DO NOT SCALE - IF IN DOUBT, ASK UNION STREET · speed hump cycle lane shared path or footpath...

4
LZ5 83 3 48 4 40 40 95 4 40 123-133 48A 37 9 48 MATCH LINE SHEET 2 EXISTING RAISED SPEED TABLE UPGRADED TO INCLUDE ZEBRA CROSSING & LIGHTING NEW PEDESTRIAN REFUGE ISLAND WITH PRAM CROSSINGS ON NEW KERB BUILDOUTS PARKING TO BE SHIFTED BY 3.5m TO CREATE SPACE FOR BI-DIRECTIONAL CYCLE LANE AND FOOTHPATH NEW 3m BI-DIRECTIONAL CYCLEWAY ALONGSIDE 2.8m FOOTPATH EXTENT OF WORKS EXTENT OF WORKS NEW RAISED SPEED TABLE WITH PRAM CROSSING AND ZEBRA CROSSING REMOVAL OF ONE CARPARK AND RELOCATION OF EXISTING PARKING METER MAINTAIN EXISTING CLEARWAY NEW NO STOPPING AT ALL TIMES ROAD MARKING EXISTING TREE PITS TO BE SHIFTED WHILE MAINTAINING ORIGINAL SIZE. LOCATION OF TREES TO REMAIN. NOTE: LIGHTING UPGRADE TO BE INCLUDED AS PART OF THE PROJECT SCOPE N KEY PLAN 1 3810136-062-R1-001 UNION STREET DRAKE STREET LEGEND: PROPOSED ROAD MARKINGS EXISTING ROAD MARKINGS TO BE RETAINED DRIVEWAY EXISTING KERBLINE PROPOSED CYCLE RAMP CYCLE SEPARATOR PROPOSED PRAM CROSSING SPEED HUMP CYCLE LANE SHARED PATH OR FOOTPATH PROPOSED TRAFFIC ISLAND VEGETATION / ROCK LANDSCAPE TREE PIT NEW KERBLINE TRAFFIC CALMING - SPEED TABLE BROKEN YELLOW LINES "NSAAT" NEW SIGN ORIGINAL SIZE 0 10 20 30 40 50 70 60 80 90 100 150 DO NOT SCALE - IF IN DOUBT, ASK 200mm Drawing No. Stamp Date Status Stamp Rev. A1 A1 Scales A3 Scales AUCKLAND TRANSPORT A FOR CONSULTATION 05/06/18 N.T.S N.T.S COOK ST & UNION ST PEDESTRIAN & CYCLE IMPROVEMENTS SHEET 1 OF 4 RETAIN EXISTING MOBILITY PARKING SPACE, REMOVAL OF ONE CARPARK

Transcript of DO NOT SCALE - IF IN DOUBT, ASK UNION STREET · speed hump cycle lane shared path or footpath...

Page 1: DO NOT SCALE - IF IN DOUBT, ASK UNION STREET · speed hump cycle lane shared path or footpath proposed traffic island vegetation / rock landscape tree pit new kerbline traffic calming

LZ5

83

3

48

4

40 40

95

4

40

123-

133

48A

37

9

48

MATCH LINE SHEET 2

EXISTING RAISED SPEED TABLE UPGRADED TO INCLUDE ZEBRA CROSSING & LIGHTING

NEW PEDESTRIAN REFUGE ISLAND WITH PRAM CROSSINGS ON NEW KERB BUILDOUTS

PARKING TO BE SHIFTED BY 3.5m TO CREATESPACE FOR BI-DIRECTIONAL CYCLE LANE AND FOOTHPATH

NEW 3m BI-DIRECTIONAL CYCLEWAY ALONGSIDE 2.8m FOOTPATH

EXTENT OF WORKS

EXTE

NT O

F W

ORKS

NEW RAISED SPEED TABLE WITHPRAM CROSSING AND ZEBRA CROSSING

REMOVAL OF ONE CARPARK ANDRELOCATION OF EXISTING PARKING METER

MAINTAIN EXISTINGCLEARWAY

NEW NO STOPPING AT ALL TIMES ROAD MARKING

EXISTING TREE PITS TO BE SHIFTED WHILE MAINTAINING ORIGINALSIZE. LOCATION OF TREES TO REMAIN.

NOTE:

LIGHTING UPGRADE TO BE INCLUDED

AS PART OF THE PROJECT SCOPE

NKEY PLAN

1

3810136-062-R1-001

U

N

IO

N

S

T

R

E

E

T

DR

AK

E S

TR

EE

T

LEGEND:PROPOSED ROAD MARKINGS

EXISTING ROAD MARKINGS TO BE RETAINED

DRIVEWAY

EXISTING KERBLINE

PROPOSED CYCLE RAMP

CYCLE SEPARATOR

PROPOSED PRAM CROSSING

SPEED HUMP

CYCLE LANE

SHARED PATH OR FOOTPATH

PROPOSED TRAFFIC ISLAND

VEGETATION / ROCK LANDSCAPE

TREE PIT

NEW KERBLINE

TRAFFIC CALMING - SPEED TABLEBROKEN YELLOW LINES "NSAAT"

NEW SIGN

ORIG

INAL

SIZ

E0

1020

3040

5070

6080

9010

015

0DO

NOT

SCA

LE -

IF IN

DOU

BT, A

SK20

0mm

Drawing No.

StampDate

StatusStamp

Rev.

A1

A1Scales

A3Scales

AUCKLAND TRANSPORT

A

FOR CONSULTATION05/06/18

N.T.S N.T.S

COOK ST & UNION STPEDESTRIAN & CYCLE IMPROVEMENTSSHEET 1 OF 4

RETAIN EXISTING MOBILITY PARKINGSPACE, REMOVAL OF ONE CARPARK

Page 2: DO NOT SCALE - IF IN DOUBT, ASK UNION STREET · speed hump cycle lane shared path or footpath proposed traffic island vegetation / rock landscape tree pit new kerbline traffic calming

LZ5

5283

74-78

41

1/81

115-119

66

115-119

41A

1//43

31

41-45

68

45 G//43

10970

81

33-35

66

68

3533

43-45

MATCH LINE SHEET 1

MATCH LINE SHEET 3

FIVE CARPARK SPACES TO BEREMOVED FOR NEW KERB ALIGNMENT

NEW TRAFFIC ISLANDS

NEW PRAM AND ZEBRA CROSSING

E

X

T

E

N

T

O

F

W

O

R

K

S

EXTENT OF WORKS

NEW TRAFFIC ISLAND

NEW CYCLE RAMP TO TRANSITION CYCLISTSFROM SHARED PATH TO THE CYCLE PATH

NEW RAISED SPEED TABLE WITHCYCLE CROSSING FACILITY

OFFRAMP WIDTH REDUCED FROM TWO LANES TO ONE 3.7m LANE

MAINTAIN EXISTING VEGETATION

NEW SHARED PATH

NEW 3.0m BI-DIRECTIONAL CYCLE LANEWITH ADDITIONAL 0.4m SEPARATORS

EXISTING TRAFFICISLAND NARROWED

EXISTING NO STOPPING ATALL TIMES ROAD MARKING

EXISTING MOTORWAY GANTRYFOOTING. CYCLE PATH NARROWS.

NEW GATEWAY SIGNAGE AND COLOURSURFACING WITH SPEED LIMIT MARKING

TREE TO BE TRIMMED TO ENHANCE VISIBILITY

NEW DRIVER FEEDBACK SIGN

EXISTING SAFETY BARRIER TO BE EXTENDED

POTENTIAL REMOVAL OF FIVE ADDITIONAL CARPARKSTO ACCOMMODATE FINAL CYCLE PATH ALIGNMENT

RAMP FOR CYCLISTS TO ACCESSSHARED PATH & CYCLEWAY

NKEY PLAN

2

3810136-062-R1-002

U

N

I

O

N

S

T

R

E

E

T

CO

OK

ST

RE

ET

U

N

I

O

N

S

T

R

E

E

T

S

A

L

E

S

T

R

E

E

T

LEGEND:PROPOSED ROAD MARKINGS

EXISTING ROAD MARKINGS TO BE RETAINED

DRIVEWAY

EXISTING KERBLINE

PROPOSED CYCLE RAMP

CYCLE SEPARATOR

PROPOSED PRAM CROSSING

SPEED HUMP

CYCLE LANE

SHARED PATH OR FOOTPATH

PROPOSED TRAFFIC ISLAND

VEGETATION / ROCK LANDSCAPE

TREE PIT

NEW KERBLINE

TRAFFIC CALMING - SPEED TABLEBROKEN YELLOW LINES "NSAAT"

NEW SIGN

ORIG

INAL

SIZ

E0

1020

3040

5070

6080

9010

015

0DO

NOT

SCA

LE -

IF IN

DOU

BT, A

SK20

0mm

Drawing No.

StampDate

StatusStamp

Rev.

A1

A1Scales

A3Scales

AUCKLAND TRANSPORT

A

FOR CONSULTATION05/06/18

N.T.S N.T.S

COOK ST & UNION STPEDESTRIAN & CYCLE IMPROVEMENTSSHEET 2 OF 4

COOK STREET OFF-RAMP

EXISTING LOADING ZONE

REMOVAL OF NO STOPPING AT ALL TIMESLINE MARKING & REINSTATE KERB

Page 3: DO NOT SCALE - IF IN DOUBT, ASK UNION STREET · speed hump cycle lane shared path or footpath proposed traffic island vegetation / rock landscape tree pit new kerbline traffic calming

52

106

101

95B

95

891 2

88

97

9389-93

66

661-2

89-93

91

95C

95

74

52

MATCH LINE SHEET 2

MATCH LINE SHEET 4

NEW SIGNALISED INTERSECTIONWITH CYCLE AND PEDESTRIANCROSSING FACILITIES

EXISTING FOOTPATH TO TIE IN WITHNEW FOOTPATH AND PRAM CROSSINGS

NEW TRAFFIC ISLAND

EXTENT OF WORKS

MAINTAIN BUS BAY PARKING(LENGTH UNCHANGED)

NEW 1.8m SINGLE-DIRECTIONCYCLE LANE WITH ADDITIONAL 1m SEPARATORS

1.8m BI-DIRECTIONAL CYCLEWAYWITH ADDITIONAL 1m SEPARATORS

CONVERT EXISTINGFOOTPATH TO SHARED PATH

NEW 3.0m BI-DIRECTIONAL CYCLE LANEWITH ADDITIONAL 0.4m SEPARATORS

EXISTING NO STOPPINGAT ALL TIMES MARKING

THREE ON-STREET CARPARKS REMOVED

NEW WAYFINDING SIGNAGE FOR CYCLISTSTO USE RAMP TO HEAD SOUTH EAST

NEW FLASHING 'HIDDEN QUEUE AHEAD' SIGNMOUNTED ON EXISTING LIGHT POLE

TREE TRIMMING TO ENSUREAPPROPRIATE TRAFFICSIGNAL VISIBILITY

RAMP FOR CYCLISTS

KEY PLAN

3

3810136-062-R1-003

COOK STREET

S

A

M

W

R

IG

L

E

Y

S

T

R

E

E

T

MO

RT

ON

S

TR

EE

T

LEGEND:PROPOSED ROAD MARKINGS

EXISTING ROAD MARKINGS TO BE RETAINED

DRIVEWAY

EXISTING KERBLINE

PROPOSED CYCLE RAMP

CYCLE SEPARATOR

PROPOSED PRAM CROSSING

SPEED HUMP

CYCLE LANE

SHARED PATH OR FOOTPATH

PROPOSED TRAFFIC ISLAND

VEGETATION / ROCK LANDSCAPE

TREE PIT

NEW KERBLINE

TRAFFIC CALMING - SPEED TABLEBROKEN YELLOW LINES "NSAAT"

NEW SIGN

ORIG

INAL

SIZ

E0

1020

3040

5070

6080

9010

015

0DO

NOT

SCA

LE -

IF IN

DOU

BT, A

SK20

0mm

Drawing No.

StampDate

StatusStamp

Rev.

A1

A1Scales

A3Scales

AUCKLAND TRANSPORT

A

FOR CONSULTATION05/06/18

N.T.S N.T.S

COOK ST & UNION STPEDESTRIAN & CYCLE IMPROVEMENTSSHEET 3 OF 4

Page 4: DO NOT SCALE - IF IN DOUBT, ASK UNION STREET · speed hump cycle lane shared path or footpath proposed traffic island vegetation / rock landscape tree pit new kerbline traffic calming

86

53-59

6062-64

54

1-4/61-87

74

5254

43

50

MATCH LINE SHEET 3

SPEED HUMPS FOR SAFERCROSSINGS OVER DRIVEWAYS

NEW 1.8m SINGLE-DIRECTION CYCLEWAYWITH ADDITIONAL 1m SEPARATORSMAINTAIN BUS BAY PARKING

(LENGTH UNCHANGED)

REMOVE EXISTING ON-STREET PARKING(15 SPACES)

NEW 1.8m BI-DIRECTIONAL CYCLEWAYWITH ADDITIONAL 1m SEPARATORS

EXTENT OF WORKS

EXTENT OF WORKS

INSET A

REMOVE NO STOPPING AT ALLTIMES LINES TO IMPLEMENT5 NEW CARPARKS

THROUGH MOVEMENT REDUCEDFROM TWO TO ONE LANE

RIGHT TURN APPROACHLANE EXTENDED

MATC

HLIN

E SH

EET

4

EX

TE

NT

O

F W

OR

KS

EXISTING NO STOPPING AT ALL TIMES MARKING

EXISTING NO STOPPING AT ALL TIMES MARKING

ONE SEPARATOR REMOVED TO ALLOW CYCLISTS TO USE ROAD. RAMP FROM CYCLE PATH TO SHARED PATH TO CONNECT TO CROSSING FACILITIES

NEW 1.8m WIDE ON-ROAD CYCLE LANE

KEY PLAN

4

3810136-062-R1-004

COOK STREET

COOK STREET

NE

LS

ON

S

TR

EE

T

NE

LS

ON

S

TR

EE

T

LEGEND:PROPOSED ROAD MARKINGS

EXISTING ROAD MARKINGS TO BE RETAINED

DRIVEWAY

EXISTING KERBLINE

PROPOSED CYCLE RAMP

CYCLE SEPARATOR

PROPOSED PRAM CROSSING

SPEED HUMP

CYCLE LANE

SHARED PATH OR FOOTPATH

PROPOSED TRAFFIC ISLAND

VEGETATION / ROCK LANDSCAPE

TREE PIT

NEW KERBLINE

TRAFFIC CALMING - SPEED TABLEBROKEN YELLOW LINES "NSAAT"

NEW SIGN

MATCHLINE INSET AOR

IGIN

AL S

IZE

010

2030

4050

7060

8090

100

150

DO N

OT S

CALE

- IF

IN D

OUBT

, ASK

200m

m

Drawing No.

StampDate

StatusStamp

Rev.

A1

A1Scales

A3Scales

AUCKLAND TRANSPORT

A

FOR CONSULTATION05/06/18

N.T.S N.T.S

COOK ST & UNION STPEDESTRIAN & CYCLE IMPROVEMENTSSHEET 4 OF 4

COOK STREET

REFER TO INSET A

CROSSING FACILITIES TO PROVIDECONNECTIONS TO EXISTING CYCLE PATHS.LAYOUT TO BE CONFIRMED IN THE NEXTSTAGE OF DESIGN.