802.11aa and 802.1Qat
Accomplishments
from slide 5 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 44
doc.: IEEE 802.11-09/1162r0
Submission
Joint meeting with 802.1AVB
Slide 44
1. Presented a solution to support 802.1Qat in 802.11 (09/926r5)
2. Presented a draft version of changes to 802.11 in order to support 802.1Qat in 802.11.
3. Status Update on 802.11aa
4. Status Update on 802.1AVB1. 802.1AS may have up to 2 recirculations before starting sponsor ballot
2. 802.1Qat has planned a recirculation before starting sponsor ballot
3. 802.1Qav is ratified
5. Goals for the March 2010 joint meeting1. Complete changes to 802.11 in order to support 802.1Qat and have the changes
included in a 11aa draft
from slide 6 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 45
doc.: IEEE 802.11-09/1162r0
Submission
Goals for the January Interim
Enter January 2010 session with TGaa Draft 0.03
Adopt text corresponding to all remaining PAR topics into TGaa Draft in the January meeting
Work towards completing Draft 1.0 by March 2010
from slide 7 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 46
doc.: IEEE 802.11-09/1162r0
Submission
Teleconferences
Mondays 11:00-12:30 Hrs ET on the following days:
Nov 30, 2009Dec 14, 2009Jan 11, 2010
from slide 8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 47
doc.: IEEE 802.11-09/1162r0
Submission
TGac November 2009 Closing ReportDate: 2009-11-19
Name Affiliations Address Phone email Osama Aboul-Magd Samsung Electronics 613-599-5078 [email protected]
Authors:
from slide 1 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 48
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
This document is the closing report for the TGac for the November 2009 session.
from slide 2 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 49
doc.: IEEE 802.11-09/1162r0
Submission
Work Completed• Selection of ad hoc group chairs is completed
– PHY (Vinko Erceg, Minho Cheong, Raja Banerjea) – MAC (Matthew Fischer, Allan Zhu, Jae Seung Lee)– MU-MIMO (Brian Hart, Robert Stacey, Sameer Vermani)– Coexistence (Youhan Kim, Eldad Perahia, Yasushi Takatori)
• Ad Hoc groups conducted their first meetings with focus on procedure discussion. Ad Hoc group reports are included in:
– PHY 09/1261r0– MAC 09/1260r1– MU-MIMO 09/1262r0– Coexistence 09/1265r2
• The TG accepted a new revision of the Functional Requirements and Evaluation Methodology document (09/0451r8).
• The TG agreed on an initial guideline for Ad Hoc scope (09/1175r1).
• Technical Presentations.
from slide 3 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 50
doc.: IEEE 802.11-09/1162r0
Submission
January 2010 Goals• Plan to continue with Ad Hoc group meetings with focus to
further define the scope and work items for each ad hoc.• Submissions
from slide 4 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 51
doc.: IEEE 802.11-09/1162r0
Submission
Conference Call Times
• December 3, 2009– PHY Ad Hoc 21:00 -22:00 ET
• December 17, 2009– MAC Ad Hoc 20:00 – 21:00 ET
– MIMO-MU Ad Hoc 11:00 –12:00 ET
• January 7, 2010– Coexistence Ad Hoc 20:00 – 22:00 ET
• January 14, 2010– PHY Ad Hoc 11:00 -12:00 ET
from slide 5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
Adrian Stephens, Intel Corporation
Slide 52
doc.: IEEE 802.11-09/1162r0
Submission
TGad November 2009 Closing ReportDate: 2009-11-19
Name Company Address Phone email Eldad Perahia Intel
Corporation
2111 NE 25th Ave Hillsboro, OR 97124
503-712-8081 [email protected]
Authors:
from slide 1 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 53
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
This document is the closing report for the TGad for the November 2009 session.
from slide 2 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 54
doc.: IEEE 802.11-09/1162r0
Submission
Work Completed (1/2)
• Evaluation Methodology– 09/1160, Proposed Evaluation Methodology Additions, John Barr– 09/1216, Internet traffic modeling, Sai Nandagopalan– 09/1213, 60GHz Impairments Modeling, Vinko Erceg– 09/1222r1, Hard disk drive traffic model, Eldad Perahia– 09/1229, Application of 60 GHz Channel Models for Comparison
of TGad Proposals, Alexander Maltsev– 09/296r12, Update to Evaluation Methodology document, Eldad
Perahia– 09/1210, Coexistence Techniques, Tuncer Baykas
• Motion to adopt 09/0296r12 as the first draft of the TGad evaluation methodology failed 24/20/7
from slide 3 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 55
doc.: IEEE 802.11-09/1162r0
Submission
Work Completed (2/2)• Channel Modeling, Tues PM2, Wed PM2, Th AM2
– 09/1252, Inter Cluster Parameters of Living Room Channel Model for 60 GHz WLAN Systems, Alexander Maltsev
– 09/1152, 60-GHz Living-Room Channel Measurements, Tian-Wei Huang– 09/1169, Human Body Blockage - Guidelines for TGad MAC
development, Thomas Kürner– 09/1170, Modeling the human induced 60 GHz channel dynamics,
Thomas Kürner– 09/1165, 60 GHz Cubicle Wall Reflectivity, Chris Hansen– 09/1232, Intra-cluster response model and parameter for channel
modeling at 60GHz (Part2), Hirokazu Sawada• Other technical submissions
– 09/1153, 60GHz Beamforming, Carlos Cordeiro– 09/1168, SCR Design and Performance Assessment, John Stine
• Call for Proposals– Motion to adopt 09/1206r0 as the TGad call for proposals passed 50/0/19– Chair to announce in WG and email reflector
from slide 4 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 56
doc.: IEEE 802.11-09/1162r0
Submission
Call for Proposals
• https://mentor.ieee.org/802.11/dcn/09/11-09-1206-00-00ad-draft-call-for-proposals.doc
• Two types of proposals– New Techniques– Complete Proposals
• Definition in https://mentor.ieee.org/802.11/dcn/09/11-09-0935-03-00ad-selection-procedure.doc
• Notification of intent to present: December 18, 2009 – Must email both TG chair and WG chair– Date applies to proposers of both New Techniques and Complete Proposals
• For New Techniques presented in March 2010– Date that material must be on mentor: February 28, 2010
• For New Techniques presented in May 2010– Date that material must be on mentor: May 2, 2010
• For Complete Proposals presented in May 2010– Date that material must be on mentor: May 2, 2010
from slide 5 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 57
doc.: IEEE 802.11-09/1162r0
Submission
Goals for January 2010
• Continue working on task group documents• Technical contributions
from slide 6 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 58
doc.: IEEE 802.11-09/1162r0
Submission
Conference call times
• Dec 10– 10:00-12:00 ET
– Evaluation Methodology
• Jan 7– 10:00-12:00 ET
– Channel Model
from slide 7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
Adrian Stephens, Intel Corporation
Slide 59
doc.: IEEE 802.11-09/1162r0
Submission
IEEE 802.11TV White Spaces Study Group
Closing ReportDate: 2009-11-20
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 60
doc.: IEEE 802.11-09/1162r0
Submission
AbstractThis presentation is the closing report for the Atlanta
meeting of the IEEE 802.11 TVWS SG.
from slide 2 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 61
doc.: IEEE 802.11-09/1162r0
Submission
Agenda
• Introduction
• Administrative items including
• Review and respond to the received comments on the 802.11 TVWS PAR and 5C– 11-09-0934-05-tvws-par-nescom-form-plus-5c
• Plan for the IEEE 802 Wireless Interim in Los Angeles [January 18th through 22nd]
• Request teleconferences
from slide 3 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 62
doc.: IEEE 802.11-09/1162r0
Submission
Accomplishments
• Reviewed all of the received comments on the 802.11 TVWS PAR and 5C – Responses in 11-09-1240-04-tvws-replies-to-comments-on-802-
11-tvws-par-5c
• Edited the PAR and 5C document and uploaded it– 11-09-0934-08-tvws-par-nescom-form-plus-5c
• Selected one teleconference slot to request– 20:00 ET on January 12th
• Discussed the plan for now until the January interim
from slide 4 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 63
doc.: IEEE 802.11-09/1162r0
Submission
Documents
• 11-09-1240-04-tvws-replies-to-comments-on-802-11-tvws-par-5c
• 11-09-0934-08-tvws-par-nescom-form-plus-5c
from slide 5 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 64
doc.: IEEE 802.11-09/1162r0
Submission
Thanks to all who participated!
See you in LA
from slide 6 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 65
doc.: IEEE 802.11-09/1162r0
Submission
QoSMAN SG Closing Report – Nov 2009Date: 2009-11-19
Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.
Mississauga, ON. Canada. L4W 0B4
+1-905-629-4746 [email protected]
Authors:
from slide 1 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 66
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
This document is the closing report for the QoSMAN SG for the November 2009 session.
from slide 2 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 67
doc.: IEEE 802.11-09/1162r0
Submission
Work Completed• Thanks to Stephen McCann as acting Secretary for the group.
– Minutes: https://mentor.ieee.org/802.11/dcn/09/11-09-1209-00-00qm-minutes-november-2009.doc
• Discussion on the process moving forward as a Task Group• Processed PAR and 5C comments:
– https://mentor.ieee.org/802.11/dcn/09/11-09-1241-03-00qm-qosman-par-comment-resolutions.xls
• Completed and accepted the PAR and 5C document– https://mentor.ieee.org/802.11/dcn/09/11-09-0942-08-00qm-qosman-par-nescom-fo
rm-plus-5cs.doc
• A Teleconference has been planned for January 14 at 11:00h ET.
• Motions to approve PAR comment resolutions and PAR and 5C document.
from slide 3 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 68
doc.: IEEE 802.11-09/1162r0
Submission
Motion to approve QOSMAN PAR comment resolutions
Move to accept the QOSMAN PAR comment resolutions in document https://mentor.ieee.org/802.11/dcn/09/11-09-1241-02-00qm-qosman-par-comment-resolutions.xls.
• Moved: Stephen McCann
• Seconded: Paul Lambert
• Vote: Yes – 6, No – 0, Abstain – 1.
• Motion Passes.
from slide 4 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 69
doc.: IEEE 802.11-09/1162r0
Submission
SG Motion
Believing that the QoSMAN PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines,
Request that the QoSMAN PAR and the Five Criteria contained in document 11-09-0942-07-00qm-qosman-par-nescom-form-plus-5cs.doc be forwarded to the 802.11 WG for approval of the full Working Group.
• Moved: Paul Lambert
• Seconded: Stephen McCann
• Vote: Yes – 6, No – 0, Abstain – 0.
from slide 5 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 70
doc.: IEEE 802.11-09/1162r0
Submission
802.11 WG Motion
Believing that the QoSMAN PAR and Five Criteria contained in the documents referenced below meet IEEE-SA guidelines,
Request that the QoSMAN PAR and the Five Criteria contained in 11-09-0942-07-00qm-qosman-par-nescom-form-plus-5cs.doc be posted to the IEEE 802 Executive Committee (EC) agenda for WG 802 preview and EC approval to submit to NesCom.
• Moved by Michael Montemurro on behalf of the IEEE 802.11 QOSMAN SG
QOSMAN SG vote:
Moved: Paul Lambert, Seconded: Stephen McCann, Result: 6-0-0
from slide 6 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 71
doc.: IEEE 802.11-09/1162r0
Submission
Task Group Process Strawman
• Prepare a Requirements Document– Consider use cases to justify requirements
– Use previous submissions as a basis
– Prioritize the requirements (mandatory/optional)
• Solicit individual proposals
• First Draft
from slide 7 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 72
doc.: IEEE 802.11-09/1162r0
Submission
January 2009 Goals• Begin work as a Task Group• Elect Task Group Officers: Chair, Editor, and Secretary• Establish a timeline.• Create a requirements and use cases document for management
frame prioritization.
from slide 8 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 73
doc.: IEEE 802.11-09/1162r0
Submission
Closing ReportDate: 2009-11-20
Name Company Address Phone email
Andrew Myles Cisco [email protected]
Authors:
from slide 1 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 74
doc.: IEEE 802.11-09/1162r0
Submission
Abstract
Closing report for JTC1 ad hoc for November 2009, Atlanta, Georgia, USA
from slide 2 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 75
doc.: IEEE 802.11-09/1162r0
Submission
JTC1 ad hoc discussed the WAPI NP proposal & wrote two liaisons to SC6
• Progress in Atlanta– Discussed China NB’s proposal for a WAPI NP in ISO/IEC– Wrote letter (11-09-1254r1) to SC6 responding to claims that 802.11 isn
insecure in the WAPI NP proposal– Wrote letter to SC6:
• Reporting recent and planned future activities in the IEEE 802.11 Working Group
• Flagging an intention to submit certain documents to ISO/IEC using the PDSO process
• Offering JTC1 and SC6 National Bodies the opportunity to submit comments into the Sponsor Ballot process
• Plans for Jan 2010– Consider any JTC1 liaison issues– Start technical evaluation of WAPI
from slide 3 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 76
doc.: IEEE 802.11-09/1162r0
Submission
JTC1 ad hoc approved a liaison to SC6 relating to ISO/IEC JTC 1/SC6 N 14123
• Motion– The IEEE 802.11 JTC1 ad hoc recommends to the IEEE 802.11 WG and
IEEE 802 ExCom that the letter contained in 11-09-1254r1 be liaised to ISO/IEC JTC1/SC6. This letter provides a response to some of the material liaised to the IEEE staff in ISO/IEC JTC 1/SC6 N 14123. The letter should be sent to the SC6 Secretariat. It should also be CC’ed to the individuals and organisations addressed by the e-mail that notified IEEE staff about ISO/IEC JTC 1/SC6 N 14123. IEEE staff should be authorised to make any necessary editorial changes
• Moved: David Hunter
• Seconded: Jerry Thrasher
• Result 11/0/0
from slide 4 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 77
doc.: IEEE 802.11-09/1162r0
Submission
802.11 WG will consider a liaison to SC6 relating to ISO/IEC JTC 1/SC6 N 14123
• Motion– The IEEE 802.11 JTC1 ad hoc and IEEE 802.11 WG recommends to the
IEEE 802 ExCom that the letter contained in 11-09-1254r1 be liaised to ISO/IEC JTC1/SC6. This letter provides a response to some of the material liaised to the IEEE staff in ISO/IEC JTC 1/SC6 N 14123. The letter should be sent to the SC6 Secretariat. It should also be CC’ed to the individuals and organisations addressed by the e-mail that notified IEEE staff about ISO/IEC JTC 1/SC6 N 14123. IEEE staff should be authorised to make any necessary editorial changes
• Moved:
• Seconded:
• Result:
from slide 5 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 78
doc.: IEEE 802.11-09/1162r0
Submission
JTC1 ad hoc approved a liaison to SC6 relating to plans to use the PSDO
• Motion– The IEEE 802.11 JTC1 ad hoc recommends to the IEEE 802.11 WG and
IEEE 802 ExCom that the letter contained in 11-09-1273r1 be liaised to ISO/IEC JTC1/SC6. This letter documents recent and planned future activities in the IEEE 802.11 Working Group, flags an intention to submit certain documents to ISO/IEC using the PDSO process, and offers JTC1 and SC6 National Bodies the opportunity to submit comments into the Sponsor Ballot process. The letter should be sent to the SC6 Secretariat. The IEEE 802.11 Working Group Chair should be authorised to make any necessary editorial changes.
• Moved: Dan Harkins
• Seconded: Jim Raab
• Result 12/0/0
from slide 6 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 79
doc.: IEEE 802.11-09/1162r0
Submission
802.11 WG will consider a liaison to SC6 relating to plans to use the PSDO
• Motion– The IEEE 802.11 JTC1 ad hoc and IEEE 802.11 WG recommends to
IEEE 802 ExCom that the letter contained in 11-09-1273r1 be liaised to ISO/IEC JTC1/SC6. This letter documents recent and planned future activities in the IEEE 802.11 Working Group, flags an intention to submit certain documents to ISO/IEC using the PDSO process, and offers JTC1 and SC6 National Bodies the opportunity to submit comments into the Sponsor Ballot process. The letter should be sent to the SC6 Secretariat. The IEEE 802.11 Working Group Chair should be authorised to make any necessary editorial changes.
• Moved:
• Seconded:
• Result:
from slide 7 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
Adrian Stephens, Intel Corporation
Slide 80
doc.: IEEE 802.11-09/1162r0
Submission
IEEE 802.11Regulatory Ad Hoc Committee
Closing ReportDate: 2009-11-20
Name Affiliations Address Phone email Rich Kennedy Research In
Motion 7305 Napier Trail Austin, TX 78729
+1-972-207-3554 [email protected]
Authors:
from slide 1 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 81
doc.: IEEE 802.11-09/1162r0
Submission
AbstractThis presentation is the closing report for the Atlanta
meeting of the IEEE 802.11 Regulatory Ad Hoc Committee.
from slide 2 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 82
doc.: IEEE 802.11-09/1162r0
Submission
Agenda
• Introduction
• The regulatory summaries– North America
– European Union
– Asia
• FOCUS: – Input to ERM TG11 on EN 300 328 v1.8.1
– FCC changes in the 5GHz band
from slide 3 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 83
doc.: IEEE 802.11-09/1162r0
Submission
Accomplishments
• Provided updates on relevant regulatory actions
• Discussed the status of the revision of ERM TG11– Called for more participation to prevent unwanted regulations
• Discussed the impact of new 5 GHz certification rules– FCC KDB 443999
– “devices will not permit operations on channels which overlap the 5600 - 5650 MHz band”
– Operation in 5250 – 5350 MHz and 5470 – 5725 MHz bands is restricted to indoor
– With these stipulations, certification can begin again
• Discussed the just released (17 November) Ofcom consultation on “Geolocation for Cognitive Access”– Responses due 9 February 2010
– Will plan response on conference calls
from slide 4 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
Adrian Stephens, Intel Corporation
Slide 84
doc.: IEEE 802.11-09/1162r0
Submission
Documents
• 11-09-1141-01-0reg-atlanta-meeting-plan-and-agenda-nov-2009
• http://fjallfoss.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=41732
• http://www.ofcom.org.uk/consult/condocs/cogaccess/cogaccess.pdf
from slide 5 of 11-09/1287r0 by Rich Kennedy, Research In Motion