DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s...

40
` IN LAC NO. DATE 1 CONSTRUCTION OF 15 KM BITUMINOUS ROAD FROM DHANJHAR MORE TO KARAPARA (BANSIDIHA), RANIBANDH, BANKURA ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 114/PM(F)/P /1B- 143/2012 16-05-2013 499.18268 374.59134 100% 326.15309 COMPLETE 2 CONSTRUCTION OF R.C.C. BOX BRIDGE ON ARKOSHA RIVER NEAR LAXMISOLE VILLAGE, CHHATNA, BANKURA ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 117/PM(F)/P /1B-13/2012 16-05-2013 51.91000 51.91000 100% 48.48564 COMPLETE 3 BORING OF TWO DEEP TUBE- WELL (`3.27600 EACH) AT LOHAGARH MOUZA AND BALI DUMDUMI MOUZA, CHHATNA, BANKURA ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 44/PM(F)/P/ 1B-163/2013 20-01-2014 6.55200 6.55200 100% 2.93547 COMPLETE 4 SCHEMES UNDER ZILLA PARISHAD-PUAD MEGA SCHEME: AGRICULTURE MACHINERY HUB FOR CULTIVATION THROUGH FARM MECHANIZATION SUPPORT AND TRAINING FOR CULTIVATORS/ FARMERS: 1 TRACTOR WITH HYDRAULIC TROLLEY, 1 TRACTOR WITH HAL, 1 TRACTOR WITH ZYLOVATOR, 5 POWER TILLER, BANKURA ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 119/PM(F)/P /1B-25/2014 03-03-2014 33.00000 33.00000 100% COMPLETE EXECUTING AGENCY WITH CONTACT DETAILS 78.97453 DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14 PHYSICAL PROGRESS NAME OF THE SCHEME RELEASED AMOUNT FROM PUP UC RECEIVED REMARKS SANCTIONED AMOUNT EXPECTED DATE OF COMPLETION SL. NO. PUA DEPT.'S SANCTION ORDER BILL PAID FROM PUP

Transcript of DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s...

Page 1: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE1 CONSTRUCTION OF 15 KM

BITUMINOUS ROAD FROM

DHANJHAR MORE TO

KARAPARA (BANSIDIHA),

RANIBANDH, BANKURA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

114/PM(F)/P

/1B-

143/2012

16-05-2013 499.18268 374.59134 100% 326.15309 COMPLETE

2 CONSTRUCTION OF R.C.C. BOX

BRIDGE ON ARKOSHA RIVER

NEAR LAXMISOLE VILLAGE,

CHHATNA, BANKURA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

117/PM(F)/P

/1B-13/2012

16-05-2013 51.91000 51.91000 100% 48.48564 COMPLETE

3 BORING OF TWO DEEP TUBE-

WELL (`3.27600 EACH) AT

LOHAGARH MOUZA AND BALI

DUMDUMI MOUZA,

CHHATNA, BANKURA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

44/PM(F)/P/

1B-163/2013

20-01-2014 6.55200 6.55200 100% 2.93547 COMPLETE

4 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

AGRICULTURE MACHINERY

HUB FOR CULTIVATION

THROUGH FARM

MECHANIZATION SUPPORT

AND TRAINING FOR

CULTIVATORS/ FARMERS: 1

TRACTOR WITH HYDRAULIC

TROLLEY, 1 TRACTOR WITH

HAL, 1 TRACTOR WITH

ZYLOVATOR, 5 POWER TILLER,

BANKURA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

119/PM(F)/P

/1B-25/2014

03-03-2014 33.00000 33.00000 100% COMPLETE

EXECUTING AGENCY WITH

CONTACT DETAILS

78.97453

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

FROM PUP

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED

DATE OF

COMPLETION

SL.

NO.

PUA DEPT.'S SANCTION

ORDER

BILL PAID

FROM PUP

Page 2: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

EXECUTING AGENCY WITH

CONTACT DETAILS

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

FROM PUP

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED

DATE OF

COMPLETION

SL.

NO.

PUA DEPT.'S SANCTION

ORDER

BILL PAID

FROM PUP

5 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

INSTALLATION OF RLI FROM

CANAL AT VEDUERA MOUZA,

SUPUR ANCHAL, KHATRA,

BANKURA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

119/PM(F)/P

/1B-25/2014

03-03-2014 50.00000 50.00000 50% WORK IN PROGRESS

6 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

RE-EXCAVATION OF MEJIA

JHIL AT MOUZA TARAPUR,

MEJIA, BANKURA

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

119/PM(F)/P

/1B-25/2014

03-03-2014 50.00000 50.00000 50% WORK IN PROGRESS

7 SINKING OF 332 DEEP TUBE-

WELLS (`1.44272 EACH) FOR

PROVIDING DRINKING WATER

IN DIFF. BLOCKS WITHIN

KHATRA SUB-DIVISION,

BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

113/PM(F)/P

/1B-49/2013

& 74

16-05-2013 478.98304 321.84940 100% 321.84940 COMPLETE

8 RE-EXCAVATION OF

TANTIKANTA BARABUNDH

WITH GUARDWALL, KHATRA,

BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

118/PM(F)/P

/1B-21/2012

16-05-2013 12.37325 100% 0.00000 COMPLETE

9 CONSTRUCTION OF CHECK

DAM OVER DHARAMPUR

MARADI JORE, KHATRA,

BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

118/PM(F)/P

/1B-21/2012

16-05-2013 9.26139 6.68601 100% 6.68601 COMPLETE

10 CONSTRUCTION OF

BITUMINOUS ROAD FROM

LOHAMERIA TO PANTRI (1 KM

TO 6 KM), RAIPUR, BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

119/PM(F)/P

/1B-24/2012

16-05-2013 56.59242 55.01622 100% 55.01622 COMPLETE

78.97453

Page 3: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

EXECUTING AGENCY WITH

CONTACT DETAILS

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

FROM PUP

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED

DATE OF

COMPLETION

SL.

NO.

PUA DEPT.'S SANCTION

ORDER

BILL PAID

FROM PUP

11 CONSTRUCTION OF

BITUMINOUS ROAD FROM

SALBONI TO SUSUNIA (0 KM

TO 3 KM), RAIPUR, BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

120/PM(F)/P

/1B-25/2012

16-05-2013 37.28448 30.25720 100% 30.25720 COMPLETE

12 CONSTRUCTION OF GROUND

FLOOR & 1ST FLOOR OF SOIL

TESTING CENTRE AT DALPUR

SREE SREE GYANANANDA

SARASWATI ASHRAM,

BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

121/PM(F)/P

/1B-48/2013

16-05-2013 31.11718 29.89978 100% 29.89978 COMPLETE

13 CONSTRUCTION OF

APPROACH ROAD FROM

KHATRA-RANIBANDH MAIN

ROAD TO NEWLY

CONSTRUCTED ITI BUILDING,

KHATRA, BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

142/PM(F)/P

/1B-62/2013

14-08-2013 22.90051 21.73302 100% 21.73302 COMPLETE

14 REPAIRING OF ROAD FROM

HIRBANDH TO MOSHIARA VIA

AMJHURI VILLAGE,

HIRBANDH, BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

174/PM(F)/P

/1B-

104/2013 &

189

09-10-2013 &

07-11-2013

27.83292 27.61950 100% 27.61950 COMPLETE

15 ESTABLISHMENT OF MOTHER

BLOCK OF MAJOR AND MINOR

FRUITS FOR SOCIO-ECONOMIC

UPLIFTMENT IN

PASCHIMANCHAL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

179/PM(F)/P

/1B-68/2013

10-10-2013 1.91300 1.91300 100% 1.91300 COMPLETE

Page 4: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

EXECUTING AGENCY WITH

CONTACT DETAILS

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

FROM PUP

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED

DATE OF

COMPLETION

SL.

NO.

PUA DEPT.'S SANCTION

ORDER

BILL PAID

FROM PUP

16 CONSTRUCTION OF CONCRETE

ROAD AND PUCCA DRAIN

FROM SYNDICATE BANK TO

THE END 'A' ZONE OF

SRINAGAR, BANKURA-I,

BANKURA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

78/PM(F)/P/

1B-04/2014

17-02-2014 26.04877 16.89118 100% 16.89118 COMPLETE

17 CONSTRUCTION OF 50

ANGANWADI CENTRES UNDER

4 BLOCKS CLUBBING WITH

MGNREGS, ONDA, CHHATNA,

BARJORA, BANKURA-I BLOCK,

BANKURA

DISTRICT MAGISTRATE,

BANKURA

154/PM(F)/P

/1B-91/2013

09-09-2013 200.58850 200.58850 60% 126.31040

18 CONSTRUCTION OF 131

ANGANWADI CENTRES EACH

@ `6.89600 LAC, BANKURA

DISTRICT MAGISTRATE,

BANKURA

160/PM(F)/P

/1B-91/2013

23-09-2013 903.37600 903.37600 90% 834.41540

19 IMPLEMENTATION OF

DIFFERENT PROJECT @ `50

LAC EACH BLOCK IN 16

BLOCKS, BANKURA

DISTRICT MAGISTRATE,

BANKURA

151/PM(F)/P

/1B-82/2013

30-08-2013 800.00000 799.97109 90% 749.67000 WORK IN

PROGRESS, 102

SCHEMES

COMPLETE

20 RENOVATION OF CANAL IN

THE FORM OF RESECTIONING

& LINING IN BETWEEN CH.

0.00 AND CH. 32.00 AND CH.

153.00 & CH. 178.00 OF DY

NO. 8 OF BISHNUPUR BRANCH

CANAL FOR RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL,

TALDANGRA,BANKURA

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION

103/PM(F)/P

/1B-67/2012

12-04-2013 24.80000 24.80000 100% 30-11-2013 24.80000 COMPLETE

TOTAL 131 (10+121)

UNITS COMPLETE,

WORK IN PROGRESS

Page 5: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

EXECUTING AGENCY WITH

CONTACT DETAILS

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

FROM PUP

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED

DATE OF

COMPLETION

SL.

NO.

PUA DEPT.'S SANCTION

ORDER

BILL PAID

FROM PUP

21 RENOVATION OF CANAL IN

THE FORM OF RESECTIONING

& LINING IN BETWEEN CH.

426.00 & CH. 445.00 OF DY

NO. 4 OF BISHNUPUR BRANCH

CANAL FOR RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL, ONDA, BANKURA

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION

103/PM(F)/P

/1B-67/2012

12-04-2013 23.12000 23.12000 100% 30-11-2013 23.12000 COMPLETE

22 RENOVATION OF CANAL IN

THE FORM OF RESECTIONING

& LINING IN BETWEEN CH.

0.00 AND CH. 50.00 OF MINOR

D OF DY-2 OF BISHNUPUR

BRANCH CANAL INCLUDING

RENOVATION OF PIPE FALL

STRUCTURE AT CH. 11.20 &

CROSS DRAINAGE WORK AT

CH. 15.35 FOR RESTORATION

OF DISTRESSED IRRIGATION

POTENTIAL UNDER BANKURA

IRRIGATION DIVISION, ONDA,

BANKURA

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION

89/PM(F)/P/

1B-67/2012

20-02-2014 19.99683 19.99683 100% 19.99683 2013-14 FUND

UTILISED

Page 6: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

EXECUTING AGENCY WITH

CONTACT DETAILS

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

FROM PUP

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED

DATE OF

COMPLETION

SL.

NO.

PUA DEPT.'S SANCTION

ORDER

BILL PAID

FROM PUP

23 IMPROVEMENT OF CANAL IN

THE FORM OF RESECTIONING

& LINING OF BERAI MAIN

CANAL INCLUDING

RENOVATION OF IRRIGATION

STRUCTURES IN BETWEEN CH.

276.70 & CH. 311.50 UNDER

BANKURA IRRIGATION

DIVISION, ONDA, BANKURA

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION

89/PM(F)/P/

1B-67/2012

20-02-2014 22.49873 22.49873 100% 22.49873 2013-14 FUND

UTILISED

24 INCOME GENERATIVE

COMMERCIAL HORTICULTURE

IN SMALL PLOT (5 KATTA) FOR

CULTIVATION OF EARLY

SUMMER VEGETABLE

SURROUNDED BY QUICK

GROWING LIME; RAIPUR,

RANIBUNDH, SARENGA,

SIMLAPAL (250 BENEFICIARIES

IN EACH BLOCK, COST OF

GROWING VEGETABLE CROPS

PER BENEFICIARY FOR 5

KATTA IS RS. 4,321/-),

BANKURA

MANAGING DIRECTOR, WEST

BENGAL STATE FOOD

PROCESSING &

HORTICULTURE

DEVELOPMENT

CORPORATION LIMITED

13/PM(F)/P/

1B-117/2013

07-01-2014 43.21000 43.21000 100% 43.21000 COMPLETE

3432.54170 2603.61449 511.86531 2812.43540TOTAL:

Page 7: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE1 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

IMPROVEMENT OF ROAD

FROM MULUK ADARSHA PALLI

TO SIAN HOSPITAL, BOLPUR-

SRINIKETAN, BIRBHUM

ADDITIONAL EXECUTIVE

OFFICER, BIRBHUM ZILLA

PARISHAD

120/PM(F)/P

/1B-28/2014

03-03-2014 22.50000 22.50000 100% 22.50000 COMPLETE

2 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

REPAIRING OF ROAD FROM

KASHIMBAZAR TO N.H.-2(B),

BOLPUR-SRINIKETAN,

BIRBHUM

ADDITIONAL EXECUTIVE

OFFICER, BIRBHUM ZILLA

PARISHAD

120/PM(F)/P

/1B-28/2014

03-03-2014 20.00000 20.00000 100% 20.00000 COMPLETE

3 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

IMPROVEMENT OF ROAD

FROM DHOLKATA TO

HABRAPAHARI PHASE-1, MD.

BAZAR, BIRBHUM

ADDITIONAL EXECUTIVE

OFFICER, BIRBHUM ZILLA

PARISHAD

120/PM(F)/P

/1B-28/2014

03-03-2014 15.00000 15.00000 100% 15.00000 COMPLETE

4 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

REPAIRING AND

MAINTENANCE OF CAUSEWAY

AT GOLTE, ILLAMBAZAR,

BIRBHUM

ADDITIONAL EXECUTIVE

OFFICER, BIRBHUM ZILLA

PARISHAD

120/PM(F)/P

/1B-28/2014

03-03-2014 22.50000 22.50000 100% 22.50000 COMPLETE

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

Page 8: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

5 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

MAINTENANCE AND

UPGRADATION OF SURI-

AMJORA ROAD, SURI,

BIRBHUM

ADDITIONAL EXECUTIVE

OFFICER, BIRBHUM ZILLA

PARISHAD

120/PM(F)/P

/1B-28/2014

03-03-2014 22.50000 22.50000 100% 22.50000 COMPLETE

6 SCHEMES UNDER ZILLA

PARISHAD-PUAD MEGA

SCHEME:

IMPROVEMENT OF ROAD

FROM KASTHOGORA TO

DHARAMPUR, RAMPURHAT-I,

BIRBHUM

ADDITIONAL EXECUTIVE

OFFICER, BIRBHUM ZILLA

PARISHAD

120/PM(F)/P

/1B-28/2014

03-03-2014 22.50000 22.50000 100% 22.50000 COMPLETE

7 REPAIR & RENOVATION OF

SURI AREA OFFICE OF PUP

SITUATED AT GOLBARI, SURI,

BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

198/PM(F)/P

/1B-

127/2013

25-11-2013 2.99546 2.88624 100% 2.88624 COMPLETE

8 IMPROVEMENT OF ROAD

FROM SIMULTALA PITCH

ROAD (PARUI GOYALPARA

ROAD) VIA BANDHANBAGRAM

HIGH SCHOOL AT KASBA G.P.,

BOLPUR-SRINIKETAN,

BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

18/PM(F)/P/

1B-155/2013

07-01-2014 11.89758 11.89758 100% 11.89758 COMPLETE

Page 9: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

9 IMPROVEMENT OF ROAD

FROM ASHADULLAPUR

ADIBASIPARA

(GHOSHALDANGA BRIDGE TO

SATTORE PRIMARY HEALTH

CENTRE) VIA SRICHANDRAPUR

AT KASBA G.P., BOLPUR-

SRINIKETAN, BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

18/PM(F)/P/

1B-155/2013

07-01-2014 19.28353 19.28353 100% 19.28353 COMPLETE

10 IMPROVEMENT OF ROAD

FROM GHOSHALDANGA

BRIDGE TO BISHNUBATI

ADIBASIPARA AT KASBA G.P.,

BOLPUR-SRINIKETAN,

BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

18/PM(F)/P/

1B-155/2013

07-01-2014 11.89758 11.89758 100% 11.89758 COMPLETE

11 CONSTRUCTION OF

APPROACH ROAD OF WEIR

BRIDGE OVER KANDAR AT

GHOSHALDANGA AT

ASHADULLAPUR AT SATTORE

G.P., BOLPUR-SRINIKETAN,

BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

18/PM(F)/P/

1B-155/2013

07-01-2014 4.23950 4.23950 100% 4.23950 COMPLETE

12 IMPROVEMENT OF ROAD

FROM DEBAGRAM

MAGHIPARA TO SALON

VILLAGE OF DEBAGRAM

MAGHIPARA BHERAMARI

ROAD AT SATTORE G.P.,

BOLPUR-SRINIKETAN,

BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

18/PM(F)/P/

1B-155/2013

07-01-2014 20.70158 20.70158 100% 20.70158 COMPLETE

Page 10: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

13 IMPROVEMENT OF ROAD

FROM SALON VILLAGE TO

BHERAMARI SCHOOL OF

DEBAGRAM MAGHIPARA

BHERAMARI ROAD AT

SATTORE G.P., BOLPUR-

SRINIKETAN, BIRBHUM

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

18/PM(F)/P/

1B-155/2013

07-01-2014 16.59200 16.59200 100% 16.59200 COMPLETE

14 IMPLEMENTATION OF

DIFFERENT PROJECT @ `50

LAC EACH BLOCK IN 10

BLOCKS, BIRBHUM

DISTRICT MAGISTRATE,

BIRBHUM

151/PM(F)/P

/1B-82/2013

30-08-2013 500.00000 499.85670 75% 431.07295 WORK IN PROGRESS

15 CONSTRUCTION OF 119

ANGANWADI CENTRES EACH

@ `6.89600 LAC IN 10

BLOCKS, BIRBHUM

DISTRICT MAGISTRATE,

BIRBHUM

188/PM(F)/P

/1B-97/2013

07-11-2013 820.62400 820.62400 75% 751.66400 WORK IN

PROGRESS, 109

COMPLETE

16 CONSTRUCTION OF MINI

BARRAGE OVER KANA AJOY

(6TH & 7TH INST.),

UPARKHARA MOUZA, BOLPUR-

SRINIKETAN, BIRBHUM

FUND: DISTRICT MAGISTRATE,

BIRBHUM; E.A.: EXECUTIVE

ENGINEER, MAYURAKSHI

SOUTH CANALS DIVISION,

IRRIGATION & WATERWAYS

DIRECTORATE, SANTINIKETAN

126/PM(F)/P

/1B-

89/2008(PT.-

I) & 29

23-05-2013 &

08-01-2014

160.91000 160.91000 75% 31-10-2013 109.39000 CIVIL PART

COMPLETE

17 IMPROVEMENT &

STRENGTHENING OF BOLPUR

— ILLAMBAZAR ROAD FROM

1.0 KMP TO 9.40 KMP

EXCLUDING 3.0 KMP TO 5.20

KMP UNDER BOLPUR SUB-

DIVISION, BIRBHUM

EXECUTIVE ENGINEER, P.W.D.,

BIRBHUM DIVISION, 03462-

255261, 9830149949,

[email protected]

158/PM(F)/P

/1B-

133/2011

17-09-2013 137.30196 135.43285 100% 31-08-2013 135.43279 COMPLETE

1831.44319 1741.82355 87.49801 1640.05775TOTAL:

Page 11: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE1 DRINKING WATER

ARRANGEMENT IN DIFFERENT

BLOCKS WITHIN JURISDICTION

OF PUP AREA, BURDWAN

ADDITIONAL EXECUTIVE

OFFICER, BURDWAN ZILLA

PARISHAD

88/PM(F)/P/

1B-20/2014

20-02-2014 251.64000 251.64000 50% 110.00000 WORK IN PROGRESS

2 CONSTRUCTION OF 200

ANGANWADI CENTRES EACH

@ `6.89600 LAC IN 10

BLOCKS, BURDWAN

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

150/PM(F)/P

/1B-73/2013

30-08-2013 1,379.20000 1,288.59469 90% 1,288.59469 WORK IN

PROGRESS, 190

COMPLETE

3 IMPLEMENTATION OF

DIFFERENT PROJECT @ `50

LAC EACH BLOCK IN 10

BLOCKS, BURDWAN

DISTRICT MAGISTRATE,

BURDWAN

151/PM(F)/P

/1B-82/2013

30-08-2013 500.00000 498.74322 100% 498.74322 COMPLETE

4 RESTORATION OF CANAL BED

AND SLOPES INCLUDING

LINING WORKS WITH PCC

FROM CH. 472.00 TO CH.

488.00 UNDER BURDWAN

IRRIGATION SUB-DIVISION NO.-

III, KANKSA, BURDWAN

DISTRICT MAGISTRATE,

BURDWAN

47/PM(F)/P/

1B-258/2012

21-01-2014 22.44526 22.44526 100% 22.44526 COMPLETE

5 RESTORATION OF CANAL BED

AND SLOPES INCLUDING

LINING WORKS WITH PCC

FROM CH. 488.00 TO CH.

506.00 UNDER BURDWAN

IRRIGATION SUB-DIVISION NO.-

III, KANKSA & AUSGRAM-II,

BURDWAN

DISTRICT MAGISTRATE,

BURDWAN

47/PM(F)/P/

1B-258/2012

21-01-2014 22.28023 22.28023 100% 22.28023 COMPLETE

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

Page 12: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

6 RESTORATION OF CANAL BED

AND SLOPES INCLUDING

LINING WORKS WITH PCC

FROM CH. 528.00 TO CH.

544.00 UNDER BURDWAN

IRRIGATION SUB-DIVISION NO.-

III, AUSGRAM-II, BURDWAN

DISTRICT MAGISTRATE,

BURDWAN

47/PM(F)/P/

1B-258/2012

21-01-2014 22.34318 22.34318 100% 22.34318 COMPLETE

2197.90867 817.45189 1288.59469 1964.40658TOTAL:

Page 13: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE1 CONSTRUCTION OF VILLAGE

ROADS AND BOULDER/

MORRUM OR CONCRETE/

SMALL CULVERT, FOOT

BRIDGE, MINOR IRRIGATION

FACILITY, DRINKING WATER

SOURCE ETC. DIFFERENT PUP

BLOCKS, PASCHIM MEDINIPUR

ADDITIONAL EXECUTIVE

OFFICER, PASCHIM

MEDINIPUR ZILLA PARISHAD

64/PM(F)/P/

1B-08/2014

31-01-2014 503.00270 503.00270 75% 447.74900 34 COMPLETE,

WORK IN PROGRESS

2 CONSTRUCTION FOR

DIVERSON OF STREAM IN ITS

DRAINAGE LINE AT GARDUAR

MOUZA, GOPIBALLAVPUR-I,

PASCHIM MEDINIPUR

ASSISTANT DIRECTOR OF

AGRICULTURE (SOIL

CONSERVATION), JHARGRAM

307/PM(F)/P

/1B-

131/2014

26-03-2015 7.95106 7.95106

3 IMPROVEMENT OF ROAD

FROM CHERABONI TO

BANDRABONI, BINPUR-I,

PASCHIM MEDINIPUR

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

108/PM(F)/P

/1B-40/2013

19-04-2013 4.44122 2.22493 100% 2.22493 COMPLETE

4 IMPROVEMENT OF ROAD

FROM TENTULDANGA TO

NAHAR KHAL, BINPUR-I,

PASCHIM MEDINIPUR

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

108/PM(F)/P

/1B-40/2013

19-04-2013 12.79257 11.91233 100% 11.91233 COMPLETE

5 CONSTRUCTION OF SLAB

CULVERT AT PASCHIM

CHAMAR BANDH, NAYAGRAM,

PASCHIM MEDINIPUR

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

177/PM(F)/P

/1B-90/2013

10-10-2013 4.46171 0.12870 4.19632 100% 4.19632 COMPLETE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

Page 14: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

6 RENOVATION OF DAMP

BANDH, GARHBETA-III,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

106/PM(F)/P

/1B-42/2013

19-04-2013 19.27379 18.81797 100% 18.81797 COMPLETE

7 CONSTRUCTION OF 2

CLASSROOMS AT BHULAVEDA

JANAKALYAN HIGH SCHOOL

(HS), BINPUR-II, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

107/PM(F)/P

/1B-41/2013

19-04-2013 12.82295 11.14291 100% 11.14291 COMPLETE

8 SINKING OF 263 INDIAN MARK-

II TUBE-WELLS (`1.44871 LAC

EACH) FOR PROVIDING

DRINKING WATER IN 5 BLOCKS

(JAMBONI, GOPIBALLAVPUR-

II, SANKRAIL, JHARGRAM,

BINPUR-II), PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

128/PM(F)/P

/1B-

112/2012 &

104

23-05-2013 &

05-05-2014

381.01073 311.54038 100% 311.54038 COMPLETE

9 CONSTRUCTION OF CHECK

DAM OVER NAHAR KHAL AT

TENTULDANGA, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

132/PM(F)/P

/1B-53/2013

23-05-2013 28.09204 28.09204 90% 28.09204 THIS FUND UTILISED,

WORK IN PROGRESS

10 CONSTRUCTION OF CHECK

DAM OVER NAHAR KHAL AT

JOULBHANGA, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

132/PM(F)/P

/1B-53/2013

23-05-2013 18.25182 10.66923 100% 10.66923 COMPLETE

Page 15: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

11 DISMENTLING OF BRIDGE &

DIVERSION OF ROAD OVER

HATITOLA TO JOSHPUR ROAD

(NAHAR KHAL), JHARGRAM,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

133/PM(F)/P

/1B-54/2013

23-05-2013 3.80927 3.80927 100% 3.80927 COMPLETE

12 PREPARATION OF DPR

ALONGWITH OTHER WORK

FOR CONSTRUCTION OF

BRIDGE AT PAPATPUR NADI

GHAT VIZ. SOIL TESTING (`1

LAC), SURVEY WORK (`0.5

LAC), PREPARATION OF DPR

(`8 LAC) & OTHER MISC.

WORK (`0.5 LAC), BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

135/PM(F)/P

/1B-55/2013

24-05-2013 10.00000 10.00000 100% 10.00000 COMPLETE

13 CONSTRUCTION OF

APPROACH ROAD WITH

CROSS DRAINAGE WORK TO

RAMGARH POLYTECHNIC,

BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

& 50

31-07-2013 &

21-01-2014

78.11984 2.27799 72.67030 100% 72.67030 COMPLETE

Page 16: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

14 CONSTRUCTION OF ACCESS

ROAD VIA SALBONI COLLEGE

TO SALBONI STADIUM FROM

BHADUTALA LALGARH BLACK

TOP ROAD (600MM) WITH

CROSS DRAINAGE STRUCTURE

(1000MM DIA DOUBLE HUME

PIPE) & GUARD WALL (30

MTR) ALONG POND TO

PROTECT THE ACCESS ROAD,

SALBONI, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

& 155 & 118

31-07-2013 &

11-09-2013 &

03-03-2014

50.67236 50.66634 100% 50.66634 COMPLETE

15 1 NO. CROSS DRAINAGE

STRUCTURE BY 1000MM DIA

DOUBLE HUME PIPE ON

ACCESS ROAD TO

GOPIBALLAVPUR MODEL

SCHOOL AND ANOTHER

CROSSING DRAINAGE WITH

600 MM DIA HUME PIPE ON

ACCESS ROAD TO

GOPIBALLAVPUR MODEL

SCHOOL, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

& 155

31-07-2013 &

11-09-2013

2.39746 2.34680 100% 2.34680 COMPLETE

16 CONSTRUCTION OF

APPROACH ROAD TO GIRLS'

HOSTEL OF LALGARH GIRLS'

HIGH SCHOOL, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

31-07-2013 3.62914 3.52095 100% 3.52095 COMPLETE

Page 17: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

17 CONSTRUCTION OF

APPROACH ROAD TO

KRISHNABANDH INTEGRATED

SCHOOL, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

31-07-2013 17.92681 17.26235 100% 17.26235 COMPLETE

18 CONSTRUCTION OF 2 NOS.

CROSS DRAINAGE WITH 900

MM DIA SINGLE BARREL

HUME PIPE CULVERT ON

ACCESS ROAD TO MIRGA

INTEGRATED SCHOOL,

SALBONI, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

& 155

31-07-2013 &

11-09-2013

2.70494 2.29095 100% 2.29095 COMPLETE

19 CONSTRUCTION OF

APPROACH ROAD TO

NAYAGRAM COLLEGE,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

31-07-2013 78.93719 78.82938 100% 78.82938 COMPLETE

20 CONSTRUCTION OF

APPROACH ROAD TO ITI AT

SALBONI, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

141/PM(F)/P

/1B-61/2013

31-07-2013 7.68883 7.40097 100% 7.40097 COMPLETE

21 REPAIRING OF BITUMEN

ROAD FROM BINPUR TO

PAPATPUR NODIGHAT AND

BOXI VIA HARDA AND

MURGIMORE (ADDITIONAL

AMOUNT), BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

152/PM(F)/P

/1B-

141/2012

06-09-2013 102.88258 79.33611 100% 79.33611 COMPLETE

Page 18: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

22 CONSTRUCTION OF OFFICE

BUILDING (1ST FLOOR) FOR

PASCHIM MEDINIPUR AREA-

OFFICE OF PUP AT

COLLECTORATE COMPOUND,

MEDINIPUR SADAR, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

153/PM(F)/P

/1B-67/2013

09-09-2013 41.98943 36.80608 100% 36.80608 COMPLETE

23 RE-EXCAVATION OF RAJ

BUNDH AT LALGARH, BINPUR-

I, PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

161/PM(F)/P

/1B-

101/2013 &

103

23-09-2013 &

05-05-2014

102.51219 102.51219 100% 102.51219 COMPLETE

24 CONSTRUCTION OF BRIDGE

OVER NAHAR KHAL, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

162/PM(F)/P

/1B-

100/2013

23-09-2013 127.39645 72.75893 100% 72.75893 TENDERED WORK

COMPLETE

25 CONSTRUCTION OF

CLASSROOM, LIBRARY AND

GIRLS' COMMON ROOM AT

GOLAR SUSHILA VIDYAPITH,

KESHPUR, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

167/PM(F)/P

/1B-

102/2013

25-09-2013 22.98739 22.98739 100% 22.98739 COMPLETE

26 CONSTRUCTION OF CONCRETE

ROAD FROM HOTEL PRAYAG

TO END OF SANJOY BOXI

HOUSE, GARHBETA-III,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 6.79559 6.54782 100% 6.54782 COMPLETE

Page 19: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

27 CONSTRUCTION OF CONCRETE

ROAD FROM HOTEL PRAYAG

TO GOPAL KHAMRI SAW MILL,

GARHBETA-III, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 6.79559 5.84165 100% 5.84165 COMPLETE

28 CONSTRUCTION OF

BOUNDARY WALL AND GATE

AT KIABONI SHREE SARADA

ASHRAM, GARHBETA-III,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 4.18037 WORK NOT YET

STARTED

29 CONSTRUCTION OF

BOUNDARY WALL AND MAIN

GATE AT KENDIJAMBONI

NORTH KABARSTHAN (WEST

SIDE), GARHBETA-III, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 7.83480 7.83480 100% 7.83480 COMPLETE

30 CONSTRUCTION OF

BOUNDARY WALL AND MAIN

GATE AT KENDIJAMBONI

NORTH KABARSTHAN (NORTH

& HALF PORTION OF EAST

SIDE), GARHBETA-III, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 7.81731 7.81731 100% 7.81731 COMPLETE

Page 20: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

31 CONSTRUCTION OF

BOUNDARY WALL AND MAIN

GATE AT KENDIJAMBONI

NORTH KABARSTHAN (SOUTH

& HALF PORTION OF EAST

SIDE), GARHBETA-III, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 7.44975 6.58456 100% 6.58456 COMPLETE

32 CONSTRUCTION OF

ADDITIONAL SCHOOL

BUILDING IN GROUND FLOOR

OF NERE BHALIBANDH JR.

HIGH SCHOOL, SALBONI,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

213/PM(F)/P

/1B-

111/2013

19-12-2013 20.69437 19.56024 90% 19.56024 WORK IN PROGRESS

33 CONSTRUCTION OF 4 NOS.

CLASSROOMS WITH

STAIRCASE AND VERANDAH

OF DHOLKATA PUKURIA

PRANABANANDA

VIDYAMANDIR, PUKURIA,

JHARGRAM, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

02/PM(F)/P/

1B-146/2013

02-01-2014 23.61376 23.46121 100% 23.46121 COMPLETE

34 CONSTRUCTION OF PIPE

CAUSEWAY ON BAITAL KHAL,

GARHBETA-II, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

04/PM(F)/P/

1B-04/2012

03-01-2014 44.38266 35.21894 100% 35.21894 COMPLETE

Page 21: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

35 CONSTRUCTION OF GROUND

FLOOR SCHOOL BUILDING OF

BALARAMPUR ABHAY

ASHRAM NAITALIM VIDYAPITH

(H.S.), ARASENI MOUZA, P.O. -

BALARAMPUR, P.S. -

KHARAGPUR, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

20/PM(F)/P/

1B-161/2013

07-01-2014 28.82273 28.62697 100% 28.62697 COMPLETE

36 CONSTRUCTION OF CONCRETE

ROAD OF BARPAT GRAMIN

ROAD IN PATINA GRAMIN

PANCHAYAT, NAYAGRAM,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

21/PM(F)/P/

1B-162/2013

07-01-2014 17.00299 17.00299 100% 17.00299 COMPLETE

37 CONSTRUCTION OF SCHOOL

BUILDING AND GROUND

FLOOR OF PROPOSED NEW

BUILDING OF BHADUTALA

VIVEKANANDA HIGH SCHOOL,

SALBONI, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

28/PM(F)/P/

1B-110/2013

08-01-2014 42.79000 35.11506 95% 35.11506 GROUND FLOOR

COMPLETE, WORK

IN PROGRESS

38 CONSTRUCTION OF BUILDING

AND OTHER INFRASTRUCTURE

FOR NEWLY SET UP DUKI

JUNIOR HIGH SCHOOL,

GARHBETA-III, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

28/PM(F)/P/

1B-110/2013

08-01-2014 7.81775 5.80986 100% 5.80986 COMPLETE

Page 22: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

39 CONSTRUCTION OF CONCRETE

ROAD FROM LALGARH GYAN

MANDIR TO AGAMANI

BANERJEE’S HOUSE VIA H/O

SUNIL SAMANTA, NIRMAL

ROY, AKHRAGORA HARI

MANDIR & DIREN ROY’S

HOUSE, LALGARH GP, BINPUR-

I, PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 41.12834 100% COMPLETE

40 CONSTRUCTION OF CONCRETE

ROAD FROM LALGARH GYAN

MANDIR TO MAHADEV ROY’S

TEA SHOP VIA AIRTEL TOWER,

POST OFFICE, BIBEK

GOSWAMI’S HOUSE & KISHOR

TEWARI’S HOUSE, LALGARH

GP, BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 36.96035 100% COMPLETE

41 CONSTRUCTION OF CONCRETE

ROAD FROM BHOKTAPARA

NIRANJAN DAS’S HOUSE TO

RAJARBANDH VIA LALGARH

GIRLS SCHOOL, U.B.I., SAROJ

GOSWAMI, PRADIP

NARAYAN’S HOUSE, LALGARH

GP, BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 26.34803 100% COMPLETE

183.08618183.08618

Page 23: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

42 CONSTRUCTION OF CONCRETE

ROAD FROM BIDYUT ROY’S

HOUSE TO RAJAR BUNDH VIA

HOUSE OF BHUDEB ROY,

RAMKHAHARI ROY, RATAN

KHILARI, LALGARH GP, BINPUR-

I, PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 15.82739 100% COMPLETE

43 CONSTRUCTION OF CONCRETE

ROAD FROM TEA SHOP OF

NARAD DAS AT LALGARH

BAZAR TO KANGSHABATI

NODI GHAT VIA

BAGHAKHULHI, LALGARH GP,

BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 25.83520 100% COMPLETE

44 CONSTRUCTION OF CONCRETE

ROAD FROM KANKON GIRL’S

SAW MILL TO RAJARBUNDH,

LALGARH GP, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 10.55103 100% COMPLETE

45 CONSTRUCTION OF CONCRETE

ROAD FROM PRASANTA

DUTTA’S HOUSE TO

RAMKRISHNA VIDYALAYA VIA

BRAHMAN PALLY, LALGARH

GP, BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 12.52810 100% COMPLETE

183.08618183.08618

Page 24: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

46 CONSTRUCTION OF CONCRETE

ROAD FROM LATE

SATYANARAYAN ROY’S HOUSE

TO RAJAR BUNDH, LALGARH

GP, BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 5.34396 100% COMPLETE

47 CONSTRUCTION OF CONCRETE

ROAD FROM TEA SHOP OF

MAHADEV ROY NEAR

BITUMEN ROAD TO CRPF

CAMP & FOREST RANGE

OFFICE VIA HOUSE OF ABDUL

SK, LALGARH GP, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

41/PM(F)/P/

1B-148/2013

17-01-2014 15.82739 100% COMPLETE

48 IMPROVEMENT OF MORRUM

BOULDER ROAD AT DARHPARI

KHAL TO KANAI HANSDA

HOUSE VIA BARANALA,

BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

54/PM(F)/P/

1B-05/2014

24-01-2014 44.58280 29.55857 100% 29.55857 COMPLETE

49 RE-EXCAVATION OF SURER

BUNDH (1ST PART) AT

RAMGARH G.P., BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

66/PM(F)/P/

1B-10/2014

& 106

31-01-2014 &

06-05-2014

198.96817 108.59017 80% 108.59017 WORK IN PROGRESS

50 REPAIR OF CAUSEWAY-1 AT

BORO MURGI TO

DHALBHANGA ROAD OVER

TARAPHENI RIVER, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

68/PM(F)/P/

1B-84/2013

06-02-2014 42.18033 WORK STARTED

183.08618183.08618

Page 25: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

51 REPAIR OF CAUSEWAY-2 AT

CHOTO MURGI TO

DHALBHANGA ROAD OVER

BIJALIS KHAL, BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

68/PM(F)/P/

1B-84/2013

06-02-2014 3.94059 WORK STARTED

52 CONSTRUCTION & REPAIR OF

ROAD FROM BITUMINOUS

MAIN ROAD TO CHILKIGARH

TEMPLE AT CHILKIGARH,

JAMBONI, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

74/PM(F)/P/

1B-159/13

11-02-2014 17.68090 16.98498 100% 16.98498 COMPLETE

53 CONSTRUCTION OF TWO

STORIED SCHOOL BUILDING,

BOYS TOILET BLOCK AND

LADIES TOILET BLOCK OF

KHASLA INDUMOTI HIGH

SCHOOL, SALBONI, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

75/PM(F)/P/

1B-112/2013

11-02-2014 36.64856 14.99202 75% 14.99202 WORK IN PROGRESS

54 CONSTRUCTION OF BRIDGE

OVER KELEGHAI NADI AT

BAGMARI GHAT, SANKRAIL,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

65/PM(F)/P/

1B-09/2014

31-01-2014 45.48852 REVISED ESTIMATE

UNDER

PREPARATION

55 CONSTRUCTION OF BRIDGE AT

PALOIDANGA OVER GHUNIA

KHAL, SANKRAIL, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

65/PM(F)/P/

1B-09/2014

31-01-2014 49.96803 18.87528 80% 18.87528 WORK IN PROGRESS

56 RE-EXCAVATION OF

BHUSKABURI’S POND OF

NEDABAHRA G.P., JHARGRAM,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

79/PM(F)/P/

1B-06/2014

& 105

17-02-2014 &

06-05-2014

48.09887 60% WORK IN PROGRESS

Page 26: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

57 CONSTRUCTION OF CHECK

DAM OVER PACHA KHAL AT

BHANGABANDH, JHARGRAM,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

79/PM(F)/P/

1B-06/2014

17-02-2014 23.18594 100% COMPLETE

58 CONSTRUCTION OF CHECK

DAM OVER PUTRANGI KHAL

AT CHANDABILA, JHARGRAM,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

79/PM(F)/P/

1B-06/2014

17-02-2014 25.73531 19.33682 100% 19.33682 COMPLETE

59 CONSTRUCTION OF CHECK

DAM OVER NAHAR KHAL AT

JORAKHALI, JHARGRAM,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

79/PM(F)/P/

1B-06/2014

17-02-2014 19.72363 25% WORK IN PROGRESS

60 RE-EXCAVATION OF PARGANA

BUNDH AT RAGHUNATHPUR

MOUJA, BINPUR-I, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

79/PM(F)/P/

1B-06/2014

17-02-2014 66.89922 39.33887 90% 39.33887 WORK IN PROGRESS

61 EXCAVATION OF NEW POND

AT KHOSA MOUZA, NEPURA

G.P., JHARGRAM, PASCHIM

MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

80/PM(F)/P/

1B-13/2014

17-02-2014 28.49980 70% WORK IN PROGRESS

62 RE-EXCAVATION OF RAJ

BUNDH AT RAMGARH,

RAMGARH G.P., BINPUR-I,

PASCHIM MEDINIPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

81/PM(F)/P/

1B-22/2014

17-02-2014 199.34859 35.77431 60% 35.77431 WORK IN PROGRESS

Page 27: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

63 IMPLEMENTATION OF

DIFFERENT PROJECT @ `50

LAC EACH BLOCK IN 18

BLOCKS, PASCHIM MEDINIPUR

DISTRICT MAGISTRATE,

PASCHIM MEDINIPUR

151/PM(F)/P

/1B-82/2013

30-08-2013 900.00000 876.53086 75% 787.29000 83 SCHEMES

COMPLETE, WORK

IN PROGRESS

64 INFRASTRUCTURAL

DEVELOPMENT OF SILDA

CHANDRA SEKHAR COLLEGE

EXECUTIVE ENGINEER-I, PWD,

KHARAGPUR DIVISION,

PASCHIM MEDINIPUR

34/PM(F)/P/

1B-

67/2008(PT-

IV)

13-01-2014 100.00000 100.00000 51% 100.00000 THIS FUND UTILISED,

WORK IN PROGRESS

65 RE-CONSTRUCTION OF SINGLE

LANE ROAD BRIDGE AT CH.

278.40 OF T.S.M.(N) UNDER

KANGSABATI CANALS

DIVISION NO. V, JHARGRAM

IN KANIMOHULI MOUZA,

SILDA GP, BINPUR-II, PASCHIM

MEDINIPUR

EXECUTIVE ENGINEER,

KANGSABATI CANAL DIVISION

NO. V, JHARGRAM

292/PM(F)/P

/1B-

134/2014

24-03-2015 65.47764 65.47764

66 CONSTRUCTION OF DEEP

TUBEWELL FOR IRRIGATION

WATER AT RANABANDH,

BINPUR-I, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 8.99553 8.99553

67 CONSTRUCTION OF DEEP

TUBEWELL FOR IRRIGATION

WATER AT DHABANI, BINPUR-

I, PASCHIM MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 8.99553 8.99553

Page 28: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

68 CONSTRUCTION OF DEEP

TUBEWELL FOR IRRIGATION

WATER AT SINGPUR, BINPUR-

I, PASCHIM MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 8.99553 8.99553

69 CONSTRUCTION OF

PASSENGER SHED WITH

TOILET AT ANDHARIA BUS

STAND, BINPUR-I, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 2.96647 2.96647

70 CONSTRUCTION OF TUBEWELL

FOR DRINKING WATER AT

BHANJADIHI S.S.K., ANDHARIA

G.P., BINPUR-I, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 4.03449 4.03449

71 CONSTRUCTION OF TUBEWELL

FOR DRINKING WATER AT

KUSUMDANGA, ANDHARIA

G.P., BINPUR-I, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 4.03449 4.03449

72 CONSTRUCTION OF TUBEWELL

FOR DRINKING WATER AT

DUBRAJPUR PR. SCHOOL AT

ANDHARIA G.P., BINPUR-I,

PASCHIM MEDINIPUR

EXECUTIVE OFFICER, BINPUR-I

PANCHAYAT SAMITY

79/PM(F)/P/

1B-06/2014

17-02-2014 4.03449 4.03449

73 CONSTRUCTION OF

COMPOUND WALL AT

CHHATINASOLE PRIMARY

SCHOOL, GOPIBALLAVPUR-I,

PASCHIM MEDINIPUR

EXECUTIVE OFFICER,

GOPIBALLAVPUR-I

PANCHAYAT SAMITY

115/PM(F)/P

/1B-05/2015

09-02-2015 10.88072 10.88072

Page 29: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

74 CONSTRUCTION OF CONCRETE

ROAD AT BHALUKHULIA MAIN

ROAD TO AAM BAGAN

VILLAGE ROAD,

GOPIBALLAVPUR-II, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER,

GOPIBALLAVPUR-II

PANCHAYAT SAMITY

77/PM(F)/P/

1B-03/2014

17-02-2014 12.76862 12.76862 100% 12.73517 COMPLETE

75 CONSTRUCTION OF CONCRETE

ROAD AT MALANCHA

BATTALA TO RAJENDRA

DANDAPAT'S HOUSE ROAD,

GOPIBALLAVPUR-II, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER,

GOPIBALLAVPUR-II

PANCHAYAT SAMITY

77/PM(F)/P/

1B-03/2014

17-02-2014 20.99831 20.99831 100% 20.99774 COMPLETE

76 CONSTRUCTION OF DARKHULI

GRAMIN ROAD IN

RADHANAGAR G.P.,

JHARGRAM, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER,

JHARGRAM PANCHAYAT

SAMITY

09/PM)F)/P/

1B-152/2013

03-01-2014 13.62735

77 IMPROVEMENT OF ROAD

FROM DARKHULI TO

MOHANPUR IN RADHANAGAR

G.P., JHARGRAM, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER,

JHARGRAM PANCHAYAT

SAMITY

09/PM)F)/P/

1B-152/2013

03-01-2014 6.74976

78 IMPROVEMENT OF ROAD

FROM TENGIOA PITCH ROAD

TO KANYADUBA IN SAPDHARA

AND RADHANAGAR G.P.,

JHARGRAM, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER,

JHARGRAM PANCHAYAT

SAMITY

09/PM)F)/P/

1B-152/2013

03-01-2014 14.97685

35.35216

Page 30: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

79 CONSTRUCTION OF MEETING

HALL AT DWARIGERIA BPHC,

GARHBETA-III, PASCHIM

MEDINIPUR

EXECUTIVE OFFICER,

GARHBETA-III PANCHAYAT

SAMITY

28/PM(F)/P/

1B-110/2013

08-01-2014 16.52647 16.52647

80 CONSTRUCTION OF SCHOOL

BUILDING AT KHAJRA SATISH

CHANDRA MEMORIAL HIGH

SCHOOL (HS), KESHIARY,

PASCHIM MEDINIPUR

HEADMASTER, KHAJRA SATISH

CHANDRA MEMORIAL HIGH

SCHOOL (HS), PO-KUSHGERIA,

DIST-PASCHIM MEDINIPUR

131/PM(F)/P

/1B-27/2013

23-05-2013 19.50000 19.50000 50% 9.75000 WORK IN PROGRESS

81 CONSTRUCTION OF HOSTEL

BUILDING AT NAYAGRAM

HIGH SCHOOL (H.S.), P.S. -

KOTWALI, PASCHIM

MEDINIPUR

SCHOOL AUTHORITY,

NAYAGRAM HIGH SCHOOL,

P.O. - NAYAGRAM-BENASULI,

P.S. - KOTWALI, PASCHIM

MEDINIPUR - 721102

206/PM(F)/P

/1B-

121/2013

10-12-2013 30.84796 30.84796 50% 15.42398 WORK IN PROGRESS

82 CONSTRUCTION OF

BOUNDARY WALL OF

GODAPIASAL MAHATMA

GANDHI MEMORIAL HIGH

SCHOOL (H.S.), SALBONI,

PASCHIM MEDINIPUR

SCHOOL AUTHORITY,

GODAPIASAL MAHATMA

GANDHI MEMORIAL HIGH

SCHOOL (H.S.), SALBONI,

PASCHIM MEDINIPUR

210/PM(F)/P

/1B-

129/2013

13-12-2013 24.92800 24.92800 50% 12.46400 WORK IN PROGRESS

83 CONSTRUCTION OF

COMMUNITY HALL AT

JHARGRAM NANIBALA BALIKA

VIDYALAYA, JHARGRAM,

PASCHIM MEDINIPUR

SCHOOL AUTHORITY,

JHARGRAM NANIBALA BALIKA

VIDYALAYA

33/PM(F)/P/

1B-17/2013

10-01-2014 17.91143 17.91143 50% 8.95571 WORK IN PROGRESS

Page 31: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

84 CONSTRUCTION OF SCHOOL

BUILDING OF PAIKAMBI

NIGAMANANDA HIGH

SCHOOL, GOPIBALLAVPUR-II,

PASCHIM MEDINIPUR

SCHOOL AUTHORITY,

PAIKAMBI NIGAMANANDA

HIGH SCHOOL

82/PM(F)/P/

1B-21/2014

17-02-2014 28.37078 14.18539 50% 14.18539 WORK IN PROGRESS

85 CONSTRUCTION OF

CLASSROOMS AT ANTRA

SARADAMONI BALIKA

VIDYALAYA, P.O. - ATTARKHI,

PASCHIM MEDINIPUR

SCHOOL AUTHORITY, ANTRA

SARADAMONI BALIKA

VIDYALAYA

91/PM(F)/P/

1B-17/2014

& 331

20-02-2014 &

19-11-2014

5.91387 5.91387 SCHEME CHANGED

86 CONSTRUCTION OF CYCLE

STAND AT SUBARNAREKHA

MAHAVIDYALAYA,

GOPIBALLAVPUR, PASCHIM

MEDINIPUR

TEACHER-IN-CHARGE,

SUBARNAREKHA

MAHAVIDYALAYA

83/PM(F)/P/

1B-139/2013

17-02-2014 6.68148 6.68148

87 CONSTRUCTION OF SINGLE

STORIED ADDITIONAL

CLASSROOMS OF

BAGHUASOLE JUNSOLE

NEHRU VIDYAPITH, P.S. -

BELIABERA, GOPIBALLAVPUR-

II, PASCHIM MEDINIPUR

HEADMASTER, BAGHUASOLE

JUNSOLE NEHRU VIDYAPITH

105/PM(F)/P

/1B-

145/2013

28-02-2014 15.88238 15.88238 50% 7.94119 WORK IN PROGRESS

88 CONSTRUCTION OF SECOND

FLOOR ACADEMIC BUILDING

FOR CLASS-ROOM OF NIRMAL

HRIDAY ASHRAM GIRLS' HIGH

SCHOOL, PASCHIM

MEDINIPUR

SECRETARY, NIRMAL HRIDAY

ASHRAM GIRLS' HIGH SCHOOL

114/PM(F)/P

/1B-04/2015

09-02-2015 5.76017 5.76017

Page 32: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

89 CONSTRUCTION OF

BOUNDARY WALL AT

BULANPUR HIGH SCHOOL

(H.S.), GARHBETA-II, PASCHIM

MEDINIPUR

HEADMASTER, BULANPUR

HIGH SCHOOL

159/PM(F)/P

/1B-

160/2013

19-02-2015 3.33539 3.33539

90 WORK OF ADDITIONAL

CONSTRUCTION OF

VERANDAH, SANITATION

SYSTEM, ELECTRIFICATION

ETC. IN RESPECT OF

CLASSROOM IN MIDNAPORE

TOWN HANDICAPPED SOCIETY

AT OLD JAIL BUILDING,

COLLEGE GROUND ROAD,

MIDNAPORE TOWN WITHIN

SOCIETY TRAINING CENTRE

(VIKASH) COMPOUND,

PASCHIM MEDINIPUR

SECRETARY, MEDINIPUR

TOWN HANDICAPPED

WELFARE SOCIETY

12/PM(F)/P/

1B-232/2013

07-01-2014 9.43872 4.71936

91 INCOME GENERATIVE

COMMERCIAL HORTICULTURE

IN SMALL PLOT (5 KATTA) FOR

CULTIVATION OF EARLY

SUMMER VEGETABLE

SURROUNDED BY QUICK

GROWING LIME; 11 BLOCKS

OF JUNGLE MAHAL (250

BENEFICIARIES IN EACH

BLOCK, COST OF GROWING

VEGETABLE CROPS PER

BENEFICIARY FOR 5 KATTA IS

RS. 4,321/-), PASCHIM

MEDINIPUR

MANAGING DIRECTOR, WEST

BENGAL STATE FOOD

PROCESSING &

HORTICULTURE

DEVELOPMENT

CORPORATION LIMITED

15/PM(F)/P/

1B-117/2013

07-01-2014 118.82750 118.82750 100% 118.82750 COMPLETE

4404.51112 1962.44469 1627.75273 3184.07241TOTAL:

Page 33: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE1 CONSTRUCTION OF ROAD

FROM BEGUNKODAR TO

SAHARJURI (AJODHYA) VIA

BAMNI IN 4 (A,B,C,D) PARTS

FROM 0.00 KM TO 14.5 KM

UNDER "ZILLA PARISHAD-

PUAD MEGA SCHEME"

PROGRAMME

ADDITIONAL EXECUTIVE

OFFICER, PURULIA ZILLA

PARISHAD

38/PM(F)/P/

1B-157/2013

16-01-2014 500.00000 500.00000 100% 25-11-2014 474.36000 COMPLETE

2 SINKING OF 15 DEEP TUBE-

WELLS WITH ELECTRIFICATION

(`3.31740 LAC EACH) IN

DIFFERENT SCHOOL

ATTACHED HOSTEL PREMISES,

PURULIA-II, PURULIA

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

110/PM(F)/P

/1B-

203/2012

08-05-2013 49.76100 45.48089 80% 45.48089 12 COMPLETE

3 IMPROVEMENT OF ROAD

FROM SIRKABAD HOSPITAL

MORE TO AJODHYA HILL TOP

(14.00 KM), BAGHMUNDI,

PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

127/PM(F)/P

/1B-60/2013

& 19 & 108

23-05-2013 &

07-01-2014 &

06-05-2014

359.42844 294.19762 100% 294.19762 COMPLETE

4 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT KULAI, SANTURI,

PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 35.18224 65% LOCATION

CHANGED, WORK IN

PROGRESS

5 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT BARI, MANBAZAR-

II, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 27.17421 21.45466 100% 21.45466 COMPLETE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

Page 34: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

6 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT K.P. RANGADI,

HURA, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 37.26413 10.55960 100% 10.55960 COMPLETE

7 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT MAHARA,

MANBAZAR-I, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 25.78526 24.05498 100% 24.05498 COMPLETE

8 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT TENTULIA,

RAGHUNATHPUR-II, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 31.63863 21.65540 100% 21.65540 COMPLETE

9 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT AGAYA, PUNCHA,

PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 34.67832 21.31206 100% 21.31206 COMPLETE

10 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT TENTULHITY,

PARA, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 32.48988 15.23606 100% 15.23606 COMPLETE

11 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT GURDA,

BARABAZAR, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 28.25933 8.59087 90% 8.59087 WORK IN PROGRESS

Page 35: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

12 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT URUSHARAM,

JHALDA-II, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 29.34824 27.15007 100% 27.15007 COMPLETE

13 CONSTRUCTION OF SURFACE

FLOW MINOR IRRIGATION

SCHEME AT PRATAPPUR,

JOYPUR, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

129/PM(F)/P

/1B-

240/2012

23-05-2013 29.73171 29.64516 100% 29.64516 COMPLETE

14 CONSTRUCTION OF

ADDITIONAL CLASSROOM OF

ARSHA COLLEGE, ARSHA,

PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

166/PM(F)/P

/1B-

103/2013 &

107

24-09-2013 &

06-05-2014

59.12228 48.51826 100% 02-08-2014 48.51826 COMPLETE

15 WORK OF CEMENT CONCRETE

ROAD FROM TULSI MAHATO'S

HOUSE TO CHIKRA SHIB

MANDIR, PURULIA-I, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

173/PM(F)/P

/1B-22/2013

09-10-2013 29.46500 20.34166 100% 15-07-2014 20.34166 COMPLETE

16 CONSTRUCTION OF 102

ANGANWADI CENTRES EACH

@ `6.89600 LAC IN DIFFERENT

BLOCKS, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

178/PM(F)/P

/1B-

116/2013

10-10-2013 703.39200 259.14319 45% 259.14319

17 CONSTRUCTION OF 81

ANGANWADI CENTRES EACH

@ `6.89600 LAC IN DIFFERENT

BLOCKS, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

42/PM(F)/P/

1B-116/2013

& 109

17-01-2014 &

06-05-2014

558.57600 209.03779 45% 209.03779

18 RE-EXCAVATION OF CHAKBAD

BORO BANDH,

RAGHUNATHPUR-II, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

179/PM(F)/P

/1B-

115/2013

21-10-2013 22.59676 20.33877 100% 20.33877 COMPLETE

WORK IN

PROGRESS, 123

COMPLETE OUT OF

151 UNITS FOR

WHICH LAND

AVAILABLE, 32 LAND

DISPUTE

Page 36: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

19 CONSTRUCTION OF GROUND

FLOOR OF SCHOOL BUILDING

AT JARGO HIGH SCHOOL,

JHALDA-I, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

217/PM(F)/P

/1B-39/2013

27-12-2013 24.98244 18.60401 100% 07-08-2014 18.60401 COMPLETE

20 CONSTRUCTION OF

ADDITIONAL CLASSROOMS IN

NEWLY UPGRADED GHONGA

HIGH SCHOOL, PURULIA-II,

PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

07/PM(F)/P/

1B-141/2013

03-01-2014 12.33650 10.19332 100% 25-07-2014 10.19332 COMPLETE

21 CONSTRUCTION OF SCHOOL

BUILDING AT PAIRACHALI

ADIBASI JR. GIRLS HIGH

SCHOOL, MANBAZAR-I,

PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

08/PM(F)/P/

1B-138/2013

03-01-2014 39.30432 24.85377 100% 31-08-2014 24.85377 COMPLETE

22 CONSTRUCTION OF CONCRETE

ROAD AND GUARD WALL

FROM MAHALI PARA TO

VAGLA GARAH (HERODIH),

ARSHA, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

37/PM(F)/P/

1B-135/2013

16-01-2014 49.47410 47.94241 100% 15-07-2014 47.94241 COMPLETE

23 CONSTRUCTION OF ROAD

FROM GOPALPUR BUS STAND

TO BAGDA BUS STAND

(ADDITIONAL WORK),

PUNCHA, PURULIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

56/PM(F)/P/

1B-198/2012

28-01-2014 51.86754 7.83094 100% 7.83094 COMPLETE

24 IMPLEMENTATION OF

DIFFERENT PROJECT @ `50

LAC EACH BLOCK IN 20

BLOCKS, PURULIA

DISTRICT MAGISTRATE,

PURULIA

151/PM(F)/P

/1B-82/2013

30-08-2013 1,000.00000 996.83444 90% 911.32444 SCHEMES ARE IN

PROGRESS, 28

COMPLETE

Page 37: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

25 CONSTRUCTION OF

BOUNDARY WALL OF PURULIA

PALLY SEVA SANGHA

FOOTBALL GROUND, KENDA,

PUNCHA, PURULIA

EXECUTIVE OFFICER, PUNCHA

PANCHAYAT SAMITY

01/PM(F)/P/

1B-140/2013

02-01-2014 22.91735 22.91735 100% 22.91735 COMPLETE

26 RE-EXCAVATION OF PUNCHA

BLOCK BUNDH, PUNCHA,

PURULIA

EXECUTIVE OFFICER, PUNCHA

PANCHAYAT SAMITY

151/PM(F)/P

/1B-

138/2014

18-02-2015 30.00842 30.00842

27 CONSTRUCTION OF

ADDITIONAL CLASSROOM OF

ADABONA NAGENDRA NATH

HIGH SCHOOL (H.S.),

BARABAZAR, PURULIA

EXECUTIVE OFFICER,

BARABAZAR PANCHAYAT

SAMITY

06/PM(F)/P/

1B-136/2013

03-01-2014 16.27236 16.27236

28 CONSTRUCTION OF

BOUNDARY WALL AT

BARABAZAR BIKRAM TUDU

MEMORIAL COLLEGE, P.O.-

BARABHUM, BARABAZAR,

PURULIA

EXECUTIVE OFFICER,

BARABAZAR PANCHAYAT

SAMITY

76/PM(F)/P/

1B-143/13

14-02-2014 17.53881 17.53881 100% 17.00189 COMPLETE

29 INSTALLATION OF MINI DEEP

TUBE WELL WITH

SUBMERSIBLE PUMP AT

SARBORI BARUIPARA,

SARBORI KIRTANPARA,

SARBORI MORE NEAR BUS

STAND, NIMDANGA PRIMARY

SCHOOL & RANIPUR COLIERY

HIGH SCHOOL, SARBORI GP,

NETURIA, PURULIA

EXECUTIVE OFFICER, NETURIA

PANCHAYAT SAMITY

16/PM(F)/P/

1B-131/2013

07-01-2014 20.59305 20.59305 100% 20.59305 COMPLETE

Page 38: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

30 CONSTRUCTION OF BRIDGE

FROM SATRA TO BALIGARA,

PURULIA-I, PURULIA

EXECUTIVE OFFICER, PURULIA-

I PANCHAYAT SAMITY

84/PM(F)/P/

1B-15/2014

17-02-2014 44.76922 44.76922 100% 41.59936 COMPLETE

31 CONSTRUCTION OF

BOUNDARY WALL, MS GRILL

GATE, MAIN ENTRANCE GATE

& COW CATCHER AT BARASINI

N.L. HIGH SCHOOL (H.S.),

PURULIA-II, PURULIA

EXECUTIVE OFFICER, PURULIA-

II PANCHAYAT SAMITY

17/PM(F)/P/

1B-156/2013

07-01-2014 12.47592 12.47592

32 CONSTRUCTION OF

BOUNDARY WALL AND MAIN

ENTRANCE GATE OF ANAI

JAMBAD P.S.D.J. HIGH

SCHOOL, PURULIA-II, PURULIA

EXECUTIVE OFFICER, PURULIA-

II PANCHAYAT SAMITY

73/PM(F)/P/

1B-142/2013

11-02-2014 7.01459 7.01459

33 CULTIVATION OF 5000

KILOGRAM 'BROOD LAC' IN

1000 KUSUM TREES FOR

EMPLOYMENT OF 1000

FAMILIES IN 14 MOUZAS,

PURULIA

MANAGING DIRECTOR, WEST

BENGAL FOREST

DEVELOPMENT

CORPORATION LIMITED, 6A,

RAJA SUBODH MULLICK

SQUARE (7TH FLOOR),

KOLKATA - 700013

72/PM(F)/P/

1B-12/2014

11-02-2014 40.00000 40.00000 100% 40.00000 COMPLETE

34 RE-EXCAVATION OF CHECK

DAM AT SUTAN TANDI,

AJODHYA HILL, BAGHMUNDI,

PURULIA

MANAGING DIRECTOR, WEST

BENGAL FOREST

DEVELOPMENT

CORPORATION LIMITED, 6A,

RAJA SUBODH MULLICK

SQUARE (7TH FLOOR),

KOLKATA - 700013

115/PM(F)/P

/1B-30/2014

28-02-2014 68.35100 34.17550

Page 39: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

35 PROPOSED BUILDING AND

OPEN STAGE FOR LAW-BIR-

BAISI AT SUTANTANDI,

AJODHYA HILL, BAGHMUNDI,

PURULIA

MANAGING DIRECTOR, WEST

BENGAL FOREST

DEVELOPMENT

CORPORATION LIMITED, 6A,

RAJA SUBODH MULLICK

SQUARE (7TH FLOOR),

KOLKATA - 700013

117/PM(F)/P

/1B-31/2014

03-03-2014 24.01281 24.01281 100% COMPLETE

36 SCIENTIFIC LAC CULTIVATION

IN THE DISTRICT OF PURULIA

IN THE ENSUING PHASE OF

FEBRUARY, 2015 IN THE

INTEREST OF SUSTAINABLE

INCOME GENERATION

MANAGING DIRECTOR, WEST

BENGAL FOREST

DEVELOPMENT

CORPORATION LIMITED, 6A,

RAJA SUBODH MULLICK

SQUARE (7TH FLOOR),

KOLKATA - 700013

74/PM(F)/P/

1B-72/2014

& 388

28-01-2015 &

17-04-2015

50.25000 50.25000

37 INCOME GENERATIVE

COMMERCIAL HORTICULTURE

IN SMALL PLOT (5 KATTA) FOR

CULTIVATION OF EARLY

SUMMER VEGETABLE

SURROUNDED BY QUICK

GROWING LIME; 8 BLOCKS OF

JUNGLE MAHAL (250

BENEFICIARIES IN EACH

BLOCK, COST OF GROWING

VEGETABLE CROPS PER

BENEFICIARY FOR 5 KATTA IS

RS. 4,321/-), PURULIA

MANAGING DIRECTOR, WEST

BENGAL STATE FOOD

PROCESSING &

HORTICULTURE

DEVELOPMENT

CORPORATION LIMITED

14/PM(F)/P/

1B-117/2013

07-01-2014 86.42000 86.42000 100% 86.42000 COMPLETE

38 EXTENSION OF HOSPITAL

BUILDING AND

CONSTRUCTION OF STAFF

QUARTERS FOR REFERRAL EYE

HOSPITAL OF NANRITAM,

PARA, PURULIA

SECRETARY, NANRITAM, FLAT

NO. 6, 28/1/2, SELIMPUR

ROAD, KOLKATA - 700031

140/PM(F)/P

/1B-09/2012

26-07-2013 56.56642 56.56642 100% 28-02-2014 56.56642 COMPLETE

Page 40: DISTRICT: BANKURA DETAILS OF SCHEMES … FUND - ALL ENTRY.pdf · completion sl. no. pua dept.'s sanction order bill paid ... from pup 23 improvement of canal in the form of resectioning

` IN LAC

NO. DATE

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2013-14

SL.

NO.

NAME OF THE SCHEME EXECUTING AGENCY WITH

CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

EXPECTED

DATE OF

COMPLETION

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

FROM PUP

BILL PAID

FROM PUP

39 CONSTRUCTION OF TRIBAL

HOSTEL AT YUGACHARYA

VIVEKANANDA SEVA SAMITY,

RADHAMOHANPUR, P.S.-

BORO, PURULIA

SECRETARY, YUGACHARYA

VIVEKANANDA SEVA SAMITY

90/PM(F)/P/

1B-19/2014

20-02-2014 47.97740 47.97740 100% 47.97740 THIS INSTALLMENT

COMPLETE

4317.02568 2007.82629 1186.14149 2904.90140TOTAL: