DET NORSKE VERITAS SURVEY REPORT DNV Id. No.: 09757 Ref.: KYUZRI Ord.Nr.: 10990302 Name of Ship WAWASAN MURNI Owner WAWASAN BULK SERVICES SDN. BHD. Original to DTP Copy to owner Copy to Ship Stamp Place: Date: SINGAOPRE 1999-05-15 .............................................................................................................................................................................................................................................................. KYUZRI ......................................................................................................................................................................................................................................................... Surveyor’s name (Capital Letters) Surveyor’s signature If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision “Det Norske Veritas” shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas. DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY TEL.INT: +47 67 57 99 00, TELEFAX: +47 67 57 99 11 Form No.: 40.9a Issue: January 98 Page 1 of 2 Survey requested by : Owners Representative Place of Survey : Singapore Date of survey : 1999-05-15 POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS AND CONTINOUS MACHINERY SURVEY Scope This is to confirm that, Undersigned Surveyor attended onboard the above vessel and had carried out the following surveys: Postponement of RCH,sighting survey Postponement of Bottom Survey, in water survey Postponement of Load Line Cert., renewal ,sigthing survey Postponement of Safety Contruction Cert., renewal, sighting survey Postponement of IOPP Cert.,complete ,sighting survey Postponement of NLS Cert.,renewal , sighting survey Safety Equipment Cert., annual survey Continuos Machinery Survey Deletion of CC 138 Postponement of CC 100, CC 114, CC 123 and CC139 Findings Following items were found not in order: Main Class/Tanker for Oil: 1. Poop deck platings found thinning down. 2. P,C,S Generator and Main Engine covered with lube oil at various locations. An indication that both machinery had experienced leaking of lube oil while running. 3. Self closing weight of F.O. tank short sounding pipe at lower platform was missing. 4. Insulation of F.O. pipe from service tank to main engine was partly damaged. 5. Port engine room ventilator mushroom found thinned and holed. 6. All pipe supports and U-bolt clamps on main deck were badly thinned/wasted. 7. Several steps of external ladders at poop decks found badly thinned. 8. Air pipe on main deck was leaking and some sections were badly corrode

Transcript of DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS

Page 1: DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYS

DET NORSKE VERITAS

SURVEY REPORT

DNV Id. No.: 09757

Ref.: KYUZRI Ord.Nr.: 10990302

Name of Ship

WAWASAN MURNI

Owner

WAWASAN BULK SERVICES SDN. BHD.

Original to DTP

Copy to owner

Copy to Ship

Stamp Place: Date: SINGAOPRE 1999-05-15 ..............................................................................................................................................................................................................................................................

KYUZRI ......................................................................................................................................................................................................................................................... Surveyor’s name (Capital Letters) Surveyor’s signature

If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million. In this provision “Det

Norske Veritas” shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske Veritas.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY TEL.INT: +47 67 57 99 00, TELEFAX: +47 67 57 99 11 Form No.: 40.9a Issue: January 98 Page 1 of 2

Survey requested by : Owners Representative

Place of Survey : Singapore

Date of survey : 1999-05-15

POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS

AND CONTINOUS MACHINERY SURVEY

Scope

This is to confirm that, Undersigned Surveyor attended onboard the above vessel and had carried out the

following surveys:

Postponement of RCH,sighting survey

Postponement of Bottom Survey, in water survey

Postponement of Load Line Cert., renewal ,sigthing survey

Postponement of Safety Contruction Cert., renewal, sighting survey

Postponement of IOPP Cert.,complete ,sighting survey

Postponement of NLS Cert.,renewal , sighting survey

Safety Equipment Cert., annual survey

Continuos Machinery Survey

Deletion of CC 138

Postponement of CC 100, CC 114, CC 123 and CC139

Findings

Following items were found not in order:

Main Class/Tanker for Oil:

1. Poop deck platings found thinning down. 2. P,C,S Generator and Main Engine covered with lube oil at various locations. An indication that both

machinery had experienced leaking of lube oil while running.

3. Self closing weight of F.O. tank short sounding pipe at lower platform was missing.

4. Insulation of F.O. pipe from service tank to main engine was partly damaged.

5. Port engine room ventilator mushroom found thinned and holed.

6. All pipe supports and U-bolt clamps on main deck were badly thinned/wasted.

7. Several steps of external ladders at poop decks found badly thinned.

8. Air pipe on main deck was leaking and some sections were badly corrode

Page 2: DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYS

SURVEY REPORT (ctd.) DNV Id. No.: 09757

Ref.: KYUZRI

Order No.: 10990302

Name of Ship WAWASAN MURNI

Owner WAWASAN BULK SERVICES SDN. BHD.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY TEL.INT: +47 67 57 99 00, TELEFAX: +47 67 57 99 11

Form No.: 40.9a Issue: January 98 Page 2 of 2

9. Hydraulic pipes at emergency generator room bulkhead and at main deck found badly thinned. Some

sections had been repaired and still in progress.

10. Pillar and brackets for securing the aft crane’s boom/block were found badly thinned.

11. Tranverse walkway at fwd main deck was completely deteriorated. Handrails, floor grating, ladder

steps,brackets etc. were badly corroded and thinned.

12. Inner plating of P&S chain locker found holed/thinned. As the above deficiencies have not been rectified, a condition of class given (see form CSE.001)

Safet Eqpt. Certificate

1. While testing of main and emergency fire pump, fire line at main deck found leaking due to hole/wasted.

2. Stbd. fire hose at main deck that was using for testing found leaking due to hole.

As the above deficiencies have not been rectified, a condition of class given (see form CSE.001)

IOPP Cert.

1. Side plate of stbd manifolds drip tray found thinned/holed.

2. Aft drip tray for stern loading/unloading arrangement found thinned/wasted.

As the above deficiencies have not been rectified, a condition of class given (see form CSE.001)

Load Line Cert.

1. P&S air vent heads at funnel bulkhead were badly damaged due to corrosion.

2. P&S air vent heads at cargo pump room bulkhead found thinned/wasted.

3. Air vent pipe at port forecastle deck was temporary repaired by cement.

4. Vent flap at emergency generator room was missing. Flap coaming was badly wasted.

5. Bulwark face plates and bracket flanges at forecastle and fwd P&S bulwarks found wasted/thinned.

As the above deficiencies have not been rectified, a condition of class given (see form CSE.001)

Continuos machinery survey:

1. CW pipe connector of stbd. generator found leaking.

2. CW pump of port generator found leaking. 3. Generator L.O. Cooler SW cooling pipe found leaking.

As the above deficiencies have not been rectified, a condition of class given (see form CSE.001)

Bottom in water survey:

- Bottom in water survey satisfactory carried by diver.

- Fishing rope entangled at tailshaft iwo rope guard had been removed.

Deletion of CC 138

Fixed installation CO2 bottles were hydraulic tested in 1994/04/07. All bottles found marked with test

date and pressure. Test certificate sighted onboard. Accordingly condition of class is now deleted. (see

form CSE.001)

Posponement of CC 100, CC 114, CC 123 and CC 139.

Above CCs are now postponed until 1999-07-15 upon satisfactory results of verification.

Conclusion

Upon satisfactory completion of examination, relevant renewal/complete surveys were extended. Interim

Certificate of Class and Short term certificates issued and valid until 1999-07-15. Safety Equipment

Certificate was endorsed.

Page 3: DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYS

SURVEY REPORT (ctd.) DNV Id. No.: 09757

Ref.: KYUZRI

Order No.: 10990302

Name of Ship WAWASAN MURNI

Owner WAWASAN BULK SERVICES SDN. BHD.

DET NORSKE VERITAS AS, VERITASVEIEN 1, N-1322 HØVIK, NORWAY TEL.INT: +47 67 57 99 00, TELEFAX: +47 67 57 99 11

Form No.: 40.9a Issue: January 98 Page 3 of 2